The Bank of New York Mellon: New York City Government Payments
as recorded by New York City: THE BANK OF NEW YORK MELLON
The Bank of New York Mellon is the 28th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 3rd in OTHER EXPENDITURES-GENERAL spending. Its payments amount to 6.5% of everything the City University Construction Fund has paid vendors in that span. Payments to it rose 182.7% year over year.
Primary spending category: OTHER EXPENDITURES-GENERAL
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OTHER EXPENDITURES-GENERAL | 87 | $867,734,821 | Sep 10, 2012 – Nov 19, 2020 |
| BLENDED COMPONENT UNITS | 32 | $86,120,261 | Apr 19, 2010 – Apr 15, 2025 |
| BANK CHARGES PUBLIC ASST ACCT | 11 | $7,498 | Jan 25, 2010 – Aug 3, 2010 |
| OTHER EXPENDITURES-REPORTABLE | 190 | $460,765,781 | Mar 24, 2014 – May 27, 2025 |
| PAYMENTS TO DORM.AUTH.DBT.SVCE | 70 | $428,306,694 | May 3, 2010 – Jul 26, 2012 |
| PROF SERV ACCTING & AUDITING | 43 | $2,683,117 | Feb 7, 2011 – Dec 5, 2012 |
| COSTS ASSOC WITH FINANCING | 440 | $25,854,479 | Jan 25, 2010 – Jun 2, 2025 |
| PROF SERV OTHER | 66 | $2,385,964 | Jan 13, 2010 – Jun 25, 2025 |
| INVESTMENT COSTS | 64 | $18,578,473 | Jul 19, 2010 – Jun 22, 2015 |
| INTEREST ON BONDS - GENERAL | 27 | $149,241,820 | Aug 12, 2010 – Sep 9, 2020 |
| MAINT & REP GENERAL | 20 | $146,046 | Jul 1, 2013 – Aug 19, 2013 |
| REDEMPTION SERIAL BONDS GENERL | 1 | $1,015,000 | Feb 25, 2020 – Feb 25, 2020 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 28 payments$22,317,953
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 27, 2024 | City University Construction Fund | $6,054,625.00 | OTHER EXPENDITURES-REPORTABLE | – |
| May 27, 2025 | City University Construction Fund | $6,054,625.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 15, 2025 | Debt Service | $6,006,442.54 | BLENDED COMPONENT UNITS | – |
| May 27, 2025 | City University Construction Fund | $2,718,727.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 15, 2024 | Debt Service | $921,164.50 | BLENDED COMPONENT UNITS | – |
| Nov 27, 2024 | City University Construction Fund | $233,727.50 | OTHER EXPENDITURES-REPORTABLE | – |
| May 5, 2025 | Debt Service | $115,023.44 | COSTS ASSOC WITH FINANCING | – |
| Jun 2, 2025 | Debt Service | $115,023.44 | COSTS ASSOC WITH FINANCING | – |
| Jun 25, 2025 | Office of the Comptroller | $104,890.00 | PROF SERV OTHER | – |
| Oct 15, 2024 | Debt Service | $88,925.62 | COSTS ASSOC WITH FINANCING | – |
| Mar 4, 2025 | Debt Service | $67,897.87 | COSTS ASSOC WITH FINANCING | – |
| Jul 30, 2024 | Debt Service | $21,801.81 | COSTS ASSOC WITH FINANCING | – |
| Mar 4, 2025 | Debt Service | $21,027.75 | COSTS ASSOC WITH FINANCING | – |
| Mar 4, 2025 | Debt Service | $6,046.63 | COSTS ASSOC WITH FINANCING | – |
| May 5, 2025 | Department of Finance | $3,021.24 | COSTS ASSOC WITH FINANCING | – |
| Aug 12, 2024 | Department of Finance | $1,633.75 | COSTS ASSOC WITH FINANCING | – |
| May 5, 2025 | Department of Finance | $1,533.96 | COSTS ASSOC WITH FINANCING | – |
| May 5, 2025 | Department of Finance | $1,529.20 | COSTS ASSOC WITH FINANCING | – |
| Mar 17, 2025 | Department of Finance | $1,362.70 | COSTS ASSOC WITH FINANCING | – |
| Mar 17, 2025 | Department of Finance | $1,299.13 | COSTS ASSOC WITH FINANCING | – |
FY 2024top 20 of 36 payments$7,894,522
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 15, 2024 | Debt Service | $5,890,419.67 | BLENDED COMPONENT UNITS | – |
| Jun 18, 2024 | City University Construction Fund | $3,662,434.72 | OTHER EXPENDITURES-REPORTABLE | – |
| May 24, 2024 | City University Construction Fund | $3,662,434.72 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 17, 2023 | Debt Service | $1,096,425.78 | BLENDED COMPONENT UNITS | – |
| May 24, 2024 | City University Construction Fund | $667,955.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 18, 2024 | City University Construction Fund | $667,955.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 22, 2023 | City University Construction Fund | $243,955.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 2, 2023 | Debt Service | $128,448.13 | COSTS ASSOC WITH FINANCING | – |
| Feb 8, 2024 | Debt Service | $128,448.12 | COSTS ASSOC WITH FINANCING | – |
| Apr 10, 2024 | Debt Service | $127,051.94 | COSTS ASSOC WITH FINANCING | – |
| Aug 14, 2023 | Debt Service | $122,433.83 | COSTS ASSOC WITH FINANCING | – |
| May 6, 2024 | Office of the Comptroller | $80,480.00 | PROF SERV OTHER | – |
