Mega Engineering and Land Surveying, P.C.: New York City Government Payments

Mega Engineering and Land Surveying, P.C. is the 1,305th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 168th in IOTB CONSTRUCTION spending. Its payments amount to 0.1% of everything the Department of Transportation has paid vendors in that span. Payments to it fell 25% year over year.

Primary spending category: IOTB CONSTRUCTION

$37,673,408total received
471payments
3agencies
Dec 27, 2011Jun 17, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Mega Engineering and Land Surveying, P.C.. No spam.

Payments by fiscal year

FY 2025$903,595
FY 2024$1,204,444
FY 2023$1,721,589
FY 2022$2,477,384
FY 2021$3,222,399
FY 2020$2,997,853
FY 2019$5,509,621
FY 2018$5,420,091
FY 2017$3,754,594
FY 2016$3,508,070
FY 2015$3,475,673
FY 2014$1,623,254
FY 2013$1,158,469
FY 2012$696,372

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Environmental Protection9$890,481
FY 2025Department of Transportation1$13,114
FY 2024Department of Environmental Protection12$1,041,344
FY 2024Department of Transportation5$163,100
FY 2023Department of Transportation12$1,069,033
FY 2023Department of Environmental Protection8$597,113
FY 2023Department of Design and Construction5$55,443
FY 2022Department of Transportation17$1,653,206
FY 2022Department of Environmental Protection11$787,390
FY 2022Department of Design and Construction2$36,789
FY 2021Department of Transportation19$2,147,372
FY 2021Department of Environmental Protection12$1,075,026
FY 2020Department of Transportation17$1,969,224
FY 2020Department of Environmental Protection8$1,028,630
FY 2019Department of Transportation31$4,458,325
FY 2019Department of Environmental Protection10$1,051,296
FY 2018Department of Transportation35$4,058,694
FY 2018Department of Environmental Protection11$1,359,030
FY 2018Department of Design and Construction2$2,367
FY 2017Department of Transportation23$2,085,128
FY 2017Department of Environmental Protection24$1,556,777
FY 2017Department of Design and Construction6$112,690
FY 2016Department of Transportation37$2,419,782
FY 2016Department of Environmental Protection14$1,088,288
FY 2015Department of Transportation40$2,465,473
FY 2015Department of Environmental Protection19$1,010,147
FY 2015Department of Design and Construction1$53
FY 2014Department of Transportation24$1,075,857
FY 2014Department of Environmental Protection14$547,397
FY 2013Department of Transportation17$770,215
FY 2013Department of Design and Construction9$248,825
FY 2013Department of Environmental Protection3$139,429
FY 2012Department of Transportation13$696,372
Total471$37,673,408

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL10$536,873Aug 21, 2012 Dec 19, 2022
OTHER EXPENDITURES-GENERAL1$52,589Mar 27, 2023 Mar 27, 2023
IOTB CONSTRUCTION221$24,516,057Jul 11, 2016 Jun 17, 2025
N/A11$207,356Jul 12, 2016 May 16, 2023
PROMPT PAYMENT INTEREST4$160Feb 26, 2015 Dec 20, 2022
DESIGN-CONSULTANT-IOTB222$12,360,723Dec 27, 2011 Nov 13, 2018
<Non-Applicable Expenditure Object>2-$350Aug 21, 2012 Apr 16, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 10 of 10 payments$903,595
DateAgencyAmountCategoryPurchase order
Feb 26, 2025Department of Environmental Protection$308,090.05IOTB CONSTRUCTION
