as recorded by New York City: HILL INTERNATIONAL INC

Hill International Inc is the 207th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 35th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.5% of everything the Department of Citywide Administrative Services has paid vendors in that span. Payments to it fell 24.1% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$309,960,941total received
4,726payments
13agencies
Feb 3, 2010Jun 24, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Hill International Inc. No spam.

Payments by fiscal year

FY 2025$2,602,540
FY 2024$3,430,761
FY 2023$1,643,092
FY 2022$2,266,897
FY 2021$5,400,174
FY 2020$7,481,197
FY 2019$12,593,322
FY 2018$24,869,852
FY 2017$33,946,985
FY 2016$36,165,028
FY 2015$29,288,609
FY 2014$24,266,722
FY 2013$29,364,542
FY 2012$51,879,599
FY 2011$41,336,800
FY 2010$3,424,821

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority521$1,035,973
FY 2025Department of Citywide Administrative Services5$824,616
FY 2025Department of Parks and Recreation44$641,494
FY 2025City University Construction Fund1$100,456
FY 2024School Construction Authority396$1,168,382
FY 2024City University Construction Fund1$1,085,014
FY 2024Department of Parks and Recreation42$1,065,469
FY 2024Fire Department1$64,249
FY 2024Department of Citywide Administrative Services1$47,648
FY 2023Department of Parks and Recreation39$1,257,352
FY 2023School Construction Authority236$262,070
FY 2023Department of Design and Construction2$64,000
FY 2023Department of Citywide Administrative Services3$59,670
FY 2022Department of Parks and Recreation60$1,267,411
FY 2022City University Construction Fund4$783,260
FY 2022School Construction Authority104$166,325
FY 2022Department of Citywide Administrative Services2$49,737
FY 2022Department of Environmental Protection1$164
FY 2021Department of Parks and Recreation106$2,030,556
FY 2021City University Construction Fund1$1,467,623
FY 2021Department of Design and Construction2$1,167,283
FY 2021Department of Citywide Administrative Services32$608,437
FY 2021School Construction Authority33$109,295
FY 2021Department of Environmental Protection4$16,980
FY 2020Department of Parks and Recreation116$3,996,954
FY 2020Department of Design and Construction2$1,527,665
FY 2020Department of Citywide Administrative Services16$1,023,395
FY 2020City University Construction Fund1$448,679
FY 2020School Construction Authority443$366,844
FY 2020Department of Environmental Protection11$117,660
FY 2019Department of Design and Construction11$4,534,615
FY 2019Department of Parks and Recreation152$3,641,822
FY 2019City University Construction Fund6$2,050,369
FY 2019Department of Citywide Administrative Services5$1,121,654
FY 2019School Construction Authority550$948,445
FY 2019Housing Preservation and Development1$135,000
FY 2019Department of Environmental Protection41$118,551
FY 2019Department of Correction1$38,721
FY 2019Department of Cultural Affairs1$2,258
FY 2019Department of Small Business Services1$1,889
FY 2018Department of Design and Construction11$9,723,862
FY 2018City University Construction Fund21$8,953,862
FY 2018Department of Parks and Recreation137$3,968,667
FY 2018Department of Citywide Administrative Services13$1,267,969
FY 2018School Construction Authority401$797,018
FY 2018Department of Environmental Protection36$148,650
FY 2018Housing Preservation and Development1$5,625
FY 2018Department of Cultural Affairs2$4,199
FY 2017City University Construction Fund14$16,898,528
FY 2017Department of Design and Construction10$10,936,321
FY 2017Department of Parks and Recreation88$3,571,162
FY 2017Department of Citywide Administrative Services26$1,388,717
FY 2017School Construction Authority244$716,847
FY 2017Housing Preservation and Development19$202,500
FY 2017Department of Cultural Affairs7$173,113
FY 2017Department of Environmental Protection9$52,955
FY 2017Department of Transportation1$6,840
FY 2016City University Construction Fund12$15,604,487
FY 2016Department of Design and Construction10$9,703,856
FY 2016Department of Citywide Administrative Services20$6,246,479
FY 2016Department of Parks and Recreation73$3,080,758
FY 2016Department of Cultural Affairs7$581,088
FY 2016Miscellaneous1$500,000
FY 2016School Construction Authority1$300,000
FY 2016Department of Correction2$77,164
FY 2016Housing Preservation and Development6$67,500
FY 2016Department of Environmental Protection4$3,697
FY 2015City University Construction Fund14$12,322,299
FY 2015Department of Citywide Administrative Services30$11,633,603
FY 2015Department of Parks and Recreation63$2,332,810
FY 2015Department of Design and Construction3$1,430,735