| May 24, 2024 | City University Construction Fund | $71,062.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 18, 2024 | City University Construction Fund | $71,062.50 | OTHER EXPENDITURES-REPORTABLE | – |
| May 6, 2024 | Office of the Comptroller | $38,380.00 | PROF SERV OTHER | – |
| Nov 22, 2023 | City University Construction Fund | $14,575.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 5, 2023 | Debt Service | $5,852.00 | COSTS ASSOC WITH FINANCING | – |
| Nov 22, 2023 | City University Construction Fund | $2,062.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 13, 2024 | Department of Finance | $1,875.78 | COSTS ASSOC WITH FINANCING | – |
| Jul 31, 2023 | Department of Finance | $1,388.75 | COSTS ASSOC WITH FINANCING | – |
FY 2023top 20 of 25 payments$19,565,149
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 23, 2023 | City University Construction Fund | $11,830,825.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 14, 2023 | Debt Service | $3,890,364.07 | BLENDED COMPONENT UNITS | – |
| May 23, 2023 | City University Construction Fund | $970,911.75 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 14, 2022 | Debt Service | $844,618.84 | BLENDED COMPONENT UNITS | – |
| May 23, 2023 | City University Construction Fund | $729,018.75 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 15, 2022 | City University Construction Fund | $330,825.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 15, 2022 | City University Construction Fund | $263,411.75 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 26, 2022 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Jan 18, 2023 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Aug 8, 2022 | Debt Service | $136,825.18 | COSTS ASSOC WITH FINANCING | – |
| Apr 24, 2023 | Debt Service | $135,321.60 | COSTS ASSOC WITH FINANCING | – |
| Jun 5, 2023 | Office of the Comptroller | $115,095.00 | PROF SERV OTHER | – |
| Nov 15, 2022 | City University Construction Fund | $21,518.75 | OTHER EXPENDITURES-REPORTABLE | – |
| May 8, 2023 | Department of Finance | $2,291.33 | COSTS ASSOC WITH FINANCING | – |
| Feb 6, 2023 | Department of Finance | $2,072.32 | COSTS ASSOC WITH FINANCING | – |
| Feb 6, 2023 | Department of Finance | $2,058.56 | COSTS ASSOC WITH FINANCING | – |
| Feb 6, 2023 | Department of Finance | $1,722.25 | COSTS ASSOC WITH FINANCING | – |
| Aug 8, 2022 | Department of Finance | $1,529.63 | COSTS ASSOC WITH FINANCING | – |
| Nov 1, 2022 | Department of Finance | $1,454.79 | COSTS ASSOC WITH FINANCING | – |
| Nov 1, 2022 | Department of Finance | $1,445.35 | COSTS ASSOC WITH FINANCING | – |
FY 2022top 20 of 27 payments$25,041,911
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 16, 2022 | City University Construction Fund | $9,074,850.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 18, 2021 | City University Construction Fund | $4,995,382.95 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 15, 2022 | Debt Service | $3,492,471.53 | BLENDED COMPONENT UNITS | – |
| Nov 18, 2021 | City University Construction Fund | $2,130,000.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 18, 2021 | City University Construction Fund | $2,130,000.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 15, 2021 | Debt Service | $778,031.84 | BLENDED COMPONENT UNITS | – |
| May 16, 2022 | City University Construction Fund | $638,449.25 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 18, 2021 | City University Construction Fund | $405,554.06 | OTHER EXPENDITURES-REPORTABLE | – |
| May 16, 2022 | City University Construction Fund | $396,556.25 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 18, 2021 | City University Construction Fund | $312,383.06 | OTHER EXPENDITURES-REPORTABLE | – |
| Jan 10, 2022 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Sep 29, 2021 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| May 18, 2022 | Debt Service | $135,321.60 | COSTS ASSOC WITH FINANCING | – |
| Jul 19, 2021 | Debt Service | $133,710.62 | COSTS ASSOC WITH FINANCING | – |
| Jun 13, 2022 | Office of the Comptroller | $124,940.00 | PROF SERV OTHER | – |
| Apr 25, 2022 | Department of Finance | $1,518.86 | COSTS ASSOC WITH FINANCING | – |
| Mar 8, 2022 | Department of Finance | $1,491.61 | COSTS ASSOC WITH FINANCING | – |
| Mar 8, 2022 | Department of Finance | $1,479.60 | COSTS ASSOC WITH FINANCING | – |
| Apr 25, 2022 | Department of Finance | $1,474.27 | COSTS ASSOC WITH FINANCING | – |