Jun 17, 2025Department of Environmental Protection$214,786.76IOTB CONSTRUCTION
Jul 23, 2024Department of Environmental Protection$120,248.12IOTB CONSTRUCTION
Feb 26, 2025Department of Environmental Protection$103,135.51IOTB CONSTRUCTION
Apr 7, 2025Department of Environmental Protection$68,974.26IOTB CONSTRUCTION
Feb 26, 2025Department of Environmental Protection$39,870.68IOTB CONSTRUCTION
Apr 7, 2025Department of Environmental Protection$23,089.66IOTB CONSTRUCTION
Apr 7, 2025Department of Transportation$13,113.69IOTB CONSTRUCTION
Feb 26, 2025Department of Environmental Protection$10,038.65IOTB CONSTRUCTION
Apr 7, 2025Department of Environmental Protection$2,247.42IOTB CONSTRUCTION
FY 2024top 17 of 17 payments$1,204,444
DateAgencyAmountCategoryPurchase order
Apr 17, 2024Department of Environmental Protection$371,689.80IOTB CONSTRUCTION
Jul 5, 2023Department of Environmental Protection$191,217.06IOTB CONSTRUCTION
Sep 13, 2023Department of Environmental Protection$181,045.36IOTB CONSTRUCTION
Aug 23, 2023Department of Transportation$124,984.19IOTB CONSTRUCTION
May 28, 2024Department of Environmental Protection$121,432.70IOTB CONSTRUCTION
Nov 13, 2023Department of Environmental Protection$65,455.63IOTB CONSTRUCTION
Feb 12, 2024Department of Environmental Protection$44,551.31IOTB CONSTRUCTION
Nov 13, 2023Department of Transportation$26,023.99IOTB CONSTRUCTION
Nov 13, 2023Department of Environmental Protection$23,394.43IOTB CONSTRUCTION
Feb 12, 2024Department of Environmental Protection$16,509.06IOTB CONSTRUCTION
Nov 13, 2023Department of Transportation$10,510.92IOTB CONSTRUCTION
Feb 12, 2024Department of Environmental Protection$9,629.32IOTB CONSTRUCTION
Nov 13, 2023Department of Environmental Protection$9,587.17IOTB CONSTRUCTION
Feb 12, 2024Department of Environmental Protection$4,865.86IOTB CONSTRUCTION
Nov 13, 2023Department of Environmental Protection$1,966.49IOTB CONSTRUCTION
Feb 12, 2024Department of Transportation$791.81IOTB CONSTRUCTION
Apr 22, 2024Department of Transportation$788.93IOTB CONSTRUCTION
FY 2023top 20 of 25 payments$1,721,589
DateAgencyAmountCategoryPurchase order
Nov 22, 2022Department of Transportation$214,674.84CONTRACTUAL SERVICES GENERAL
Oct 11, 2022Department of Transportation$210,281.01IOTB CONSTRUCTION
Aug 1, 2022Department of Transportation$178,475.73IOTB CONSTRUCTION
Apr 17, 2023Department of Environmental Protection$148,918.86IOTB CONSTRUCTION
Jan 17, 2023Department of Environmental Protection$122,158.08IOTB CONSTRUCTION
Jan 30, 2023Department of Transportation$101,536.56IOTB CONSTRUCTION
Sep 23, 2022Department of Environmental Protection$75,736.41IOTB CONSTRUCTION
Aug 1, 2022Department of Environmental Protection$75,095.82IOTB CONSTRUCTION
Mar 20, 2023Department of Environmental Protection$75,013.74IOTB CONSTRUCTION
Dec 19, 2022Department of Transportation$73,198.15CONTRACTUAL SERVICES GENERAL
May 30, 2023Department of Transportation$68,758.38IOTB CONSTRUCTION
Nov 30, 2022Department of Environmental Protection$63,347.34IOTB CONSTRUCTION
Mar 27, 2023Department of Transportation$52,589.22OTHER EXPENDITURES-GENERAL
Nov 28, 2022Department of Transportation$50,328.00IOTB CONSTRUCTION