FY 2015Department of Cultural Affairs6$624,272
FY 2015School Construction Authority25$401,968
FY 2015Housing Preservation and Development9$265,375
FY 2015Department of Correction6$176,305
FY 2015Department of Environmental Protection10$101,242
FY 2014Department of Citywide Administrative Services16$13,537,132
FY 2014City University Construction Fund10$5,997,584
FY 2014Department of Parks and Recreation43$2,932,759
FY 2014Department of Cultural Affairs11$610,620
FY 2014Department of Correction5$584,919
FY 2014School Construction Authority21$419,054
FY 2014Department of Environmental Protection4$154,655
FY 2014Housing Preservation and Development1$30,000
FY 2013Department of Citywide Administrative Services23$17,177,833
FY 2013City University Construction Fund5$8,132,427
FY 2013Department of Parks and Recreation47$3,131,063
FY 2013Department of Cultural Affairs9$313,675
FY 2013School Construction Authority2$225,000
FY 2013Miscellaneous1$185,747
FY 2013Department of Environmental Protection2$121,186
FY 2013Department of Correction1$77,612
FY 2012Department of Citywide Administrative Services12$47,574,231
FY 2012Department of Parks and Recreation48$2,965,426
FY 2012Department of Cultural Affairs8$682,680
FY 2012Department of Correction3$357,261
FY 2012School Construction Authority2$300,000
FY 2011Department of Citywide Administrative Services19$34,824,690
FY 2011Department of Parks and Recreation60$5,485,180
FY 2011Department of Cultural Affairs4$575,926
FY 2011School Construction Authority2$350,181
FY 2011Department of Correction1$61,548
FY 2011Department of Environmental Protection1$38,230
FY 2011Housing Preservation and Development1$1,045
FY 2010Department of Citywide Administrative Services3$2,089,038
FY 2010Department of Parks and Recreation14$891,811
FY 2010Department of Cultural Affairs2$367,173
FY 2010Housing Preservation and Development2$38,705
FY 2010Department of Environmental Protection2$38,094
Total4,726$309,960,941

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
SUPPLIES + MATERIALS - GENERAL2$93,376Jan 13, 2020 Feb 19, 2020
OTHER EXPENDITURES-REPORTABLE79$60,937,838Feb 26, 2014 Jul 11, 2024
JUDGMENTS AND CLAIMS-NONEMP COMP1$500,000Dec 7, 2015 Dec 7, 2015
CONTRACTUAL SERVICES GENERAL61$3,994,035Jul 21, 2011 Sep 26, 2022
PROF SERV LEGAL SERVICES3$39,750Apr 29, 2010 Oct 13, 2010
PROF SERV OTHER46$39,024,164Feb 10, 2015 Jan 6, 2021
OFFICE EQUIPMENT MAINTENANCE24$376,875Feb 16, 2016 Sep 17, 2018
CAPITAL PURCHASED EQUIPMENT13$329,125Apr 9, 2014 Aug 3, 2015
DESIGN-CONSULTANT-BUILDINGS38$2,951,656Jul 19, 2010 Feb 16, 2016
PROMPT PAYMENT INTEREST4$236Nov 13, 2017 Nov 30, 2020
DESIGN-CONSULTANT-IOTB681$20,967,370Feb 16, 2010 Jun 23, 2025
JUDGMENTS AND CLAIMS-NOT REPORTABLE1$185,747May 1, 2013 May 1, 2013
ADMINISTRATIVE EXPENSES44$1,680,576Jul 25, 2014 Mar 25, 2019
POLLUTION REMEDIATION OBLIGATIONS19$1,597,349Oct 15, 2013 Sep 4, 2020
CONSTRUCTION-BUILDINGS3,224$149,137,431Feb 3, 2010 Jun 24, 2025
PROF SERV ENGINEER & ARCHITECT1$14,000Feb 27, 2023 Feb 27, 2023
IOTB CONSTRUCTION446$13,798,026Jul 27, 2010 Jun 9, 2025
DEMOLITION1$132,400Mar 16, 2020 Mar 16, 2020
AUDIO VISUAL SUPPLIES-BOE ONLY27$1,294,235Feb 24, 2011 Jun 12, 2014
OTHER EXPENDITURES-GENERAL11$12,906,751Feb 20, 2013 Jan 13, 2014

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 571 payments$2,602,540
DateAgencyAmountCategoryPurchase order
Jan 29, 2025Department of Citywide Administrative Services$230,841.85CONSTRUCTION-BUILDINGS
May 27, 2025Department of Citywide Administrative Services$229,501.98CONSTRUCTION-BUILDINGS
Mar 31, 2025Department of Citywide Administrative Services$220,948.71CONSTRUCTION-BUILDINGS
Jul 11, 2024City University Construction Fund$100,456.11OTHER EXPENDITURES-REPORTABLE
Mar 31, 2025Department of Citywide Administrative Services$79,442.85CONSTRUCTION-BUILDINGS
May 12, 2025Department of Citywide Administrative Services$63,880.94CONSTRUCTION-BUILDINGS
Jul 23, 2024Department of Parks and Recreation$63,720.00IOTB CONSTRUCTION
Sep 16, 2024Department of Parks and Recreation$49,392.00IOTB CONSTRUCTION
Mar 31, 2025Department of Parks and Recreation$47,040.00IOTB CONSTRUCTION
Oct 2, 2024Department of Parks and Recreation$45,155.00DESIGN-CONSULTANT-IOTB
Jan 13, 2025Department of Parks and Recreation$28,700.00IOTB CONSTRUCTION
Dec 16, 2024Department of Parks and Recreation$26,313.00IOTB CONSTRUCTION
Oct 1, 2024Department of Parks and Recreation$25,872.00IOTB CONSTRUCTION
Mar 10, 2025Department of Parks and Recreation$25,355.00DESIGN-CONSULTANT-IOTB
Jun 9, 2025Department of Parks and Recreation$24,640.00IOTB CONSTRUCTION
Feb 18, 2025Department of Parks and Recreation$24,080.00IOTB CONSTRUCTION
