MFM Contracting Corp.: New York City Government Payments

MFM Contracting Corp. is the 258th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 42nd in IOTB CONSTRUCTION spending. Its payments amount to 0.6% of everything the Department of Transportation has paid vendors in that span. Payments to it rose 100.3% year over year.

Primary spending category: IOTB CONSTRUCTION

$257,598,675total received
3,620payments
7agencies
Sep 13, 2011Jun 3, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to MFM Contracting Corp.. No spam.

Payments by fiscal year

FY 2025$7,787,548
FY 2024$3,888,192
FY 2023$6,845,655
FY 2022$15,218,598
FY 2021$22,822,955
FY 2020$30,441,225
FY 2019$33,528,099
FY 2018$30,296,282
FY 2017$33,970,060
FY 2016$23,687,036
FY 2015$21,444,465
FY 2014$14,115,707
FY 2013$8,818,693
FY 2012$4,734,160

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Transportation78$4,601,915
FY 2025Department of Environmental Protection216$3,185,633
FY 2024Department of Environmental Protection38$2,180,115
FY 2024Department of Transportation60$1,708,077
FY 2023Department of Environmental Protection186$5,403,154
FY 2023Department of Transportation60$1,442,501
FY 2022Department of Environmental Protection185$8,367,076
FY 2022Department of Transportation144$6,851,522
FY 2021Department of Environmental Protection207$13,273,304
FY 2021Department of Transportation178$9,521,747
FY 2021Department of Parks and Recreation9$27,905
FY 2020Department of Environmental Protection172$18,114,494
FY 2020Department of Transportation191$12,180,531
FY 2020Department of Design and Construction6$146,200
FY 2019Department of Environmental Protection148$20,822,180
FY 2019Department of Transportation138$12,471,537
FY 2019Department of Parks and Recreation17$158,608
FY 2019Department of Design and Construction4$75,774
FY 2018Department of Environmental Protection87$16,937,169
FY 2018Department of Transportation140$11,213,039
FY 2018Department of Parks and Recreation8$1,143,189
FY 2018Department of Citywide Administrative Services9$692,745
FY 2018Department of Correction8$311,540
FY 2018Department of Design and Construction4-$1,400
FY 2017Department of Transportation241$18,693,854
FY 2017Department of Environmental Protection128$13,053,734
FY 2017Department of Correction3$1,293,472
FY 2017Department of Citywide Administrative Services2$468,250
FY 2017Department of Parks and Recreation4$460,750
FY 2016Department of Environmental Protection88$12,816,079
FY 2016Department of Transportation156$8,244,264
FY 2016Department of Citywide Administrative Services5$2,613,572
FY 2016Department of Education1$12,315
FY 2016Department of Design and Construction26$807
FY 2015Department of Transportation164$15,871,677
FY 2015Department of Environmental Protection62$5,572,788
FY 2014Department of Transportation163$11,315,302
FY 2014Department of Parks and Recreation16$1,397,984
FY 2014Department of Environmental Protection45$1,312,952
FY 2014Department of Education1$89,469
FY 2013Department of Transportation94$4,542,164
FY 2013Department of Parks and Recreation7$3,918,086
FY 2013Department of Environmental Protection26$358,443
FY 2012Department of Transportation72$4,294,057
FY 2012Department of Environmental Protection23$440,104
Total3,620$257,598,675

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROMPT PAYMENT INTEREST26$807Dec 10, 2015 Jun 27, 2016
