Laws Construction Corp.: New York City Government Payments

as recorded by New York City: LAWS CONSTRUCTION CORP.

Laws Construction Corp. is the 274th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 46th in IOTB CONSTRUCTION spending. Its payments amount to 1.9% of everything the Department of Parks and Recreation has paid vendors in that span. Payments to it rose 9.4% year over year.

Primary spending category: IOTB CONSTRUCTION

$243,910,804total received
1,664payments
6agencies
Jan 14, 2010Jun 9, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Laws Construction Corp.. No spam.

Payments by fiscal year

FY 2025$3,914,339
FY 2024$3,576,849
FY 2023$10,323,615
FY 2022$19,365,950
FY 2021$14,699,055
FY 2020$14,018,484
FY 2019$13,313,321
FY 2018$14,793,006
FY 2017$15,374,460
FY 2016$7,576,708
FY 2015$2,947,050
FY 2014$20,845,400
FY 2013$31,620,525
FY 2012$19,577,524
FY 2011$41,884,042
FY 2010$10,080,476

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Parks and Recreation18$3,914,339
FY 2024Department of Environmental Protection165$1,939,766
FY 2024Department of Parks and Recreation32$1,637,082
FY 2023Department of Parks and Recreation104$6,260,850
FY 2023Department of Environmental Protection66$3,910,093
FY 2023Department of Transportation14$147,546
FY 2023Fire Department4$3,627
FY 2023Department of Design and Construction1$1,500
FY 2022Department of Parks and Recreation59$11,741,779
FY 2022Department of Environmental Protection139$7,487,954
FY 2022Department of Transportation47$136,217
FY 2021Department of Parks and Recreation34$8,910,239
FY 2021Department of Environmental Protection56$5,419,021
FY 2021Department of Transportation56$369,795
FY 2020Department of Environmental Protection54$6,076,423
FY 2020Department of Parks and Recreation17$5,874,961
FY 2020Department of Transportation39$2,067,100
FY 2019Department of Environmental Protection59$8,195,003
FY 2019Department of Transportation67$4,127,876
FY 2019Department of Parks and Recreation7$990,443
FY 2018Department of Environmental Protection53$11,590,610
FY 2018Department of Transportation34$3,157,168
FY 2018Department of Design and Construction3$27,800
FY 2018Fire Department3$17,429
FY 2017Department of Environmental Protection51$9,712,782
FY 2017Department of Transportation61$5,609,772
FY 2017Fire Department1$51,484
FY 2017Department of Design and Construction6$421
FY 2016Department of Transportation41$4,266,274
FY 2016Department of Environmental Protection13$1,907,694
FY 2016Department of Parks and Recreation8$1,402,740
FY 2015Department of Environmental Protection11$1,574,842
FY 2015Department of Parks and Recreation21$1,372,208
FY 2014Department of Parks and Recreation45$20,773,963
FY 2014Department of Transportation10$71,437
FY 2013Department of Parks and Recreation100$31,544,195
FY 2013Department of Environmental Protection5$50,528
FY 2013Department of Sanitation2$16,456
FY 2013Department of Transportation1$9,347
FY 2012Department of Parks and Recreation67$19,264,086
FY 2012Department of Transportation19$172,796
FY 2012Department of Sanitation2$96,605
FY 2012Department of Environmental Protection4$44,037
FY 2011Department of Parks and Recreation43$41,477,918
FY 2011Department of Transportation9$190,714
FY 2011Department of Sanitation2$175,748
FY 2011Department of Environmental Protection1$39,662
FY 2010Department of Parks and Recreation5$9,682,096
FY 2010Department of Transportation3$327,020
FY 2010Department of Sanitation2$71,360
Total1,664$243,910,804

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL3$39,316Jul 21, 2014 Apr 10, 2023
CONSTRUCTION-BUILDINGS8$360,168Jan 19, 2010 Aug 22, 2012
DESIGN-CONSULTANT-IOTB5$327,274Dec 10, 2018 Dec 15, 2020
IOTB CONSTRUCTION1,632$243,163,585Jan 14, 2010 Jun 9, 2025
POLLUTION REMEDIATION OBLIGATIONS2$20,000Dec 10, 2018 Jun 10, 2019