Dec 19, 2022Department of Transportation$42,738.41IOTB CONSTRUCTION
Mar 14, 2023Department of Design and Construction$34,545.38N/A
Mar 27, 2023Department of Transportation$33,035.73IOTB CONSTRUCTION
Nov 30, 2022Department of Transportation$24,970.89IOTB CONSTRUCTION
May 16, 2023Department of Design and Construction$20,790.00N/A
Nov 30, 2022Department of Environmental Protection$20,423.37IOTB CONSTRUCTION
FY 2022top 20 of 30 payments$2,477,384
DateAgencyAmountCategoryPurchase order
Dec 13, 2021Department of Transportation$312,383.65IOTB CONSTRUCTION
May 17, 2022Department of Transportation$220,038.30IOTB CONSTRUCTION
Jan 18, 2022Department of Transportation$210,043.13IOTB CONSTRUCTION
Oct 5, 2021Department of Transportation$195,290.37IOTB CONSTRUCTION
Jan 25, 2022Department of Environmental Protection$169,449.84IOTB CONSTRUCTION
Nov 15, 2021Department of Transportation$114,443.50IOTB CONSTRUCTION
Mar 23, 2022Department of Transportation$111,814.20IOTB CONSTRUCTION
Apr 4, 2022Department of Environmental Protection$104,064.30IOTB CONSTRUCTION
Oct 12, 2021Department of Environmental Protection$101,741.40IOTB CONSTRUCTION
May 25, 2022Department of Environmental Protection$89,751.05IOTB CONSTRUCTION
Nov 17, 2021Department of Transportation$88,984.50IOTB CONSTRUCTION
Feb 22, 2022Department of Environmental Protection$88,808.04IOTB CONSTRUCTION
Aug 31, 2021Department of Environmental Protection$78,144.75IOTB CONSTRUCTION
Aug 10, 2021Department of Environmental Protection$74,917.87IOTB CONSTRUCTION
Jul 21, 2021Department of Environmental Protection$67,905.00IOTB CONSTRUCTION
Aug 2, 2021Department of Transportation$65,097.54IOTB CONSTRUCTION
Jan 14, 2022Department of Transportation$57,132.00IOTB CONSTRUCTION
Feb 9, 2022Department of Transportation$56,300.00IOTB CONSTRUCTION
Dec 1, 2021Department of Transportation$47,787.90IOTB CONSTRUCTION
Dec 1, 2021Department of Transportation$45,859.11IOTB CONSTRUCTION
FY 2021top 20 of 31 payments$3,222,399
DateAgencyAmountCategoryPurchase order
Apr 28, 2021Department of Transportation$220,783.33IOTB CONSTRUCTION
Dec 18, 2020Department of Environmental Protection$167,548.32IOTB CONSTRUCTION
Jun 29, 2021Department of Transportation$167,175.00IOTB CONSTRUCTION
Sep 16, 2020Department of Transportation$164,214.01IOTB CONSTRUCTION
Dec 7, 2020Department of Transportation$160,767.63IOTB CONSTRUCTION
Mar 4, 2021Department of Environmental Protection$160,212.78IOTB CONSTRUCTION
Feb 8, 2021Department of Transportation$158,197.74IOTB CONSTRUCTION
Feb 11, 2021Department of Transportation$155,373.38IOTB CONSTRUCTION
Jul 23, 2020Department of Transportation$141,303.88IOTB CONSTRUCTION
Jan 20, 2021Department of Environmental Protection$141,260.40IOTB CONSTRUCTION
Sep 10, 2020Department of Transportation$135,576.50IOTB CONSTRUCTION
Jul 24, 2020Department of Transportation$134,384.00IOTB CONSTRUCTION
Jul 17, 2020Department of Transportation$130,946.06IOTB CONSTRUCTION
Apr 26, 2021Department of Transportation$130,392.00IOTB CONSTRUCTION
Nov 19, 2020Department of Transportation$111,054.52IOTB CONSTRUCTION
May 26, 2021Department of Environmental Protection$109,810.80IOTB CONSTRUCTION
Aug 5, 2020Department of Environmental Protection$106,003.98IOTB CONSTRUCTION
