Liro Program and Construction Management Pe PC: New York City Government Payments
as recorded by New York City: LIRO PROGRAM AND CONSTRUCTION MANAGEMENT PE PC
Liro Program and Construction Management Pe PC is the 66th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 9th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 1.1% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 8.5% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 2 | $91,090 | Jun 11, 2020 – Feb 10, 2023 |
| DESIGN-CONSULTANT-BUILDINGS | 144 | $9,008,818 | Jun 7, 2017 – Jul 10, 2024 |
| DESIGN-CONSULTANT-IOTB | 361 | $7,376,418 | May 15, 2017 – Jul 29, 2024 |
| MAINTENANCE SUPPLIES | 1 | $7,347 | Mar 16, 2018 – Mar 16, 2018 |
| CLEANING SERVICES | 2 | $7,121,808 | Sep 7, 2022 – Feb 14, 2023 |
| ADMINISTRATIVE EXPENSES | 7 | $60,867 | Oct 25, 2021 – Jul 31, 2024 |
| IOTB CONSTRUCTION | 198 | $6,057,873 | May 30, 2017 – Jun 30, 2025 |
| CONSTRUCTION-BUILDINGS | 10,533 | $566,968,036 | May 15, 2017 – Jun 26, 2025 |
| CAPITAL PURCHASED EQUIPMENT | 4 | $505,314 | Jun 12, 2020 – Jul 5, 2022 |
| PROF SERV COMPUTER SERVICES | 2 | $45,996 | Jul 19, 2023 – Jun 12, 2025 |
| MAINT & REP GENERAL | 7 | $45,736 | May 1, 2018 – Jan 31, 2023 |
| OTHR SERV AND CHRGS-GENERAL | 1 | $43,298 | Feb 25, 2025 – Feb 25, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 79 | $3,749,827 | Jun 19, 2017 – Jun 9, 2025 |
| DEMOLITION | 61 | $2,254,274 | May 17, 2017 – Aug 20, 2024 |
| CONTRACTUAL SERVICES GENERAL | 211 | $193,527,102 | May 22, 2017 – Jun 12, 2023 |
| PROMPT PAYMENT INTEREST | 20 | $1,825 | Dec 9, 2019 – Feb 24, 2025 |
| INTEREST ON LAND ACQUISITION | 8 | $140,541 | Jul 19, 2021 – Aug 23, 2022 |
| OTHER EXPENDITURES-REPORTABLE | 158 | $135,481,521 | Jun 28, 2017 – Jun 18, 2025 |
| POLLUTION REMEDIATION OBLIGATIONS | 25 | $130,120 | Aug 26, 2019 – Jun 20, 2023 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 746 payments$66,036,329
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 20, 2025 | School Construction Authority | $4,876,998.90 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2024 | School Construction Authority | $4,439,265.23 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2025 | City University Construction Fund | $3,290,893.76 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 27, 2025 | City University Construction Fund | $2,507,561.77 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 9, 2024 | School Construction Authority | $2,303,096.46 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2025 | City University Construction Fund | $2,015,852.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 31, 2024 | School Construction Authority | $2,005,586.40 | CONSTRUCTION-BUILDINGS | – |
| Jul 2, 2024 | School Construction Authority | $1,576,021.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2024 | School Construction Authority | $1,545,410.71 | CONSTRUCTION-BUILDINGS | – |
| Jul 31, 2024 | School Construction Authority | $1,535,869.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2025 | City University Construction Fund | $1,505,706.87 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 20, 2025 | School Construction Authority | $1,278,622.31 | CONSTRUCTION-BUILDINGS | – |
| Jul 15, 2024 | Department of Sanitation | $1,167,708.88 | CONSTRUCTION-BUILDINGS | – |
| Jul 31, 2024 | School Construction Authority | $1,041,785.22 | CONSTRUCTION-BUILDINGS | – |
| Apr 7, 2025 | Department of Sanitation | $1,038,854.13 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2024 | School Construction Authority | $976,991.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 20, 2025 | School Construction Authority | $904,903.59 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2025 | School Construction Authority | $750,919.75 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2024 | School Construction Authority | $672,819.10 | CONSTRUCTION-BUILDINGS | – |
| Dec 12, 2024 | School Construction Authority | $664,283.87 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 910 payments$60,869,449
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 28, 2024 | School Construction Authority | $2,353,292.50 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2023 | School Construction Authority | $2,026,777.38 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2023 | School Construction Authority | $1,994,802.81 | CONSTRUCTION-BUILDINGS | – |
| Aug 2, 2023 | School Construction Authority | $1,635,970.15 | CONSTRUCTION-BUILDINGS | – |
| May 29, 2024 | Department of Sanitation | $1,593,705.95 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2024 | School Construction Authority | $1,141,201.96 | CONSTRUCTION-BUILDINGS | – |
| Jan 16, 2024 | School Construction Authority | $988,775.08 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2024 | School Construction Authority | $925,775.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 27, 2023 | School Construction Authority | $917,914.44 | CONSTRUCTION-BUILDINGS | – |
| Aug 10, 2023 | School Construction Authority | $881,401.18 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2024 | School Construction Authority | $872,714.42 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2024 | School Construction Authority | $806,840.78 | CONSTRUCTION-BUILDINGS | – |
| Apr 3, 2024 | School Construction Authority | $802,277.98 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2023 | Department of Sanitation | $777,762.72 | CONSTRUCTION-BUILDINGS | – |
| Jul 14, 2023 | School Construction Authority | $770,363.43 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2024 | School Construction Authority | $716,765.76 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2024 | School Construction Authority | $685,672.20 | CONSTRUCTION-BUILDINGS | – |
