Doyle-Baldante Inc: New York City Government Payments

as recorded by New York City: DOYLE-BALDANTE INC

Doyle-Baldante Inc is the 1,397th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 177th in IOTB CONSTRUCTION spending. Its payments amount to 0.4% of everything the Department of Parks and Recreation has paid vendors in that span. Payments to it fell 96.6% year over year.

Primary spending category: IOTB CONSTRUCTION

$33,635,381total received
354payments
2agencies
Feb 23, 2010May 19, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Doyle-Baldante Inc. No spam.

Payments by fiscal year

FY 2025$99,381
FY 2024$2,890,996
FY 2023$1,131,770
FY 2022$2,349,083
FY 2021$1,091,519
FY 2020$2,213,104
FY 2019$3,218,862
FY 2018$3,304,215
FY 2017$2,794,409
FY 2016$3,376,956
FY 2015$1,709,768
FY 2014$1,913,914
FY 2013$1,735,353
FY 2012$2,793,448
FY 2011$2,330,477
FY 2010$682,125

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Parks and Recreation7$99,381
FY 2024Department of Parks and Recreation25$2,890,996
FY 2023Department of Parks and Recreation3$1,131,770
FY 2022Department of Parks and Recreation5$2,349,083
FY 2021Department of Parks and Recreation18$1,091,519
FY 2020Department of Parks and Recreation22$2,213,104
FY 2019Department of Parks and Recreation15$3,218,862
FY 2018Department of Parks and Recreation23$3,282,156
FY 2018Department of Environmental Protection2$22,058
FY 2017Department of Parks and Recreation30$2,375,300
FY 2017Department of Environmental Protection2$419,110
FY 2016Department of Parks and Recreation29$3,376,956
FY 2015Department of Parks and Recreation20$1,559,302
FY 2015Department of Environmental Protection19$150,466
FY 2014Department of Parks and Recreation20$1,372,798
FY 2014Department of Environmental Protection6$541,116
FY 2013Department of Environmental Protection13$1,491,922
FY 2013Department of Parks and Recreation24$243,431
FY 2012Department of Parks and Recreation40$2,793,448
FY 2011Department of Parks and Recreation26$2,330,477
FY 2010Department of Parks and Recreation5$682,125
Total354$33,635,381

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
IOTB CONSTRUCTION334$33,638,202Feb 23, 2010 May 19, 2025
PROMPT PAYMENT INTEREST11$154Apr 8, 2021 May 1, 2024
<Non-Applicable Expenditure Object>9-$2,975Dec 19, 2011 Mar 18, 2019

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 7 of 7 payments$99,381
DateAgencyAmountCategoryPurchase order
May 19, 2025Department of Parks and Recreation$29,774.32IOTB CONSTRUCTION
Sep 9, 2024Department of Parks and Recreation$29,130.51IOTB CONSTRUCTION
Sep 9, 2024Department of Parks and Recreation$18,600.00IOTB CONSTRUCTION
Sep 9, 2024Department of Parks and Recreation$18,414.00IOTB CONSTRUCTION
May 19, 2025Department of Parks and Recreation$2,038.24IOTB CONSTRUCTION
Sep 9, 2024Department of Parks and Recreation$748.31IOTB CONSTRUCTION
May 19, 2025Department of Parks and Recreation$675.68IOTB CONSTRUCTION
FY 2024top 20 of 25 payments$2,890,996
DateAgencyAmountCategoryPurchase order
Dec 4, 2023Department of Parks and Recreation$1,235,273.00IOTB CONSTRUCTION
Jan 23, 2024Department of Parks and Recreation$578,161.98IOTB CONSTRUCTION
Aug 28, 2023Department of Parks and Recreation$504,534.87IOTB CONSTRUCTION
Apr 10, 2024Department of Parks and Recreation$162,598.44IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$85,305.19IOTB CONSTRUCTION
Apr 11, 2024Department of Parks and Recreation$65,014.37IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$60,180.52IOTB CONSTRUCTION
