Community Asphalt Corp. is the 113th-largest recipient of Florida state government payments tracked by SpendLedger, and ranks 7th in INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS spending. Its payments amount to 1.1% of everything the Department of Transportation has paid vendors in that span. Payments to it rose 93.8% year over year.
Primary spending category: INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as Florida state government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| REPAIRS AND MAINTENANCE-CONTRACTED SERVICES | 20 | $925,754 | Jul 29, 2008 – Jul 11, 2011 |
| ENGINEERING SERVICES | 10 | $912,450 | May 16, 2011 – Jun 13, 2014 |
| INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | 1,903 | $775,013,648 | Jul 8, 2014 – Oct 30, 2024 |
| BUILDING & CONSTRUCTION MATERIAL | 267 | $574,287 | Jul 18, 2008 – Jun 20, 2014 |
| OTHER STRUCTURES AND IMPROVEMENTS | 2,029 | $541,743,662 | Jul 16, 2008 – Jun 30, 2014 |
| INDEPENDENT CONTRACTOR-NOT OTHERWISE CLASSIFIED | 3 | $54,167 | Oct 14, 2008 – Oct 18, 2013 |
| CONTRACTED SERVICES - OTHER | 2 | $536,213 | Oct 14, 2015 – Jan 6, 2016 |
| REFUNDS | 3 | $50,400 | May 11, 2010 – Mar 14, 2011 |
| INTEREST - GENERAL | 2 | $48,804 | Mar 15, 2016 – Apr 28, 2016 |
| CONSTRUCTION SERVICES - GENERAL | 117 | $31,031,004 | Jul 27, 2015 – May 27, 2020 |
| INTEREST - LATE PAYMENT OF INVOICES | 12 | $244 | Jan 14, 2016 – Oct 1, 2018 |
| OTHER MATERIALS AND SUPPLIES-TRAINING | 1 | $2,199 | Jun 12, 2009 – Jun 12, 2009 |
| REPAIRS/MAINTENANCE - CONTRACT - GENERAL | 35 | $19,869,570 | Jan 10, 2017 – Jul 28, 2022 |
| REPAIRS AND MAINTENANCE-COMMODITIES | 1 | $1,908 | Dec 10, 2014 – Dec 10, 2014 |
| CONSTRUCTION SERVICES | 69 | $17,231,767 | Jul 21, 2008 – Jun 30, 2015 |
| REFUNDS - GENERAL | 4 | $1,650 | Apr 27, 2017 – Jan 27, 2021 |
| OTHER MATERIAL AND SUPPLIES | 9 | $15,102 | Dec 17, 2008 – Apr 18, 2013 |
| FREIGHT | 1 | $150 | Dec 10, 2014 – Dec 10, 2014 |
| BUILDING MATERIALS - GENERAL | 149 | $144,900 | Jul 24, 2014 – Oct 18, 2024 |
| DISTRIBUTIONS/TRANSFERS - GENERAL | 1 | $1,422,951 | Mar 15, 2016 – Mar 15, 2016 |
| ENGINEERING SERVICES - GENERAL | 10 | $1,356,500 | Aug 8, 2014 – Jun 14, 2017 |
| BUILDINGS/BUILDING IMPROVEMENTS | 25 | $1,157,370 | May 6, 2015 – Nov 22, 2016 |
| OTHER CUR CHGS-OTHER | 21 | $1,103 | Oct 9, 2008 – Oct 25, 2010 |
| No category recorded by the source | $118,145 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 4 of 4 payments$1,804,590
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 30, 2024 | Department of Transportation | $1,728,347.94 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 30, 2024 | Department of Transportation | $74,959.02 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 30, 2024 | Department of Transportation | $1,026.59 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 18, 2024 | Department of Transportation | $256.14 | BUILDING MATERIALS - GENERAL | – |
FY 2024top 5 of 5 payments$931,087
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 21, 2023 | Department of Transportation | $930,033.26 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 19, 2023 | Department of Transportation | $652.00 | BUILDING MATERIALS - GENERAL | – |
| Jan 23, 2024 | Department of Transportation | $177.50 | BUILDING MATERIALS - GENERAL | – |
| Mar 22, 2024 | Department of Transportation | $154.50 | BUILDING MATERIALS - GENERAL | – |
| Mar 22, 2024 | Department of Transportation | $70.00 | BUILDING MATERIALS - GENERAL | – |
FY 2023top 18 of 18 payments$1,689,812
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 17, 2022 | Department of Transportation | $1,018,180.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $341,156.04 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $78,632.55 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 3, 2023 | Department of Transportation | $72,500.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 5, 2023 | Department of Transportation | $52,733.31 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $51,046.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 28, 2022 | Department of Transportation | $47,764.60 | REPAIRS/MAINTENANCE - CONTRACT - GENERAL | – |
| Sep 29, 2022 | Department of Transportation | $18,682.08 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 9, 2022 | Department of Transportation | $3,997.60 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 18, 2022 | Department of Transportation | $2,634.83 | BUILDING MATERIALS - GENERAL | – |
| Sep 29, 2022 | Department of Transportation | $1,723.72 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 13, 2023 | Department of Transportation | $179.69 | BUILDING MATERIALS - GENERAL | – |
| Mar 14, 2023 | Department of Transportation | $149.65 | BUILDING MATERIALS - GENERAL | – |
| May 3, 2023 | Department of Transportation | $145.38 | BUILDING MATERIALS - GENERAL | – |
| Jan 17, 2023 | Department of Transportation | $144.13 | BUILDING MATERIALS - GENERAL | – |
| Mar 10, 2023 | Department of Transportation | $73.73 | BUILDING MATERIALS - GENERAL | – |
| Jan 27, 2023 | Department of Transportation | $67.00 | BUILDING MATERIALS - GENERAL | – |
| Aug 9, 2022 | Department of Transportation | $1.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2022top 20 of 90 payments$14,309,966