| Jan 18, 2024 | School Construction Authority | $670,492.23 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2024 | Department of Sanitation | $645,070.35 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2024 | School Construction Authority | $624,177.76 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 1,125 payments$121,317,776
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 7, 2022 | Department of Correction | $7,121,807.76 | CLEANING SERVICES | – |
| Jan 13, 2023 | School Construction Authority | $4,084,937.01 | CONSTRUCTION-BUILDINGS | – |
| Dec 16, 2022 | School Construction Authority | $3,618,340.53 | CONSTRUCTION-BUILDINGS | – |
| Sep 1, 2022 | School Construction Authority | $3,382,063.95 | CONSTRUCTION-BUILDINGS | – |
| Apr 26, 2023 | School Construction Authority | $2,729,326.43 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2023 | School Construction Authority | $2,369,841.47 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2022 | School Construction Authority | $2,349,242.67 | CONSTRUCTION-BUILDINGS | – |
| Apr 26, 2023 | School Construction Authority | $2,266,022.91 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2022 | School Construction Authority | $2,167,888.17 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2022 | School Construction Authority | $2,127,055.51 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2023 | School Construction Authority | $2,101,717.79 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2022 | School Construction Authority | $2,078,341.38 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2022 | School Construction Authority | $2,072,381.44 | CONSTRUCTION-BUILDINGS | – |
| Feb 13, 2023 | School Construction Authority | $1,868,290.16 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2022 | School Construction Authority | $1,866,351.16 | CONSTRUCTION-BUILDINGS | – |
| Feb 13, 2023 | School Construction Authority | $1,841,049.62 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2022 | School Construction Authority | $1,787,261.53 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2023 | School Construction Authority | $1,751,395.72 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2022 | School Construction Authority | $1,710,744.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 1, 2022 | School Construction Authority | $1,664,401.90 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 1,605 payments$99,015,307
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 6, 2021 | Department of Design and Construction | $7,405,382.05 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 19, 2021 | Department of Design and Construction | $5,847,839.00 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 10, 2021 | School Construction Authority | $3,513,578.18 | CONSTRUCTION-BUILDINGS | – |
| May 31, 2022 | School Construction Authority | $2,498,769.83 | CONSTRUCTION-BUILDINGS | – |
| Jun 27, 2022 | School Construction Authority | $2,482,710.99 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2022 | School Construction Authority | $2,250,550.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 18, 2021 | School Construction Authority | $2,230,668.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 22, 2022 | School Construction Authority | $2,204,500.82 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2022 | School Construction Authority | $1,856,475.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2022 | School Construction Authority | $1,547,517.41 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2021 | School Construction Authority | $1,537,662.53 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2022 | School Construction Authority | $1,257,541.75 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2021 | City University Construction Fund | $1,228,691.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 18, 2021 | School Construction Authority | $1,117,806.52 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2022 | School Construction Authority | $1,070,728.29 | CONSTRUCTION-BUILDINGS | – |
| Jun 27, 2022 | School Construction Authority | $1,064,329.46 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2022 | School Construction Authority | $1,044,489.42 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2022 | School Construction Authority | $1,018,579.46 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2021 | School Construction Authority | $1,012,781.20 | CONSTRUCTION-BUILDINGS | – |
| Aug 11, 2021 | School Construction Authority | $934,884.25 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 2,573 payments$88,426,748
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 1, 2021 | Department of Design and Construction | $4,822,472.21 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 12, 2021 | Department of Design and Construction | $3,096,300.49 | CONTRACTUAL SERVICES GENERAL | – |
| Mar 23, 2021 | Department of Design and Construction | $3,056,285.65 | CONTRACTUAL SERVICES GENERAL | – |
| Oct 26, 2020 | Department of Design and Construction | $3,028,760.61 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 13, 2020 | School Construction Authority | $2,532,875.56 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2021 | Department of Design and Construction | $2,397,879.24 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 21, 2021 | City University Construction Fund | $2,025,198.77 | OTHER EXPENDITURES-REPORTABLE | – |
| Aug 4, 2020 | School Construction Authority | $1,709,249.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2021 | City University Construction Fund | $1,633,662.82 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 22, 2020 | School Construction Authority | $1,500,014.91 | CONSTRUCTION-BUILDINGS | – |