Nov 6, 2024Department of Parks and Recreation$23,520.00IOTB CONSTRUCTION
May 12, 2025Department of Parks and Recreation$23,520.00IOTB CONSTRUCTION
Jul 8, 2024Department of Parks and Recreation$22,344.00IOTB CONSTRUCTION
Dec 17, 2024Department of Parks and Recreation$20,860.00IOTB CONSTRUCTION
FY 2024top 20 of 441 payments$3,430,761
DateAgencyAmountCategoryPurchase order
Jul 19, 2023City University Construction Fund$1,085,014.34OTHER EXPENDITURES-REPORTABLE
Jul 19, 2023Department of Parks and Recreation$135,116.24IOTB CONSTRUCTION
Jul 25, 2023Department of Parks and Recreation$83,720.00IOTB CONSTRUCTION
Oct 30, 2023Department of Parks and Recreation$71,885.00CONSTRUCTION-BUILDINGS
Jul 1, 2023Department of Parks and Recreation$67,265.00CONSTRUCTION-BUILDINGS
Dec 11, 2023Fire Department$64,248.84IOTB CONSTRUCTION
Jan 16, 2024Department of Parks and Recreation$56,067.65IOTB CONSTRUCTION
Jul 5, 2023Department of Parks and Recreation$55,438.00IOTB CONSTRUCTION
Jan 8, 2024Department of Parks and Recreation$54,780.00CONSTRUCTION-BUILDINGS
Jan 29, 2024Department of Parks and Recreation$52,794.00IOTB CONSTRUCTION
Oct 31, 2023Department of Citywide Administrative Services$47,648.00CONSTRUCTION-BUILDINGS
Jan 30, 2024Department of Parks and Recreation$47,040.00IOTB CONSTRUCTION
Dec 18, 2023Department of Parks and Recreation$43,512.00IOTB CONSTRUCTION
Sep 11, 2023Department of Parks and Recreation$34,056.00IOTB CONSTRUCTION
Nov 20, 2023Department of Parks and Recreation$32,508.00IOTB CONSTRUCTION
Nov 8, 2023Department of Parks and Recreation$31,588.00IOTB CONSTRUCTION
Jun 17, 2024Department of Parks and Recreation$29,400.00IOTB CONSTRUCTION
May 13, 2024Department of Parks and Recreation$25,872.00IOTB CONSTRUCTION
Oct 2, 2023School Construction Authority$23,718.96CONSTRUCTION-BUILDINGS
Mar 27, 2024Department of Parks and Recreation$23,520.00IOTB CONSTRUCTION
FY 2023top 20 of 280 payments$1,643,092
DateAgencyAmountCategoryPurchase order
Jun 5, 2023Department of Parks and Recreation$107,855.00CONSTRUCTION-BUILDINGS
Aug 22, 2022Department of Parks and Recreation$77,976.00IOTB CONSTRUCTION
Jan 17, 2023Department of Parks and Recreation$72,423.75IOTB CONSTRUCTION
Jul 20, 2022Department of Parks and Recreation$65,120.00IOTB CONSTRUCTION
Oct 3, 2022Department of Parks and Recreation$65,120.00CONSTRUCTION-BUILDINGS
Jan 17, 2023Department of Parks and Recreation$64,152.00IOTB CONSTRUCTION
Oct 31, 2022Department of Parks and Recreation$62,964.00IOTB CONSTRUCTION
Aug 15, 2022Department of Parks and Recreation$60,720.00IOTB CONSTRUCTION
Feb 21, 2023Department of Parks and Recreation$57,346.00IOTB CONSTRUCTION
Jul 20, 2022Department of Parks and Recreation$57,087.95IOTB CONSTRUCTION
Nov 14, 2022Department of Parks and Recreation$53,444.03IOTB CONSTRUCTION
May 16, 2023Department of Parks and Recreation$52,948.00IOTB CONSTRUCTION
Sep 26, 2022Department of Design and Construction$50,000.00CONTRACTUAL SERVICES GENERAL
May 16, 2023Department of Parks and Recreation$49,104.00IOTB CONSTRUCTION
Nov 21, 2022Department of Parks and Recreation$46,872.00IOTB CONSTRUCTION
Feb 27, 2023Department of Parks and Recreation$45,712.00IOTB CONSTRUCTION
Nov 21, 2022Department of Parks and Recreation$43,461.00IOTB CONSTRUCTION
Sep 26, 2022Department of Parks and Recreation$42,570.00IOTB CONSTRUCTION
Mar 20, 2023Department of Citywide Administrative Services$42,067.30CONSTRUCTION-BUILDINGS
Jun 13, 2023Department of Parks and Recreation$36,130.50IOTB CONSTRUCTION
FY 2022top 20 of 171 payments$2,266,897
DateAgencyAmountCategoryPurchase order
Aug 9, 2021City University Construction Fund$361,932.96OTHER EXPENDITURES-REPORTABLE
Feb 23, 2022City University Construction Fund$303,055.47OTHER EXPENDITURES-REPORTABLE
Jul 7, 2021Department of Parks and Recreation$106,040.00CONSTRUCTION-BUILDINGS
Jan 10, 2022Department of Parks and Recreation$100,650.00CONSTRUCTION-BUILDINGS
Sep 20, 2021Department of Parks and Recreation$100,100.00CONSTRUCTION-BUILDINGS
Jun 6, 2022Department of Parks and Recreation$98,560.00CONSTRUCTION-BUILDINGS
May 16, 2022City University Construction Fund$74,142.36OTHER EXPENDITURES-REPORTABLE
Jan 7, 2022Department of Parks and Recreation$72,468.00IOTB CONSTRUCTION
Mar 16, 2022Department of Parks and Recreation$72,100.00CONSTRUCTION-BUILDINGS
Apr 4, 2022Department of Parks and Recreation$56,256.00IOTB CONSTRUCTION
Jan 18, 2022Department of Parks and Recreation$55,000.00DESIGN-CONSULTANT-IOTB
Apr 4, 2022Department of Parks and Recreation$53,568.00IOTB CONSTRUCTION
Nov 8, 2021Department of Parks and Recreation$52,800.00CONSTRUCTION-BUILDINGS
Sep 20, 2021Department of Parks and Recreation$52,704.00IOTB CONSTRUCTION
