Ces Consultants, Inc.: New York City Government Payments

as recorded by New York City: CES CONSULTANTS, INC.

Ces Consultants, Inc. is the 1,373rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 25th in N/A spending. Its payments amount to 0.5% of everything the Department of Design and Construction has paid vendors in that span. Payments to it fell 65.2% year over year.

Primary spending category: N/A

$34,683,446total received
585payments
4agencies
Feb 10, 2014May 14, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Ces Consultants, Inc.. No spam.

Payments by fiscal year

FY 2025$276,681
FY 2024$795,372
FY 2023$1,322,060
FY 2022$4,035,269
FY 2021$6,604,830
FY 2020$4,219,346
FY 2019$5,057,670
FY 2018$4,697,977
FY 2017$4,597,199
FY 2016$2,216,806
FY 2015$448,501
FY 2014$411,736

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Environmental Protection13$276,681
FY 2024Department of Design and Construction3$558,207
FY 2024Department of Environmental Protection11$237,165
FY 2023Department of Design and Construction2$801,074
FY 2023Department of Environmental Protection13$520,986
FY 2022Department of Design and Construction61$3,291,532
FY 2022Department of Environmental Protection6$743,737
FY 2021Department of Design and Construction110$6,506,120
FY 2021Department of Environmental Protection1$98,710
FY 2020Department of Design and Construction75$3,993,631
FY 2020Department of Environmental Protection3$225,715
FY 2019Department of Design and Construction59$3,055,102
FY 2019Department of Transportation11$1,074,229
FY 2019Department of Environmental Protection15$799,193
FY 2019Department of Parks and Recreation1$129,145
FY 2018Department of Transportation13$2,015,222
FY 2018Department of Design and Construction40$1,558,707
FY 2018Department of Environmental Protection19$595,673
FY 2018Department of Parks and Recreation3$528,375
FY 2017Department of Design and Construction61$2,451,403
FY 2017Department of Environmental Protection15$1,088,163
FY 2017Department of Transportation6$1,057,633
FY 2016Department of Environmental Protection12$1,209,530
FY 2016Department of Design and Construction12$832,011
FY 2016Department of Transportation11$175,265
FY 2015Department of Transportation3$448,474
FY 2015Department of Design and Construction1$27
FY 2014Department of Transportation5$411,736
Total585$34,683,446