PROMPT PAYMENT INTEREST12$1,161Jul 5, 2016 Aug 22, 2023
<Non-Applicable Expenditure Object>2-$700Jan 22, 2018 Jan 22, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 18 of 18 payments$3,914,339
DateAgencyAmountCategoryPurchase order
Jun 9, 2025Department of Parks and Recreation$1,539,523.96IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$711,534.32IOTB CONSTRUCTION
Sep 16, 2024Department of Parks and Recreation$292,461.02IOTB CONSTRUCTION
Jan 6, 2025Department of Parks and Recreation$248,971.11IOTB CONSTRUCTION
Jul 8, 2024Department of Parks and Recreation$219,675.15IOTB CONSTRUCTION
Dec 13, 2024Department of Parks and Recreation$208,209.71IOTB CONSTRUCTION
Feb 13, 2025Department of Parks and Recreation$167,517.54IOTB CONSTRUCTION
Aug 19, 2024Department of Parks and Recreation$126,470.44IOTB CONSTRUCTION
Mar 17, 2025Department of Parks and Recreation$122,884.55IOTB CONSTRUCTION
Mar 17, 2025Department of Parks and Recreation$81,215.25IOTB CONSTRUCTION
Oct 29, 2024Department of Parks and Recreation$57,701.66IOTB CONSTRUCTION
Mar 17, 2025Department of Parks and Recreation$31,748.81IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$28,525.00IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$27,098.75IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$26,950.00IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$8,913.97IOTB CONSTRUCTION
Feb 13, 2025Department of Parks and Recreation$8,468.27IOTB CONSTRUCTION
Apr 23, 2025Department of Parks and Recreation$6,469.80IOTB CONSTRUCTION
FY 2024top 20 of 197 payments$3,576,849
DateAgencyAmountCategoryPurchase order
Sep 5, 2023Department of Parks and Recreation$737,757.86IOTB CONSTRUCTION
Jul 10, 2023Department of Environmental Protection$597,475.68IOTB CONSTRUCTION
Oct 10, 2023Department of Parks and Recreation$244,692.46IOTB CONSTRUCTION
Aug 2, 2023Department of Parks and Recreation$191,169.14IOTB CONSTRUCTION
Apr 3, 2024Department of Environmental Protection$102,776.35IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$88,464.09IOTB CONSTRUCTION
Aug 28, 2023Department of Parks and Recreation$77,462.48IOTB CONSTRUCTION
Aug 28, 2023Department of Parks and Recreation$52,406.15IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$50,090.86IOTB CONSTRUCTION
Jan 31, 2024Department of Environmental Protection$42,621.65IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$42,206.65IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$42,149.39IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$41,200.06IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$37,988.44IOTB CONSTRUCTION
Aug 28, 2023Department of Parks and Recreation$35,025.58IOTB CONSTRUCTION
Nov 30, 2023Department of Parks and Recreation$34,838.18IOTB CONSTRUCTION
Jul 10, 2023Department of Environmental Protection$31,925.52IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$31,446.12IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$29,955.97IOTB CONSTRUCTION
Apr 5, 2024Department of Environmental Protection$29,370.42IOTB CONSTRUCTION
FY 2023top 20 of 189 payments$10,323,615
DateAgencyAmountCategoryPurchase order
Aug 25, 2022Department of Parks and Recreation$993,947.78IOTB CONSTRUCTION
Jul 15, 2022Department of Parks and Recreation$788,809.83IOTB CONSTRUCTION
Aug 3, 2022Department of Parks and Recreation$661,925.60IOTB CONSTRUCTION
Aug 2, 2022Department of Environmental Protection$468,532.54IOTB CONSTRUCTION
Sep 12, 2022Department of Environmental Protection$449,877.29IOTB CONSTRUCTION
Sep 19, 2022Department of Parks and Recreation$394,701.66IOTB CONSTRUCTION
Dec 12, 2022Department of Parks and Recreation$389,841.38IOTB CONSTRUCTION
Aug 15, 2022Department of Environmental Protection$355,408.96IOTB CONSTRUCTION
Nov 28, 2022Department of Parks and Recreation$338,000.00IOTB CONSTRUCTION