Jan 23, 2024Department of Parks and Recreation$38,414.85IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$35,550.83IOTB CONSTRUCTION
Jul 17, 2023Department of Parks and Recreation$31,912.15IOTB CONSTRUCTION
Apr 11, 2024Department of Parks and Recreation$26,554.46IOTB CONSTRUCTION
Apr 11, 2024Department of Parks and Recreation$26,389.04IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$26,269.70IOTB CONSTRUCTION
Jan 23, 2024Department of Parks and Recreation$5,004.03IOTB CONSTRUCTION
Dec 4, 2023Department of Parks and Recreation$4,753.83IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$2,332.96IOTB CONSTRUCTION
Jul 6, 2023Department of Parks and Recreation$1,265.66IOTB CONSTRUCTION
Apr 11, 2024Department of Parks and Recreation$902.22IOTB CONSTRUCTION
Apr 11, 2024Department of Parks and Recreation$250.20IOTB CONSTRUCTION
Apr 10, 2024Department of Parks and Recreation$200.16IOTB CONSTRUCTION
FY 2023top 3 of 3 payments$1,131,770
DateAgencyAmountCategoryPurchase order
Jun 26, 2023Department of Parks and Recreation$501,391.71IOTB CONSTRUCTION
Aug 22, 2022Department of Parks and Recreation$323,616.25IOTB CONSTRUCTION
Aug 22, 2022Department of Parks and Recreation$306,762.22IOTB CONSTRUCTION
FY 2022top 5 of 5 payments$2,349,083
DateAgencyAmountCategoryPurchase order
Jan 11, 2022Department of Parks and Recreation$1,143,429.79IOTB CONSTRUCTION
Jun 1, 2022Department of Parks and Recreation$675,465.82IOTB CONSTRUCTION
Nov 22, 2021Department of Parks and Recreation$499,124.35IOTB CONSTRUCTION
Nov 22, 2021Department of Parks and Recreation$19,917.04IOTB CONSTRUCTION
Nov 22, 2021Department of Parks and Recreation$11,145.98IOTB CONSTRUCTION
FY 2021top 18 of 18 payments$1,091,519
DateAgencyAmountCategoryPurchase order
Aug 26, 2020Department of Parks and Recreation$686,964.66IOTB CONSTRUCTION
Oct 5, 2020Department of Parks and Recreation$211,773.53IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$43,208.36IOTB CONSTRUCTION
Mar 18, 2021Department of Parks and Recreation$29,803.99IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$23,612.82IOTB CONSTRUCTION
Mar 5, 2021Department of Parks and Recreation$22,754.50IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$17,250.00IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$16,239.00IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$14,120.98IOTB CONSTRUCTION
Mar 5, 2021Department of Parks and Recreation$10,000.00IOTB CONSTRUCTION
Mar 19, 2021Department of Parks and Recreation$8,330.71IOTB CONSTRUCTION
Mar 5, 2021Department of Parks and Recreation$7,433.52IOTB CONSTRUCTION
Apr 8, 2021Department of Parks and Recreation$9.38PROMPT PAYMENT INTEREST
Apr 8, 2021Department of Parks and Recreation$5.12PROMPT PAYMENT INTEREST
Apr 8, 2021Department of Parks and Recreation$3.75PROMPT PAYMENT INTEREST
Apr 8, 2021Department of Parks and Recreation$3.52PROMPT PAYMENT INTEREST
Apr 8, 2021Department of Parks and Recreation$3.06PROMPT PAYMENT INTEREST
Apr 8, 2021Department of Parks and Recreation$1.81PROMPT PAYMENT INTEREST
FY 2020top 20 of 22 payments$2,213,104
DateAgencyAmountCategoryPurchase order
Jan 2, 2020Department of Parks and Recreation$820,958.84IOTB CONSTRUCTION
May 21, 2020Department of Parks and Recreation$448,643.68IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$327,750.00IOTB CONSTRUCTION
