Svam International Inc: New York City Government Payments
as recorded by New York City: SVAM INTERNATIONAL INC
Svam International Inc is the 663rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 9th in PROF SERV COMPUTER SERVICES spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it rose 111.5% year over year.
Primary spending category: PROF SERV COMPUTER SERVICES
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| CONSTRUCTION-BUILDINGS | 104 | $9,957,327 | Jun 20, 2019 – Jun 26, 2025 |
| PROF SERV OTHER | 49 | $817,165 | Aug 14, 2017 – Jan 11, 2023 |
| PROMPT PAYMENT INTEREST | 7 | $748 | Feb 29, 2024 – Feb 12, 2025 |
| OTHR SERV AND CHRGS-GENERAL | 27 | $610,495 | Jul 5, 2012 – Feb 26, 2025 |
| CAPITAL PURCHASED EQUIPMENT | 263 | $5,541,932 | May 24, 2010 – May 6, 2025 |
| PROF SERV COMPUTER SERVICES | 854 | $50,637,954 | Feb 8, 2010 – Jun 30, 2025 |
| EXPENSE ONLY FUNDED SBITA | 3 | $469,860 | May 6, 2025 – May 6, 2025 |
| DATA PROCESSING SUPPLIES | 5 | $299,950 | Mar 9, 2016 – Aug 9, 2021 |
| SPLIT FUNDED SBITA | 3 | $253,442 | Apr 5, 2024 – Apr 10, 2024 |
| N/A | 10 | $213,988 | Jan 26, 2021 – Oct 7, 2021 |
| TEMPORARY SERVICES | 11 | $183,456 | Sep 26, 2023 – Feb 20, 2024 |
| TELECOMMUNICATIONS EQUIPMENT | 1 | $17,800 | Jul 9, 2012 – Jul 9, 2012 |
| PROF SERV ENGINEER & ARCHITECT | 9 | $158,712 | Jun 9, 2025 – Jun 17, 2025 |
| TRAINING PRGM CITY EMPLOYEES | 2 | $15,240 | Feb 11, 2019 – Jun 27, 2019 |
| ADMINISTRATIVE EXPENSES | 978 | $15,224,784 | Jun 20, 2019 – Jun 26, 2025 |
| CONTRACTUAL SERVICES GENERAL | 54 | $1,481,950 | Feb 13, 2013 – Jan 10, 2025 |
| DATA PROCESSING EQUIPMENT MAINTENANCE | 171 | $11,122,009 | Jan 30, 2012 – Apr 15, 2025 |
| DESIGN-CONSULTANT-IOTB | 2 | $100,000 | Feb 1, 2010 – May 24, 2010 |
| <Non-Applicable Expenditure Object> | 1 | -$175 | Jun 20, 2023 – Jun 20, 2023 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 347 payments$20,420,941
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2024 | Department of Environmental Protection | $1,589,280.75 | PROF SERV COMPUTER SERVICES | – |
| May 6, 2025 | Department of Citywide Administrative Services | $1,362,496.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 7, 2024 | School Construction Authority | $1,213,785.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 14, 2024 | School Construction Authority | $998,200.00 | ADMINISTRATIVE EXPENSES | – |
| Jan 3, 2025 | School Construction Authority | $928,770.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 2, 2025 | School Construction Authority | $902,110.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 8, 2024 | Department of Environmental Protection | $523,519.37 | PROF SERV COMPUTER SERVICES | – |
| Jan 3, 2025 | School Construction Authority | $464,120.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 7, 2024 | School Construction Authority | $409,276.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2024 | School Construction Authority | $366,688.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 14, 2024 | School Construction Authority | $349,510.60 | ADMINISTRATIVE EXPENSES | – |
| Aug 7, 2024 | School Construction Authority | $344,270.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 8, 2024 | Department of Environmental Protection | $301,083.86 | PROF SERV COMPUTER SERVICES | – |
| Dec 3, 2024 | School Construction Authority | $287,252.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2024 | School Construction Authority | $267,272.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 14, 2024 | School Construction Authority | $265,000.00 | ADMINISTRATIVE EXPENSES | – |
| May 6, 2025 | Department of Citywide Administrative Services | $253,250.00 | CAPITAL PURCHASED EQUIPMENT | – |
| May 6, 2025 | Department of Citywide Administrative Services | $224,020.00 | EXPENSE ONLY FUNDED SBITA | – |
| May 13, 2025 | Department of Education | $222,985.00 | PROF SERV COMPUTER SERVICES | – |
| Jun 24, 2025 | School Construction Authority | $218,082.00 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 402 payments$9,653,671
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 11, 2023 | School Construction Authority | $676,050.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 31, 2024 | School Construction Authority | $491,525.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 6, 2023 | Department of Education | $311,930.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $190,935.84 | PROF SERV COMPUTER SERVICES | – |