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
IOTB CONSTRUCTION42$5,560,649Mar 2, 2017 Jan 30, 2019
DESIGN-CONSULTANT-IOTB47$3,503,837Feb 10, 2014 Jul 26, 2018
PROMPT PAYMENT INTEREST1$27Jul 1, 2014 Jul 1, 2014
N/A495$25,618,933Feb 25, 2016 May 14, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 13 of 13 payments$276,681
DateAgencyAmountCategoryPurchase order
Apr 22, 2025Department of Environmental Protection$46,064.90N/A
Apr 22, 2025Department of Environmental Protection$33,600.28N/A
Jan 21, 2025Department of Environmental Protection$27,097.00N/A
Sep 17, 2024Department of Environmental Protection$22,388.52N/A
May 14, 2025Department of Environmental Protection$20,691.76N/A
Jan 21, 2025Department of Environmental Protection$20,593.72N/A
Nov 26, 2024Department of Environmental Protection$20,593.72N/A
Jul 2, 2024Department of Environmental Protection$20,353.60N/A
Nov 26, 2024Department of Environmental Protection$20,031.49N/A
Aug 27, 2024Department of Environmental Protection$19,741.00N/A
Apr 16, 2025Department of Environmental Protection$17,424.64N/A
Aug 13, 2024Department of Environmental Protection$5,922.30N/A
Apr 25, 2025Department of Environmental Protection$2,178.08N/A
FY 2024top 14 of 14 payments$795,372
DateAgencyAmountCategoryPurchase order
May 9, 2024Department of Design and Construction$377,185.21N/A
Dec 28, 2023Department of Design and Construction$104,811.41N/A
Feb 29, 2024Department of Design and Construction$76,210.64N/A
Feb 23, 2024Department of Environmental Protection$45,137.92N/A
Dec 15, 2023Department of Environmental Protection$43,972.04N/A
Aug 4, 2023Department of Environmental Protection$29,656.89N/A
Dec 13, 2023Department of Environmental Protection$23,769.25N/A
Oct 20, 2023Department of Environmental Protection$22,568.96N/A
Sep 1, 2023Department of Environmental Protection$21,427.81N/A
Oct 4, 2023Department of Environmental Protection$20,262.09N/A
Dec 22, 2023Department of Environmental Protection$20,193.28N/A
Jun 11, 2024Department of Environmental Protection$10,176.80N/A
Dec 13, 2023Department of Environmental Protection$0.00N/A
Dec 22, 2023Department of Environmental Protection$0.00N/A
FY 2023top 15 of 15 payments$1,322,060
DateAgencyAmountCategoryPurchase order
Jan 4, 2023Department of Design and Construction$786,230.89N/A
Jul 6, 2022Department of Environmental Protection$88,306.64N/A
Oct 21, 2022Department of Environmental Protection$77,441.62N/A
Aug 26, 2022Department of Environmental Protection$71,201.04N/A
Feb 24, 2023Department of Environmental Protection$48,926.23N/A
Jul 6, 2022Department of Environmental Protection$44,656.72N/A
Jul 29, 2022Department of Environmental Protection$43,542.40N/A
Jun 23, 2023Department of Environmental Protection$29,643.14N/A
Apr 7, 2023Department of Environmental Protection$27,241.25N/A
Sep 14, 2022Department of Environmental Protection$23,741.82N/A
May 24, 2023Department of Environmental Protection$22,992.80N/A
Dec 7, 2022Department of Environmental Protection$21,635.68N/A
Apr 7, 2023Department of Environmental Protection$21,617.44N/A
Jul 6, 2022Department of Design and Construction$14,843.40N/A
Mar 29, 2023Department of Environmental Protection$38.73N/A
FY 2022top 20 of 67 payments$4,035,269
DateAgencyAmountCategoryPurchase order
Sep 1, 2021Department of Environmental Protection$282,852.71N/A
Jul 14, 2021Department of Design and Construction$232,297.60N/A
Aug 18, 2021Department of Design and Construction$220,791.68N/A
Mar 9, 2022Department of Environmental Protection$191,880.48N/A
Nov 24, 2021Department of Environmental Protection$168,607.72N/A
Mar 9, 2022Department of Design and Construction$147,186.00N/A
Jul 14, 2021Department of Design and Construction$136,792.37N/A
Oct 15, 2021Department of Design and Construction$127,186.98N/A
Aug 12, 2021Department of Design and Construction$119,978.00N/A
Mar 2, 2022Department of Design and Construction$95,695.63N/A
Nov 24, 2021Department of Design and Construction$90,198.60N/A