Apr 12, 2021Department of Environmental Protection$101,552.76IOTB CONSTRUCTION
Jun 29, 2021Department of Environmental Protection$99,418.14IOTB CONSTRUCTION
Feb 4, 2021Department of Transportation$98,691.80IOTB CONSTRUCTION
FY 2020top 20 of 25 payments$2,997,853
DateAgencyAmountCategoryPurchase order
Apr 1, 2020Department of Transportation$281,005.13IOTB CONSTRUCTION
Jul 29, 2019Department of Transportation$214,513.38IOTB CONSTRUCTION
Sep 25, 2019Department of Transportation$200,832.29IOTB CONSTRUCTION
Sep 30, 2019Department of Transportation$170,780.00IOTB CONSTRUCTION
Dec 2, 2019Department of Environmental Protection$170,061.44IOTB CONSTRUCTION
Feb 11, 2020Department of Environmental Protection$165,726.86IOTB CONSTRUCTION
Jul 3, 2019Department of Transportation$158,768.42IOTB CONSTRUCTION
Jun 1, 2020Department of Transportation$158,253.00IOTB CONSTRUCTION
Apr 1, 2020Department of Environmental Protection$153,602.32IOTB CONSTRUCTION
Jul 1, 2019Department of Transportation$145,744.20IOTB CONSTRUCTION
Mar 30, 2020Department of Transportation$131,227.25IOTB CONSTRUCTION
Jul 3, 2019Department of Environmental Protection$129,739.48IOTB CONSTRUCTION
Jun 8, 2020Department of Environmental Protection$125,073.40IOTB CONSTRUCTION
Aug 14, 2019Department of Environmental Protection$120,760.78IOTB CONSTRUCTION
May 20, 2020Department of Transportation$120,555.00IOTB CONSTRUCTION
Nov 25, 2019Department of Transportation$118,728.00IOTB CONSTRUCTION
Sep 30, 2019Department of Environmental Protection$82,035.66IOTB CONSTRUCTION
Sep 30, 2019Department of Environmental Protection$81,629.62IOTB CONSTRUCTION
Feb 4, 2020Department of Transportation$80,484.75IOTB CONSTRUCTION
Jul 3, 2019Department of Transportation$58,869.58IOTB CONSTRUCTION
FY 2019top 20 of 41 payments$5,509,621
DateAgencyAmountCategoryPurchase order
Jan 10, 2019Department of Transportation$754,036.41IOTB CONSTRUCTION
Mar 25, 2019Department of Transportation$391,874.42IOTB CONSTRUCTION
Sep 11, 2018Department of Transportation$373,448.75IOTB CONSTRUCTION
Jan 22, 2019Department of Transportation$313,239.81IOTB CONSTRUCTION
May 20, 2019Department of Environmental Protection$297,593.98IOTB CONSTRUCTION
Dec 10, 2018Department of Transportation$291,657.13IOTB CONSTRUCTION
Dec 17, 2018Department of Transportation$226,478.00IOTB CONSTRUCTION
Sep 18, 2018Department of Transportation$199,657.65IOTB CONSTRUCTION
Aug 27, 2018Department of Environmental Protection$164,561.13IOTB CONSTRUCTION
Jun 3, 2019Department of Transportation$163,131.25IOTB CONSTRUCTION
Jul 30, 2018Department of Transportation$150,349.34IOTB CONSTRUCTION
Jan 22, 2019Department of Transportation$149,423.86IOTB CONSTRUCTION
Feb 25, 2019Department of Transportation$149,032.14IOTB CONSTRUCTION
Oct 3, 2018Department of Environmental Protection$148,064.31IOTB CONSTRUCTION
May 20, 2019Department of Transportation$141,244.02IOTB CONSTRUCTION
May 20, 2019Department of Environmental Protection$140,777.97IOTB CONSTRUCTION
Aug 27, 2018Department of Transportation$127,998.00IOTB CONSTRUCTION
Jan 22, 2019Department of Transportation$101,145.25IOTB CONSTRUCTION
Mar 4, 2019Department of Transportation$94,986.00IOTB CONSTRUCTION
Apr 17, 2019Department of Transportation$89,840.34IOTB CONSTRUCTION