Nov 14, 2022Department of Environmental Protection$312,575.81IOTB CONSTRUCTION
Nov 3, 2022Department of Parks and Recreation$275,810.37IOTB CONSTRUCTION
Jul 11, 2022Department of Parks and Recreation$267,132.16IOTB CONSTRUCTION
Apr 10, 2023Department of Environmental Protection$236,567.98IOTB CONSTRUCTION
Jan 30, 2023Department of Environmental Protection$217,750.73IOTB CONSTRUCTION
Jan 25, 2023Department of Parks and Recreation$206,534.92IOTB CONSTRUCTION
Jan 3, 2023Department of Environmental Protection$202,137.21IOTB CONSTRUCTION
May 31, 2023Department of Parks and Recreation$202,010.41IOTB CONSTRUCTION
Oct 11, 2022Department of Environmental Protection$196,008.34IOTB CONSTRUCTION
May 9, 2023Department of Environmental Protection$161,424.11IOTB CONSTRUCTION
Aug 15, 2022Department of Parks and Recreation$137,000.00IOTB CONSTRUCTION
FY 2022top 20 of 245 payments$19,365,950
DateAgencyAmountCategoryPurchase order
Apr 4, 2022Department of Environmental Protection$951,725.83IOTB CONSTRUCTION
Jan 12, 2022Department of Parks and Recreation$852,701.52IOTB CONSTRUCTION
Dec 20, 2021Department of Parks and Recreation$837,864.70IOTB CONSTRUCTION
May 16, 2022Department of Environmental Protection$800,838.49IOTB CONSTRUCTION
Mar 9, 2022Department of Parks and Recreation$736,979.14IOTB CONSTRUCTION
Feb 23, 2022Department of Environmental Protection$721,780.34IOTB CONSTRUCTION
Nov 1, 2021Department of Parks and Recreation$710,832.94IOTB CONSTRUCTION
Nov 15, 2021Department of Parks and Recreation$641,302.60IOTB CONSTRUCTION
Jun 27, 2022Department of Environmental Protection$546,741.24IOTB CONSTRUCTION
Nov 9, 2021Department of Parks and Recreation$516,791.64IOTB CONSTRUCTION
Jan 24, 2022Department of Parks and Recreation$473,465.22IOTB CONSTRUCTION
Sep 23, 2021Department of Parks and Recreation$445,451.52IOTB CONSTRUCTION
Nov 22, 2021Department of Environmental Protection$427,205.57IOTB CONSTRUCTION
Jul 9, 2021Department of Parks and Recreation$402,327.43IOTB CONSTRUCTION
Sep 21, 2021Department of Environmental Protection$393,300.94IOTB CONSTRUCTION
Dec 21, 2021Department of Parks and Recreation$373,220.78IOTB CONSTRUCTION
Nov 22, 2021Department of Environmental Protection$371,405.87IOTB CONSTRUCTION
Jul 29, 2021Department of Parks and Recreation$361,198.13IOTB CONSTRUCTION
Oct 12, 2021Department of Parks and Recreation$324,363.11IOTB CONSTRUCTION
Feb 28, 2022Department of Parks and Recreation$308,718.18IOTB CONSTRUCTION
FY 2021top 20 of 146 payments$14,699,055
DateAgencyAmountCategoryPurchase order
Oct 8, 2020Department of Environmental Protection$1,680,817.55IOTB CONSTRUCTION
Sep 16, 2020Department of Parks and Recreation$1,445,837.02IOTB CONSTRUCTION
Jan 29, 2021Department of Parks and Recreation$743,334.69IOTB CONSTRUCTION
Jan 22, 2021Department of Parks and Recreation$530,638.21IOTB CONSTRUCTION
Dec 23, 2020Department of Parks and Recreation$514,620.81IOTB CONSTRUCTION
Dec 2, 2020Department of Parks and Recreation$505,898.47IOTB CONSTRUCTION
May 27, 2021Department of Parks and Recreation$500,204.22IOTB CONSTRUCTION
Nov 19, 2020Department of Environmental Protection$495,357.76IOTB CONSTRUCTION
Jan 29, 2021Department of Parks and Recreation$457,132.98IOTB CONSTRUCTION
Jun 7, 2021Department of Parks and Recreation$409,156.98IOTB CONSTRUCTION
Sep 14, 2020Department of Environmental Protection$366,639.49IOTB CONSTRUCTION
Apr 20, 2021Department of Parks and Recreation$355,877.54IOTB CONSTRUCTION
Mar 10, 2021Department of Parks and Recreation$352,777.97IOTB CONSTRUCTION
Nov 19, 2020Department of Environmental Protection$343,999.43IOTB CONSTRUCTION
Jun 28, 2021Department of Environmental Protection$329,778.13IOTB CONSTRUCTION
Sep 14, 2020Department of Environmental Protection$305,738.11IOTB CONSTRUCTION
Apr 20, 2021Department of Parks and Recreation$285,778.66IOTB CONSTRUCTION