Oct 6, 2021Department of Design and Construction$79,181.80N/A
Sep 29, 2021Department of Design and Construction$77,833.54N/A
Mar 30, 2022Department of Design and Construction$70,543.43N/A
Jan 5, 2022Department of Design and Construction$69,596.80N/A
Nov 24, 2021Department of Design and Construction$68,067.86N/A
Aug 5, 2021Department of Design and Construction$67,712.08N/A
Aug 25, 2021Department of Design and Construction$66,973.44N/A
Jul 23, 2021Department of Design and Construction$66,601.65N/A
Dec 22, 2021Department of Design and Construction$64,727.06N/A
FY 2021top 20 of 111 payments$6,604,830
DateAgencyAmountCategoryPurchase order
Apr 23, 2021Department of Design and Construction$344,833.50N/A
Jun 16, 2021Department of Design and Construction$319,730.80N/A
Mar 10, 2021Department of Design and Construction$175,172.47N/A
Dec 4, 2020Department of Design and Construction$166,253.80N/A
Oct 2, 2020Department of Design and Construction$165,744.34N/A
Jun 30, 2021Department of Design and Construction$164,646.32N/A
Nov 13, 2020Department of Design and Construction$161,039.40N/A
May 5, 2021Department of Design and Construction$151,918.60N/A
Jan 29, 2021Department of Design and Construction$145,423.48N/A
Dec 4, 2020Department of Design and Construction$143,739.05N/A
Sep 4, 2020Department of Design and Construction$133,548.84N/A
Sep 9, 2020Department of Design and Construction$130,130.01N/A
Mar 8, 2021Department of Design and Construction$124,843.24N/A
Mar 5, 2021Department of Design and Construction$119,640.54N/A
Mar 19, 2021Department of Design and Construction$114,671.86N/A
Mar 29, 2021Department of Design and Construction$113,932.02N/A
Apr 28, 2021Department of Design and Construction$103,864.75N/A
Jul 17, 2020Department of Design and Construction$100,166.15N/A
Apr 16, 2021Department of Environmental Protection$98,709.52N/A
Jul 24, 2020Department of Design and Construction$97,127.54N/A
FY 2020top 20 of 78 payments$4,219,346
DateAgencyAmountCategoryPurchase order
Jan 3, 2020Department of Design and Construction$140,601.70N/A
Feb 12, 2020Department of Design and Construction$121,792.45N/A
Oct 14, 2019Department of Design and Construction$117,292.52N/A
Nov 29, 2019Department of Design and Construction$112,913.58N/A
Feb 23, 2020Department of Design and Construction$108,372.41N/A
Jan 3, 2020Department of Design and Construction$106,797.10N/A
Aug 1, 2019Department of Design and Construction$103,498.18N/A
Jun 19, 2020Department of Design and Construction$97,885.90N/A
Mar 4, 2020Department of Design and Construction$97,792.97N/A
Oct 2, 2019Department of Design and Construction$96,874.88N/A
Jul 5, 2019Department of Environmental Protection$95,479.97N/A
Mar 16, 2020Department of Design and Construction$94,031.80N/A
Nov 6, 2019Department of Design and Construction$92,144.22N/A
Feb 17, 2020Department of Design and Construction$89,382.45N/A
Jan 17, 2020Department of Design and Construction$87,141.57N/A
Jun 19, 2020Department of Design and Construction$86,865.50N/A
Aug 23, 2019Department of Design and Construction$86,632.70N/A
Nov 14, 2019Department of Design and Construction$85,348.65N/A
Jan 3, 2020Department of Design and Construction$73,803.50N/A
Jun 19, 2020Department of Design and Construction$70,398.50N/A
FY 2019top 20 of 86 payments$5,057,670
DateAgencyAmountCategoryPurchase order
Jul 10, 2018Department of Design and Construction$321,431.53N/A
Oct 29, 2018Department of Transportation$208,683.59IOTB CONSTRUCTION
Jul 1, 2018Department of Environmental Protection$179,428.34IOTB CONSTRUCTION
Dec 20, 2018Department of Transportation$177,726.89IOTB CONSTRUCTION
Jul 12, 2018Department of Design and Construction$170,011.79N/A
Jan 30, 2019Department of Transportation$162,477.63IOTB CONSTRUCTION
Jul 19, 2018Department of Design and Construction$162,064.26N/A
Jan 11, 2019Department of Design and Construction$161,769.60N/A
Dec 10, 2018Department of Transportation$139,011.96IOTB CONSTRUCTION
May 31, 2019Department of Design and Construction$135,572.55N/A