| Mar 8, 2022 | Department of Finance | $1,459.38 | COSTS ASSOC WITH FINANCING | – |
FY 2021top 20 of 30 payments$47,701,124
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 17, 2021 | City University Construction Fund | $21,218,941.10 | OTHER EXPENDITURES-REPORTABLE | – |
| Sep 9, 2020 | Debt Service | $7,745,750.01 | INTEREST ON BONDS - GENERAL | – |
| Nov 19, 2020 | City University Construction Fund | $5,503,002.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 15, 2021 | Debt Service | $3,452,654.04 | BLENDED COMPONENT UNITS | – |
| Nov 19, 2020 | City University Construction Fund | $2,080,000.00 | OTHER EXPENDITURES-GENERAL | – |
| Nov 19, 2020 | City University Construction Fund | $2,079,999.96 | OTHER EXPENDITURES-GENERAL | – |
| May 17, 2021 | City University Construction Fund | $1,274,261.27 | OTHER EXPENDITURES-REPORTABLE | – |
| May 17, 2021 | City University Construction Fund | $1,274,261.27 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 19, 2020 | City University Construction Fund | $1,075,985.64 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 15, 2020 | Debt Service | $926,263.80 | BLENDED COMPONENT UNITS | – |
| Nov 19, 2020 | City University Construction Fund | $366,658.75 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 15, 2020 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Aug 24, 2020 | Debt Service | $136,825.18 | COSTS ASSOC WITH FINANCING | – |
| Apr 26, 2021 | Debt Service | $135,321.61 | COSTS ASSOC WITH FINANCING | – |
| Feb 22, 2021 | Debt Service | $134,140.22 | COSTS ASSOC WITH FINANCING | – |
| Jun 2, 2021 | Office of the Comptroller | $131,305.00 | PROF SERV OTHER | – |
| Mar 1, 2021 | Debt Service | $5,775.00 | COSTS ASSOC WITH FINANCING | – |
| Aug 12, 2020 | Department of Finance | $2,702.46 | COSTS ASSOC WITH FINANCING | – |
| Aug 12, 2020 | Department of Finance | $2,451.27 | COSTS ASSOC WITH FINANCING | – |
| Aug 12, 2020 | Department of Finance | $1,963.36 | COSTS ASSOC WITH FINANCING | – |
FY 2020top 20 of 38 payments$168,984,515
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 22, 2020 | City University Construction Fund | $87,985,000.00 | OTHER EXPENDITURES-GENERAL | – |
| May 22, 2020 | City University Construction Fund | $32,133,532.51 | OTHER EXPENDITURES-GENERAL | – |
| Feb 25, 2020 | Debt Service | $12,345,121.50 | INTEREST ON BONDS - GENERAL | – |
| Nov 20, 2019 | City University Construction Fund | $9,065,421.63 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 20, 2019 | City University Construction Fund | $6,581,847.00 | OTHER EXPENDITURES-GENERAL | – |
| Mar 31, 2020 | Debt Service | $5,000,000.00 | INTEREST ON BONDS - GENERAL | – |
| Apr 15, 2020 | Debt Service | $3,368,350.56 | BLENDED COMPONENT UNITS | – |
| May 22, 2020 | City University Construction Fund | $2,356,412.49 | OTHER EXPENDITURES-GENERAL | – |
| Nov 20, 2019 | City University Construction Fund | $2,029,077.50 | OTHER EXPENDITURES-GENERAL | – |
| Nov 20, 2019 | City University Construction Fund | $2,029,074.50 | OTHER EXPENDITURES-GENERAL | – |
| May 22, 2020 | City University Construction Fund | $1,954,858.88 | OTHER EXPENDITURES-GENERAL | – |
| Nov 20, 2019 | City University Construction Fund | $1,064,749.75 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 25, 2020 | Debt Service | $1,015,000.00 | REDEMPTION SERIAL BONDS GENERL | – |
| Oct 15, 2019 | Debt Service | $751,537.37 | BLENDED COMPONENT UNITS | – |
| Nov 20, 2019 | City University Construction Fund | $578,695.06 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 3, 2019 | Office of the Comptroller | $145,264.34 | PROF SERV OTHER | – |
| Jan 21, 2020 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Mar 3, 2020 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Sep 30, 2019 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Jul 29, 2019 | Debt Service | $136,825.17 | COSTS ASSOC WITH FINANCING | – |
FY 2019top 20 of 64 payments$105,477,408
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 28, 2019 | City University Construction Fund | $47,215,225.00 | OTHER EXPENDITURES-GENERAL | – |
| Nov 19, 2018 | City University Construction Fund | $14,305,515.50 | OTHER EXPENDITURES-REPORTABLE | – |
| Aug 22, 2018 | Debt Service | $9,524,803.13 | INTEREST ON BONDS - GENERAL | – |
| May 28, 2019 | City University Construction Fund | $6,367,900.00 | OTHER EXPENDITURES-GENERAL | – |
| Mar 19, 2019 | Debt Service | $5,932,207.51 | INTEREST ON BONDS - GENERAL | – |