Oct 5, 2020Department of Parks and Recreation$253,396.61IOTB CONSTRUCTION
Oct 21, 2020Department of Parks and Recreation$224,567.24IOTB CONSTRUCTION
Nov 13, 2020Department of Parks and Recreation$223,907.87IOTB CONSTRUCTION
FY 2020top 20 of 110 payments$14,018,484
DateAgencyAmountCategoryPurchase order
Jul 29, 2019Department of Parks and Recreation$1,471,787.15IOTB CONSTRUCTION
Dec 23, 2019Department of Parks and Recreation$995,716.71IOTB CONSTRUCTION
Nov 13, 2019Department of Parks and Recreation$665,486.07IOTB CONSTRUCTION
Nov 4, 2019Department of Environmental Protection$569,163.33IOTB CONSTRUCTION
Oct 3, 2019Department of Environmental Protection$558,037.48IOTB CONSTRUCTION
Feb 26, 2020Department of Parks and Recreation$524,175.63IOTB CONSTRUCTION
Mar 23, 2020Department of Environmental Protection$515,233.71IOTB CONSTRUCTION
Jul 8, 2019Department of Environmental Protection$419,239.47IOTB CONSTRUCTION
Jun 11, 2020Department of Parks and Recreation$395,730.76IOTB CONSTRUCTION
Jan 13, 2020Department of Environmental Protection$393,227.37IOTB CONSTRUCTION
Dec 2, 2019Department of Environmental Protection$392,473.50IOTB CONSTRUCTION
Mar 30, 2020Department of Parks and Recreation$323,853.59IOTB CONSTRUCTION
Jul 1, 2019Department of Transportation$323,366.73IOTB CONSTRUCTION
Oct 28, 2019Department of Parks and Recreation$314,622.91IOTB CONSTRUCTION
Jun 1, 2020Department of Environmental Protection$305,776.58IOTB CONSTRUCTION
Feb 12, 2020Department of Environmental Protection$281,999.73IOTB CONSTRUCTION
Aug 28, 2019Department of Environmental Protection$271,934.30IOTB CONSTRUCTION
Dec 16, 2019Department of Transportation$233,726.00IOTB CONSTRUCTION
Apr 20, 2020Department of Parks and Recreation$222,973.61IOTB CONSTRUCTION
Aug 19, 2019Department of Transportation$206,070.96IOTB CONSTRUCTION
FY 2019top 20 of 133 payments$13,313,321
DateAgencyAmountCategoryPurchase order
May 14, 2019Department of Environmental Protection$765,165.17IOTB CONSTRUCTION
May 14, 2019Department of Environmental Protection$746,916.69IOTB CONSTRUCTION
Feb 25, 2019Department of Environmental Protection$741,627.19IOTB CONSTRUCTION
Jan 7, 2019Department of Environmental Protection$585,402.39IOTB CONSTRUCTION
May 14, 2019Department of Environmental Protection$492,202.79IOTB CONSTRUCTION
Dec 28, 2018Department of Environmental Protection$435,229.57IOTB CONSTRUCTION
May 21, 2019Department of Transportation$400,427.56IOTB CONSTRUCTION
Aug 20, 2018Department of Environmental Protection$348,894.62IOTB CONSTRUCTION
Jun 17, 2019Department of Environmental Protection$345,673.19IOTB CONSTRUCTION
Apr 17, 2019Department of Environmental Protection$340,452.45IOTB CONSTRUCTION
Jul 5, 2018Department of Environmental Protection$336,985.96IOTB CONSTRUCTION
Jun 17, 2019Department of Environmental Protection$333,012.06IOTB CONSTRUCTION
Apr 16, 2019Department of Parks and Recreation$297,788.14IOTB CONSTRUCTION
Jul 11, 2018Department of Transportation$260,216.76IOTB CONSTRUCTION
May 29, 2019Department of Parks and Recreation$256,725.39IOTB CONSTRUCTION
Dec 10, 2018Department of Environmental Protection$254,909.54DESIGN-CONSULTANT-IOTB
Jan 7, 2019Department of Transportation$244,008.34IOTB CONSTRUCTION
Oct 1, 2018Department of Transportation$230,682.18IOTB CONSTRUCTION
Dec 31, 2018Department of Transportation$225,432.27IOTB CONSTRUCTION
Jul 17, 2018Department of Environmental Protection$225,181.87IOTB CONSTRUCTION
FY 2018top 20 of 93 payments$14,793,006
DateAgencyAmountCategoryPurchase order
Sep 12, 2017Department of Environmental Protection$1,873,826.05IOTB CONSTRUCTION
Dec 4, 2017Department of Environmental Protection$1,468,590.58IOTB CONSTRUCTION
Jan 2, 2018Department of Environmental Protection$1,433,861.23IOTB CONSTRUCTION