Mar 6, 2019Department of Design and Construction$134,347.44N/A
Jul 16, 2018Department of Environmental Protection$129,600.00IOTB CONSTRUCTION
Dec 10, 2018Department of Transportation$129,157.39IOTB CONSTRUCTION
Nov 19, 2018Department of Parks and Recreation$129,145.41IOTB CONSTRUCTION
Aug 30, 2018Department of Transportation$112,845.72IOTB CONSTRUCTION
Aug 30, 2018Department of Transportation$111,498.34IOTB CONSTRUCTION
Jul 30, 2018Department of Environmental Protection$109,414.53IOTB CONSTRUCTION
Jun 24, 2019Department of Design and Construction$101,504.33N/A
Apr 5, 2019Department of Environmental Protection$98,566.14N/A
Feb 4, 2019Department of Design and Construction$90,692.90N/A
FY 2018top 20 of 75 payments$4,697,977
DateAgencyAmountCategoryPurchase order
Jun 6, 2018Department of Transportation$461,561.56IOTB CONSTRUCTION
Feb 20, 2018Department of Parks and Recreation$253,622.35IOTB CONSTRUCTION
Jun 25, 2018Department of Transportation$252,018.33IOTB CONSTRUCTION
Dec 14, 2017Department of Transportation$242,032.30IOTB CONSTRUCTION
Sep 15, 2017Department of Design and Construction$212,514.84N/A
Sep 27, 2017Department of Transportation$178,069.10IOTB CONSTRUCTION
Apr 6, 2018Department of Parks and Recreation$177,486.30IOTB CONSTRUCTION
Nov 6, 2017Department of Transportation$143,699.00IOTB CONSTRUCTION
Feb 28, 2018Department of Environmental Protection$141,710.33IOTB CONSTRUCTION
Jul 24, 2017Department of Transportation$138,437.60IOTB CONSTRUCTION
Jun 11, 2018Department of Transportation$120,632.88IOTB CONSTRUCTION
Jun 15, 2018Department of Design and Construction$115,736.95N/A
Jul 3, 2017Department of Transportation$101,147.65DESIGN-CONSULTANT-IOTB
Jun 11, 2018Department of Parks and Recreation$97,266.50IOTB CONSTRUCTION
Aug 28, 2017Department of Transportation$95,629.10IOTB CONSTRUCTION
Feb 22, 2018Department of Transportation$91,917.75IOTB CONSTRUCTION
Mar 30, 2018Department of Design and Construction$88,474.40N/A
Mar 2, 2018Department of Design and Construction$88,044.62N/A
Dec 22, 2017Department of Transportation$85,038.64IOTB CONSTRUCTION
Apr 30, 2018Department of Environmental Protection$81,095.70DESIGN-CONSULTANT-IOTB
FY 2017top 20 of 82 payments$4,597,199
DateAgencyAmountCategoryPurchase order
Jun 1, 2017Department of Transportation$533,795.80IOTB CONSTRUCTION
Dec 14, 2016Department of Environmental Protection$281,339.75DESIGN-CONSULTANT-IOTB
Jun 16, 2017Department of Transportation$186,664.70IOTB CONSTRUCTION
Sep 9, 2016Department of Environmental Protection$136,852.55DESIGN-CONSULTANT-IOTB
Oct 26, 2016Department of Environmental Protection$134,592.00DESIGN-CONSULTANT-IOTB
Dec 2, 2016Department of Design and Construction$122,649.80N/A
Apr 26, 2017Department of Transportation$122,623.35IOTB CONSTRUCTION
Mar 13, 2017Department of Design and Construction$113,150.80N/A
Jan 19, 2017Department of Design and Construction$107,999.75N/A
Feb 17, 2017Department of Design and Construction$106,863.40N/A
Jun 19, 2017Department of Transportation$95,613.50IOTB CONSTRUCTION
Sep 23, 2016Department of Environmental Protection$87,440.10DESIGN-CONSULTANT-IOTB
Jan 6, 2017Department of Design and Construction$71,609.70N/A
Jul 25, 2016Department of Environmental Protection$71,179.50DESIGN-CONSULTANT-IOTB
Jun 9, 2017Department of Design and Construction$67,198.50N/A
Jul 27, 2016Department of Environmental Protection$65,366.00DESIGN-CONSULTANT-IOTB
May 11, 2017Department of Transportation$63,873.20IOTB CONSTRUCTION
May 9, 2017Department of Design and Construction$63,195.00N/A
Jun 16, 2017Department of Design and Construction$61,632.80N/A
Jan 17, 2017Department of Environmental Protection$61,088.00DESIGN-CONSULTANT-IOTB
FY 2016top 20 of 35 payments$2,216,806
DateAgencyAmountCategoryPurchase order
May 18, 2016Department of Design and Construction$181,409.74N/A
Jan 21, 2016Department of Environmental Protection$179,138.60DESIGN-CONSULTANT-IOTB
Mar 3, 2016Department of Environmental Protection$172,418.35DESIGN-CONSULTANT-IOTB