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 23, 2021 | Department of Transportation | $1,073,834.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 1, 2022 | Department of Transportation | $783,320.49 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 25, 2021 | Department of Transportation | $632,472.25 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 28, 2021 | Department of Transportation | $617,555.84 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 2, 2021 | Department of Transportation | $610,637.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 2, 2022 | Department of Transportation | $572,655.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 28, 2021 | Department of Transportation | $566,195.67 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 28, 2021 | Department of Transportation | $546,565.24 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 28, 2021 | Department of Transportation | $529,969.13 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 7, 2022 | Department of Transportation | $501,502.89 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 27, 2021 | Department of Transportation | $486,053.24 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 28, 2021 | Department of Transportation | $463,470.42 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 23, 2021 | Department of Transportation | $424,452.62 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 27, 2021 | Department of Transportation | $403,261.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 30, 2022 | Department of Transportation | $400,345.42 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 21, 2021 | Department of Transportation | $398,018.16 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 26, 2022 | Department of Transportation | $370,574.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 26, 2022 | Department of Transportation | $354,251.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 27, 2021 | Department of Transportation | $352,970.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 25, 2021 | Department of Transportation | $338,433.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2021top 20 of 120 payments$56,176,299
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 1, 2020 | Department of Transportation | $3,801,201.23 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 29, 2020 | Department of Transportation | $3,504,885.60 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 26, 2020 | Department of Transportation | $3,271,509.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 30, 2020 | Department of Transportation | $2,619,521.25 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 26, 2020 | Department of Transportation | $1,976,331.45 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 1, 2020 | Department of Transportation | $1,892,880.17 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 19, 2020 | Department of Transportation | $1,767,754.89 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 24, 2020 | Department of Transportation | $1,726,317.84 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 3, 2020 | Department of Transportation | $1,671,841.95 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 30, 2020 | Department of Transportation | $1,597,763.35 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 1, 2020 | Department of Transportation | $1,512,949.67 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 29, 2020 | Department of Transportation | $1,503,492.11 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 26, 2020 | Department of Transportation | $1,370,035.11 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 31, 2021 | Department of Transportation | $1,346,026.78 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 29, 2021 | Department of Transportation | $1,330,065.46 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 3, 2021 | Department of Transportation | $1,118,940.91 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 28, 2021 | Department of Transportation | $1,028,345.09 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 30, 2020 | Department of Transportation | $1,023,760.07 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 24, 2020 | Department of Transportation | $1,022,873.20 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 19, 2020 | Department of Transportation | $1,018,832.79 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2020top 20 of 316 payments$108,592,514
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 24, 2020 | Department of Transportation | $7,034,151.84 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 29, 2020 | Department of Transportation | $5,862,552.75 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 28, 2020 | Department of Transportation | $4,640,320.33 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 29, 2019 | Department of Transportation | $3,093,579.59 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 25, 2020 | Department of Transportation | $2,884,373.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 31, 2019 | Department of Transportation | $2,677,677.93 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 10, 2020 | Department of Transportation | $2,527,466.39 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 31, 2019 | Department of Transportation | $2,482,826.42 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 27, 2020 | Department of Transportation | $2,472,460.39 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 26, 2019 | Department of Transportation | $2,448,768.94 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 30, 2019 | Department of Transportation | $2,348,606.19 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 31, 2019 | Department of Transportation | $2,341,190.72 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 26, 2019 | Department of Transportation | $2,247,955.65 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 28, 2020 | Department of Transportation | $2,189,595.01 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 29, 2020 | Department of Transportation | $1,973,477.97 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 28, 2020 | Department of Transportation | $1,777,332.54 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 28, 2020 | Department of Transportation | $1,711,886.67 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 30, 2020 | Department of Transportation | $1,655,068.36 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 29, 2019 | Department of Transportation | $1,605,429.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 21, 2019 | Department of Transportation | $1,475,583.57 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2019top 20 of 447 payments$120,346,215