Nov 13, 2019Department of Parks and Recreation$268,298.52IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$158,283.54IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$29,609.75IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$20,605.24IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$19,055.03IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$18,065.32IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$16,719.69IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$15,000.00IOTB CONSTRUCTION
Sep 9, 2019Department of Parks and Recreation$14,972.50IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$14,402.25IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$13,739.90IOTB CONSTRUCTION
Sep 9, 2019Department of Parks and Recreation$4,975.56IOTB CONSTRUCTION
Sep 9, 2019Department of Parks and Recreation$4,882.44IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$4,559.20IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$4,550.00IOTB CONSTRUCTION
Sep 9, 2019Department of Parks and Recreation$3,000.00IOTB CONSTRUCTION
Sep 16, 2019Department of Parks and Recreation$2,600.00IOTB CONSTRUCTION
FY 2019top 15 of 15 payments$3,218,862
DateAgencyAmountCategoryPurchase order
Oct 22, 2018Department of Parks and Recreation$562,585.15IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$432,335.50IOTB CONSTRUCTION
Jul 18, 2018Department of Parks and Recreation$391,499.47IOTB CONSTRUCTION
Dec 17, 2018Department of Parks and Recreation$362,045.67IOTB CONSTRUCTION
Aug 28, 2018Department of Parks and Recreation$343,241.22IOTB CONSTRUCTION
Oct 22, 2018Department of Parks and Recreation$273,642.75IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$261,058.10IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$227,861.58IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$190,000.00IOTB CONSTRUCTION
Oct 22, 2018Department of Parks and Recreation$86,450.00IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$49,400.00IOTB CONSTRUCTION
May 28, 2019Department of Parks and Recreation$22,030.67IOTB CONSTRUCTION
May 28, 2019Department of Parks and Recreation$10,411.90IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation$6,650.00IOTB CONSTRUCTION
Mar 18, 2019Department of Parks and Recreation-$350.00<Non-Applicable Expenditure Object>
FY 2018top 20 of 25 payments$3,304,215
DateAgencyAmountCategoryPurchase order
Nov 20, 2017Department of Parks and Recreation$762,920.19IOTB CONSTRUCTION
Oct 18, 2017Department of Parks and Recreation$633,603.26IOTB CONSTRUCTION
Sep 13, 2017Department of Parks and Recreation$600,170.98IOTB CONSTRUCTION
Jun 5, 2018Department of Parks and Recreation$317,674.16IOTB CONSTRUCTION
Jul 17, 2017Department of Parks and Recreation$315,934.10IOTB CONSTRUCTION
Jun 5, 2018Department of Parks and Recreation$285,000.00IOTB CONSTRUCTION
Dec 20, 2017Department of Parks and Recreation$196,826.03IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$33,347.54IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$31,656.37IOTB CONSTRUCTION
Jun 6, 2018Department of Parks and Recreation$18,364.89IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$18,123.02IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$16,628.11IOTB CONSTRUCTION
Oct 18, 2017Department of Parks and Recreation$15,238.95IOTB CONSTRUCTION
Jun 11, 2018Department of Environmental Protection$13,917.68IOTB CONSTRUCTION
Apr 23, 2018Department of Parks and Recreation$13,879.60IOTB CONSTRUCTION
Oct 16, 2017Department of Parks and Recreation$12,035.15IOTB CONSTRUCTION
Jun 11, 2018Department of Environmental Protection$8,140.72IOTB CONSTRUCTION