Dec 22, 2021Department of Parks and Recreation$50,304.00IOTB CONSTRUCTION
Aug 31, 2021Department of Parks and Recreation$48,672.00IOTB CONSTRUCTION
Feb 7, 2022Department of Citywide Administrative Services$48,248.01CONSTRUCTION-BUILDINGS
Apr 27, 2022Department of Parks and Recreation$48,002.46IOTB CONSTRUCTION
May 9, 2022Department of Parks and Recreation$47,850.00IOTB CONSTRUCTION
Oct 12, 2021Department of Parks and Recreation$46,090.00IOTB CONSTRUCTION
FY 2021top 20 of 178 payments$5,400,174
DateAgencyAmountCategoryPurchase order
Nov 23, 2020City University Construction Fund$1,467,622.84OTHER EXPENDITURES-REPORTABLE
Jan 6, 2021Department of Design and Construction$876,069.09PROF SERV OTHER
Sep 14, 2020Department of Design and Construction$291,213.85PROF SERV OTHER
Mar 11, 2021Department of Parks and Recreation$136,950.00CONSTRUCTION-BUILDINGS
Nov 9, 2020Department of Parks and Recreation$98,560.00CONSTRUCTION-BUILDINGS
Jan 27, 2021Department of Parks and Recreation$90,768.00IOTB CONSTRUCTION
Aug 12, 2020Department of Parks and Recreation$73,920.00IOTB CONSTRUCTION
Mar 24, 2021Department of Parks and Recreation$73,480.00IOTB CONSTRUCTION
Nov 18, 2020Department of Parks and Recreation$62,608.00IOTB CONSTRUCTION
Aug 20, 2020Department of Citywide Administrative Services$62,179.76CONSTRUCTION-BUILDINGS
Jan 29, 2021Department of Parks and Recreation$61,975.00IOTB CONSTRUCTION
Nov 18, 2020Department of Parks and Recreation$57,640.00IOTB CONSTRUCTION
Mar 24, 2021Department of Parks and Recreation$57,564.00IOTB CONSTRUCTION
Jun 1, 2021Department of Parks and Recreation$56,980.00IOTB CONSTRUCTION
Sep 4, 2020Department of Citywide Administrative Services$55,786.82CONSTRUCTION-BUILDINGS
Apr 19, 2021Department of Parks and Recreation$54,170.50IOTB CONSTRUCTION
Apr 19, 2021Department of Parks and Recreation$52,982.00IOTB CONSTRUCTION
Dec 31, 2020Department of Parks and Recreation$52,141.41IOTB CONSTRUCTION
Aug 7, 2020Department of Parks and Recreation$51,985.00IOTB CONSTRUCTION
Dec 7, 2020Department of Parks and Recreation$50,208.00IOTB CONSTRUCTION
FY 2020top 20 of 589 payments$7,481,197
DateAgencyAmountCategoryPurchase order
Feb 3, 2020Department of Design and Construction$1,007,181.63PROF SERV OTHER
Nov 25, 2019Department of Citywide Administrative Services$625,269.86CONSTRUCTION-BUILDINGS
Jul 29, 2019Department of Design and Construction$520,483.48PROF SERV OTHER
Oct 21, 2019Department of Parks and Recreation$495,588.00IOTB CONSTRUCTION
Apr 28, 2020City University Construction Fund$448,679.18OTHER EXPENDITURES-REPORTABLE
Apr 27, 2020Department of Parks and Recreation$222,055.00IOTB CONSTRUCTION
Nov 27, 2019Department of Parks and Recreation$177,261.00CONTRACTUAL SERVICES GENERAL
Mar 16, 2020Department of Parks and Recreation$132,400.00DEMOLITION
Jul 24, 2019Department of Parks and Recreation$111,132.00CONTRACTUAL SERVICES GENERAL
Nov 27, 2019Department of Citywide Administrative Services$106,317.24CONSTRUCTION-BUILDINGS
Jun 16, 2020Department of Parks and Recreation$90,290.00CONTRACTUAL SERVICES GENERAL
Jan 13, 2020Department of Parks and Recreation$89,278.00SUPPLIES + MATERIALS - GENERAL
Oct 28, 2019Department of Parks and Recreation$76,221.00IOTB CONSTRUCTION
Nov 25, 2019Department of Parks and Recreation$75,762.00IOTB CONSTRUCTION
May 28, 2020Department of Parks and Recreation$72,144.00IOTB CONSTRUCTION
Sep 17, 2019Department of Parks and Recreation$71,904.00IOTB CONSTRUCTION
Sep 18, 2019Department of Parks and Recreation$70,522.00DESIGN-CONSULTANT-IOTB
Aug 19, 2019Department of Parks and Recreation$67,797.50CONTRACTUAL SERVICES GENERAL
Jan 13, 2020Department of Parks and Recreation$66,528.00IOTB CONSTRUCTION
Jun 16, 2020Department of Parks and Recreation$66,230.00IOTB CONSTRUCTION
FY 2019top 20 of 769 payments$12,593,322
DateAgencyAmountCategoryPurchase order
Jul 23, 2018Department of Design and Construction$1,044,572.94PROF SERV OTHER
Feb 11, 2019Department of Design and Construction$889,320.82PROF SERV OTHER
Oct 16, 2018Department of Design and Construction$797,798.47PROF SERV OTHER
Apr 18, 2019Department of Citywide Administrative Services$690,471.13CONSTRUCTION-BUILDINGS
Feb 6, 2019City University Construction Fund$660,604.44OTHER EXPENDITURES-REPORTABLE
Oct 23, 2018City University Construction Fund$450,994.68OTHER EXPENDITURES-REPORTABLE
Jun 10, 2019City University Construction Fund$440,314.79OTHER EXPENDITURES-REPORTABLE
Aug 22, 2018Department of Design and Construction$431,666.23PROF SERV OTHER
Dec 24, 2018Department of Design and Construction$368,020.54PROF SERV OTHER
Dec 3, 2018Department of Design and Construction$339,623.93PROF SERV OTHER