Aug 14, 2017Department of Environmental Protection$1,374,551.85IOTB CONSTRUCTION
Jul 11, 2017Department of Environmental Protection$1,340,356.50IOTB CONSTRUCTION
Jan 23, 2018Department of Environmental Protection$1,294,401.88IOTB CONSTRUCTION
Oct 10, 2017Department of Environmental Protection$756,329.37IOTB CONSTRUCTION
Jul 24, 2017Department of Transportation$453,400.05IOTB CONSTRUCTION
Feb 26, 2018Department of Environmental Protection$419,186.17IOTB CONSTRUCTION
Sep 26, 2017Department of Transportation$397,335.15IOTB CONSTRUCTION
Oct 30, 2017Department of Transportation$371,314.79IOTB CONSTRUCTION
Jul 5, 2017Department of Transportation$319,572.10IOTB CONSTRUCTION
Apr 3, 2018Department of Environmental Protection$284,665.73IOTB CONSTRUCTION
Aug 28, 2017Department of Transportation$235,122.44IOTB CONSTRUCTION
May 23, 2018Department of Transportation$226,955.54IOTB CONSTRUCTION
Jun 18, 2018Department of Environmental Protection$225,469.30IOTB CONSTRUCTION
Dec 27, 2017Department of Transportation$178,238.08IOTB CONSTRUCTION
May 8, 2018Department of Environmental Protection$170,899.98IOTB CONSTRUCTION
Jan 22, 2018Department of Environmental Protection$157,385.29IOTB CONSTRUCTION
Mar 8, 2018Department of Environmental Protection$154,624.40IOTB CONSTRUCTION
FY 2017top 20 of 119 payments$15,374,460
DateAgencyAmountCategoryPurchase order
Nov 28, 2016Department of Environmental Protection$1,705,067.13IOTB CONSTRUCTION
Jun 6, 2017Department of Environmental Protection$1,175,404.90IOTB CONSTRUCTION
Oct 31, 2016Department of Environmental Protection$963,452.22IOTB CONSTRUCTION
Aug 12, 2016Department of Transportation$792,334.04IOTB CONSTRUCTION
Jun 26, 2017Department of Transportation$561,750.55IOTB CONSTRUCTION
Jul 5, 2016Department of Transportation$549,379.60IOTB CONSTRUCTION
Jan 17, 2017Department of Environmental Protection$539,510.92IOTB CONSTRUCTION
Jan 17, 2017Department of Environmental Protection$522,193.63IOTB CONSTRUCTION
Feb 13, 2017Department of Environmental Protection$510,736.95IOTB CONSTRUCTION
Apr 11, 2017Department of Transportation$446,343.94IOTB CONSTRUCTION
Sep 26, 2016Department of Environmental Protection$385,507.86IOTB CONSTRUCTION
Feb 13, 2017Department of Environmental Protection$378,845.64IOTB CONSTRUCTION
Apr 11, 2017Department of Environmental Protection$376,547.84IOTB CONSTRUCTION
May 30, 2017Department of Transportation$362,042.48IOTB CONSTRUCTION
Mar 13, 2017Department of Environmental Protection$357,770.38IOTB CONSTRUCTION
Sep 21, 2016Department of Transportation$327,311.98IOTB CONSTRUCTION
May 11, 2017Department of Environmental Protection$319,267.23IOTB CONSTRUCTION
Nov 28, 2016Department of Environmental Protection$313,099.16IOTB CONSTRUCTION
Oct 28, 2016Department of Transportation$306,656.61IOTB CONSTRUCTION
Sep 26, 2016Department of Environmental Protection$271,700.95IOTB CONSTRUCTION
FY 2016top 20 of 62 payments$7,576,708
DateAgencyAmountCategoryPurchase order
Jun 14, 2016Department of Transportation$797,281.78IOTB CONSTRUCTION
Mar 28, 2016Department of Parks and Recreation$791,923.27IOTB CONSTRUCTION
Nov 30, 2015Department of Transportation$391,303.91IOTB CONSTRUCTION
Oct 20, 2015Department of Environmental Protection$355,073.76IOTB CONSTRUCTION
Feb 2, 2016Department of Transportation$346,992.47IOTB CONSTRUCTION
Jul 7, 2015Department of Environmental Protection$343,638.96IOTB CONSTRUCTION
Aug 24, 2015Department of Environmental Protection$287,842.88IOTB CONSTRUCTION
Mar 21, 2016Department of Transportation$261,242.58IOTB CONSTRUCTION
Aug 27, 2015Department of Parks and Recreation$255,000.87IOTB CONSTRUCTION
Nov 30, 2015Department of Transportation$254,142.45IOTB CONSTRUCTION
Dec 16, 2015Department of Environmental Protection$250,389.59IOTB CONSTRUCTION
Jun 20, 2016Department of Environmental Protection$249,017.73IOTB CONSTRUCTION