| Apr 1, 2019 | Debt Service | $3,679,750.00 | BLENDED COMPONENT UNITS | – |
| Nov 19, 2018 | City University Construction Fund | $3,373,104.78 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 19, 2018 | City University Construction Fund | $3,373,104.78 | OTHER EXPENDITURES-REPORTABLE | – |
| May 28, 2019 | City University Construction Fund | $2,373,361.75 | OTHER EXPENDITURES-GENERAL | – |
| May 28, 2019 | City University Construction Fund | $1,952,433.63 | OTHER EXPENDITURES-GENERAL | – |
| Oct 15, 2018 | Debt Service | $1,431,407.50 | BLENDED COMPONENT UNITS | – |
| Jul 16, 2018 | City University Construction Fund | $982,757.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 12, 2019 | Debt Service | $886,803.65 | BLENDED COMPONENT UNITS | – |
| Aug 21, 2018 | City University Construction Fund | $533,667.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 22, 2019 | City University Construction Fund | $520,549.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 25, 2019 | City University Construction Fund | $359,784.00 | OTHER EXPENDITURES-REPORTABLE | – |
| May 28, 2019 | City University Construction Fund | $270,858.02 | OTHER EXPENDITURES-GENERAL | – |
| May 28, 2019 | City University Construction Fund | $270,853.98 | OTHER EXPENDITURES-GENERAL | – |
| Dec 18, 2018 | Debt Service | $138,328.75 | COSTS ASSOC WITH FINANCING | – |
| Sep 24, 2018 | Debt Service | $136,825.18 | COSTS ASSOC WITH FINANCING | – |
FY 2018top 20 of 85 payments$164,369,967
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 21, 2018 | City University Construction Fund | $83,207,151.14 | OTHER EXPENDITURES-GENERAL | – |
| Nov 21, 2017 | City University Construction Fund | $41,673,261.62 | OTHER EXPENDITURES-GENERAL | – |
| Aug 10, 2017 | Debt Service | $8,895,508.13 | INTEREST ON BONDS - GENERAL | – |
| Aug 7, 2017 | Debt Service | $8,895,508.13 | INTEREST ON BONDS - GENERAL | – |
| Nov 21, 2017 | City University Construction Fund | $5,725,621.07 | OTHER EXPENDITURES-GENERAL | – |
| Nov 21, 2017 | City University Construction Fund | $5,725,621.06 | OTHER EXPENDITURES-GENERAL | – |
| Apr 13, 2018 | Debt Service | $4,916,520.88 | BLENDED COMPONENT UNITS | – |
| May 21, 2018 | City University Construction Fund | $2,995,357.90 | OTHER EXPENDITURES-GENERAL | – |
| May 21, 2018 | City University Construction Fund | $2,995,357.89 | OTHER EXPENDITURES-GENERAL | – |
| Oct 13, 2017 | Debt Service | $1,437,172.63 | BLENDED COMPONENT UNITS | – |
| Jan 22, 2018 | City University Construction Fund | $960,707.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 23, 2018 | City University Construction Fund | $912,899.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 23, 2017 | City University Construction Fund | $701,701.00 | OTHER EXPENDITURES-REPORTABLE | – |
| May 21, 2018 | City University Construction Fund | $538,641.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 18, 2018 | City University Construction Fund | $524,482.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 20, 2018 | City University Construction Fund | $399,527.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 24, 2017 | City University Construction Fund | $245,248.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 27, 2018 | Office of the Comptroller | $155,975.00 | PROF SERV OTHER | – |
| Apr 24, 2018 | Debt Service | $141,335.90 | COSTS ASSOC WITH FINANCING | – |
| May 9, 2018 | Debt Service | $141,335.90 | COSTS ASSOC WITH FINANCING | – |
FY 2017top 20 of 78 payments$174,435,023
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 17, 2017 | City University Construction Fund | $74,756,533.41 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 21, 2016 | City University Construction Fund | $32,637,474.04 | OTHER EXPENDITURES-GENERAL | – |
| May 30, 2017 | City University Construction Fund | $26,200,000.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 22, 2017 | Debt Service | $10,584,043.75 | INTEREST ON BONDS - GENERAL | – |
| Apr 13, 2017 | Debt Service | $4,806,108.50 | BLENDED COMPONENT UNITS | – |
| Nov 21, 2016 | City University Construction Fund | $4,293,461.99 | OTHER EXPENDITURES-GENERAL | – |
| Nov 21, 2016 | City University Construction Fund | $4,293,461.98 | OTHER EXPENDITURES-GENERAL | – |
| May 17, 2017 | City University Construction Fund | $4,159,454.20 | OTHER EXPENDITURES-REPORTABLE | – |