N/A13$3,031,826Nov 15, 2017 Jun 17, 2020
IOTB CONSTRUCTION3,566$253,185,178Sep 13, 2011 Jun 3, 2025
CONTRACTUAL SERVICES GENERAL2$16,354Jun 11, 2019 Dec 22, 2022
CONSTRUCTION-BUILDINGS9$1,365,910Mar 22, 2017 May 30, 2018
<Non-Applicable Expenditure Object>4-$1,400Apr 30, 2018 Apr 30, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 294 payments$7,787,548
DateAgencyAmountCategoryPurchase order
Aug 28, 2024Department of Transportation$723,250.07IOTB CONSTRUCTION
Mar 24, 2025Department of Environmental Protection$580,865.36IOTB CONSTRUCTION
Aug 28, 2024Department of Transportation$514,239.03IOTB CONSTRUCTION
Mar 7, 2025Department of Environmental Protection$323,014.62IOTB CONSTRUCTION
Nov 25, 2024Department of Environmental Protection$276,801.96IOTB CONSTRUCTION
Nov 27, 2024Department of Transportation$268,812.31IOTB CONSTRUCTION
Dec 30, 2024Department of Transportation$253,332.48IOTB CONSTRUCTION
Jan 28, 2025Department of Transportation$245,849.37IOTB CONSTRUCTION
Mar 10, 2025Department of Transportation$224,225.97IOTB CONSTRUCTION
May 5, 2025Department of Transportation$197,539.18IOTB CONSTRUCTION
Mar 25, 2025Department of Transportation$183,793.54IOTB CONSTRUCTION
Aug 28, 2024Department of Transportation$180,812.52IOTB CONSTRUCTION
Oct 30, 2024Department of Transportation$172,828.24IOTB CONSTRUCTION
May 5, 2025Department of Environmental Protection$156,093.69IOTB CONSTRUCTION
Sep 17, 2024Department of Transportation$147,946.35IOTB CONSTRUCTION
Aug 6, 2024Department of Environmental Protection$143,900.89IOTB CONSTRUCTION
Oct 28, 2024Department of Environmental Protection$135,581.91IOTB CONSTRUCTION
Dec 2, 2024Department of Transportation$122,911.08IOTB CONSTRUCTION
Sep 30, 2024Department of Environmental Protection$118,760.06IOTB CONSTRUCTION
Aug 28, 2024Department of Transportation$117,600.39IOTB CONSTRUCTION
FY 2024top 20 of 98 payments$3,888,192
DateAgencyAmountCategoryPurchase order
Jul 17, 2023Department of Environmental Protection$365,318.21IOTB CONSTRUCTION
Jan 8, 2024Department of Transportation$335,652.72IOTB CONSTRUCTION
Nov 29, 2023Department of Transportation$313,879.45IOTB CONSTRUCTION
Jan 30, 2024Department of Transportation$191,335.02IOTB CONSTRUCTION
Aug 9, 2023Department of Environmental Protection$186,696.68IOTB CONSTRUCTION
Dec 4, 2023Department of Environmental Protection$183,210.54IOTB CONSTRUCTION
Jan 16, 2024Department of Environmental Protection$140,576.52IOTB CONSTRUCTION
Sep 5, 2023Department of Environmental Protection$111,040.95IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$104,550.06IOTB CONSTRUCTION
Jun 5, 2024Department of Environmental Protection$101,217.29IOTB CONSTRUCTION
Mar 4, 2024Department of Environmental Protection$96,475.16IOTB CONSTRUCTION
Sep 11, 2023Department of Environmental Protection$92,494.53IOTB CONSTRUCTION
Dec 4, 2023Department of Environmental Protection$74,238.23IOTB CONSTRUCTION
May 23, 2024Department of Environmental Protection$72,388.86IOTB CONSTRUCTION
Aug 1, 2023Department of Environmental Protection$69,462.52IOTB CONSTRUCTION
Apr 1, 2024Department of Environmental Protection$67,797.51IOTB CONSTRUCTION
Aug 9, 2023Department of Environmental Protection$65,486.76IOTB CONSTRUCTION
Oct 2, 2023Department of Transportation$59,155.64IOTB CONSTRUCTION
Dec 27, 2023Department of Transportation$56,519.47IOTB CONSTRUCTION
Sep 11, 2023Department of Environmental Protection$52,445.67IOTB CONSTRUCTION