Apr 4, 2016Department of Environmental Protection$153,284.95DESIGN-CONSULTANT-IOTB
Apr 20, 2016Department of Environmental Protection$125,954.60DESIGN-CONSULTANT-IOTB
Jun 2, 2016Department of Environmental Protection$117,525.39DESIGN-CONSULTANT-IOTB
Apr 1, 2016Department of Environmental Protection$98,670.00DESIGN-CONSULTANT-IOTB
May 16, 2016Department of Design and Construction$92,593.23N/A
Mar 11, 2016Department of Transportation$90,000.00DESIGN-CONSULTANT-IOTB
Apr 15, 2016Department of Design and Construction$86,477.65N/A
May 12, 2016Department of Design and Construction$78,998.40N/A
May 2, 2016Department of Design and Construction$78,998.40N/A
Jun 24, 2016Department of Design and Construction$78,591.50N/A
Jun 29, 2016Department of Environmental Protection$72,780.30DESIGN-CONSULTANT-IOTB
Jun 3, 2016Department of Environmental Protection$71,898.00DESIGN-CONSULTANT-IOTB
May 6, 2016Department of Environmental Protection$66,856.40DESIGN-CONSULTANT-IOTB
Feb 10, 2016Department of Environmental Protection$59,478.40DESIGN-CONSULTANT-IOTB
Jun 29, 2016Department of Environmental Protection$58,272.80DESIGN-CONSULTANT-IOTB
Jun 6, 2016Department of Design and Construction$53,254.50N/A
Jun 30, 2016Department of Design and Construction$51,184.00N/A
FY 2015top 4 of 4 payments$448,501
DateAgencyAmountCategoryPurchase order
Apr 17, 2015Department of Transportation$355,412.82DESIGN-CONSULTANT-IOTB
Jul 9, 2014Department of Transportation$62,118.80DESIGN-CONSULTANT-IOTB
Aug 8, 2014Department of Transportation$30,941.90DESIGN-CONSULTANT-IOTB
Jul 1, 2014Department of Design and Construction$27.09PROMPT PAYMENT INTEREST
FY 2014top 5 of 5 payments$411,736
DateAgencyAmountCategoryPurchase order
Mar 17, 2014Department of Transportation$130,649.50DESIGN-CONSULTANT-IOTB
Feb 10, 2014Department of Transportation$128,966.60DESIGN-CONSULTANT-IOTB
Jun 11, 2014Department of Transportation$51,577.13DESIGN-CONSULTANT-IOTB
Apr 14, 2014Department of Transportation$51,512.00DESIGN-CONSULTANT-IOTB
Apr 2, 2014Department of Transportation$49,030.40DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
May 14, 2025Department of Environmental Protection$20,691.76N/AContracts
Apr 25, 2025Department of Environmental Protection$2,178.08N/AContracts
Apr 22, 2025Department of Environmental Protection$46,064.90N/AContracts
Apr 22, 2025Department of Environmental Protection$33,600.28N/AContracts
Apr 16, 2025Department of Environmental Protection$17,424.64N/AContracts
Jan 21, 2025Department of Environmental Protection$27,097.00N/AContracts
Jan 21, 2025Department of Environmental Protection$20,593.72N/AContracts
Nov 26, 2024Department of Environmental Protection$20,031.49N/AContracts
Nov 26, 2024Department of Environmental Protection$20,593.72N/AContracts
Sep 17, 2024Department of Environmental Protection$22,388.52N/AContracts
Aug 27, 2024Department of Environmental Protection$19,741.00N/AContracts
Aug 13, 2024Department of Environmental Protection$5,922.30N/AContracts
Jul 2, 2024Department of Environmental Protection$20,353.60N/AContracts
Jun 11, 2024Department of Environmental Protection$10,176.80N/AContracts
May 9, 2024Department of Design and Construction$377,185.21N/AContracts
Feb 29, 2024Department of Design and Construction$76,210.64N/AContracts
Feb 23, 2024Department of Environmental Protection$45,137.92N/AContracts
Dec 28, 2023Department of Design and Construction$104,811.41N/AContracts
Dec 22, 2023Department of Environmental Protection$20,193.28N/AContracts
Dec 22, 2023Department of Environmental Protection$0.00N/AContracts
Dec 15, 2023Department of Environmental Protection$43,972.04N/AContracts
Dec 13, 2023Department of Environmental Protection$0.00N/AContracts
Dec 13, 2023Department of Environmental Protection$23,769.25N/AContracts
Oct 20, 2023Department of Environmental Protection$22,568.96N/AContracts
Oct 4, 2023Department of Environmental Protection$20,262.09N/AContracts

Other vendors serving Department of Design and Construction

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data