Jun 6, 2018Department of Parks and Recreation$4,178.91IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$3,338.35IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$1,700.00IOTB CONSTRUCTION
FY 2017top 20 of 32 payments$2,794,409
DateAgencyAmountCategoryPurchase order
Dec 21, 2016Department of Parks and Recreation$825,362.69IOTB CONSTRUCTION
Jul 20, 2016Department of Parks and Recreation$402,389.49IOTB CONSTRUCTION
May 17, 2017Department of Environmental Protection$264,435.86IOTB CONSTRUCTION
Aug 29, 2016Department of Parks and Recreation$228,779.59IOTB CONSTRUCTION
Sep 14, 2016Department of Parks and Recreation$203,712.90IOTB CONSTRUCTION
Oct 31, 2016Department of Parks and Recreation$165,466.89IOTB CONSTRUCTION
Feb 21, 2017Department of Environmental Protection$154,673.74IOTB CONSTRUCTION
Mar 6, 2017Department of Parks and Recreation$89,998.55IOTB CONSTRUCTION
May 17, 2017Department of Parks and Recreation$63,428.65IOTB CONSTRUCTION
Sep 14, 2016Department of Parks and Recreation$45,894.50IOTB CONSTRUCTION
Mar 7, 2017Department of Parks and Recreation$44,681.00IOTB CONSTRUCTION
Mar 6, 2017Department of Parks and Recreation$37,247.21IOTB CONSTRUCTION
May 17, 2017Department of Parks and Recreation$32,300.00IOTB CONSTRUCTION
Mar 6, 2017Department of Parks and Recreation$28,930.80IOTB CONSTRUCTION
Mar 6, 2017Department of Parks and Recreation$24,132.71IOTB CONSTRUCTION
Mar 8, 2017Department of Parks and Recreation$21,160.54IOTB CONSTRUCTION
Mar 7, 2017Department of Parks and Recreation$19,916.98IOTB CONSTRUCTION
May 17, 2017Department of Parks and Recreation$18,700.27IOTB CONSTRUCTION
Feb 6, 2017Department of Parks and Recreation$16,867.33IOTB CONSTRUCTION
Mar 7, 2017Department of Parks and Recreation$16,638.75IOTB CONSTRUCTION
FY 2016top 20 of 29 payments$3,376,956
DateAgencyAmountCategoryPurchase order
Jul 27, 2015Department of Parks and Recreation$712,500.00IOTB CONSTRUCTION
Nov 25, 2015Department of Parks and Recreation$707,696.92IOTB CONSTRUCTION
Oct 6, 2015Department of Parks and Recreation$652,150.32IOTB CONSTRUCTION
Mar 2, 2016Department of Parks and Recreation$389,542.55IOTB CONSTRUCTION
Jun 1, 2016Department of Parks and Recreation$320,479.23IOTB CONSTRUCTION
Jul 27, 2015Department of Parks and Recreation$244,794.56IOTB CONSTRUCTION
Feb 29, 2016Department of Parks and Recreation$178,591.55IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$37,500.00IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$24,246.70IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$19,644.11IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$19,359.93IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$15,046.56IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$12,883.92IOTB CONSTRUCTION
Jul 27, 2015Department of Parks and Recreation$10,842.17IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$10,000.79IOTB CONSTRUCTION
Jul 22, 2015Department of Parks and Recreation$6,754.13IOTB CONSTRUCTION
Jul 22, 2015Department of Parks and Recreation$6,409.89IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$3,129.98IOTB CONSTRUCTION
Mar 7, 2016Department of Parks and Recreation$1,971.29IOTB CONSTRUCTION
Jul 22, 2015Department of Parks and Recreation$1,792.64IOTB CONSTRUCTION
FY 2015top 20 of 39 payments$1,709,768
DateAgencyAmountCategoryPurchase order
Jan 5, 2015Department of Parks and Recreation$460,687.20IOTB CONSTRUCTION
Jun 23, 2015Department of Parks and Recreation$367,838.57IOTB CONSTRUCTION