| May 17, 2017 | City University Construction Fund | $4,159,454.19 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 14, 2016 | Debt Service | $1,484,525.22 | BLENDED COMPONENT UNITS | – |
| Jan 23, 2017 | City University Construction Fund | $921,870.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 24, 2016 | City University Construction Fund | $921,012.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 24, 2017 | City University Construction Fund | $809,000.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 25, 2016 | City University Construction Fund | $682,504.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 21, 2016 | City University Construction Fund | $311,512.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 19, 2016 | City University Construction Fund | $282,460.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Mar 27, 2017 | City University Construction Fund | $279,880.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 21, 2017 | City University Construction Fund | $255,969.00 | OTHER EXPENDITURES-REPORTABLE | – |
| May 17, 2017 | City University Construction Fund | $206,578.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 12, 2017 | Office of the Comptroller | $191,298.33 | PROF SERV OTHER | – |
FY 2016top 20 of 72 payments$162,244,670
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 31, 2016 | City University Construction Fund | $93,739,905.29 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 30, 2015 | City University Construction Fund | $33,045,906.00 | OTHER EXPENDITURES-GENERAL | – |
| May 31, 2016 | City University Construction Fund | $11,145,140.11 | OTHER EXPENDITURES-REPORTABLE | – |
| May 31, 2016 | City University Construction Fund | $11,145,140.11 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 15, 2016 | Debt Service | $4,620,602.03 | BLENDED COMPONENT UNITS | – |
| Nov 30, 2015 | City University Construction Fund | $1,563,141.00 | OTHER EXPENDITURES-GENERAL | – |
| Nov 30, 2015 | City University Construction Fund | $1,563,141.00 | OTHER EXPENDITURES-GENERAL | – |
| Oct 15, 2015 | Debt Service | $1,491,404.68 | BLENDED COMPONENT UNITS | – |
| Jul 27, 2015 | City University Construction Fund | $616,684.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Sep 30, 2015 | City University Construction Fund | $608,555.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 27, 2016 | City University Construction Fund | $382,705.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jan 25, 2016 | City University Construction Fund | $301,120.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 15, 2016 | Office of the Comptroller | $172,005.00 | PROF SERV OTHER | – |
| Jul 21, 2015 | Office of the Comptroller | $151,665.80 | PROF SERV OTHER | – |
| Dec 21, 2015 | Debt Service | $115,992.47 | COSTS ASSOC WITH FINANCING | – |
| Dec 21, 2015 | Debt Service | $115,992.47 | COSTS ASSOC WITH FINANCING | – |
| Sep 8, 2015 | Debt Service | $115,992.46 | COSTS ASSOC WITH FINANCING | – |
| Sep 8, 2015 | Debt Service | $115,992.46 | COSTS ASSOC WITH FINANCING | – |
| Mar 28, 2016 | Debt Service | $114,731.68 | COSTS ASSOC WITH FINANCING | – |
| Mar 28, 2016 | Debt Service | $114,731.68 | COSTS ASSOC WITH FINANCING | – |
FY 2015top 20 of 93 payments$247,787,168
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 26, 2015 | City University Construction Fund | $70,093,276.00 | OTHER EXPENDITURES-GENERAL | – |
| May 26, 2015 | City University Construction Fund | $70,093,276.00 | OTHER EXPENDITURES-GENERAL | – |
| Nov 24, 2014 | City University Construction Fund | $37,236,287.00 | OTHER EXPENDITURES-GENERAL | – |
| Jun 29, 2015 | Debt Service | $13,600,000.00 | INTEREST ON BONDS - GENERAL | – |
| Jun 29, 2015 | Debt Service | $8,900,000.00 | INTEREST ON BONDS - GENERAL | – |
| May 26, 2015 | City University Construction Fund | $7,642,477.00 | OTHER EXPENDITURES-GENERAL | – |
| May 26, 2015 | City University Construction Fund | $7,642,476.00 | OTHER EXPENDITURES-GENERAL | – |
| May 26, 2015 | City University Construction Fund | $7,642,476.00 | OTHER EXPENDITURES-GENERAL | – |
| May 26, 2015 | City University Construction Fund | $7,642,476.00 | OTHER EXPENDITURES-GENERAL | – |
| Apr 15, 2015 | Debt Service | $4,579,731.56 | BLENDED COMPONENT UNITS | – |
| Nov 24, 2014 | City University Construction Fund | $1,939,855.00 | OTHER EXPENDITURES-GENERAL | – |
| Nov 24, 2014 | City University Construction Fund | $1,939,855.00 | OTHER EXPENDITURES-GENERAL | – |
| Oct 15, 2014 | Debt Service | $1,414,224.21 | BLENDED COMPONENT UNITS | – |