FY 2023top 20 of 246 payments$6,845,655
DateAgencyAmountCategoryPurchase order
Apr 5, 2023Department of Environmental Protection$590,490.07IOTB CONSTRUCTION
May 8, 2023Department of Environmental Protection$570,947.38IOTB CONSTRUCTION
Mar 27, 2023Department of Transportation$515,031.77IOTB CONSTRUCTION
Nov 7, 2022Department of Environmental Protection$399,658.94IOTB CONSTRUCTION
Jun 30, 2023Department of Environmental Protection$395,924.15IOTB CONSTRUCTION
May 31, 2023Department of Environmental Protection$370,883.38IOTB CONSTRUCTION
Aug 15, 2022Department of Environmental Protection$369,632.01IOTB CONSTRUCTION
Aug 9, 2022Department of Environmental Protection$206,296.65IOTB CONSTRUCTION
Oct 11, 2022Department of Environmental Protection$191,701.74IOTB CONSTRUCTION
Sep 19, 2022Department of Environmental Protection$191,561.25IOTB CONSTRUCTION
Mar 2, 2023Department of Environmental Protection$171,633.18IOTB CONSTRUCTION
Jan 23, 2023Department of Environmental Protection$146,663.86IOTB CONSTRUCTION
Dec 19, 2022Department of Environmental Protection$101,094.87IOTB CONSTRUCTION
Jul 26, 2022Department of Environmental Protection$97,018.75IOTB CONSTRUCTION
Dec 19, 2022Department of Environmental Protection$95,073.80IOTB CONSTRUCTION
May 8, 2023Department of Transportation$89,641.47IOTB CONSTRUCTION
Oct 19, 2022Department of Transportation$86,512.81IOTB CONSTRUCTION
Mar 6, 2023Department of Environmental Protection$85,211.12IOTB CONSTRUCTION
Nov 7, 2022Department of Environmental Protection$62,866.49IOTB CONSTRUCTION
Aug 15, 2022Department of Transportation$59,313.44IOTB CONSTRUCTION
FY 2022top 20 of 329 payments$15,218,598
DateAgencyAmountCategoryPurchase order
Oct 20, 2021Department of Transportation$1,123,957.14IOTB CONSTRUCTION
Nov 22, 2021Department of Transportation$893,389.36IOTB CONSTRUCTION
Mar 1, 2022Department of Transportation$774,102.22IOTB CONSTRUCTION
Nov 15, 2021Department of Environmental Protection$538,756.99IOTB CONSTRUCTION
Dec 27, 2021Department of Environmental Protection$519,517.81IOTB CONSTRUCTION
Mar 21, 2022Department of Environmental Protection$507,589.92IOTB CONSTRUCTION
Jan 5, 2022Department of Environmental Protection$432,630.90IOTB CONSTRUCTION
Dec 23, 2021Department of Transportation$326,849.88IOTB CONSTRUCTION
Aug 3, 2021Department of Transportation$315,103.68IOTB CONSTRUCTION
Apr 6, 2022Department of Environmental Protection$313,446.73IOTB CONSTRUCTION
Jul 6, 2021Department of Environmental Protection$301,081.62IOTB CONSTRUCTION
May 2, 2022Department of Environmental Protection$300,230.34IOTB CONSTRUCTION
Aug 9, 2021Department of Environmental Protection$289,808.51IOTB CONSTRUCTION
Apr 18, 2022Department of Environmental Protection$253,218.82IOTB CONSTRUCTION
Dec 23, 2021Department of Transportation$231,264.21IOTB CONSTRUCTION
Oct 12, 2021Department of Environmental Protection$220,563.69IOTB CONSTRUCTION
Nov 23, 2021Department of Transportation$215,713.34IOTB CONSTRUCTION
Apr 12, 2022Department of Environmental Protection$210,483.22IOTB CONSTRUCTION
Sep 20, 2021Department of Transportation$206,594.20IOTB CONSTRUCTION
Apr 18, 2022Department of Environmental Protection$204,453.06IOTB CONSTRUCTION
FY 2021top 20 of 394 payments$22,822,955
DateAgencyAmountCategoryPurchase order
Jul 9, 2020Department of Transportation$847,867.93IOTB CONSTRUCTION
Aug 13, 2020Department of Transportation$788,724.21IOTB CONSTRUCTION