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 28, 2018 | Department of Transportation | $3,798,844.98 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 28, 2019 | Department of Transportation | $3,094,397.17 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 17, 2019 | Department of Transportation | $3,080,913.61 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 19, 2019 | Department of Transportation | $2,675,783.09 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 4, 2018 | Department of Transportation | $2,494,353.13 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 30, 2019 | Department of Transportation | $2,464,780.03 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 5, 2018 | Department of Transportation | $2,369,411.53 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 5, 2019 | Department of Transportation | $2,211,097.17 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 30, 2018 | Department of Transportation | $2,167,486.40 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 25, 2018 | Department of Transportation | $2,158,664.08 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 29, 2018 | Department of Transportation | $2,096,111.63 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 3, 2019 | Department of Transportation | $1,924,261.98 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 30, 2019 | Department of Transportation | $1,852,679.35 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 23, 2018 | Department of Transportation | $1,732,570.01 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 25, 2018 | Department of Transportation | $1,602,178.02 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 27, 2018 | Department of Transportation | $1,582,713.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 25, 2019 | Department of Transportation | $1,541,299.24 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 27, 2018 | Department of Transportation | $1,515,227.79 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 1, 2019 | Department of Transportation | $1,403,913.65 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 24, 2018 | Department of Transportation | $1,365,399.34 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2018top 20 of 358 payments$133,570,759
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 31, 2018 | Department of Transportation | $6,136,339.54 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 29, 2017 | Department of Transportation | $5,748,974.08 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 7, 2017 | Department of Transportation | $5,213,960.98 | REPAIRS/MAINTENANCE - CONTRACT - GENERAL | – |
| Dec 26, 2017 | Department of Transportation | $4,974,098.63 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 2, 2018 | Department of Transportation | $4,951,589.65 | REPAIRS/MAINTENANCE - CONTRACT - GENERAL | – |
| Feb 27, 2018 | Department of Transportation | $3,864,424.91 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 25, 2017 | Department of Transportation | $3,574,901.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 23, 2018 | Department of Transportation | $3,200,854.40 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 21, 2017 | Department of Transportation | $3,109,769.71 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 8, 2017 | Department of Transportation | $2,942,642.88 | REPAIRS/MAINTENANCE - CONTRACT - GENERAL | – |
| Jun 6, 2018 | Department of Transportation | $2,779,886.87 | REPAIRS/MAINTENANCE - CONTRACT - GENERAL | – |
| Jun 19, 2018 | Department of Transportation | $2,670,527.45 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 26, 2017 | Department of Transportation | $2,660,436.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 26, 2018 | Department of Transportation | $2,547,384.88 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 23, 2017 | Department of Transportation | $2,431,708.71 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 26, 2017 | Department of Transportation | $2,350,155.32 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 1, 2018 | Department of Transportation | $2,129,045.27 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 26, 2017 | Department of Transportation | $2,091,885.33 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 31, 2018 | Department of Transportation | $1,950,416.97 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 25, 2018 | Department of Transportation | $1,740,542.94 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2017top 20 of 278 payments$144,092,851