Sep 23, 2015Department of Environmental Protection$240,687.48IOTB CONSTRUCTION
Jan 4, 2016Department of Transportation$230,023.31IOTB CONSTRUCTION
Feb 2, 2016Department of Transportation$225,363.24IOTB CONSTRUCTION
Mar 21, 2016Department of Transportation$169,670.76IOTB CONSTRUCTION
Jan 4, 2016Department of Transportation$155,675.00IOTB CONSTRUCTION
Aug 27, 2015Department of Parks and Recreation$152,264.38IOTB CONSTRUCTION
Jan 4, 2016Department of Transportation$149,394.59IOTB CONSTRUCTION
Apr 25, 2016Department of Transportation$146,924.14IOTB CONSTRUCTION
FY 2015top 20 of 32 payments$2,947,050
DateAgencyAmountCategoryPurchase order
Dec 29, 2014Department of Environmental Protection$451,603.64IOTB CONSTRUCTION
Feb 9, 2015Department of Environmental Protection$431,418.38IOTB CONSTRUCTION
Aug 11, 2014Department of Parks and Recreation$426,342.46IOTB CONSTRUCTION
Jun 10, 2015Department of Environmental Protection$351,956.97IOTB CONSTRUCTION
Jul 7, 2014Department of Parks and Recreation$228,908.94IOTB CONSTRUCTION
Dec 1, 2014Department of Environmental Protection$212,394.15IOTB CONSTRUCTION
Aug 13, 2014Department of Parks and Recreation$210,341.95IOTB CONSTRUCTION
Jul 21, 2014Department of Parks and Recreation$157,599.88IOTB CONSTRUCTION
Oct 14, 2014Department of Parks and Recreation$132,809.62IOTB CONSTRUCTION
Oct 6, 2014Department of Parks and Recreation$71,313.95IOTB CONSTRUCTION
Feb 25, 2015Department of Environmental Protection$40,519.23IOTB CONSTRUCTION
Mar 24, 2015Department of Environmental Protection$36,324.26IOTB CONSTRUCTION
Oct 8, 2014Department of Parks and Recreation$33,860.10IOTB CONSTRUCTION
Nov 10, 2014Department of Parks and Recreation$27,318.49IOTB CONSTRUCTION
Oct 6, 2014Department of Parks and Recreation$22,726.34IOTB CONSTRUCTION
Feb 9, 2015Department of Environmental Protection$17,752.00IOTB CONSTRUCTION
Oct 6, 2014Department of Parks and Recreation$13,751.94IOTB CONSTRUCTION
Oct 21, 2014Department of Parks and Recreation$13,634.63IOTB CONSTRUCTION
Apr 29, 2015Department of Environmental Protection$12,218.16IOTB CONSTRUCTION
Dec 1, 2014Department of Environmental Protection$10,450.00IOTB CONSTRUCTION
FY 2014top 20 of 55 payments$20,845,400
DateAgencyAmountCategoryPurchase order
Oct 15, 2013Department of Parks and Recreation$3,061,326.10IOTB CONSTRUCTION
Aug 26, 2013Department of Parks and Recreation$2,501,675.08IOTB CONSTRUCTION
Feb 24, 2014Department of Parks and Recreation$2,170,375.38IOTB CONSTRUCTION
Nov 18, 2013Department of Parks and Recreation$2,038,681.08IOTB CONSTRUCTION
Jul 23, 2013Department of Parks and Recreation$1,675,500.00IOTB CONSTRUCTION
Feb 24, 2014Department of Parks and Recreation$1,267,318.77IOTB CONSTRUCTION
Dec 23, 2013Department of Parks and Recreation$1,028,000.00IOTB CONSTRUCTION
Jul 30, 2013Department of Parks and Recreation$636,000.00IOTB CONSTRUCTION
Mar 5, 2014Department of Parks and Recreation$617,162.28IOTB CONSTRUCTION
Sep 9, 2013Department of Parks and Recreation$600,824.92IOTB CONSTRUCTION
Oct 15, 2013Department of Parks and Recreation$473,619.72IOTB CONSTRUCTION
Dec 23, 2013Department of Parks and Recreation$445,000.00IOTB CONSTRUCTION
Mar 5, 2014Department of Parks and Recreation$439,210.22IOTB CONSTRUCTION
May 12, 2014Department of Parks and Recreation$392,481.39IOTB CONSTRUCTION
Oct 21, 2013Department of Parks and Recreation$382,500.00IOTB CONSTRUCTION
Apr 30, 2014Department of Parks and Recreation$325,703.03IOTB CONSTRUCTION
Nov 18, 2013Department of Parks and Recreation$274,089.45IOTB CONSTRUCTION
Jun 2, 2014Department of Parks and Recreation$265,650.07IOTB CONSTRUCTION
Jun 2, 2014Department of Parks and Recreation$222,448.79IOTB CONSTRUCTION
Nov 25, 2013Department of Parks and Recreation$215,200.02IOTB CONSTRUCTION
FY 2013top 20 of 108 payments$31,620,525