Dec 1, 2014Department of Parks and Recreation$285,884.73IOTB CONSTRUCTION
May 5, 2015Department of Parks and Recreation$181,265.09IOTB CONSTRUCTION
Dec 9, 2014Department of Parks and Recreation$98,337.17IOTB CONSTRUCTION
Apr 13, 2015Department of Parks and Recreation$59,469.61IOTB CONSTRUCTION
Apr 13, 2015Department of Parks and Recreation$37,454.52IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$23,105.34IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$21,196.64IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$18,875.99IOTB CONSTRUCTION
Dec 15, 2014Department of Parks and Recreation$17,149.56IOTB CONSTRUCTION
Dec 15, 2014Department of Parks and Recreation$16,622.44IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$11,905.15IOTB CONSTRUCTION
Oct 22, 2014Department of Environmental Protection$11,353.85IOTB CONSTRUCTION
Aug 8, 2014Department of Environmental Protection$10,661.56IOTB CONSTRUCTION
Aug 8, 2014Department of Environmental Protection$10,056.39IOTB CONSTRUCTION
Oct 22, 2014Department of Environmental Protection$9,801.28IOTB CONSTRUCTION
May 5, 2015Department of Parks and Recreation$8,750.00IOTB CONSTRUCTION
Aug 8, 2014Department of Environmental Protection$8,546.95IOTB CONSTRUCTION
Aug 8, 2014Department of Environmental Protection$8,000.00IOTB CONSTRUCTION
FY 2014top 20 of 26 payments$1,913,914
DateAgencyAmountCategoryPurchase order
Oct 16, 2013Department of Parks and Recreation$325,841.69IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$316,417.00IOTB CONSTRUCTION
Dec 10, 2013Department of Parks and Recreation$313,801.74IOTB CONSTRUCTION
Jan 21, 2014Department of Parks and Recreation$241,156.78IOTB CONSTRUCTION
May 19, 2014Department of Parks and Recreation$119,567.70IOTB CONSTRUCTION
Jan 21, 2014Department of Parks and Recreation$112,615.20IOTB CONSTRUCTION
Nov 25, 2013Department of Parks and Recreation$111,799.76IOTB CONSTRUCTION
Aug 28, 2013Department of Environmental Protection$79,197.03IOTB CONSTRUCTION
Dec 10, 2013Department of Parks and Recreation$65,218.80IOTB CONSTRUCTION
Aug 28, 2013Department of Environmental Protection$59,846.00IOTB CONSTRUCTION
Aug 28, 2013Department of Environmental Protection$47,181.25IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$25,556.73IOTB CONSTRUCTION
Mar 17, 2014Department of Parks and Recreation$25,280.44IOTB CONSTRUCTION
Nov 25, 2013Department of Parks and Recreation$16,158.31IOTB CONSTRUCTION
Nov 12, 2013Department of Parks and Recreation$13,458.14IOTB CONSTRUCTION
Jul 3, 2013Department of Environmental Protection$12,918.34IOTB CONSTRUCTION
May 19, 2014Department of Parks and Recreation$7,760.67IOTB CONSTRUCTION
Mar 17, 2014Department of Parks and Recreation$5,544.00IOTB CONSTRUCTION
Mar 17, 2014Department of Parks and Recreation$5,266.80IOTB CONSTRUCTION
Dec 10, 2013Department of Parks and Recreation$2,445.52IOTB CONSTRUCTION
FY 2013top 20 of 37 payments$1,735,353
DateAgencyAmountCategoryPurchase order
Oct 9, 2012Department of Environmental Protection$402,736.11IOTB CONSTRUCTION
Jan 30, 2013Department of Environmental Protection$353,789.07IOTB CONSTRUCTION
Nov 26, 2012Department of Environmental Protection$349,387.20IOTB CONSTRUCTION
May 15, 2013Department of Environmental Protection$226,197.91IOTB CONSTRUCTION
Oct 30, 2012Department of Parks and Recreation$85,372.96IOTB CONSTRUCTION
Jan 22, 2013Department of Environmental Protection$40,770.19IOTB CONSTRUCTION