| May 3, 2021 | Department of Design and Construction | $1,476,998.92 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 31, 2020 | School Construction Authority | $1,313,150.90 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2020 | City University Construction Fund | $1,293,715.66 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 8, 2020 | Department of Design and Construction | $1,254,579.25 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 22, 2020 | School Construction Authority | $1,253,128.47 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2020 | School Construction Authority | $1,034,383.87 | CONSTRUCTION-BUILDINGS | – |
| Aug 24, 2020 | City University Construction Fund | $1,026,875.43 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 21, 2021 | City University Construction Fund | $1,025,647.56 | OTHER EXPENDITURES-REPORTABLE | – |
| Aug 13, 2020 | School Construction Authority | $980,685.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2020 | School Construction Authority | $951,985.04 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 2,511 payments$162,284,307
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 18, 2020 | Department of Design and Construction | $11,364,269.92 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 23, 2019 | School Construction Authority | $5,129,847.23 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2019 | School Construction Authority | $4,631,525.16 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2019 | Department of Design and Construction | $3,900,194.33 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2020 | School Construction Authority | $3,472,108.95 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2019 | School Construction Authority | $2,798,424.50 | CONSTRUCTION-BUILDINGS | – |
| Jul 15, 2019 | City University Construction Fund | $2,786,571.82 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 21, 2019 | School Construction Authority | $2,683,329.91 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2019 | School Construction Authority | $2,598,852.67 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2020 | City University Construction Fund | $2,572,811.97 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 13, 2020 | City University Construction Fund | $2,560,278.57 | OTHER EXPENDITURES-REPORTABLE | – |
| Aug 20, 2019 | City University Construction Fund | $2,520,414.20 | OTHER EXPENDITURES-REPORTABLE | – |
| Jan 28, 2020 | City University Construction Fund | $2,349,088.61 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 16, 2020 | City University Construction Fund | $2,221,405.08 | OTHER EXPENDITURES-REPORTABLE | – |
| Jan 22, 2020 | School Construction Authority | $2,210,964.39 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2019 | School Construction Authority | $2,016,386.38 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2019 | School Construction Authority | $1,893,365.07 | CONSTRUCTION-BUILDINGS | – |
| Mar 12, 2020 | School Construction Authority | $1,887,240.03 | CONSTRUCTION-BUILDINGS | – |
| Jan 15, 2020 | Department of Design and Construction | $1,877,310.20 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 14, 2019 | Department of Design and Construction | $1,840,599.44 | CONTRACTUAL SERVICES GENERAL | – |
FY 2019top 20 of 1,194 payments$105,270,690
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 28, 2019 | Department of Design and Construction | $5,533,133.52 | CONTRACTUAL SERVICES GENERAL | – |
| Feb 11, 2019 | Department of Design and Construction | $3,766,879.33 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 17, 2019 | City University Construction Fund | $3,461,313.53 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 21, 2019 | City University Construction Fund | $3,095,138.81 | OTHER EXPENDITURES-REPORTABLE | – |
| Sep 25, 2018 | City University Construction Fund | $2,934,353.71 | OTHER EXPENDITURES-REPORTABLE | – |
| Sep 12, 2018 | City University Construction Fund | $2,878,005.12 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 12, 2018 | Department of Design and Construction | $2,742,665.28 | CONTRACTUAL SERVICES GENERAL | – |
| May 9, 2019 | School Construction Authority | $2,448,322.11 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2019 | City University Construction Fund | $2,309,555.48 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 6, 2019 | School Construction Authority | $2,307,891.24 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2019 | City University Construction Fund | $1,778,577.41 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 24, 2018 | City University Construction Fund | $1,715,282.66 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 9, 2018 | City University Construction Fund | $1,564,187.24 | OTHER EXPENDITURES-REPORTABLE | – |
| May 9, 2019 | School Construction Authority | $1,558,727.07 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2018 | City University Construction Fund | $1,519,430.13 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 20, 2019 | City University Construction Fund | $1,454,680.82 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 10, 2018 | Administration for Children's Services | $1,240,434.37 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2018 | City University Construction Fund | $1,229,075.76 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 6, 2019 | School Construction Authority | $1,227,230.48 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2018 | Department of Design and Construction | $1,159,725.42 | CONTRACTUAL SERVICES GENERAL | – |
FY 2018top 20 of 1,010 payments$193,206,421
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 31, 2017 | Department of Design and Construction | $21,100,000.00 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 5, 2018 | Department of Design and Construction | $9,784,236.67 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 5, 2017 | Department of Design and Construction | $9,661,784.03 | CONTRACTUAL SERVICES GENERAL | – |