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2016 | Department of Transportation | $9,052,203.24 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 27, 2017 | Department of Transportation | $7,972,899.63 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 21, 2017 | Department of Transportation | $6,517,429.70 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 30, 2016 | Department of Transportation | $6,178,440.09 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 9, 2017 | Department of Transportation | $5,330,059.82 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 28, 2016 | Department of Transportation | $4,909,410.74 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 27, 2016 | Department of Transportation | $4,906,648.67 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2017 | Department of Transportation | $4,891,210.85 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 29, 2016 | Department of Transportation | $4,663,215.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 29, 2016 | Department of Transportation | $4,663,215.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 25, 2016 | Department of Transportation | $4,629,149.61 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 26, 2017 | Department of Transportation | $4,056,436.19 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 21, 2016 | Department of Transportation | $2,793,095.55 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 3, 2017 | Department of Transportation | $1,956,852.69 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 21, 2016 | Department of Transportation | $1,928,782.64 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 29, 2017 | Department of Transportation | $1,713,145.50 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2017 | Department of Transportation | $1,505,953.36 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 2, 2017 | Department of Transportation | $1,464,428.92 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 29, 2016 | Department of Transportation | $1,434,705.39 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 23, 2016 | Department of Transportation | $1,409,691.28 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2016top 20 of 351 payments$137,816,186
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 26, 2016 | Department of Transportation | $7,702,638.94 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 30, 2015 | Department of Transportation | $7,090,279.11 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 27, 2015 | Department of Transportation | $5,601,931.67 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 28, 2016 | Department of Transportation | $5,459,388.11 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 2, 2016 | Department of Transportation | $5,005,184.10 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 21, 2015 | Department of Transportation | $3,952,000.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 29, 2016 | Department of Transportation | $3,946,751.80 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 23, 2016 | Department of Transportation | $3,820,365.99 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 24, 2015 | Department of Transportation | $3,373,881.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 30, 2016 | Department of Transportation | $3,139,898.10 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 30, 2015 | Department of Transportation | $2,879,907.82 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 24, 2015 | Department of Transportation | $2,833,154.35 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2016 | Department of Transportation | $2,807,710.09 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 21, 2016 | Department of Transportation | $2,660,734.81 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 27, 2015 | Department of Transportation | $2,632,760.54 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 27, 2015 | Department of Transportation | $2,531,000.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 24, 2015 | Department of Transportation | $2,075,659.41 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2016 | Department of Transportation | $1,950,734.17 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 24, 2015 | Department of Transportation | $1,476,122.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Mar 15, 2016 | Department of Financial Services | $1,422,951.43 | DISTRIBUTIONS/TRANSFERS - GENERAL | – |
FY 2015top 20 of 296 payments$116,065,430
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 3, 2014 | Department of Transportation | $15,389,500.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2015 | Department of Transportation | $7,707,166.83 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 23, 2015 | Department of Transportation | $5,592,877.61 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 27, 2015 | Department of Transportation | $4,381,385.87 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 27, 2015 | Department of Transportation | $2,936,445.02 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 24, 2015 | Department of Transportation | $2,657,928.69 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 23, 2015 | Department of Transportation | $2,616,642.26 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jul 30, 2014 | Department of Transportation | $2,457,290.55 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 24, 2015 | Department of Transportation | $2,070,797.05 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 23, 2014 | Department of Transportation | $1,719,198.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 26, 2014 | Department of Transportation | $1,635,853.80 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 1, 2014 | Department of Transportation | $1,612,976.09 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jan 26, 2015 | Department of Transportation | $1,590,305.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Feb 23, 2015 | Department of Transportation | $1,334,704.59 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 24, 2015 | Department of Transportation | $1,249,625.08 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Dec 24, 2014 | Department of Transportation | $1,208,576.37 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Apr 29, 2015 | Department of Transportation | $1,170,184.43 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 27, 2014 | Department of Transportation | $1,165,130.00 | CONSTRUCTION SERVICES | – |