Apr 12, 2021Department of Environmental Protection$676,926.04IOTB CONSTRUCTION
Oct 15, 2020Department of Environmental Protection$675,933.46IOTB CONSTRUCTION
Mar 15, 2021Department of Environmental Protection$621,415.46IOTB CONSTRUCTION
Mar 15, 2021Department of Environmental Protection$588,492.30IOTB CONSTRUCTION
Sep 8, 2020Department of Transportation$548,902.23IOTB CONSTRUCTION
Jun 22, 2021Department of Environmental Protection$460,735.86IOTB CONSTRUCTION
Aug 6, 2020Department of Transportation$392,086.08IOTB CONSTRUCTION
Dec 2, 2020Department of Transportation$374,985.67IOTB CONSTRUCTION
Sep 15, 2020Department of Environmental Protection$341,937.41IOTB CONSTRUCTION
Jul 9, 2020Department of Environmental Protection$334,651.56IOTB CONSTRUCTION
Feb 9, 2021Department of Environmental Protection$334,365.96IOTB CONSTRUCTION
Mar 15, 2021Department of Environmental Protection$320,423.17IOTB CONSTRUCTION
Aug 18, 2020Department of Environmental Protection$317,119.49IOTB CONSTRUCTION
Nov 5, 2020Department of Transportation$293,633.63IOTB CONSTRUCTION
Jul 2, 2020Department of Environmental Protection$293,457.64IOTB CONSTRUCTION
Jan 20, 2021Department of Environmental Protection$286,567.70IOTB CONSTRUCTION
Nov 10, 2020Department of Environmental Protection$261,328.94IOTB CONSTRUCTION
Oct 13, 2020Department of Environmental Protection$259,845.25IOTB CONSTRUCTION
FY 2020top 20 of 369 payments$30,441,225
DateAgencyAmountCategoryPurchase order
Nov 26, 2019Department of Transportation$742,310.18IOTB CONSTRUCTION
Mar 10, 2020Department of Environmental Protection$726,746.41IOTB CONSTRUCTION
Dec 9, 2019Department of Environmental Protection$687,953.16IOTB CONSTRUCTION
Feb 4, 2020Department of Environmental Protection$678,479.26IOTB CONSTRUCTION
Dec 24, 2019Department of Environmental Protection$659,658.76IOTB CONSTRUCTION
Oct 23, 2019Department of Transportation$628,830.46IOTB CONSTRUCTION
Mar 31, 2020Department of Environmental Protection$621,090.19IOTB CONSTRUCTION
Apr 1, 2020Department of Environmental Protection$591,757.89IOTB CONSTRUCTION
Jun 10, 2020Department of Environmental Protection$590,794.59IOTB CONSTRUCTION
Aug 20, 2019Department of Transportation$524,050.81IOTB CONSTRUCTION
Oct 21, 2019Department of Transportation$521,093.50IOTB CONSTRUCTION
Dec 30, 2019Department of Transportation$513,923.04IOTB CONSTRUCTION
Sep 3, 2019Department of Environmental Protection$501,921.82IOTB CONSTRUCTION
Apr 1, 2020Department of Transportation$498,718.52IOTB CONSTRUCTION
Sep 23, 2019Department of Transportation$487,080.06IOTB CONSTRUCTION
Mar 30, 2020Department of Environmental Protection$486,158.81IOTB CONSTRUCTION
Jan 7, 2020Department of Environmental Protection$484,779.96IOTB CONSTRUCTION
Sep 3, 2019Department of Transportation$479,583.75IOTB CONSTRUCTION
Jul 2, 2019Department of Transportation$472,302.82IOTB CONSTRUCTION
Sep 23, 2019Department of Transportation$452,653.46IOTB CONSTRUCTION
FY 2019top 20 of 307 payments$33,528,099
DateAgencyAmountCategoryPurchase order
Sep 20, 2018Department of Environmental Protection$1,879,852.08N/A
May 28, 2019Department of Transportation$1,411,426.53IOTB CONSTRUCTION
Jul 3, 2018Department of Environmental Protection$953,430.96IOTB CONSTRUCTION
Jul 1, 2018Department of Transportation$814,961.67IOTB CONSTRUCTION
Sep 4, 2018Department of Transportation$801,683.48IOTB CONSTRUCTION
