Condotte/De Moya JV, LLC: Florida Government Payments
as recorded by Florida: CONDOTTE/DE MOYA JV, LLC
Condotte/De Moya JV, LLC is the 340th-largest recipient of Florida state government payments tracked by SpendLedger, and ranks 4th in OTHER STRUCTURES AND IMPROVEMENTS spending. Its payments amount to 0.3% of everything the Department of Transportation has paid vendors in that span.
Primary spending category: OTHER STRUCTURES AND IMPROVEMENTS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2020 | Department of Transportation | 3 | $136,029 |
| FY 2019 | Department of Transportation | 2 | $940,500 |
| FY 2018 | Department of Transportation | 27 | $7,422,397 |
| FY 2017 | Department of Transportation | 41 | $28,780,743 |
| FY 2016 | Department of Transportation | 32 | $45,497,833 |
| FY 2015 | Department of Transportation | 26 | $49,679,366 |
| FY 2014 | Department of Transportation | 25 | $47,418,332 |
| FY 2013 | Department of Transportation | 16 | $45,636,607 |
| FY 2012 | Department of Transportation | 24 | $39,534,958 |
| FY 2011 | Department of Transportation | 19 | $61,248,705 |
| FY 2010 | Department of Transportation | 14 | $54,644,487 |
| FY 2009 | Department of Transportation | 8 | $28,125,924 |
| Total | 237 | $409,065,881 |
What the payments were for
Spending categories exactly as Florida state government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OTHER STRUCTURES AND IMPROVEMENTS | 106 | $276,609,015 | Dec 9, 2008 – Jun 20, 2014 |
| INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | 131 | $132,456,867 | Jul 31, 2014 – Dec 2, 2019 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2020top 3 of 3 payments$136,029
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 4, 2019 | Department of Transportation | $85,510.29 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 4, 2019 | Department of Transportation | $42,523.98 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 2, 2019 | Department of Transportation | $7,994.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2019top 2 of 2 payments$940,500
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 12, 2018 | Department of Transportation | $606,187.30 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 12, 2018 | Department of Transportation | $334,312.70 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2018top 20 of 27 payments$7,422,397
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 26, 2017 | Department of Transportation | $1,436,738.22 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 29, 2017 | Department of Transportation | $1,104,877.80 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 22, 2017 | Department of Transportation | $936,367.38 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $608,867.26 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 28, 2017 | Department of Transportation | $571,330.68 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 5, 2017 | Department of Transportation | $453,980.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 25, 2017 | Department of Transportation | $420,565.07 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $365,590.96 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2018 | Department of Transportation | $351,013.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2018 | Department of Transportation | $307,512.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 28, 2018 | Department of Transportation | $239,252.38 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $137,189.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2018 | Department of Transportation | $131,587.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $126,141.61 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $65,307.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $55,750.78 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 25, 2018 | Department of Transportation | $52,885.22 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 28, 2018 | Department of Transportation | $49,940.89 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 5, 2017 | Department of Transportation | $3,299.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2018 | Department of Transportation | $2,953.15 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2017top 20 of 41 payments$28,780,743
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 28, 2016 | Department of Transportation | $3,145,380.91 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 22, 2016 | Department of Transportation | $2,389,779.19 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 30, 2016 | Department of Transportation | $2,202,486.35 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 2, 2016 | Department of Transportation | $1,992,475.90 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 25, 2016 | Department of Transportation | $1,944,646.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 26, 2016 | Department of Transportation | $1,941,946.65 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 25, 2016 | Department of Transportation | $1,883,865.15 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 28, 2016 | Department of Transportation | $1,624,641.95 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2017 | Department of Transportation | $1,623,500.55 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 28, 2016 | Department of Transportation | $1,517,508.78 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 28, 2016 | Department of Transportation | $1,494,096.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 1, 2017 | Department of Transportation | $1,283,874.36 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 25, 2017 | Department of Transportation | $1,108,365.12 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 28, 2016 | Department of Transportation | $1,067,370.91 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 21, 2017 | Department of Transportation | $763,881.23 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 26, 2017 | Department of Transportation | $650,153.66 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 29, 2017 | Department of Transportation | $500,154.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 28, 2017 | Department of Transportation | $335,020.21 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 9, 2017 | Department of Transportation | $268,958.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 9, 2017 | Department of Transportation | $200,318.35 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2016top 20 of 32 payments$45,497,833
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 28, 2015 | Department of Transportation | $4,272,693.01 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 25, 2015 | Department of Transportation | $3,375,502.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 29, 2015 | Department of Transportation | $2,804,532.12 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 2, 2016 | Department of Transportation | $2,231,807.23 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 25, 2015 | Department of Transportation | $2,224,664.07 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 27, 2015 | Department of Transportation | $2,192,001.63 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 30, 2015 | Department of Transportation | $2,150,690.44 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 1, 2016 | Department of Transportation | $2,130,537.25 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 21, 2015 | Department of Transportation | $2,115,238.19 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 25, 2016 | Department of Transportation | $2,109,475.43 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 21, 2016 | Department of Transportation | $2,012,292.99 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 26, 2016 | Department of Transportation | $1,941,130.30 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 2, 2015 | Department of Transportation | $1,872,342.03 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 31, 2015 | Department of Transportation | $1,731,962.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 23, 2015 | Department of Transportation | $1,648,651.07 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 29, 2016 | Department of Transportation | $1,628,638.31 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 31, 2016 | Department of Transportation | $1,570,557.32 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 26, 2015 | Department of Transportation | $1,474,395.01 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2016 | Department of Transportation | $1,470,588.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 26, 2015 | Department of Transportation | $1,238,955.49 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2015top 20 of 26 payments$49,679,366