Jan 30, 2013Department of Environmental Protection$37,043.17IOTB CONSTRUCTION
Jan 17, 2013Department of Parks and Recreation$26,061.13IOTB CONSTRUCTION
Jan 30, 2013Department of Environmental Protection$25,350.00IOTB CONSTRUCTION
Nov 26, 2012Department of Environmental Protection$19,984.98IOTB CONSTRUCTION
Jan 17, 2013Department of Parks and Recreation$19,899.00IOTB CONSTRUCTION
Dec 3, 2012Department of Parks and Recreation$19,305.00IOTB CONSTRUCTION
Oct 24, 2012Department of Parks and Recreation$17,313.42IOTB CONSTRUCTION
Oct 24, 2012Department of Parks and Recreation$12,650.00IOTB CONSTRUCTION
Mar 12, 2013Department of Parks and Recreation$12,230.60IOTB CONSTRUCTION
Jan 30, 2013Department of Environmental Protection$11,780.00IOTB CONSTRUCTION
Oct 10, 2012Department of Parks and Recreation$11,763.74IOTB CONSTRUCTION
Nov 26, 2012Department of Environmental Protection$9,256.82IOTB CONSTRUCTION
Oct 24, 2012Department of Parks and Recreation$8,550.00IOTB CONSTRUCTION
Dec 3, 2012Department of Parks and Recreation$6,204.24IOTB CONSTRUCTION
FY 2012top 20 of 40 payments$2,793,448
DateAgencyAmountCategoryPurchase order
Jun 28, 2012Department of Parks and Recreation$584,659.75IOTB CONSTRUCTION
Dec 19, 2011Department of Parks and Recreation$281,647.01IOTB CONSTRUCTION
Oct 17, 2011Department of Parks and Recreation$266,334.17IOTB CONSTRUCTION
Aug 8, 2011Department of Parks and Recreation$254,181.01IOTB CONSTRUCTION
Aug 31, 2011Department of Parks and Recreation$250,694.45IOTB CONSTRUCTION
Jun 4, 2012Department of Parks and Recreation$240,350.00IOTB CONSTRUCTION
Jan 3, 2012Department of Parks and Recreation$162,450.00IOTB CONSTRUCTION
Sep 26, 2011Department of Parks and Recreation$116,397.87IOTB CONSTRUCTION
Aug 8, 2011Department of Parks and Recreation$81,736.86IOTB CONSTRUCTION
Dec 27, 2011Department of Parks and Recreation$61,100.50IOTB CONSTRUCTION
Jun 4, 2012Department of Parks and Recreation$57,324.79IOTB CONSTRUCTION
Jan 3, 2012Department of Parks and Recreation$47,500.00IOTB CONSTRUCTION
Jan 10, 2012Department of Parks and Recreation$41,803.48IOTB CONSTRUCTION
Jan 3, 2012Department of Parks and Recreation$39,900.00IOTB CONSTRUCTION
Apr 2, 2012Department of Parks and Recreation$39,600.00IOTB CONSTRUCTION
Oct 17, 2011Department of Parks and Recreation$32,126.15IOTB CONSTRUCTION
Jan 9, 2012Department of Parks and Recreation$28,113.83IOTB CONSTRUCTION
Sep 26, 2011Department of Parks and Recreation$24,230.53IOTB CONSTRUCTION
Jan 10, 2012Department of Parks and Recreation$23,535.18IOTB CONSTRUCTION
Aug 29, 2011Department of Parks and Recreation$22,026.92IOTB CONSTRUCTION
FY 2011top 20 of 26 payments$2,330,477
DateAgencyAmountCategoryPurchase order
Aug 18, 2010Department of Parks and Recreation$534,286.19IOTB CONSTRUCTION
Jun 20, 2011Department of Parks and Recreation$428,545.29IOTB CONSTRUCTION
Jan 11, 2011Department of Parks and Recreation$377,975.67IOTB CONSTRUCTION
Jul 12, 2010Department of Parks and Recreation$243,713.09IOTB CONSTRUCTION
Sep 20, 2010Department of Parks and Recreation$223,510.89IOTB CONSTRUCTION
Feb 22, 2011Department of Parks and Recreation$130,008.79IOTB CONSTRUCTION
Jun 20, 2011Department of Parks and Recreation$107,719.25IOTB CONSTRUCTION
Jun 20, 2011Department of Parks and Recreation$105,617.61IOTB CONSTRUCTION
Nov 15, 2010Department of Parks and Recreation$38,430.57IOTB CONSTRUCTION
Feb 15, 2011Department of Parks and Recreation$23,198.53IOTB CONSTRUCTION
Jul 6, 2010Department of Parks and Recreation$15,958.82IOTB CONSTRUCTION