Mar 25, 2019Department of Environmental Protection$790,368.11IOTB CONSTRUCTION
Jul 25, 2018Department of Transportation$759,465.39IOTB CONSTRUCTION
May 22, 2019Department of Environmental Protection$733,777.44IOTB CONSTRUCTION
Mar 25, 2019Department of Environmental Protection$719,761.09IOTB CONSTRUCTION
Dec 24, 2018Department of Environmental Protection$637,235.54IOTB CONSTRUCTION
Jun 5, 2019Department of Transportation$635,414.04IOTB CONSTRUCTION
Apr 4, 2019Department of Transportation$593,506.07IOTB CONSTRUCTION
Aug 6, 2018Department of Environmental Protection$592,269.57IOTB CONSTRUCTION
Sep 20, 2018Department of Environmental Protection$585,000.00N/A
Dec 19, 2018Department of Environmental Protection$574,570.69IOTB CONSTRUCTION
Mar 11, 2019Department of Transportation$574,219.39IOTB CONSTRUCTION
Oct 31, 2018Department of Environmental Protection$572,840.87IOTB CONSTRUCTION
Sep 19, 2018Department of Environmental Protection$507,200.52IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$501,495.23IOTB CONSTRUCTION
Dec 17, 2018Department of Environmental Protection$492,180.32IOTB CONSTRUCTION
FY 2018top 20 of 256 payments$30,296,282
DateAgencyAmountCategoryPurchase order
Nov 1, 2017Department of Environmental Protection$4,103,072.22IOTB CONSTRUCTION
Oct 10, 2017Department of Environmental Protection$2,534,261.68IOTB CONSTRUCTION
Apr 9, 2018Department of Environmental Protection$1,157,669.66IOTB CONSTRUCTION
Dec 11, 2017Department of Environmental Protection$994,318.67IOTB CONSTRUCTION
Jul 1, 2017Department of Environmental Protection$873,156.95IOTB CONSTRUCTION
Aug 2, 2017Department of Environmental Protection$785,994.24IOTB CONSTRUCTION
Oct 2, 2017Department of Transportation$615,833.41IOTB CONSTRUCTION
Aug 29, 2017Department of Transportation$610,262.20IOTB CONSTRUCTION
Apr 2, 2018Department of Environmental Protection$572,032.92IOTB CONSTRUCTION
Jul 5, 2017Department of Environmental Protection$548,253.56IOTB CONSTRUCTION
Jul 19, 2017Department of Parks and Recreation$544,719.21IOTB CONSTRUCTION
Aug 2, 2017Department of Transportation$542,128.15IOTB CONSTRUCTION
Mar 5, 2018Department of Transportation$534,402.76IOTB CONSTRUCTION
Jun 4, 2018Department of Transportation$532,539.03IOTB CONSTRUCTION
Jul 1, 2017Department of Transportation$519,148.83IOTB CONSTRUCTION
Oct 30, 2017Department of Transportation$512,522.73IOTB CONSTRUCTION
Dec 4, 2017Department of Transportation$505,283.76IOTB CONSTRUCTION
Jan 2, 2018Department of Transportation$479,723.18IOTB CONSTRUCTION
Aug 29, 2017Department of Environmental Protection$477,943.76IOTB CONSTRUCTION
Aug 22, 2017Department of Environmental Protection$445,574.89IOTB CONSTRUCTION
FY 2017top 20 of 378 payments$33,970,060
DateAgencyAmountCategoryPurchase order
Mar 27, 2017Department of Transportation$1,361,889.46IOTB CONSTRUCTION
May 2, 2017Department of Transportation$1,055,878.29IOTB CONSTRUCTION
Nov 18, 2016Department of Transportation$875,059.07IOTB CONSTRUCTION
Dec 12, 2016Department of Environmental Protection$862,744.10IOTB CONSTRUCTION
Jan 9, 2017Department of Transportation$770,792.08IOTB CONSTRUCTION
May 15, 2017Department of Environmental Protection$712,584.62IOTB CONSTRUCTION
May 9, 2017Department of Correction$675,966.80CONSTRUCTION-BUILDINGS
Jun 5, 2017Department of Environmental Protection$674,317.08IOTB CONSTRUCTION
Aug 22, 2016Department of Transportation$638,821.89IOTB CONSTRUCTION