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 29, 2014 | Department of Transportation | $4,823,359.88 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 31, 2014 | Department of Transportation | $3,655,343.01 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 3, 2014 | Department of Transportation | $3,150,812.76 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 27, 2014 | Department of Transportation | $3,080,270.76 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 23, 2015 | Department of Transportation | $3,058,668.39 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 27, 2015 | Department of Transportation | $2,716,059.78 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 24, 2014 | Department of Transportation | $2,643,219.48 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 29, 2014 | Department of Transportation | $2,639,337.63 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 30, 2014 | Department of Transportation | $2,235,893.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 26, 2015 | Department of Transportation | $2,039,963.93 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 2, 2015 | Department of Transportation | $2,015,493.73 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 1, 2014 | Department of Transportation | $1,942,663.23 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 31, 2014 | Department of Transportation | $1,905,607.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 29, 2015 | Department of Transportation | $1,810,511.22 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 27, 2015 | Department of Transportation | $1,645,953.40 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 30, 2015 | Department of Transportation | $1,530,989.18 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 22, 2014 | Department of Transportation | $1,483,090.39 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2015 | Department of Transportation | $1,400,030.33 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 2, 2015 | Department of Transportation | $1,215,615.20 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 24, 2015 | Department of Transportation | $1,181,325.56 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2014top 20 of 25 payments$47,418,332
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 5, 2014 | Department of Transportation | $5,538,595.96 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 26, 2014 | Department of Transportation | $4,139,075.29 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 20, 2013 | Department of Transportation | $3,435,128.56 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 28, 2014 | Department of Transportation | $3,104,768.78 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 29, 2014 | Department of Transportation | $3,066,909.80 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 30, 2013 | Department of Transportation | $2,903,491.43 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 20, 2014 | Department of Transportation | $2,871,439.69 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 26, 2014 | Department of Transportation | $2,790,854.37 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 24, 2014 | Department of Transportation | $2,512,841.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 25, 2014 | Department of Transportation | $2,365,976.03 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 30, 2013 | Department of Transportation | $2,340,226.87 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 29, 2014 | Department of Transportation | $2,237,457.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 26, 2013 | Department of Transportation | $2,226,223.85 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 30, 2013 | Department of Transportation | $1,945,398.63 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 29, 2014 | Department of Transportation | $1,911,612.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 28, 2014 | Department of Transportation | $1,492,062.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 28, 2013 | Department of Transportation | $1,480,835.15 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 16, 2014 | Department of Transportation | $992,508.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 26, 2014 | Department of Transportation | $24,087.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 30, 2013 | Department of Transportation | $19,912.31 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2013top 16 of 16 payments$45,636,607
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 30, 2012 | Department of Transportation | $7,377,893.87 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 1, 2012 | Department of Transportation | $6,989,042.15 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 1, 2012 | Department of Transportation | $4,813,545.16 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 24, 2012 | Department of Transportation | $4,608,225.50 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 30, 2012 | Department of Transportation | $3,208,991.69 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 30, 2013 | Department of Transportation | $3,080,474.78 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 30, 2013 | Department of Transportation | $2,899,186.83 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 1, 2013 | Department of Transportation | $2,806,716.25 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 20, 2012 | Department of Transportation | $2,549,838.45 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 27, 2013 | Department of Transportation | $2,402,754.94 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 27, 2013 | Department of Transportation | $1,836,464.88 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 26, 2012 | Department of Transportation | $1,714,723.85 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 19, 2013 | Department of Transportation | $1,337,571.57 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 1, 2012 | Department of Transportation | $8,191.37 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 30, 2013 | Department of Transportation | $1,784.26 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 30, 2012 | Department of Transportation | $1,201.84 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2012top 20 of 24 payments$39,534,958
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 7, 2011 | Department of Transportation | $8,333,384.61 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 19, 2012 | Department of Transportation | $4,795,199.10 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 4, 2011 | Department of Transportation | $4,790,446.20 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 1, 2012 | Department of Transportation | $4,281,758.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 30, 2011 | Department of Transportation | $3,924,148.01 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 6, 2011 | Department of Transportation | $3,863,442.87 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 3, 2011 | Department of Transportation | $3,264,498.49 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2012 | Department of Transportation | $1,993,434.51 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 23, 2011 | Department of Transportation | $1,538,147.11 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 23, 2011 | Department of Transportation | $1,445,625.81 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2012 | Department of Transportation | $541,987.79 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 2, 2012 | Department of Transportation | $332,741.88 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 1, 2012 | Department of Transportation | $184,483.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 4, 2011 | Department of Transportation | $55,836.77 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 23, 2011 | Department of Transportation | $52,800.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 30, 2011 | Department of Transportation | $42,104.50 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 6, 2011 | Department of Transportation | $37,251.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 7, 2011 | Department of Transportation | $20,548.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 3, 2011 | Department of Transportation | $11,863.02 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2012 | Department of Transportation | $7,847.32 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2011top 19 of 19 payments$61,248,705