| Sep 6, 2023 | Department of Environmental Protection | $176,361.82 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $174,812.97 | PROF SERV COMPUTER SERVICES | – |
| Dec 4, 2023 | School Construction Authority | $173,200.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 5, 2023 | Department of Environmental Protection | $171,013.58 | PROF SERV COMPUTER SERVICES | – |
| May 1, 2024 | Department of Citywide Administrative Services | $170,000.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $168,251.21 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $164,938.41 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $164,331.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $163,730.04 | PROF SERV COMPUTER SERVICES | – |
| Sep 5, 2023 | Department of Environmental Protection | $163,477.67 | PROF SERV COMPUTER SERVICES | – |
| Mar 13, 2024 | School Construction Authority | $156,260.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 31, 2024 | School Construction Authority | $137,332.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 3, 2023 | School Construction Authority | $137,100.00 | ADMINISTRATIVE EXPENSES | – |
| Apr 5, 2024 | Department of Homeless Services | $130,196.88 | SPLIT FUNDED SBITA | – |
| Apr 5, 2024 | Department of Homeless Services | $120,604.75 | SPLIT FUNDED SBITA | – |
| Oct 11, 2023 | School Construction Authority | $114,316.00 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 298 payments$9,456,017
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 8, 2022 | Department of Education | $1,309,200.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 9, 2022 | Department of Education | $563,300.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 9, 2022 | Department of Education | $519,200.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 14, 2022 | Department of Education | $371,200.00 | PROF SERV COMPUTER SERVICES | – |
| May 26, 2023 | Department of Education | $355,500.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 14, 2022 | Department of Education | $278,000.00 | PROF SERV COMPUTER SERVICES | – |
| Mar 13, 2023 | Department of Education | $238,520.00 | PROF SERV COMPUTER SERVICES | – |
| Mar 22, 2023 | Department of Education | $231,730.00 | PROF SERV COMPUTER SERVICES | – |
| Feb 24, 2023 | School Construction Authority | $228,900.00 | ADMINISTRATIVE EXPENSES | – |
| Jun 5, 2023 | Department of Environmental Protection | $177,698.02 | PROF SERV COMPUTER SERVICES | – |
| Jun 5, 2023 | Department of Environmental Protection | $170,088.57 | PROF SERV COMPUTER SERVICES | – |
| Mar 13, 2023 | Department of Education | $163,700.00 | PROF SERV COMPUTER SERVICES | – |
| Jun 5, 2023 | Department of Environmental Protection | $159,161.49 | PROF SERV COMPUTER SERVICES | – |
| Dec 13, 2022 | School Construction Authority | $137,100.00 | ADMINISTRATIVE EXPENSES | – |
| Dec 13, 2022 | School Construction Authority | $137,100.00 | ADMINISTRATIVE EXPENSES | – |
| May 26, 2023 | Department of Education | $134,900.00 | PROF SERV COMPUTER SERVICES | – |
| Jan 17, 2023 | Department of Social Services | $126,401.60 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 13, 2023 | Department of Education | $117,220.00 | PROF SERV COMPUTER SERVICES | – |
| Jun 20, 2023 | Department of Citywide Administrative Services | $105,000.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 26, 2022 | School Construction Authority | $84,188.89 | ADMINISTRATIVE EXPENSES | – |
FY 2022top 20 of 299 payments$10,120,824
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 7, 2022 | Department of Education | $739,980.00 | PROF SERV COMPUTER SERVICES | – |
| Apr 8, 2022 | Department of Education | $734,000.00 | PROF SERV COMPUTER SERVICES | – |
| Mar 10, 2022 | Department of Education | $553,840.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 24, 2021 | Department of Environmental Protection | $329,535.56 | PROF SERV COMPUTER SERVICES | – |
| Oct 25, 2021 | Department of Environmental Protection | $315,582.28 | PROF SERV COMPUTER SERVICES | – |
| Jan 24, 2022 | Department of Environmental Protection | $312,430.06 | PROF SERV COMPUTER SERVICES | – |
| Aug 20, 2021 | Department of Environmental Protection | $301,216.42 | PROF SERV COMPUTER SERVICES | – |
| Jul 15, 2021 | Department of Environmental Protection | $300,000.00 | PROF SERV COMPUTER SERVICES | – |
| Nov 26, 2021 | Department of Environmental Protection | $290,958.32 | PROF SERV COMPUTER SERVICES | – |