DateAgencyAmountCategoryPurchase order
Sep 26, 2012Department of Parks and Recreation$2,640,000.00IOTB CONSTRUCTION
Aug 8, 2012Department of Parks and Recreation$2,247,000.00IOTB CONSTRUCTION
May 15, 2013Department of Parks and Recreation$1,920,000.00IOTB CONSTRUCTION
Oct 31, 2012Department of Parks and Recreation$1,682,035.30IOTB CONSTRUCTION
Jul 9, 2012Department of Parks and Recreation$1,454,000.00IOTB CONSTRUCTION
Jan 2, 2013Department of Parks and Recreation$1,369,302.91IOTB CONSTRUCTION
Jul 9, 2012Department of Parks and Recreation$1,258,200.00IOTB CONSTRUCTION
Apr 8, 2013Department of Parks and Recreation$1,126,681.10IOTB CONSTRUCTION
Oct 31, 2012Department of Parks and Recreation$1,084,590.00IOTB CONSTRUCTION
Nov 28, 2012Department of Parks and Recreation$1,014,123.48IOTB CONSTRUCTION
Mar 4, 2013Department of Parks and Recreation$960,005.94IOTB CONSTRUCTION
Aug 8, 2012Department of Parks and Recreation$960,000.00IOTB CONSTRUCTION
Sep 26, 2012Department of Parks and Recreation$745,151.45IOTB CONSTRUCTION
Jun 19, 2013Department of Parks and Recreation$646,000.00IOTB CONSTRUCTION
Jun 24, 2013Department of Parks and Recreation$565,500.00IOTB CONSTRUCTION
Feb 25, 2013Department of Parks and Recreation$545,988.12IOTB CONSTRUCTION
Aug 8, 2012Department of Parks and Recreation$500,000.00IOTB CONSTRUCTION
Sep 26, 2012Department of Parks and Recreation$480,000.00IOTB CONSTRUCTION
Mar 4, 2013Department of Parks and Recreation$409,172.17IOTB CONSTRUCTION
Mar 4, 2013Department of Parks and Recreation$387,922.44IOTB CONSTRUCTION
FY 2012top 20 of 92 payments$19,577,524
DateAgencyAmountCategoryPurchase order
Oct 24, 2011Department of Parks and Recreation$1,918,000.00IOTB CONSTRUCTION
Apr 16, 2012Department of Parks and Recreation$1,762,000.00IOTB CONSTRUCTION
Sep 13, 2011Department of Parks and Recreation$1,752,000.00IOTB CONSTRUCTION
Apr 16, 2012Department of Parks and Recreation$1,735,000.00IOTB CONSTRUCTION
May 29, 2012Department of Parks and Recreation$1,552,728.00IOTB CONSTRUCTION
Feb 7, 2012Department of Parks and Recreation$1,296,000.00IOTB CONSTRUCTION
Jul 25, 2011Department of Parks and Recreation$1,259,868.61IOTB CONSTRUCTION
Nov 21, 2011Department of Parks and Recreation$1,254,000.00IOTB CONSTRUCTION
Mar 19, 2012Department of Parks and Recreation$928,200.00IOTB CONSTRUCTION
Jan 9, 2012Department of Parks and Recreation$780,000.00IOTB CONSTRUCTION
Mar 19, 2012Department of Parks and Recreation$524,000.00IOTB CONSTRUCTION
Jul 25, 2011Department of Parks and Recreation$436,747.62IOTB CONSTRUCTION
Mar 19, 2012Department of Parks and Recreation$325,906.17IOTB CONSTRUCTION
Jan 9, 2012Department of Parks and Recreation$300,000.00IOTB CONSTRUCTION
Feb 7, 2012Department of Parks and Recreation$298,763.07IOTB CONSTRUCTION
Jan 18, 2012Department of Parks and Recreation$285,569.82IOTB CONSTRUCTION
Sep 7, 2011Department of Parks and Recreation$276,000.00IOTB CONSTRUCTION
Oct 17, 2011Department of Parks and Recreation$260,733.00IOTB CONSTRUCTION
Jan 9, 2012Department of Parks and Recreation$230,000.00IOTB CONSTRUCTION
Apr 19, 2012Department of Parks and Recreation$214,756.65IOTB CONSTRUCTION
FY 2011top 20 of 55 payments$41,884,042
DateAgencyAmountCategoryPurchase order
Aug 30, 2010Department of Parks and Recreation$8,132,730.53IOTB CONSTRUCTION
Nov 1, 2010Department of Parks and Recreation$5,099,390.64IOTB CONSTRUCTION
Jan 31, 2011Department of Parks and Recreation$3,967,464.75IOTB CONSTRUCTION
Dec 20, 2010Department of Parks and Recreation$3,562,538.53IOTB CONSTRUCTION
Jul 21, 2010Department of Parks and Recreation$3,313,966.12IOTB CONSTRUCTION
Oct 4, 2010Department of Parks and Recreation$3,267,874.00IOTB CONSTRUCTION
Mar 7, 2011Department of Parks and Recreation$2,943,274.89IOTB CONSTRUCTION
Aug 26, 2010Department of Parks and Recreation$1,342,387.28IOTB CONSTRUCTION