| Aug 4, 2014 | City University Construction Fund | $808,729.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 6, 2015 | City University Construction Fund | $619,376.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 27, 2014 | City University Construction Fund | $513,994.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Oct 14, 2014 | Debt Service | $415,107.13 | COSTS ASSOC WITH FINANCING | – |
| Oct 14, 2014 | Office of the Comptroller | $323,400.08 | INVESTMENT COSTS | – |
| Sep 22, 2014 | Office of the Comptroller | $284,311.27 | INVESTMENT COSTS | – |
| Sep 22, 2014 | Office of the Comptroller | $272,535.13 | INVESTMENT COSTS | – |
FY 2014top 20 of 122 payments$190,095,311
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 27, 2014 | City University Construction Fund | $89,952,665.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Dec 2, 2013 | City University Construction Fund | $38,528,628.00 | OTHER EXPENDITURES-GENERAL | – |
| Jun 23, 2014 | Debt Service | $22,541,371.14 | INTEREST ON BONDS - GENERAL | – |
| May 27, 2014 | City University Construction Fund | $7,181,269.00 | OTHER EXPENDITURES-REPORTABLE | – |
| May 27, 2014 | City University Construction Fund | $7,181,269.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Apr 15, 2014 | Debt Service | $4,519,369.45 | BLENDED COMPONENT UNITS | – |
| Dec 2, 2013 | City University Construction Fund | $4,359,356.00 | OTHER EXPENDITURES-GENERAL | – |
| Dec 2, 2013 | City University Construction Fund | $4,359,356.00 | OTHER EXPENDITURES-GENERAL | – |
| Oct 15, 2013 | Debt Service | $1,239,886.27 | BLENDED COMPONENT UNITS | – |
| May 5, 2014 | City University Construction Fund | $877,406.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Jul 29, 2013 | City University Construction Fund | $815,672.00 | OTHER EXPENDITURES-GENERAL | – |
| Feb 3, 2014 | City University Construction Fund | $811,772.00 | OTHER EXPENDITURES-GENERAL | – |
| Dec 19, 2013 | Debt Service | $736,900.00 | INTEREST ON BONDS - GENERAL | – |
| Dec 2, 2013 | City University Construction Fund | $631,646.00 | OTHER EXPENDITURES-GENERAL | – |
| Dec 24, 2013 | Debt Service | $415,531.42 | COSTS ASSOC WITH FINANCING | – |
| Oct 7, 2013 | Debt Service | $415,531.42 | COSTS ASSOC WITH FINANCING | – |
| Jun 24, 2014 | Debt Service | $411,014.76 | COSTS ASSOC WITH FINANCING | – |
| Jul 8, 2013 | Debt Service | $411,014.76 | COSTS ASSOC WITH FINANCING | – |
| Mar 17, 2014 | Debt Service | $406,498.12 | COSTS ASSOC WITH FINANCING | – |
| Dec 23, 2013 | Debt Service | $261,194.42 | COSTS ASSOC WITH FINANCING | – |
FY 2013top 20 of 110 payments$224,310,319
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 28, 2013 | City University Construction Fund | $89,533,790.00 | OTHER EXPENDITURES-GENERAL | – |
| Dec 3, 2012 | City University Construction Fund | $75,674,549.00 | OTHER EXPENDITURES-GENERAL | – |
| Jan 3, 2013 | Debt Service | $7,513,331.29 | INTEREST ON BONDS - GENERAL | – |
| Oct 23, 2012 | Debt Service | $6,614,537.47 | INTEREST ON BONDS - GENERAL | – |
| May 28, 2013 | City University Construction Fund | $6,234,663.00 | OTHER EXPENDITURES-GENERAL | – |
| May 28, 2013 | City University Construction Fund | $6,234,663.00 | OTHER EXPENDITURES-GENERAL | – |
| Apr 15, 2013 | Debt Service | $4,464,649.49 | BLENDED COMPONENT UNITS | – |
| Dec 3, 2012 | City University Construction Fund | $3,992,603.00 | OTHER EXPENDITURES-GENERAL | – |
| Dec 3, 2012 | City University Construction Fund | $3,992,603.00 | OTHER EXPENDITURES-GENERAL | – |
| Mar 19, 2013 | Debt Service | $1,630,562.50 | INTEREST ON BONDS - GENERAL | – |
| Oct 15, 2012 | Debt Service | $1,573,738.12 | BLENDED COMPONENT UNITS | – |
| Feb 4, 2013 | City University Construction Fund | $946,615.00 | OTHER EXPENDITURES-GENERAL | – |
| Feb 19, 2013 | Office of the Comptroller | $854,547.31 | INVESTMENT COSTS | – |
| Oct 22, 2012 | Office of the Comptroller | $668,249.33 | INVESTMENT COSTS | – |
| Oct 22, 2012 | Office of the Comptroller | $664,361.03 | INVESTMENT COSTS | – |
| Oct 22, 2012 | Office of the Comptroller | $651,272.50 | INVESTMENT COSTS | – |
| Dec 24, 2012 | Office of the Comptroller | $638,784.56 | INVESTMENT COSTS | – |
| Dec 24, 2012 | Office of the Comptroller | $593,864.63 | INVESTMENT COSTS | – |
| Dec 24, 2012 | Office of the Comptroller | $588,694.72 | INVESTMENT COSTS | – |
| Jul 26, 2012 | City University of New York | $565,005.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