| Oct 27, 2014 | Department of Transportation | $1,155,065.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Nov 24, 2014 | Department of Transportation | $1,153,118.74 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
FY 2014top 20 of 328 payments$87,495,396
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 4, 2014 | Department of Transportation | $3,961,985.35 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 15, 2014 | Department of Transportation | $2,697,486.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 24, 2013 | Department of Transportation | $2,619,159.24 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 26, 2014 | Department of Transportation | $2,582,126.79 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 28, 2014 | Department of Transportation | $2,249,564.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 25, 2013 | Department of Transportation | $2,104,376.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 19, 2013 | Department of Transportation | $2,074,282.96 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 30, 2013 | Department of Transportation | $1,996,955.71 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 30, 2014 | Department of Transportation | $1,683,871.62 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 18, 2013 | Department of Transportation | $1,502,714.69 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 27, 2014 | Department of Transportation | $1,361,298.08 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 25, 2013 | Department of Transportation | $1,306,227.44 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 23, 2013 | Department of Transportation | $1,218,215.10 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 24, 2013 | Department of Transportation | $1,189,888.41 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 18, 2014 | Department of Transportation | $1,180,560.64 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 5, 2013 | Department of Transportation | $1,172,662.41 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 18, 2013 | Department of Transportation | $1,095,282.60 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 26, 2013 | Department of Transportation | $1,043,301.97 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 30, 2014 | Department of Transportation | $1,040,751.52 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 29, 2013 | Department of Transportation | $1,029,666.70 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2013top 20 of 361 payments$61,716,888
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 2, 2013 | Department of Transportation | $1,400,834.40 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 27, 2013 | Department of Transportation | $1,388,251.46 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 5, 2013 | Department of Transportation | $1,357,806.31 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 31, 2012 | Department of Transportation | $1,317,578.93 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 3, 2013 | Department of Transportation | $1,290,102.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 30, 2013 | Department of Transportation | $1,211,914.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 1, 2013 | Department of Transportation | $1,101,064.54 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 27, 2012 | Department of Transportation | $1,079,025.50 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 1, 2013 | Department of Transportation | $988,026.15 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 19, 2013 | Department of Transportation | $967,573.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 8, 2012 | Department of Transportation | $960,669.58 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 28, 2013 | Department of Transportation | $955,394.55 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 27, 2012 | Department of Transportation | $909,984.11 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 8, 2013 | Department of Transportation | $879,997.18 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 30, 2013 | Department of Transportation | $823,405.91 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 27, 2012 | Department of Transportation | $815,898.19 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 24, 2012 | Department of Transportation | $783,783.55 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 24, 2013 | Department of Transportation | $780,118.79 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 23, 2012 | Department of Transportation | $743,885.99 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 25, 2013 | Department of Transportation | $720,717.28 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2012top 20 of 438 payments$65,586,772