FY 2018top 20 of 48 payments$5,420,091
DateAgencyAmountCategoryPurchase order
May 29, 2018Department of Environmental Protection$404,604.55IOTB CONSTRUCTION
Jul 1, 2017Department of Transportation$352,314.40IOTB CONSTRUCTION
Oct 30, 2017Department of Transportation$328,973.40IOTB CONSTRUCTION
Feb 20, 2018Department of Transportation$314,762.43IOTB CONSTRUCTION
Jun 5, 2018Department of Transportation$301,012.68IOTB CONSTRUCTION
Nov 27, 2017Department of Transportation$300,472.15IOTB CONSTRUCTION
Jan 2, 2018Department of Transportation$274,856.15IOTB CONSTRUCTION
Feb 7, 2018Department of Transportation$265,549.50IOTB CONSTRUCTION
Dec 18, 2017Department of Environmental Protection$246,984.26IOTB CONSTRUCTION
Jul 19, 2017Department of Transportation$188,381.88IOTB CONSTRUCTION
Aug 23, 2017Department of Environmental Protection$166,333.80IOTB CONSTRUCTION
Oct 25, 2017Department of Environmental Protection$163,295.74IOTB CONSTRUCTION
Dec 19, 2017Department of Transportation$160,609.75IOTB CONSTRUCTION
Jul 10, 2017Department of Transportation$156,389.89IOTB CONSTRUCTION
May 29, 2018Department of Transportation$143,385.25IOTB CONSTRUCTION
Nov 21, 2017Department of Transportation$143,137.91IOTB CONSTRUCTION
Dec 18, 2017Department of Environmental Protection$130,444.94IOTB CONSTRUCTION
Aug 31, 2017Department of Transportation$126,657.88IOTB CONSTRUCTION
Apr 16, 2018Department of Transportation$99,954.00IOTB CONSTRUCTION
Nov 22, 2017Department of Transportation$91,351.46IOTB CONSTRUCTION
FY 2017top 20 of 53 payments$3,754,594
DateAgencyAmountCategoryPurchase order
Feb 13, 2017Department of Transportation$350,299.54IOTB CONSTRUCTION
Apr 11, 2017Department of Environmental Protection$257,297.04IOTB CONSTRUCTION
Mar 22, 2017Department of Transportation$176,480.25IOTB CONSTRUCTION
May 17, 2017Department of Transportation$174,556.63IOTB CONSTRUCTION
Feb 22, 2017Department of Transportation$152,083.50IOTB CONSTRUCTION
Oct 11, 2016Department of Environmental Protection$142,886.16DESIGN-CONSULTANT-IOTB
Aug 31, 2016Department of Environmental Protection$140,080.05DESIGN-CONSULTANT-IOTB
Nov 28, 2016Department of Environmental Protection$134,041.50DESIGN-CONSULTANT-IOTB
Feb 22, 2017Department of Environmental Protection$127,325.77IOTB CONSTRUCTION
Aug 8, 2016Department of Transportation$123,569.50DESIGN-CONSULTANT-IOTB
Feb 22, 2017Department of Transportation$114,488.50IOTB CONSTRUCTION
May 1, 2017Department of Transportation$108,109.88IOTB CONSTRUCTION
Jan 9, 2017Department of Environmental Protection$98,751.55DESIGN-CONSULTANT-IOTB
Sep 19, 2016Department of Transportation$95,018.25DESIGN-CONSULTANT-IOTB
Oct 31, 2016Department of Transportation$93,670.75DESIGN-CONSULTANT-IOTB
Jan 30, 2017Department of Transportation$90,641.13DESIGN-CONSULTANT-IOTB
Feb 22, 2017Department of Environmental Protection$88,343.23IOTB CONSTRUCTION
Mar 6, 2017Department of Environmental Protection$86,720.77DESIGN-CONSULTANT-IOTB
Aug 31, 2016Department of Transportation$85,631.54DESIGN-CONSULTANT-IOTB
Feb 13, 2017Department of Transportation$68,137.90IOTB CONSTRUCTION
FY 2016top 20 of 51 payments$3,508,070
DateAgencyAmountCategoryPurchase order
Aug 10, 2015Department of Transportation$281,288.10DESIGN-CONSULTANT-IOTB