FY 2012top 20 of 93 payments$198,703,074
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 21, 2012 | City University of New York | $86,229,779.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 30, 2011 | City University of New York | $26,844,053.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Mar 8, 2012 | Debt Service | $18,465,945.02 | INTEREST ON BONDS - GENERAL | – |
| May 21, 2012 | City University of New York | $13,797,362.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 30, 2011 | City University of New York | $13,763,207.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| May 21, 2012 | City University of New York | $7,780,977.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 30, 2011 | City University of New York | $7,780,973.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Apr 13, 2012 | Debt Service | $4,489,730.19 | BLENDED COMPONENT UNITS | – |
| Jun 7, 2012 | Debt Service | $4,428,840.46 | INTEREST ON BONDS - GENERAL | – |
| Oct 14, 2011 | Debt Service | $1,677,911.41 | BLENDED COMPONENT UNITS | – |
| Jul 27, 2011 | City University of New York | $981,253.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 3, 2011 | City University of New York | $909,275.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 2, 2011 | Office of the Comptroller | $850,844.00 | PROF SERV ACCTING & AUDITING | – |
| Feb 3, 2012 | City University of New York | $843,649.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| May 1, 2012 | City University of New York | $772,103.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Nov 30, 2011 | City University of New York | $575,560.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Oct 17, 2011 | Office of the Comptroller | $517,773.58 | INVESTMENT COSTS | – |
| Oct 17, 2011 | Office of the Comptroller | $514,351.30 | INVESTMENT COSTS | – |
| Oct 17, 2011 | Office of the Comptroller | $509,724.33 | INVESTMENT COSTS | – |
| Oct 17, 2011 | Office of the Comptroller | $472,010.73 | INVESTMENT COSTS | – |
FY 2011top 20 of 114 payments$191,535,404
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 7, 2011 | City University of New York | $90,307,026.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Dec 6, 2010 | City University of New York | $24,224,834.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Dec 6, 2010 | City University of New York | $13,788,054.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 7, 2011 | City University of New York | $13,739,599.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Dec 6, 2010 | City University of New York | $7,780,973.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 7, 2011 | City University of New York | $7,780,973.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Dec 6, 2010 | City University of New York | $7,463,986.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 7, 2011 | City University of New York | $7,443,690.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Apr 15, 2011 | Debt Service | $2,699,942.42 | BLENDED COMPONENT UNITS | – |
| Apr 1, 2011 | Debt Service | $2,454,695.38 | INTEREST ON BONDS - GENERAL | – |
| Oct 15, 2010 | Debt Service | $1,551,253.19 | BLENDED COMPONENT UNITS | – |
| Aug 9, 2010 | City University of New York | $1,132,732.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| May 2, 2011 | City University of New York | $941,463.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Feb 4, 2011 | City University of New York | $921,416.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Aug 12, 2010 | Debt Service | $650,000.00 | INTEREST ON BONDS - GENERAL | – |
| Jan 18, 2011 | Office of the Comptroller | $440,739.70 | INVESTMENT COSTS | – |
| Jun 23, 2011 | Debt Service | $420,000.00 | INTEREST ON BONDS - GENERAL | – |
| Jan 18, 2011 | Office of the Comptroller | $411,605.33 | INVESTMENT COSTS | – |
| Dec 27, 2010 | Office of the Comptroller | $406,865.06 | INVESTMENT COSTS | – |
| Jan 18, 2011 | Office of the Comptroller | $393,778.63 | INVESTMENT COSTS | – |
FY 2010top 20 of 36 payments$92,376,436
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 3, 2010 | City University of New York | $34,814,291.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 3, 2010 | City University of New York | $34,388,638.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 3, 2010 | City University of New York | $11,753,142.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Jun 3, 2010 | City University of New York | $7,780,973.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Apr 19, 2010 | Debt Service | $1,736,784.94 | BLENDED COMPONENT UNITS | – |