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 23, 2012 | Department of Transportation | $1,489,762.94 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 25, 2012 | Department of Transportation | $1,247,875.35 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 29, 2012 | Department of Transportation | $1,206,012.73 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 2, 2011 | Department of Transportation | $1,085,520.07 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 29, 2012 | Department of Transportation | $1,059,022.45 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 27, 2011 | Department of Transportation | $1,044,430.38 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 26, 2011 | Department of Transportation | $1,040,982.66 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 26, 2011 | Department of Transportation | $1,025,401.73 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 24, 2011 | Department of Transportation | $998,663.93 | CONSTRUCTION SERVICES | – |
| Sep 7, 2011 | Department of Transportation | $955,898.58 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 9, 2011 | Department of Transportation | $954,679.80 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 1, 2012 | Department of Transportation | $924,994.13 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 29, 2011 | Department of Transportation | $896,640.45 | CONSTRUCTION SERVICES | – |
| Dec 19, 2011 | Department of Transportation | $878,720.73 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 12, 2011 | Department of Transportation | $848,921.06 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 27, 2012 | Department of Transportation | $812,771.83 | CONSTRUCTION SERVICES | – |
| Nov 23, 2011 | Department of Transportation | $803,696.83 | CONSTRUCTION SERVICES | – |
| Oct 26, 2011 | Department of Transportation | $772,898.76 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 26, 2011 | Department of Transportation | $771,281.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 1, 2012 | Department of Transportation | $756,879.90 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2011top 20 of 396 payments$59,389,025
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 25, 2010 | Department of Transportation | $1,307,692.21 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 25, 2011 | Department of Transportation | $1,278,175.73 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 28, 2011 | Department of Transportation | $1,193,971.97 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 24, 2011 | Department of Transportation | $1,187,338.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 28, 2011 | Department of Transportation | $1,168,751.53 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 28, 2011 | Department of Transportation | $1,136,067.06 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 29, 2011 | Department of Transportation | $1,134,287.62 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 20, 2011 | Department of Transportation | $983,637.12 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 20, 2010 | Department of Transportation | $980,699.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 23, 2010 | Department of Transportation | $964,165.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 18, 2011 | Department of Transportation | $956,552.12 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 25, 2011 | Department of Transportation | $940,509.16 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 22, 2010 | Department of Transportation | $931,224.53 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 19, 2010 | Department of Transportation | $926,738.95 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 20, 2011 | Department of Transportation | $917,187.78 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 19, 2010 | Department of Transportation | $912,949.64 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 3, 2011 | Department of Transportation | $897,540.80 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 22, 2010 | Department of Transportation | $876,183.70 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 27, 2010 | Department of Transportation | $872,990.04 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 26, 2011 | Department of Transportation | $870,610.00 | CONSTRUCTION SERVICES | – |
FY 2010top 20 of 391 payments$103,297,893
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 28, 2009 | Department of Transportation | $2,770,759.77 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 26, 2009 | Department of Transportation | $2,333,051.53 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 28, 2009 | Department of Transportation | $2,208,200.72 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 19, 2009 | Department of Transportation | $2,205,960.41 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 27, 2009 | Department of Transportation | $2,165,051.22 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 23, 2009 | Department of Transportation | $2,061,067.94 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 25, 2009 | Department of Transportation | $1,873,564.94 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 28, 2009 | Department of Transportation | $1,858,453.93 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 2, 2009 | Department of Transportation | $1,788,285.34 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 1, 2010 | Department of Transportation | $1,778,342.21 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 22, 2009 | Department of Transportation | $1,756,330.26 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 4, 2010 | Department of Transportation | $1,739,368.38 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Nov 27, 2009 | Department of Transportation | $1,732,596.90 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 26, 2009 | Department of Transportation | $1,590,543.47 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 23, 2009 | Department of Transportation | $1,542,311.03 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 23, 2010 | Department of Transportation | $1,526,835.60 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 28, 2010 | Department of Transportation | $1,485,977.70 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 28, 2010 | Department of Transportation | $1,464,715.58 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 4, 2010 | Department of Transportation | $1,391,238.18 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 28, 2009 | Department of Transportation | $1,343,751.54 | OTHER STRUCTURES AND IMPROVEMENTS | – |