Aug 1, 2016Department of Transportation$596,344.50IOTB CONSTRUCTION
Dec 27, 2016Department of Environmental Protection$595,082.28IOTB CONSTRUCTION
May 2, 2017Department of Environmental Protection$586,541.68IOTB CONSTRUCTION
May 2, 2017Department of Transportation$540,598.12IOTB CONSTRUCTION
Feb 21, 2017Department of Transportation$530,833.54IOTB CONSTRUCTION
May 31, 2017Department of Transportation$498,486.08IOTB CONSTRUCTION
Oct 11, 2016Department of Transportation$486,607.03IOTB CONSTRUCTION
Apr 19, 2017Department of Environmental Protection$480,989.72IOTB CONSTRUCTION
Aug 17, 2016Department of Environmental Protection$467,046.22IOTB CONSTRUCTION
Oct 31, 2016Department of Citywide Administrative Services$459,160.06IOTB CONSTRUCTION
Jul 11, 2016Department of Environmental Protection$447,530.06IOTB CONSTRUCTION
FY 2016top 20 of 276 payments$23,687,036
DateAgencyAmountCategoryPurchase order
Jan 4, 2016Department of Environmental Protection$1,337,200.00IOTB CONSTRUCTION
Mar 2, 2016Department of Citywide Administrative Services$1,267,107.44IOTB CONSTRUCTION
May 25, 2016Department of Citywide Administrative Services$1,182,677.73IOTB CONSTRUCTION
Apr 18, 2016Department of Transportation$1,110,633.06IOTB CONSTRUCTION
Mar 2, 2016Department of Environmental Protection$818,800.00IOTB CONSTRUCTION
Nov 25, 2015Department of Environmental Protection$773,100.00IOTB CONSTRUCTION
May 9, 2016Department of Environmental Protection$632,266.21IOTB CONSTRUCTION
Aug 10, 2015Department of Environmental Protection$523,223.27IOTB CONSTRUCTION
Jan 26, 2016Department of Environmental Protection$521,576.48IOTB CONSTRUCTION
Nov 23, 2015Department of Transportation$469,915.72IOTB CONSTRUCTION
Apr 11, 2016Department of Environmental Protection$464,241.06IOTB CONSTRUCTION
May 5, 2016Department of Transportation$446,298.15IOTB CONSTRUCTION
Jun 6, 2016Department of Environmental Protection$405,716.98IOTB CONSTRUCTION
Sep 16, 2015Department of Environmental Protection$386,773.64IOTB CONSTRUCTION
Jul 15, 2015Department of Environmental Protection$380,181.07IOTB CONSTRUCTION
Oct 21, 2015Department of Transportation$365,098.51IOTB CONSTRUCTION
Jan 26, 2016Department of Transportation$358,239.64IOTB CONSTRUCTION
Apr 11, 2016Department of Environmental Protection$323,004.83IOTB CONSTRUCTION
Jun 6, 2016Department of Environmental Protection$319,043.23IOTB CONSTRUCTION
Mar 1, 2016Department of Transportation$293,353.94IOTB CONSTRUCTION
FY 2015top 20 of 226 payments$21,444,465
DateAgencyAmountCategoryPurchase order
Jan 5, 2015Department of Transportation$1,201,629.50IOTB CONSTRUCTION
May 5, 2015Department of Transportation$899,070.27IOTB CONSTRUCTION
Aug 4, 2014Department of Transportation$866,234.77IOTB CONSTRUCTION
Dec 3, 2014Department of Transportation$829,303.25IOTB CONSTRUCTION
Jan 28, 2015Department of Transportation$716,746.08IOTB CONSTRUCTION
Mar 11, 2015Department of Environmental Protection$641,847.97IOTB CONSTRUCTION
Mar 23, 2015Department of Transportation$471,431.28IOTB CONSTRUCTION
Sep 2, 2014Department of Transportation$466,587.14IOTB CONSTRUCTION
Aug 25, 2014Department of Transportation$462,417.77IOTB CONSTRUCTION
Jun 17, 2015Department of Environmental Protection$442,751.86IOTB CONSTRUCTION
May 5, 2015Department of Environmental Protection$418,583.67IOTB CONSTRUCTION
Apr 13, 2015Department of Transportation$407,503.95IOTB CONSTRUCTION