Apr 11, 2016Department of Environmental Protection$247,913.53DESIGN-CONSULTANT-IOTB
May 11, 2016Department of Transportation$184,650.91DESIGN-CONSULTANT-IOTB
Mar 15, 2016Department of Transportation$172,983.73DESIGN-CONSULTANT-IOTB
Feb 22, 2016Department of Transportation$167,868.00DESIGN-CONSULTANT-IOTB
May 11, 2016Department of Transportation$159,474.23DESIGN-CONSULTANT-IOTB
Aug 10, 2015Department of Environmental Protection$151,170.32DESIGN-CONSULTANT-IOTB
May 10, 2016Department of Environmental Protection$141,862.45DESIGN-CONSULTANT-IOTB
Jan 11, 2016Department of Transportation$134,281.34DESIGN-CONSULTANT-IOTB
Apr 19, 2016Department of Transportation$119,610.00DESIGN-CONSULTANT-IOTB
May 31, 2016Department of Transportation$108,345.63DESIGN-CONSULTANT-IOTB
Jul 13, 2015Department of Transportation$103,971.48DESIGN-CONSULTANT-IOTB
Jun 27, 2016Department of Environmental Protection$101,739.60DESIGN-CONSULTANT-IOTB
Aug 3, 2015Department of Environmental Protection$91,591.33DESIGN-CONSULTANT-IOTB
Apr 11, 2016Department of Environmental Protection$87,923.25DESIGN-CONSULTANT-IOTB
Nov 23, 2015Department of Transportation$79,084.48DESIGN-CONSULTANT-IOTB
Oct 26, 2015Department of Transportation$74,805.04DESIGN-CONSULTANT-IOTB
Apr 25, 2016Department of Transportation$72,203.96DESIGN-CONSULTANT-IOTB
Sep 21, 2015Department of Transportation$66,861.04DESIGN-CONSULTANT-IOTB
Aug 17, 2015Department of Transportation$63,678.20DESIGN-CONSULTANT-IOTB
FY 2015top 20 of 60 payments$3,475,673
DateAgencyAmountCategoryPurchase order
Mar 23, 2015Department of Transportation$223,661.92DESIGN-CONSULTANT-IOTB
Feb 3, 2015Department of Transportation$143,325.12DESIGN-CONSULTANT-IOTB
May 26, 2015Department of Transportation$135,987.32DESIGN-CONSULTANT-IOTB
Feb 6, 2015Department of Transportation$113,694.23DESIGN-CONSULTANT-IOTB
Mar 3, 2015Department of Transportation$106,324.50DESIGN-CONSULTANT-IOTB
Dec 8, 2014Department of Environmental Protection$99,276.42DESIGN-CONSULTANT-IOTB
Dec 19, 2014Department of Transportation$97,967.56DESIGN-CONSULTANT-IOTB
Oct 21, 2014Department of Transportation$88,650.94DESIGN-CONSULTANT-IOTB
Feb 2, 2015Department of Environmental Protection$86,813.75DESIGN-CONSULTANT-IOTB
Mar 3, 2015Department of Environmental Protection$81,662.66DESIGN-CONSULTANT-IOTB
Jun 29, 2015Department of Transportation$80,612.51DESIGN-CONSULTANT-IOTB
Mar 25, 2015Department of Transportation$77,625.92DESIGN-CONSULTANT-IOTB
Mar 9, 2015Department of Environmental Protection$76,822.86DESIGN-CONSULTANT-IOTB
Nov 24, 2014Department of Transportation$75,735.55DESIGN-CONSULTANT-IOTB
Apr 8, 2015Department of Transportation$73,473.78DESIGN-CONSULTANT-IOTB
Mar 9, 2015Department of Transportation$73,294.98DESIGN-CONSULTANT-IOTB
May 26, 2015Department of Transportation$73,028.97DESIGN-CONSULTANT-IOTB
Jun 24, 2015Department of Transportation$70,471.98DESIGN-CONSULTANT-IOTB
Apr 22, 2015Department of Transportation$66,797.12DESIGN-CONSULTANT-IOTB
Sep 23, 2014Department of Transportation$66,076.19DESIGN-CONSULTANT-IOTB
FY 2014top 20 of 38 payments$1,623,254
DateAgencyAmountCategoryPurchase order
Jan 15, 2014Department of Transportation$119,188.70DESIGN-CONSULTANT-IOTB