Oct 30, 2018School Construction Authority$315,000.00ADMINISTRATIVE EXPENSES
May 8, 2019Department of Design and Construction$311,625.69PROF SERV OTHER
Aug 13, 2018City University Construction Fund$294,581.31OTHER EXPENDITURES-REPORTABLE
Sep 18, 2018Department of Parks and Recreation$286,459.13IOTB CONSTRUCTION
Mar 26, 2019Department of Design and Construction$257,275.83PROF SERV OTHER
Mar 4, 2019Department of Parks and Recreation$248,004.66IOTB CONSTRUCTION
Jul 25, 2018Department of Citywide Administrative Services$208,358.91CONSTRUCTION-BUILDINGS
Jul 25, 2018Department of Citywide Administrative Services$206,851.85CONSTRUCTION-BUILDINGS
Jul 9, 2018Department of Parks and Recreation$202,068.81IOTB CONSTRUCTION
Dec 4, 2018Department of Parks and Recreation$182,227.39IOTB CONSTRUCTION
FY 2018top 20 of 622 payments$24,869,852
DateAgencyAmountCategoryPurchase order
Sep 26, 2017Department of Design and Construction$2,281,436.43PROF SERV OTHER
Jul 17, 2017Department of Design and Construction$2,190,804.87PROF SERV OTHER
Oct 10, 2017Department of Design and Construction$1,720,198.16PROF SERV OTHER
Sep 19, 2017City University Construction Fund$1,408,648.59OTHER EXPENDITURES-REPORTABLE
Jul 11, 2017City University Construction Fund$1,306,673.05OTHER EXPENDITURES-REPORTABLE
Apr 9, 2018Department of Design and Construction$1,154,219.38PROF SERV OTHER
Aug 15, 2017City University Construction Fund$931,139.01OTHER EXPENDITURES-REPORTABLE
Mar 28, 2018City University Construction Fund$806,177.43OTHER EXPENDITURES-REPORTABLE
Oct 17, 2017City University Construction Fund$796,259.41OTHER EXPENDITURES-REPORTABLE
Aug 8, 2017City University Construction Fund$773,549.01OTHER EXPENDITURES-REPORTABLE
Sep 26, 2017Department of Design and Construction$773,131.60PROF SERV OTHER
May 9, 2018City University Construction Fund$771,523.80OTHER EXPENDITURES-REPORTABLE
Jan 2, 2018Department of Design and Construction$704,265.09PROF SERV OTHER
Jun 21, 2018City University Construction Fund$648,464.62OTHER EXPENDITURES-REPORTABLE
Feb 26, 2018City University Construction Fund$628,258.16OTHER EXPENDITURES-REPORTABLE
Feb 1, 2018Department of Design and Construction$588,220.96PROF SERV OTHER
Oct 23, 2017Department of Citywide Administrative Services$457,409.70CONSTRUCTION-BUILDINGS
Nov 15, 2017City University Construction Fund$398,755.38OTHER EXPENDITURES-REPORTABLE
Dec 11, 2017Department of Citywide Administrative Services$396,027.80CONSTRUCTION-BUILDINGS
Jan 24, 2018Department of Parks and Recreation$371,183.60IOTB CONSTRUCTION
FY 2017top 20 of 418 payments$33,946,985
DateAgencyAmountCategoryPurchase order
Dec 27, 2016City University Construction Fund$3,039,935.50OTHER EXPENDITURES-REPORTABLE
Jul 25, 2016City University Construction Fund$2,356,729.19OTHER EXPENDITURES-REPORTABLE
Aug 22, 2016City University Construction Fund$2,015,740.26OTHER EXPENDITURES-REPORTABLE
Nov 17, 2016Department of Design and Construction$1,863,311.24PROF SERV OTHER
Apr 17, 2017Department of Design and Construction$1,826,750.05PROF SERV OTHER
Jul 8, 2016Department of Design and Construction$1,826,082.83PROF SERV OTHER
Sep 27, 2016City University Construction Fund$1,636,771.69OTHER EXPENDITURES-REPORTABLE
Jan 25, 2017City University Construction Fund$1,424,472.26OTHER EXPENDITURES-REPORTABLE
Jun 6, 2017City University Construction Fund$1,211,889.58OTHER EXPENDITURES-REPORTABLE
Oct 17, 2016City University Construction Fund$1,139,916.75OTHER EXPENDITURES-REPORTABLE
Feb 28, 2017Department of Design and Construction$1,123,727.70PROF SERV OTHER
Dec 28, 2016Department of Design and Construction$1,089,659.51PROF SERV OTHER
May 30, 2017Department of Design and Construction$1,086,759.42PROF SERV OTHER
May 1, 2017City University Construction Fund$981,417.84OTHER EXPENDITURES-REPORTABLE
Dec 5, 2016City University Construction Fund$973,082.46OTHER EXPENDITURES-REPORTABLE
Feb 27, 2017City University Construction Fund$876,082.21OTHER EXPENDITURES-REPORTABLE
Sep 13, 2016Department of Design and Construction$841,963.95PROF SERV OTHER
Aug 8, 2016Department of Design and Construction$758,558.62PROF SERV OTHER
Mar 28, 2017City University Construction Fund$560,756.85OTHER EXPENDITURES-REPORTABLE
Mar 28, 2017City University Construction Fund$522,215.87OTHER EXPENDITURES-REPORTABLE
FY 2016top 20 of 136 payments$36,165,028
DateAgencyAmountCategoryPurchase order
Jul 20, 2015Department of Design and Construction$3,292,446.51PROF SERV OTHER
Feb 8, 2016City University Construction Fund$1,967,888.40OTHER EXPENDITURES-REPORTABLE
Mar 31, 2016Department of Design and Construction$1,865,817.15PROF SERV OTHER
Mar 21, 2016City University Construction Fund$1,778,409.97OTHER EXPENDITURES-REPORTABLE