Oct 15, 2014Department of Transportation$396,820.80IOTB CONSTRUCTION
Nov 24, 2014Department of Transportation$392,901.76IOTB CONSTRUCTION
Jun 17, 2015Department of Transportation$385,887.33IOTB CONSTRUCTION
Mar 11, 2015Department of Environmental Protection$370,356.59IOTB CONSTRUCTION
Apr 22, 2015Department of Transportation$356,596.30IOTB CONSTRUCTION
Jul 7, 2014Department of Transportation$341,333.16IOTB CONSTRUCTION
Oct 6, 2014Department of Environmental Protection$332,138.27IOTB CONSTRUCTION
May 22, 2015Department of Transportation$311,858.46IOTB CONSTRUCTION
FY 2014top 20 of 225 payments$14,115,707
DateAgencyAmountCategoryPurchase order
Mar 17, 2014Department of Transportation$1,119,127.27IOTB CONSTRUCTION
Aug 27, 2013Department of Parks and Recreation$569,027.13IOTB CONSTRUCTION
Jun 9, 2014Department of Transportation$564,151.84IOTB CONSTRUCTION
Apr 8, 2014Department of Transportation$509,348.29IOTB CONSTRUCTION
May 6, 2014Department of Transportation$489,424.59IOTB CONSTRUCTION
Mar 17, 2014Department of Transportation$428,612.74IOTB CONSTRUCTION
Jul 31, 2013Department of Parks and Recreation$345,314.11IOTB CONSTRUCTION
Jun 3, 2014Department of Transportation$337,269.29IOTB CONSTRUCTION
Mar 17, 2014Department of Environmental Protection$332,444.73IOTB CONSTRUCTION
Apr 8, 2014Department of Transportation$331,162.73IOTB CONSTRUCTION
Mar 17, 2014Department of Transportation$304,204.11IOTB CONSTRUCTION
Sep 11, 2013Department of Transportation$288,907.99IOTB CONSTRUCTION
Dec 30, 2013Department of Transportation$259,252.52IOTB CONSTRUCTION
Nov 12, 2013Department of Transportation$258,676.08IOTB CONSTRUCTION
Dec 11, 2013Department of Transportation$256,062.11IOTB CONSTRUCTION
Jul 15, 2013Department of Transportation$228,797.49IOTB CONSTRUCTION
Feb 18, 2014Department of Transportation$227,777.52IOTB CONSTRUCTION
Dec 16, 2013Department of Transportation$226,970.16IOTB CONSTRUCTION
May 12, 2014Department of Transportation$218,925.51IOTB CONSTRUCTION
Aug 6, 2013Department of Transportation$212,181.57IOTB CONSTRUCTION
FY 2013top 20 of 127 payments$8,818,693
DateAgencyAmountCategoryPurchase order
Dec 10, 2012Department of Parks and Recreation$952,703.77IOTB CONSTRUCTION
Nov 13, 2012Department of Parks and Recreation$935,454.95IOTB CONSTRUCTION
Sep 4, 2012Department of Parks and Recreation$790,456.41IOTB CONSTRUCTION
Oct 1, 2012Department of Parks and Recreation$608,150.86IOTB CONSTRUCTION
May 13, 2013Department of Transportation$467,327.92IOTB CONSTRUCTION
Jun 14, 2013Department of Transportation$434,440.26IOTB CONSTRUCTION
Oct 1, 2012Department of Parks and Recreation$373,602.03IOTB CONSTRUCTION
Aug 20, 2012Department of Transportation$370,629.48IOTB CONSTRUCTION
Mar 18, 2013Department of Transportation$326,685.20IOTB CONSTRUCTION
Oct 23, 2012Department of Transportation$269,369.31IOTB CONSTRUCTION
Aug 1, 2012Department of Parks and Recreation$237,316.93IOTB CONSTRUCTION
Dec 17, 2012Department of Transportation$182,169.77IOTB CONSTRUCTION
Nov 7, 2012Department of Transportation$177,130.75IOTB CONSTRUCTION
Jul 11, 2012Department of Transportation$175,071.14IOTB CONSTRUCTION
Jul 11, 2012Department of Transportation$172,802.35IOTB CONSTRUCTION
Sep 10, 2012Department of Transportation$158,490.64IOTB CONSTRUCTION
Dec 17, 2012Department of Transportation$148,682.05IOTB CONSTRUCTION
Feb 19, 2013Department of Transportation$133,700.37IOTB CONSTRUCTION