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 22, 2010 | Department of Transportation | $5,626,149.07 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 2, 2011 | Department of Transportation | $5,607,434.62 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 8, 2010 | Department of Transportation | $5,573,989.80 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 3, 2011 | Department of Transportation | $5,433,944.94 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 2, 2010 | Department of Transportation | $5,300,895.73 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 28, 2011 | Department of Transportation | $5,279,599.41 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2011 | Department of Transportation | $5,234,224.92 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 28, 2010 | Department of Transportation | $4,920,969.59 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 10, 2011 | Department of Transportation | $4,633,901.31 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 6, 2011 | Department of Transportation | $3,840,769.99 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 30, 2010 | Department of Transportation | $3,657,344.64 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 13, 2010 | Department of Transportation | $3,311,236.76 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 13, 2010 | Department of Transportation | $2,080,925.20 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2011 | Department of Transportation | $670,875.06 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 2, 2011 | Department of Transportation | $70,400.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 10, 2011 | Department of Transportation | $3,300.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 3, 2011 | Department of Transportation | $3,300.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 6, 2011 | Department of Transportation | $1,782.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 2, 2011 | Department of Transportation | -$2,337.62 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2010top 14 of 14 payments$54,644,487
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 7, 2009 | Department of Transportation | $5,965,699.14 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 3, 2010 | Department of Transportation | $5,763,646.48 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 3, 2009 | Department of Transportation | $5,685,200.50 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 1, 2009 | Department of Transportation | $5,576,196.89 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 6, 2009 | Department of Transportation | $5,099,435.32 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 10, 2010 | Department of Transportation | $4,939,899.01 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 4, 2010 | Department of Transportation | $4,207,771.61 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 28, 2009 | Department of Transportation | $3,491,204.71 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 5, 2010 | Department of Transportation | $3,371,371.46 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 1, 2009 | Department of Transportation | $2,880,337.81 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 24, 2010 | Department of Transportation | $2,803,458.81 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 30, 2010 | Department of Transportation | $2,517,214.10 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 1, 2010 | Department of Transportation | $2,318,618.83 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 24, 2010 | Department of Transportation | $24,432.63 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2009top 8 of 8 payments$28,125,924
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 10, 2009 | Department of Transportation | $6,791,549.53 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 13, 2009 | Department of Transportation | $5,244,608.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 5, 2009 | Department of Transportation | $5,231,165.82 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 9, 2008 | Department of Transportation | $4,659,670.87 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 2, 2009 | Department of Transportation | $2,657,846.26 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 1, 2009 | Department of Transportation | $1,988,590.63 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 11, 2009 | Department of Transportation | $1,570,696.79 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 10, 2009 | Department of Transportation | -$18,203.54 | OTHER STRUCTURES AND IMPROVEMENTS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Dec 2, 2019 | Department of Transportation | $7,994.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 4, 2019 | Department of Transportation | $85,510.29 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 4, 2019 | Department of Transportation | $42,523.98 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 12, 2018 | Department of Transportation | $334,312.70 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 12, 2018 | Department of Transportation | $606,187.30 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2018 | Department of Transportation | $131,587.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2018 | Department of Transportation | $2,953.15 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 25, 2018 | Department of Transportation | $52,885.22 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 25, 2018 | Department of Transportation | $553.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2018 | Department of Transportation | $307,512.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2018 | Department of Transportation | $687.74 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2018 | Department of Transportation | $351,013.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 28, 2018 | Department of Transportation | $49,940.89 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 28, 2018 | Department of Transportation | $239,252.38 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $608,867.26 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $126,141.61 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $365,590.96 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2018 | Department of Transportation | $55,750.78 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $1.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $65,307.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $137,189.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 27, 2017 | Department of Transportation | $1.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 22, 2017 | Department of Transportation | $936,367.38 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 25, 2017 | Department of Transportation | $420,565.07 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 25, 2017 | Department of Transportation | $1.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
Other vendors serving Department of Transportation
- State Board of Administration $3,787,091,475
- Anderson Columbia Co., Inc. $2,637,301,871
- Superior Construction Company O $2,387,023,998
- I-4 Mobility Partners Opco LLC $2,254,328,908
- Prince Contracting, LLC $2,177,502,510
- Lane Construction Corporation $1,907,721,395
- I 595 Express, LLC $1,634,910,952
- Ajax Paving Industries of Flori $1,445,921,149
- Community Asphalt Corp. $1,390,668,749
- Hubbard Construction Company $1,317,189,445
VerifiedData refreshed Jul 27, 2026 from Florida CFO Vendor Payments (myfloridacfo.com): 62,260,406 payments on record, Jul 1, 2008 to Jun 30, 2025. How we verify this data