Feb 14, 2011Department of Parks and Recreation$1,077,757.00IOTB CONSTRUCTION
Dec 20, 2010Department of Parks and Recreation$1,050,000.00IOTB CONSTRUCTION
Apr 6, 2011Department of Parks and Recreation$832,381.52IOTB CONSTRUCTION
Oct 4, 2010Department of Parks and Recreation$777,748.38IOTB CONSTRUCTION
May 31, 2011Department of Parks and Recreation$752,724.65IOTB CONSTRUCTION
Aug 26, 2010Department of Parks and Recreation$705,582.50IOTB CONSTRUCTION
Feb 14, 2011Department of Parks and Recreation$523,209.25IOTB CONSTRUCTION
Jun 21, 2011Department of Parks and Recreation$516,643.29IOTB CONSTRUCTION
Feb 24, 2011Department of Parks and Recreation$425,577.93IOTB CONSTRUCTION
Nov 22, 2010Department of Parks and Recreation$390,000.00IOTB CONSTRUCTION
Feb 24, 2011Department of Parks and Recreation$332,978.37IOTB CONSTRUCTION
Jul 2, 2010Department of Parks and Recreation$305,910.70IOTB CONSTRUCTION
FY 2010top 10 of 10 payments$10,080,476
DateAgencyAmountCategoryPurchase order
May 24, 2010Department of Parks and Recreation$6,276,589.07IOTB CONSTRUCTION
Apr 19, 2010Department of Parks and Recreation$1,682,116.65IOTB CONSTRUCTION
Mar 30, 2010Department of Parks and Recreation$681,089.83IOTB CONSTRUCTION
Feb 8, 2010Department of Parks and Recreation$657,106.74IOTB CONSTRUCTION
Feb 1, 2010Department of Parks and Recreation$385,193.23IOTB CONSTRUCTION
Jan 14, 2010Department of Transportation$284,029.01IOTB CONSTRUCTION
Jan 19, 2010Department of Sanitation$64,300.00CONSTRUCTION-BUILDINGS
Feb 8, 2010Department of Transportation$40,141.30IOTB CONSTRUCTION
Jan 19, 2010Department of Sanitation$7,060.20CONSTRUCTION-BUILDINGS
Mar 11, 2010Department of Transportation$2,850.00IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Jun 9, 2025Department of Parks and Recreation$1,539,523.96IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$8,913.97IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$711,534.32IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$28,525.00IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$27,098.75IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$26,950.00IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Parks and Recreation$6,469.80IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Parks and Recreation$122,884.55IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Parks and Recreation$31,748.81IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Parks and Recreation$81,215.25IOTB CONSTRUCTIONCapital Contracts
Feb 13, 2025Department of Parks and Recreation$8,468.27IOTB CONSTRUCTIONCapital Contracts
Feb 13, 2025Department of Parks and Recreation$167,517.54IOTB CONSTRUCTIONCapital Contracts
Jan 6, 2025Department of Parks and Recreation$248,971.11IOTB CONSTRUCTIONCapital Contracts
Dec 13, 2024Department of Parks and Recreation$208,209.71IOTB CONSTRUCTIONCapital Contracts
Oct 29, 2024Department of Parks and Recreation$57,701.66IOTB CONSTRUCTIONCapital Contracts
Sep 16, 2024Department of Parks and Recreation$292,461.02IOTB CONSTRUCTIONCapital Contracts
Aug 19, 2024Department of Parks and Recreation$126,470.44IOTB CONSTRUCTIONCapital Contracts
Jul 8, 2024Department of Parks and Recreation$219,675.15IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$42,206.65IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$10,700.64IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$1,293.91IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$50,090.86IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$45.90IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$3,340.61IOTB CONSTRUCTIONCapital Contracts
Apr 5, 2024Department of Environmental Protection$93.41IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Parks and Recreation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data