Aug 20, 2012Department of Transportation$123,223.50IOTB CONSTRUCTION
May 13, 2013Department of Transportation$113,364.94IOTB CONSTRUCTION
FY 2012top 20 of 95 payments$4,734,160
DateAgencyAmountCategoryPurchase order
Mar 12, 2012Department of Transportation$686,554.85IOTB CONSTRUCTION
Jan 11, 2012Department of Transportation$295,229.59IOTB CONSTRUCTION
Jun 13, 2012Department of Transportation$274,909.20IOTB CONSTRUCTION
May 7, 2012Department of Transportation$267,206.64IOTB CONSTRUCTION
Apr 9, 2012Department of Transportation$225,317.11IOTB CONSTRUCTION
Dec 12, 2011Department of Transportation$212,621.60IOTB CONSTRUCTION
Mar 12, 2012Department of Transportation$193,597.68IOTB CONSTRUCTION
Jun 13, 2012Department of Transportation$189,717.14IOTB CONSTRUCTION
Feb 21, 2012Department of Transportation$173,320.93IOTB CONSTRUCTION
Nov 9, 2011Department of Transportation$151,058.06IOTB CONSTRUCTION
Mar 12, 2012Department of Transportation$150,253.13IOTB CONSTRUCTION
Apr 9, 2012Department of Transportation$147,037.85IOTB CONSTRUCTION
Jan 11, 2012Department of Transportation$143,302.37IOTB CONSTRUCTION
May 7, 2012Department of Transportation$139,029.29IOTB CONSTRUCTION
Oct 24, 2011Department of Transportation$99,630.92IOTB CONSTRUCTION
Apr 9, 2012Department of Environmental Protection$82,556.76IOTB CONSTRUCTION
Nov 9, 2011Department of Environmental Protection$81,678.22IOTB CONSTRUCTION
Oct 24, 2011Department of Transportation$81,080.39IOTB CONSTRUCTION
Feb 21, 2012Department of Transportation$71,970.04IOTB CONSTRUCTION
Dec 12, 2011Department of Transportation$66,579.74IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Jun 3, 2025Department of Environmental Protection$30,049.86IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$5,327.23IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$2,990.35IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$3,568.29IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$191.50IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$776.52IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$2,608.52IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$5,273.87IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$2,242.43IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$1,116.00IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$230.06IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$250.55IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$2,012.50IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$25.00IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$327.03IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$10,410.61IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$2,903.18IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$458.75IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$31,078.43IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$25.00IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$115.51IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$824.70IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$19,520.19IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Environmental Protection$2,025.58IOTB CONSTRUCTIONCapital Contracts
Jun 3, 2025Department of Transportation$64.10IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Transportation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data