May 19, 2014Department of Transportation$80,610.88DESIGN-CONSULTANT-IOTB
Feb 19, 2014Department of Transportation$71,164.16DESIGN-CONSULTANT-IOTB
Dec 17, 2013Department of Environmental Protection$64,647.14DESIGN-CONSULTANT-IOTB
Jun 16, 2014Department of Transportation$59,478.32DESIGN-CONSULTANT-IOTB
Apr 21, 2014Department of Transportation$58,875.20DESIGN-CONSULTANT-IOTB
Jun 16, 2014Department of Transportation$58,136.83DESIGN-CONSULTANT-IOTB
Jul 15, 2013Department of Transportation$56,185.93DESIGN-CONSULTANT-IOTB
Sep 9, 2013Department of Transportation$53,875.64DESIGN-CONSULTANT-IOTB
May 19, 2014Department of Transportation$53,520.00DESIGN-CONSULTANT-IOTB
Aug 7, 2013Department of Transportation$52,616.10DESIGN-CONSULTANT-IOTB
Jan 27, 2014Department of Transportation$51,626.24DESIGN-CONSULTANT-IOTB
Jul 8, 2013Department of Transportation$50,891.33DESIGN-CONSULTANT-IOTB
Apr 21, 2014Department of Transportation$48,524.80DESIGN-CONSULTANT-IOTB
Oct 8, 2013Department of Transportation$47,360.13DESIGN-CONSULTANT-IOTB
Jan 27, 2014Department of Environmental Protection$46,903.41DESIGN-CONSULTANT-IOTB
Nov 12, 2013Department of Environmental Protection$45,561.10DESIGN-CONSULTANT-IOTB
Sep 9, 2013Department of Environmental Protection$42,744.46DESIGN-CONSULTANT-IOTB
Mar 17, 2014Department of Environmental Protection$42,212.15DESIGN-CONSULTANT-IOTB
Apr 7, 2014Department of Environmental Protection$42,055.17DESIGN-CONSULTANT-IOTB
FY 2013top 20 of 29 payments$1,158,469
DateAgencyAmountCategoryPurchase order
May 20, 2013Department of Transportation$83,949.96DESIGN-CONSULTANT-IOTB
Sep 4, 2012Department of Design and Construction$82,369.47CONTRACTUAL SERVICES GENERAL
Jul 17, 2012Department of Transportation$74,336.02DESIGN-CONSULTANT-IOTB
Apr 22, 2013Department of Transportation$74,267.84DESIGN-CONSULTANT-IOTB
Mar 5, 2013Department of Transportation$66,584.96DESIGN-CONSULTANT-IOTB
Apr 1, 2013Department of Environmental Protection$55,173.42DESIGN-CONSULTANT-IOTB
Sep 17, 2012Department of Design and Construction$51,857.11CONTRACTUAL SERVICES GENERAL
Jan 22, 2013Department of Transportation$51,219.20DESIGN-CONSULTANT-IOTB
Aug 21, 2012Department of Transportation$49,293.50DESIGN-CONSULTANT-IOTB
Dec 4, 2012Department of Transportation$49,251.67DESIGN-CONSULTANT-IOTB
Jul 23, 2012Department of Transportation$47,943.32DESIGN-CONSULTANT-IOTB
Dec 4, 2012Department of Transportation$45,130.56DESIGN-CONSULTANT-IOTB
Apr 29, 2013Department of Environmental Protection$42,744.46DESIGN-CONSULTANT-IOTB
May 15, 2013Department of Environmental Protection$41,511.30DESIGN-CONSULTANT-IOTB
Dec 19, 2012Department of Transportation$40,941.44DESIGN-CONSULTANT-IOTB
Oct 9, 2012Department of Design and Construction$38,363.85CONTRACTUAL SERVICES GENERAL
Sep 18, 2012Department of Transportation$34,700.16DESIGN-CONSULTANT-IOTB
Oct 15, 2012Department of Transportation$32,181.60DESIGN-CONSULTANT-IOTB
Jan 22, 2013Department of Transportation$31,812.72DESIGN-CONSULTANT-IOTB
Aug 20, 2012Department of Transportation$30,327.44DESIGN-CONSULTANT-IOTB
FY 2012top 13 of 13 payments$696,372
DateAgencyAmountCategoryPurchase order
Dec 27, 2011Department of Transportation$114,819.05DESIGN-CONSULTANT-IOTB
Jun 11, 2012Department of Transportation$98,185.31DESIGN-CONSULTANT-IOTB