FY 2009top 20 of 498 payments$179,332,265
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 7, 2008 | Department of Transportation | $5,359,567.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 30, 2009 | Department of Transportation | $4,451,128.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 11, 2009 | Department of Transportation | $4,377,284.81 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 5, 2008 | Department of Transportation | $4,349,898.00 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 1, 2009 | Department of Transportation | $3,204,252.71 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Feb 25, 2009 | Department of Transportation | $3,202,695.63 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 30, 2008 | Department of Transportation | $2,970,513.55 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jan 29, 2009 | Department of Transportation | $2,914,880.05 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 2, 2008 | Department of Transportation | $2,813,097.16 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Oct 1, 2008 | Department of Transportation | $2,532,354.45 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Aug 27, 2008 | Department of Transportation | $2,391,195.47 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Mar 26, 2009 | Department of Transportation | $2,338,796.07 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 28, 2009 | Department of Transportation | $2,334,220.77 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Sep 2, 2008 | Department of Transportation | $2,217,265.86 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 24, 2008 | Department of Transportation | $2,197,745.82 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Apr 29, 2009 | Department of Transportation | $2,176,095.66 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jul 28, 2008 | Department of Transportation | $2,000,003.79 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Dec 24, 2008 | Department of Transportation | $1,950,456.18 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| Jun 25, 2009 | Department of Transportation | $1,940,718.31 | OTHER STRUCTURES AND IMPROVEMENTS | – |
| May 28, 2009 | Department of Transportation | $1,939,954.33 | OTHER STRUCTURES AND IMPROVEMENTS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Oct 30, 2024 | Department of Transportation | $74,959.02 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 30, 2024 | Department of Transportation | $1,728,347.94 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 30, 2024 | Department of Transportation | $1,026.59 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 18, 2024 | Department of Transportation | $256.14 | BUILDING MATERIALS - GENERAL | – |
| Mar 22, 2024 | Department of Transportation | $154.50 | BUILDING MATERIALS - GENERAL | – |
| Mar 22, 2024 | Department of Transportation | $70.00 | BUILDING MATERIALS - GENERAL | – |
| Jan 23, 2024 | Department of Transportation | $177.50 | BUILDING MATERIALS - GENERAL | – |
| Sep 19, 2023 | Department of Transportation | $652.00 | BUILDING MATERIALS - GENERAL | – |
| Aug 21, 2023 | Department of Transportation | $930,033.26 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Jun 13, 2023 | Department of Transportation | $179.69 | BUILDING MATERIALS - GENERAL | – |
| May 3, 2023 | Department of Transportation | $72,500.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| May 3, 2023 | Department of Transportation | $145.38 | BUILDING MATERIALS - GENERAL | – |
| Mar 14, 2023 | Department of Transportation | $149.65 | BUILDING MATERIALS - GENERAL | – |
| Mar 10, 2023 | Department of Transportation | $73.73 | BUILDING MATERIALS - GENERAL | – |
| Jan 27, 2023 | Department of Transportation | $67.00 | BUILDING MATERIALS - GENERAL | – |
| Jan 17, 2023 | Department of Transportation | $144.13 | BUILDING MATERIALS - GENERAL | – |
| Jan 5, 2023 | Department of Transportation | $52,733.31 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Oct 17, 2022 | Department of Transportation | $1,018,180.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $1,723.72 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $78,632.55 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $18,682.08 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $341,156.04 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Sep 29, 2022 | Department of Transportation | $51,046.58 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 9, 2022 | Department of Transportation | $1.00 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
| Aug 9, 2022 | Department of Transportation | $3,997.60 | INFRASTRUCTURE/INFRASTRUCTURE IMPROVEMENTS | – |
Other vendors serving Department of Transportation
- State Board of Administration $3,787,091,475
- Anderson Columbia Co., Inc. $2,637,301,871
- Superior Construction Company O $2,387,023,998
- I-4 Mobility Partners Opco LLC $2,254,328,908
- Prince Contracting, LLC $2,177,502,510
- Lane Construction Corporation $1,907,721,395
- I 595 Express, LLC $1,634,910,952
- Ajax Paving Industries of Flori $1,445,921,149
- Hubbard Construction Company $1,317,189,445
- Ranger Construction Industries $1,286,789,339