Jun 30, 2016City University Construction Fund$1,598,889.48OTHER EXPENDITURES-REPORTABLE
May 18, 2016Department of Design and Construction$1,563,072.13PROF SERV OTHER
May 11, 2016City University Construction Fund$1,556,419.32OTHER EXPENDITURES-REPORTABLE
Jan 11, 2016City University Construction Fund$1,372,715.39OTHER EXPENDITURES-REPORTABLE
Apr 18, 2016City University Construction Fund$1,369,791.12OTHER EXPENDITURES-REPORTABLE
Oct 26, 2015City University Construction Fund$1,240,846.83OTHER EXPENDITURES-REPORTABLE
Dec 21, 2015City University Construction Fund$1,219,169.25OTHER EXPENDITURES-REPORTABLE
Nov 24, 2015City University Construction Fund$1,144,463.43OTHER EXPENDITURES-REPORTABLE
Dec 7, 2015Department of Citywide Administrative Services$1,031,680.30CONSTRUCTION-BUILDINGS
Aug 3, 2015Department of Citywide Administrative Services$1,031,281.21CONSTRUCTION-BUILDINGS
Jul 27, 2015City University Construction Fund$991,429.01OTHER EXPENDITURES-REPORTABLE
Aug 19, 2015Department of Design and Construction$988,489.82PROF SERV OTHER
Aug 18, 2015City University Construction Fund$800,862.29OTHER EXPENDITURES-REPORTABLE
Jul 10, 2015Department of Citywide Administrative Services$641,767.82CONSTRUCTION-BUILDINGS
Aug 25, 2015Department of Citywide Administrative Services$640,590.90CONSTRUCTION-BUILDINGS
Sep 23, 2015Department of Design and Construction$599,568.72PROF SERV OTHER
FY 2015top 20 of 166 payments$29,288,609
DateAgencyAmountCategoryPurchase order
Feb 9, 2015City University Construction Fund$1,535,946.36OTHER EXPENDITURES-REPORTABLE
Jul 16, 2014Department of Citywide Administrative Services$1,512,586.18CONSTRUCTION-BUILDINGS
Nov 24, 2014City University Construction Fund$1,439,021.52OTHER EXPENDITURES-REPORTABLE
Dec 23, 2014City University Construction Fund$1,423,306.11OTHER EXPENDITURES-REPORTABLE
May 13, 2015Department of Citywide Administrative Services$1,149,859.89CONSTRUCTION-BUILDINGS
Dec 23, 2014City University Construction Fund$1,125,374.85OTHER EXPENDITURES-REPORTABLE
Oct 2, 2014Department of Citywide Administrative Services$1,120,282.57CONSTRUCTION-BUILDINGS
Mar 16, 2015City University Construction Fund$1,015,182.63OTHER EXPENDITURES-REPORTABLE
Nov 24, 2014City University Construction Fund$931,171.06OTHER EXPENDITURES-REPORTABLE
Aug 27, 2014City University Construction Fund$882,005.30OTHER EXPENDITURES-REPORTABLE
Dec 10, 2014Department of Citywide Administrative Services$858,401.17CONSTRUCTION-BUILDINGS
Aug 13, 2014Department of Citywide Administrative Services$805,936.36CONSTRUCTION-BUILDINGS
Jun 10, 2015Department of Citywide Administrative Services$762,253.75CONSTRUCTION-BUILDINGS
Mar 24, 2015City University Construction Fund$737,988.71OTHER EXPENDITURES-REPORTABLE
Mar 26, 2015City University Construction Fund$715,192.63OTHER EXPENDITURES-REPORTABLE
Aug 18, 2014City University Construction Fund$713,627.66OTHER EXPENDITURES-REPORTABLE
Jul 8, 2014City University Construction Fund$708,034.82OTHER EXPENDITURES-REPORTABLE
Jan 14, 2015Department of Citywide Administrative Services$685,948.54CONSTRUCTION-BUILDINGS
May 18, 2015Department of Design and Construction$591,974.60PROF SERV OTHER
Feb 10, 2015Department of Design and Construction$552,502.13PROF SERV OTHER
FY 2014top 20 of 111 payments$24,266,722
DateAgencyAmountCategoryPurchase order
Dec 23, 2013Department of Citywide Administrative Services$2,292,974.32CONSTRUCTION-BUILDINGS
Jul 16, 2013Department of Citywide Administrative Services$1,918,353.52CONSTRUCTION-BUILDINGS
Aug 16, 2013Department of Citywide Administrative Services$1,847,355.61CONSTRUCTION-BUILDINGS
Oct 22, 2013Department of Citywide Administrative Services$1,603,057.92CONSTRUCTION-BUILDINGS
Nov 29, 2013Department of Citywide Administrative Services$1,531,696.93CONSTRUCTION-BUILDINGS
Sep 16, 2013Department of Citywide Administrative Services$1,498,052.37CONSTRUCTION-BUILDINGS
Oct 1, 2013City University Construction Fund$1,237,244.79OTHER EXPENDITURES-GENERAL
Jan 13, 2014City University Construction Fund$955,538.28OTHER EXPENDITURES-GENERAL
Nov 12, 2013City University Construction Fund$917,819.94OTHER EXPENDITURES-GENERAL
Sep 16, 2013Department of Citywide Administrative Services$707,861.93CONSTRUCTION-BUILDINGS
Aug 27, 2013City University Construction Fund$679,078.90OTHER EXPENDITURES-GENERAL
Sep 16, 2013City University Construction Fund$562,938.75OTHER EXPENDITURES-GENERAL
Feb 12, 2014Department of Citywide Administrative Services$540,381.08CONSTRUCTION-BUILDINGS
Dec 11, 2013Department of Parks and Recreation$448,528.00DESIGN-CONSULTANT-IOTB
Mar 3, 2014Department of Parks and Recreation$444,792.00DESIGN-CONSULTANT-IOTB