May 14, 2012Department of Transportation$60,630.43DESIGN-CONSULTANT-IOTB
Feb 21, 2012Department of Transportation$59,282.85DESIGN-CONSULTANT-IOTB
Apr 23, 2012Department of Transportation$58,307.64DESIGN-CONSULTANT-IOTB
May 14, 2012Department of Transportation$57,254.74DESIGN-CONSULTANT-IOTB
Apr 16, 2012Department of Transportation$49,846.70DESIGN-CONSULTANT-IOTB
Feb 6, 2012Department of Transportation$48,811.19DESIGN-CONSULTANT-IOTB
Mar 28, 2012Department of Transportation$42,795.11DESIGN-CONSULTANT-IOTB
Jun 11, 2012Department of Transportation$34,634.56DESIGN-CONSULTANT-IOTB
Mar 12, 2012Department of Transportation$31,402.64DESIGN-CONSULTANT-IOTB
Jan 31, 2012Department of Transportation$21,628.09DESIGN-CONSULTANT-IOTB
Feb 6, 2012Department of Transportation$18,773.47DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
Jun 17, 2025Department of Environmental Protection$214,786.76IOTB CONSTRUCTIONCapital Contracts
Apr 7, 2025Department of Transportation$13,113.69IOTB CONSTRUCTIONCapital Contracts
Apr 7, 2025Department of Environmental Protection$68,974.26IOTB CONSTRUCTIONCapital Contracts
Apr 7, 2025Department of Environmental Protection$2,247.42IOTB CONSTRUCTIONCapital Contracts
Apr 7, 2025Department of Environmental Protection$23,089.66IOTB CONSTRUCTIONCapital Contracts
Feb 26, 2025Department of Environmental Protection$103,135.51IOTB CONSTRUCTIONCapital Contracts
Feb 26, 2025Department of Environmental Protection$308,090.05IOTB CONSTRUCTIONCapital Contracts
Feb 26, 2025Department of Environmental Protection$39,870.68IOTB CONSTRUCTIONCapital Contracts
Feb 26, 2025Department of Environmental Protection$10,038.65IOTB CONSTRUCTIONCapital Contracts
Jul 23, 2024Department of Environmental Protection$120,248.12IOTB CONSTRUCTIONCapital Contracts
May 28, 2024Department of Environmental Protection$121,432.70IOTB CONSTRUCTIONCapital Contracts
Apr 22, 2024Department of Transportation$788.93IOTB CONSTRUCTIONCapital Contracts
Apr 17, 2024Department of Environmental Protection$371,689.80IOTB CONSTRUCTIONCapital Contracts
Feb 12, 2024Department of Environmental Protection$16,509.06IOTB CONSTRUCTIONCapital Contracts
Feb 12, 2024Department of Environmental Protection$44,551.31IOTB CONSTRUCTIONCapital Contracts
Feb 12, 2024Department of Environmental Protection$4,865.86IOTB CONSTRUCTIONCapital Contracts
Feb 12, 2024Department of Environmental Protection$9,629.32IOTB CONSTRUCTIONCapital Contracts
Feb 12, 2024Department of Transportation$791.81IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Environmental Protection$9,587.17IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Environmental Protection$23,394.43IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Environmental Protection$1,966.49IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Environmental Protection$65,455.63IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Transportation$26,023.99IOTB CONSTRUCTIONCapital Contracts
Nov 13, 2023Department of Transportation$10,510.92IOTB CONSTRUCTIONCapital Contracts
Sep 13, 2023Department of Environmental Protection$181,045.36IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Transportation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data