| Feb 26, 2018 | Department of Design and Construction | $6,176,354.43 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 24, 2017 | School Construction Authority | $5,101,937.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2017 | School Construction Authority | $5,101,937.18 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2017 | Department of Design and Construction | $4,122,558.64 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 31, 2017 | City University Construction Fund | $3,932,262.03 | OTHER EXPENDITURES-REPORTABLE | – |
| Aug 18, 2017 | Department of Design and Construction | $3,489,965.74 | CONTRACTUAL SERVICES GENERAL | – |
| Feb 26, 2018 | Department of Design and Construction | $3,123,645.57 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 12, 2017 | City University Construction Fund | $2,958,472.97 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 26, 2018 | Department of Design and Construction | $2,841,372.50 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 4, 2017 | Department of Design and Construction | $2,797,517.85 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 18, 2017 | City University Construction Fund | $2,617,902.91 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 25, 2017 | Department of Design and Construction | $2,616,512.23 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 6, 2017 | School Construction Authority | $2,588,970.17 | CONSTRUCTION-BUILDINGS | – |
| Oct 5, 2017 | Department of Design and Construction | $2,578,654.35 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 8, 2017 | Department of Design and Construction | $2,561,784.03 | CONTRACTUAL SERVICES GENERAL | – |
| Mar 19, 2018 | City University Construction Fund | $2,365,353.09 | OTHER EXPENDITURES-REPORTABLE | – |
| Sep 12, 2017 | Department of Design and Construction | $2,275,025.85 | CONTRACTUAL SERVICES GENERAL | – |
FY 2017top 20 of 150 payments$36,190,781
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 5, 2017 | Department of Design and Construction | $22,238,000.00 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 28, 2017 | Department of Design and Construction | $3,063,727.83 | CONTRACTUAL SERVICES GENERAL | – |
| May 22, 2017 | Department of Design and Construction | $3,005,085.07 | CONTRACTUAL SERVICES GENERAL | – |
| May 31, 2017 | School Construction Authority | $1,576,778.65 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2017 | City University Construction Fund | $1,149,490.51 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 14, 2017 | School Construction Authority | $663,422.06 | CONSTRUCTION-BUILDINGS | – |
| May 31, 2017 | School Construction Authority | $491,963.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2017 | Department of Sanitation | $299,720.49 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 31, 2017 | School Construction Authority | $265,064.76 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2017 | Police Department | $258,122.45 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 31, 2017 | School Construction Authority | $199,902.02 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2017 | School Construction Authority | $176,565.98 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2017 | Department of Citywide Administrative Services | $174,546.56 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2017 | Department of Sanitation | $169,611.75 | DEMOLITION | – |
| Jun 20, 2017 | Department of Sanitation | $140,289.01 | DEMOLITION | – |
| Jun 20, 2017 | Department of Transportation | $108,290.86 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2017 | Department of Parks and Recreation | $102,357.94 | DESIGN-CONSULTANT-IOTB | – |
| Jun 14, 2017 | School Construction Authority | $100,687.18 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2017 | School Construction Authority | $99,925.79 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2017 | School Construction Authority | $94,792.45 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Department of Cultural Affairs | $4,032.00 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 26, 2025 | Fire Department | $33,962.54 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | Department of Transportation | $28,270.82 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $27,873.55 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $12,970.60 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | City University Construction Fund | $2,015,852.50 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| Jun 18, 2025 | Fire Department | $21,898.05 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $14,228.91 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $53,723.90 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $167,573.74 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $477,174.02 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $10,409.98 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $2,780.08 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $23,241.49 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $526.65 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $1,115.79 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $40,917.78 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $12,146.60 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $52,381.44 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $3,291.63 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $410.63 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | Department of Design and Construction | $2,365.10 | PROF SERV COMPUTER SERVICES | Contracts |
| Jun 9, 2025 | City University Construction Fund | $3,290,893.76 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| Jun 9, 2025 | City University Construction Fund | $1,505,706.87 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| Jun 9, 2025 | Fire Department | $1,568.93 | PROF SERV ENGINEER & ARCHITECT | Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data