Feb 26, 2014City University Construction Fund$432,493.63OTHER EXPENDITURES-REPORTABLE
Mar 10, 2014Department of Citywide Administrative Services$428,666.83CONSTRUCTION-BUILDINGS
Dec 24, 2013City University Construction Fund$421,703.58OTHER EXPENDITURES-GENERAL
Apr 21, 2014City University Construction Fund$326,106.47OTHER EXPENDITURES-REPORTABLE
Jun 2, 2014Department of Citywide Administrative Services$295,994.71CONSTRUCTION-BUILDINGS
FY 2013top 20 of 90 payments$29,364,542
DateAgencyAmountCategoryPurchase order
Feb 20, 2013City University Construction Fund$3,580,923.24OTHER EXPENDITURES-GENERAL
Oct 30, 2012Department of Citywide Administrative Services$2,567,317.01CONSTRUCTION-BUILDINGS
May 28, 2013Department of Citywide Administrative Services$2,183,205.24CONSTRUCTION-BUILDINGS
Apr 16, 2013Department of Citywide Administrative Services$2,153,960.94CONSTRUCTION-BUILDINGS
Jun 25, 2013City University Construction Fund$1,594,642.19OTHER EXPENDITURES-GENERAL
Mar 29, 2013Department of Citywide Administrative Services$1,374,041.05CONSTRUCTION-BUILDINGS
Jul 11, 2012Department of Citywide Administrative Services$1,314,339.36CONSTRUCTION-BUILDINGS
Sep 17, 2012Department of Citywide Administrative Services$1,295,427.64CONSTRUCTION-BUILDINGS
Jan 30, 2013Department of Citywide Administrative Services$1,134,013.45CONSTRUCTION-BUILDINGS
May 15, 2013City University Construction Fund$1,103,097.21OTHER EXPENDITURES-GENERAL
Aug 6, 2012Department of Citywide Administrative Services$1,059,846.18CONSTRUCTION-BUILDINGS
Apr 29, 2013City University Construction Fund$1,013,984.36OTHER EXPENDITURES-GENERAL
Mar 25, 2013City University Construction Fund$839,780.07OTHER EXPENDITURES-GENERAL
Feb 20, 2013Department of Citywide Administrative Services$779,487.26CONSTRUCTION-BUILDINGS
Dec 10, 2012Department of Citywide Administrative Services$726,942.01CONSTRUCTION-BUILDINGS
Jun 20, 2013Department of Citywide Administrative Services$644,009.84CONSTRUCTION-BUILDINGS
Oct 10, 2012Department of Citywide Administrative Services$484,415.26CONSTRUCTION-BUILDINGS
Jun 4, 2013Department of Citywide Administrative Services$398,415.00CONSTRUCTION-BUILDINGS
Oct 22, 2012Department of Parks and Recreation$394,288.00DESIGN-CONSULTANT-BUILDINGS
Jul 9, 2012Department of Parks and Recreation$392,506.00DESIGN-CONSULTANT-IOTB
FY 2012top 20 of 73 payments$51,879,599
DateAgencyAmountCategoryPurchase order
Dec 9, 2011Department of Citywide Administrative Services$6,217,995.67CONSTRUCTION-BUILDINGS
Nov 7, 2011Department of Citywide Administrative Services$5,629,866.13CONSTRUCTION-BUILDINGS
Jan 9, 2012Department of Citywide Administrative Services$5,607,912.60CONSTRUCTION-BUILDINGS
Jul 26, 2011Department of Citywide Administrative Services$5,235,527.62CONSTRUCTION-BUILDINGS
Jan 30, 2012Department of Citywide Administrative Services$4,426,248.56CONSTRUCTION-BUILDINGS
Oct 5, 2011Department of Citywide Administrative Services$4,306,944.09CONSTRUCTION-BUILDINGS
Sep 6, 2011Department of Citywide Administrative Services$4,091,656.91CONSTRUCTION-BUILDINGS
Mar 5, 2012Department of Citywide Administrative Services$2,868,565.72CONSTRUCTION-BUILDINGS
May 14, 2012Department of Citywide Administrative Services$2,674,798.15CONSTRUCTION-BUILDINGS
Jun 11, 2012Department of Citywide Administrative Services$2,608,983.93CONSTRUCTION-BUILDINGS
Apr 23, 2012Department of Citywide Administrative Services$2,498,651.93CONSTRUCTION-BUILDINGS
Oct 5, 2011Department of Citywide Administrative Services$1,407,079.57CONSTRUCTION-BUILDINGS
Nov 14, 2011Department of Parks and Recreation$401,183.93DESIGN-CONSULTANT-IOTB
Mar 26, 2012Department of Parks and Recreation$326,759.00DESIGN-CONSULTANT-IOTB
Nov 14, 2011Department of Parks and Recreation$228,113.00DESIGN-CONSULTANT-IOTB
May 4, 2012School Construction Authority$200,000.00AUDIO VISUAL SUPPLIES-BOE ONLY
Sep 7, 2011Department of Parks and Recreation$194,506.00DESIGN-CONSULTANT-BUILDINGS
Apr 23, 2012Department of Parks and Recreation$192,280.00DESIGN-CONSULTANT-BUILDINGS
Jan 23, 2012Department of Correction$188,979.59CONSTRUCTION-BUILDINGS
Mar 26, 2012Department of Parks and Recreation$166,594.90DESIGN-CONSULTANT-IOTB
FY 2011top 20 of 88 payments$41,336,800
DateAgencyAmountCategoryPurchase order
Jun 28, 2011Department of Citywide Administrative Services$7,648,270.32CONSTRUCTION-BUILDINGS
Apr 4, 2011Department of Citywide Administrative Services$5,768,652.13CONSTRUCTION-BUILDINGS
Feb 14, 2011Department of Citywide Administrative Services$4,276,684.51CONSTRUCTION-BUILDINGS
May 3, 2011Department of Citywide Administrative Services$3,718,944.20CONSTRUCTION-BUILDINGS