| Feb 24, 2022 | Department of Environmental Protection | $287,077.72 | PROF SERV COMPUTER SERVICES | – |
| Dec 30, 2021 | Department of Environmental Protection | $283,646.64 | PROF SERV COMPUTER SERVICES | – |
| Jun 2, 2022 | Department of Environmental Protection | $245,000.00 | PROF SERV COMPUTER SERVICES | – |
| Aug 9, 2021 | Department of Environmental Protection | $243,685.11 | PROF SERV COMPUTER SERVICES | – |
| Apr 14, 2022 | Department of Homeless Services | $214,877.45 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 15, 2022 | Department of Homeless Services | $195,008.57 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 29, 2021 | Department of Environmental Protection | $141,021.10 | DATA PROCESSING SUPPLIES | – |
| Apr 25, 2022 | Department of Environmental Protection | $135,867.89 | PROF SERV COMPUTER SERVICES | – |
| Apr 25, 2022 | Department of Environmental Protection | $125,609.63 | PROF SERV COMPUTER SERVICES | – |
| Jul 29, 2021 | Department of Environmental Protection | $100,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 14, 2022 | Department of Homeless Services | $99,057.79 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2021top 20 of 273 payments$7,669,490
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 29, 2021 | Department of Environmental Protection | $328,109.65 | PROF SERV COMPUTER SERVICES | – |
| Aug 18, 2020 | Department of Environmental Protection | $323,461.87 | PROF SERV COMPUTER SERVICES | – |
| Nov 5, 2020 | Department of Environmental Protection | $309,991.04 | PROF SERV COMPUTER SERVICES | – |
| Nov 5, 2020 | Department of Environmental Protection | $307,990.60 | PROF SERV COMPUTER SERVICES | – |
| Nov 30, 2020 | Department of Environmental Protection | $291,848.99 | PROF SERV COMPUTER SERVICES | – |
| May 28, 2021 | Department of Environmental Protection | $250,000.00 | PROF SERV COMPUTER SERVICES | – |
| Apr 12, 2021 | Department of Environmental Protection | $247,935.27 | PROF SERV COMPUTER SERVICES | – |
| Sep 28, 2020 | Department of Environmental Protection | $202,698.35 | PROF SERV COMPUTER SERVICES | – |
| Jan 25, 2021 | Department of Environmental Protection | $186,383.54 | PROF SERV COMPUTER SERVICES | – |
| May 13, 2021 | Department of Social Services | $182,607.36 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 8, 2020 | Department of Environmental Protection | $157,513.66 | PROF SERV COMPUTER SERVICES | – |
| Feb 24, 2021 | Department of Environmental Protection | $156,828.74 | PROF SERV COMPUTER SERVICES | – |
| Jul 8, 2020 | Department of Environmental Protection | $136,670.58 | PROF SERV COMPUTER SERVICES | – |
| Feb 24, 2021 | Department of Environmental Protection | $135,506.81 | PROF SERV COMPUTER SERVICES | – |
| Sep 28, 2020 | Department of Environmental Protection | $119,024.47 | PROF SERV COMPUTER SERVICES | – |
| Jan 25, 2021 | Department of Environmental Protection | $87,471.02 | PROF SERV COMPUTER SERVICES | – |
| May 28, 2021 | Department of Environmental Protection | $77,832.83 | PROF SERV COMPUTER SERVICES | – |
| Mar 11, 2021 | School Construction Authority | $76,500.00 | ADMINISTRATIVE EXPENSES | – |
| Jun 1, 2021 | School Construction Authority | $76,500.00 | ADMINISTRATIVE EXPENSES | – |
| Sep 10, 2020 | School Construction Authority | $71,615.48 | ADMINISTRATIVE EXPENSES | – |
FY 2020top 20 of 260 payments$7,002,059
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 22, 2020 | Department of Environmental Protection | $318,146.80 | PROF SERV COMPUTER SERVICES | – |
| Dec 12, 2019 | Department of Environmental Protection | $316,453.13 | PROF SERV COMPUTER SERVICES | – |
| Mar 9, 2020 | Department of Environmental Protection | $302,924.56 | PROF SERV COMPUTER SERVICES | – |
| Sep 23, 2019 | Department of Environmental Protection | $294,023.32 | PROF SERV COMPUTER SERVICES | – |
| Oct 3, 2019 | Department of Environmental Protection | $290,176.74 | PROF SERV COMPUTER SERVICES | – |
| Nov 6, 2019 | Department of Environmental Protection | $289,148.16 | PROF SERV COMPUTER SERVICES | – |
| Aug 15, 2019 | Department of Environmental Protection | $279,491.49 | PROF SERV COMPUTER SERVICES | – |
| Apr 13, 2020 | Department of Environmental Protection | $263,596.80 | PROF SERV COMPUTER SERVICES | – |
| Jan 27, 2020 | Department of Environmental Protection | $259,579.36 | PROF SERV COMPUTER SERVICES | – |
| Jul 22, 2019 | Department of Environmental Protection | $241,863.88 | PROF SERV COMPUTER SERVICES | – |
| Feb 18, 2020 | Department of Environmental Protection | $224,051.20 | PROF SERV COMPUTER SERVICES | – |