| May 3, 2010 | City University of New York | $782,134.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Mar 30, 2010 | Debt Service | $249,309.16 | COSTS ASSOC WITH FINANCING | – |
| Jun 22, 2010 | Debt Service | $245,587.16 | COSTS ASSOC WITH FINANCING | – |
| Jun 28, 2010 | Office of the Comptroller | $182,503.93 | PROF SERV OTHER | – |
| May 3, 2010 | City University of New York | $80,292.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Mar 30, 2010 | Debt Service | $70,919.31 | COSTS ASSOC WITH FINANCING | – |
| Jun 22, 2010 | Debt Service | $69,950.53 | COSTS ASSOC WITH FINANCING | – |
| Jan 25, 2010 | Debt Service | $64,440.26 | COSTS ASSOC WITH FINANCING | – |
| Jun 3, 2010 | City University of New York | $62,097.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| May 18, 2010 | Debt Service | $41,846.17 | COSTS ASSOC WITH FINANCING | – |
| May 18, 2010 | Debt Service | $20,492.78 | COSTS ASSOC WITH FINANCING | – |
| Jun 22, 2010 | Debt Service | $6,492.10 | COSTS ASSOC WITH FINANCING | – |
| Jun 3, 2010 | City University of New York | $6,395.00 | PAYMENTS TO DORM.AUTH.DBT.SVCE | – |
| Apr 13, 2010 | Office of the Comptroller | $3,595.86 | PROF SERV OTHER | – |
| Jan 13, 2010 | Office of the Comptroller | $2,636.77 | PROF SERV OTHER | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 25, 2025 | Office of the Comptroller | $104,890.00 | PROF SERV OTHER | Contracts |
| Jun 2, 2025 | Debt Service | -$115,023.44 | COSTS ASSOC WITH FINANCING | Contracts |
| Jun 2, 2025 | Debt Service | $115,023.44 | COSTS ASSOC WITH FINANCING | Contracts |
| May 27, 2025 | City University Construction Fund | $2,718,727.50 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| May 27, 2025 | City University Construction Fund | $6,054,625.00 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| May 5, 2025 | Department of Finance | $1,529.20 | COSTS ASSOC WITH FINANCING | Contracts |
| May 5, 2025 | Debt Service | $115,023.44 | COSTS ASSOC WITH FINANCING | Contracts |
| May 5, 2025 | Department of Finance | $3,021.24 | COSTS ASSOC WITH FINANCING | Contracts |
| May 5, 2025 | Department of Finance | $1,533.96 | COSTS ASSOC WITH FINANCING | Contracts |
| May 5, 2025 | Debt Service | -$115,023.44 | COSTS ASSOC WITH FINANCING | Contracts |
| Apr 15, 2025 | Debt Service | $6,006,442.54 | BLENDED COMPONENT UNITS | Others |
| Mar 17, 2025 | Department of Finance | $1,362.70 | COSTS ASSOC WITH FINANCING | Contracts |
| Mar 17, 2025 | Department of Finance | $1,296.14 | COSTS ASSOC WITH FINANCING | Contracts |
| Mar 17, 2025 | Department of Finance | $1,299.13 | COSTS ASSOC WITH FINANCING | Contracts |
| Mar 4, 2025 | Debt Service | $21,027.75 | COSTS ASSOC WITH FINANCING | Contracts |
| Mar 4, 2025 | Debt Service | $6,046.63 | COSTS ASSOC WITH FINANCING | Contracts |
| Mar 4, 2025 | Debt Service | $67,897.87 | COSTS ASSOC WITH FINANCING | Contracts |
| Nov 27, 2024 | City University Construction Fund | $6,054,625.00 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| Nov 27, 2024 | City University Construction Fund | $233,727.50 | OTHER EXPENDITURES-REPORTABLE | Trust & Agency |
| Nov 13, 2024 | Department of Finance | $1,296.27 | COSTS ASSOC WITH FINANCING | Contracts |
| Nov 13, 2024 | Department of Finance | $1,250.63 | COSTS ASSOC WITH FINANCING | Contracts |
| Nov 13, 2024 | Department of Finance | $1,295.42 | COSTS ASSOC WITH FINANCING | Contracts |
| Oct 15, 2024 | Debt Service | $921,164.50 | BLENDED COMPONENT UNITS | Others |
| Oct 15, 2024 | Debt Service | $88,925.62 | COSTS ASSOC WITH FINANCING | Contracts |
| Aug 12, 2024 | Department of Finance | $1,633.75 | COSTS ASSOC WITH FINANCING | Contracts |
Other vendors serving City University Construction Fund
- Dormitory Authority State of Ny $482,122,711
- FJ Sciame Construction Co Inc $345,453,415
- Liro Program and Construction Management Pe PC $135,481,521
- Research Foundation of the City University of New York $107,998,899
- Hill International Inc $73,844,589
- Weill Medical College of Cornell University $67,154,000
- Johnson Controls Inc $60,564,886
- Epic Management Inc $45,224,166
- Board of Managers of Two Court Square Condominium $35,143,400
- City University of New York Senior Colleges $34,656,519
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data