Mar 10, 2011Department of Citywide Administrative Services$3,071,191.76CONSTRUCTION-BUILDINGS
Dec 6, 2010Department of Citywide Administrative Services$2,314,304.67CONSTRUCTION-BUILDINGS
May 31, 2011Department of Citywide Administrative Services$2,231,295.00CONSTRUCTION-BUILDINGS
Nov 17, 2010Department of Citywide Administrative Services$1,980,698.31CONSTRUCTION-BUILDINGS
Oct 25, 2010Department of Citywide Administrative Services$1,683,770.44CONSTRUCTION-BUILDINGS
Jan 7, 2011Department of Citywide Administrative Services$998,662.63CONSTRUCTION-BUILDINGS
Aug 19, 2010Department of Citywide Administrative Services$753,531.67CONSTRUCTION-BUILDINGS
Jun 13, 2011Department of Parks and Recreation$716,148.00DESIGN-CONSULTANT-IOTB
Jul 27, 2010Department of Parks and Recreation$684,400.00IOTB CONSTRUCTION
Nov 1, 2010Department of Parks and Recreation$661,666.00IOTB CONSTRUCTION
Feb 24, 2011School Construction Authority$300,000.00AUDIO VISUAL SUPPLIES-BOE ONLY
Nov 22, 2010Department of Parks and Recreation$249,453.84DESIGN-CONSULTANT-IOTB
Jun 6, 2011Department of Parks and Recreation$218,332.00DESIGN-CONSULTANT-BUILDINGS
Jan 26, 2011Department of Parks and Recreation$215,440.00IOTB CONSTRUCTION
Dec 27, 2010Department of Cultural Affairs$202,124.26CONSTRUCTION-BUILDINGS
Mar 2, 2011Department of Parks and Recreation$179,263.09DESIGN-CONSULTANT-IOTB
FY 2010top 20 of 23 payments$3,424,821
DateAgencyAmountCategoryPurchase order
Jun 28, 2010Department of Citywide Administrative Services$1,060,068.01CONSTRUCTION-BUILDINGS
Apr 5, 2010Department of Citywide Administrative Services$541,883.64CONSTRUCTION-BUILDINGS
Feb 3, 2010Department of Citywide Administrative Services$487,086.12CONSTRUCTION-BUILDINGS
Jun 22, 2010Department of Cultural Affairs$283,016.41CONSTRUCTION-BUILDINGS
Mar 1, 2010Department of Parks and Recreation$181,034.00DESIGN-CONSULTANT-IOTB
Mar 1, 2010Department of Parks and Recreation$156,100.00DESIGN-CONSULTANT-IOTB
Feb 8, 2010Department of Cultural Affairs$84,156.62CONSTRUCTION-BUILDINGS
Jun 1, 2010Department of Parks and Recreation$71,200.00DESIGN-CONSULTANT-IOTB
Feb 16, 2010Department of Parks and Recreation$71,009.00DESIGN-CONSULTANT-IOTB
Apr 6, 2010Department of Parks and Recreation$65,392.00DESIGN-CONSULTANT-IOTB
Jun 9, 2010Department of Parks and Recreation$64,386.00DESIGN-CONSULTANT-IOTB
Jun 9, 2010Department of Parks and Recreation$49,395.00DESIGN-CONSULTANT-IOTB
Apr 26, 2010Department of Parks and Recreation$46,258.00DESIGN-CONSULTANT-IOTB
Mar 1, 2010Department of Parks and Recreation$45,780.00DESIGN-CONSULTANT-IOTB
Apr 19, 2010Department of Parks and Recreation$39,972.00DESIGN-CONSULTANT-IOTB
Apr 19, 2010Department of Parks and Recreation$38,628.00DESIGN-CONSULTANT-IOTB
Feb 17, 2010Department of Environmental Protection$27,304.00DESIGN-CONSULTANT-IOTB
Jun 14, 2010Department of Parks and Recreation$26,928.00DESIGN-CONSULTANT-IOTB
Apr 29, 2010Housing Preservation and Development$24,581.65PROF SERV LEGAL SERVICES
Jun 1, 2010Department of Parks and Recreation$19,952.00DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
Jun 24, 2025School Construction Authority$1,801.77CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$189.66CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$189.66CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$853.47CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$474.15CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$7,870.89CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$4,267.35CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$94.83CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,785.24CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,612.11CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,991.43CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$3,852.36CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$474.15CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,879.20CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$4,322.16CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$5,310.48CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,221.48CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$4,134.24CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,517.28CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$3,006.72CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$663.81CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$2,370.75CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$1,597.32CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$189.66CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2025School Construction Authority$4,979.88CONSTRUCTION-BUILDINGSCapital Contracts