Feb 15, 2011Department of Parks and Recreation$14,156.79IOTB CONSTRUCTION
Feb 15, 2011Department of Parks and Recreation$12,827.00IOTB CONSTRUCTION
Jun 20, 2011Department of Parks and Recreation$11,788.07IOTB CONSTRUCTION
Jun 20, 2011Department of Parks and Recreation$10,000.00IOTB CONSTRUCTION
Feb 15, 2011Department of Parks and Recreation$9,496.79IOTB CONSTRUCTION
Jul 21, 2010Department of Parks and Recreation$9,478.49IOTB CONSTRUCTION
Nov 15, 2010Department of Parks and Recreation$7,444.16IOTB CONSTRUCTION
Nov 15, 2010Department of Parks and Recreation$7,207.50IOTB CONSTRUCTION
Jan 11, 2011Department of Parks and Recreation$6,047.70IOTB CONSTRUCTION
FY 2010top 5 of 5 payments$682,125
DateAgencyAmountCategoryPurchase order
Feb 23, 2010Department of Parks and Recreation$225,750.71IOTB CONSTRUCTION
Jun 1, 2010Department of Parks and Recreation$180,439.11IOTB CONSTRUCTION
Mar 29, 2010Department of Parks and Recreation$158,973.01IOTB CONSTRUCTION
Apr 5, 2010Department of Parks and Recreation$73,734.35IOTB CONSTRUCTION
Feb 23, 2010Department of Parks and Recreation$43,228.20IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
May 19, 2025Department of Parks and Recreation$29,774.32IOTB CONSTRUCTIONCapital Contracts
May 19, 2025Department of Parks and Recreation$675.68IOTB CONSTRUCTIONCapital Contracts
May 19, 2025Department of Parks and Recreation$2,038.24IOTB CONSTRUCTIONCapital Contracts
Sep 9, 2024Department of Parks and Recreation$748.31IOTB CONSTRUCTIONCapital Contracts
Sep 9, 2024Department of Parks and Recreation$18,600.00IOTB CONSTRUCTIONCapital Contracts
Sep 9, 2024Department of Parks and Recreation$18,414.00IOTB CONSTRUCTIONCapital Contracts
Sep 9, 2024Department of Parks and Recreation$29,130.51IOTB CONSTRUCTIONCapital Contracts
May 1, 2024Department of Parks and Recreation$69.54PROMPT PAYMENT INTERESTContracts
May 1, 2024Department of Parks and Recreation$28.40PROMPT PAYMENT INTERESTContracts
May 1, 2024Department of Parks and Recreation$0.27PROMPT PAYMENT INTERESTContracts
May 1, 2024Department of Parks and Recreation$28.22PROMPT PAYMENT INTERESTContracts
May 1, 2024Department of Parks and Recreation$0.97PROMPT PAYMENT INTERESTContracts
Apr 11, 2024Department of Parks and Recreation$26,554.46IOTB CONSTRUCTIONCapital Contracts
Apr 11, 2024Department of Parks and Recreation$250.20IOTB CONSTRUCTIONCapital Contracts
Apr 11, 2024Department of Parks and Recreation$26,389.04IOTB CONSTRUCTIONCapital Contracts
Apr 11, 2024Department of Parks and Recreation$65,014.37IOTB CONSTRUCTIONCapital Contracts
Apr 11, 2024Department of Parks and Recreation$902.22IOTB CONSTRUCTIONCapital Contracts
Apr 10, 2024Department of Parks and Recreation$162,598.44IOTB CONSTRUCTIONCapital Contracts
Apr 10, 2024Department of Parks and Recreation$200.16IOTB CONSTRUCTIONCapital Contracts
Jan 23, 2024Department of Parks and Recreation$578,161.98IOTB CONSTRUCTIONCapital Contracts
Jan 23, 2024Department of Parks and Recreation$38,414.85IOTB CONSTRUCTIONCapital Contracts
Jan 23, 2024Department of Parks and Recreation$5,004.03IOTB CONSTRUCTIONCapital Contracts
Dec 4, 2023Department of Parks and Recreation$4,753.83IOTB CONSTRUCTIONCapital Contracts
Dec 4, 2023Department of Parks and Recreation$1,235,273.00IOTB CONSTRUCTIONCapital Contracts
Aug 28, 2023Department of Parks and Recreation$504,534.87IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Parks and Recreation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data