| May 21, 2020 | Department of Environmental Protection | $179,195.62 | PROF SERV COMPUTER SERVICES | – |
| Jan 21, 2020 | Department of Social Services | $172,588.16 | PROF SERV COMPUTER SERVICES | – |
| May 21, 2020 | Department of Environmental Protection | $145,182.62 | PROF SERV COMPUTER SERVICES | – |
| Jul 22, 2019 | Department of Social Services | $89,600.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 20, 2019 | Department of Social Services | $84,500.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 20, 2019 | Department of Social Services | $79,700.00 | PROF SERV COMPUTER SERVICES | – |
| Aug 30, 2019 | Department of Homeless Services | $65,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| May 6, 2020 | School Construction Authority | $63,851.32 | ADMINISTRATIVE EXPENSES | – |
| Jun 2, 2020 | School Construction Authority | $59,075.27 | ADMINISTRATIVE EXPENSES | – |
FY 2019top 20 of 140 payments$5,406,428
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 15, 2018 | Department of Environmental Protection | $330,506.30 | PROF SERV COMPUTER SERVICES | – |
| Dec 6, 2018 | Department of Environmental Protection | $289,361.14 | PROF SERV COMPUTER SERVICES | – |
| Feb 14, 2019 | Department of Environmental Protection | $288,362.35 | PROF SERV COMPUTER SERVICES | – |
| Nov 13, 2018 | Department of Environmental Protection | $274,303.14 | PROF SERV COMPUTER SERVICES | – |
| Oct 15, 2018 | Department of Environmental Protection | $272,564.59 | PROF SERV COMPUTER SERVICES | – |
| Apr 19, 2019 | Department of Environmental Protection | $268,270.62 | PROF SERV COMPUTER SERVICES | – |
| Jan 7, 2019 | Department of Environmental Protection | $263,200.82 | PROF SERV COMPUTER SERVICES | – |
| Jun 5, 2019 | Department of Environmental Protection | $259,558.06 | PROF SERV COMPUTER SERVICES | – |
| Jun 26, 2019 | Department of Environmental Protection | $258,136.12 | PROF SERV COMPUTER SERVICES | – |
| Aug 13, 2018 | Department of Environmental Protection | $240,283.54 | PROF SERV COMPUTER SERVICES | – |
| Jul 27, 2018 | Department of Environmental Protection | $231,220.04 | PROF SERV COMPUTER SERVICES | – |
| Apr 19, 2019 | Department of Environmental Protection | $220,956.78 | PROF SERV COMPUTER SERVICES | – |
| Aug 13, 2018 | Department of Environmental Protection | $197,368.72 | PROF SERV COMPUTER SERVICES | – |
| Jul 27, 2018 | Department of Environmental Protection | $139,958.43 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 13, 2018 | Department of Environmental Protection | $136,895.43 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 19, 2019 | Department of Environmental Protection | $84,332.94 | PROF SERV COMPUTER SERVICES | – |
| Mar 15, 2019 | Department of Social Services | $52,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 27, 2018 | Department of Environmental Protection | $51,535.95 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 25, 2019 | Department of Homeless Services | $37,480.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 15, 2019 | Department of Social Services | $34,400.00 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2018top 20 of 107 payments$5,143,880
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 26, 2018 | Department of Environmental Protection | $550,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 26, 2018 | Department of Environmental Protection | $257,364.09 | PROF SERV COMPUTER SERVICES | – |
| Apr 30, 2018 | Department of Environmental Protection | $238,896.59 | PROF SERV COMPUTER SERVICES | – |
| Aug 16, 2017 | Department of Environmental Protection | $237,924.31 | PROF SERV COMPUTER SERVICES | – |
| Oct 30, 2017 | Department of Environmental Protection | $237,301.29 | PROF SERV COMPUTER SERVICES | – |
| Dec 18, 2017 | Department of Environmental Protection | $225,871.41 | PROF SERV COMPUTER SERVICES | – |
| Oct 30, 2017 | Department of Environmental Protection | $219,119.27 | PROF SERV COMPUTER SERVICES | – |
| Apr 9, 2018 | Department of Environmental Protection | $214,170.52 | PROF SERV COMPUTER SERVICES | – |
| Jan 4, 2018 | Department of Environmental Protection | $212,537.55 | PROF SERV COMPUTER SERVICES | – |
| Sep 13, 2017 | Department of Environmental Protection | $169,753.57 | PROF SERV COMPUTER SERVICES | – |
| Mar 26, 2018 | Department of Environmental Protection | $148,917.39 | PROF SERV COMPUTER SERVICES | – |
| May 31, 2018 | Department of Environmental Protection | $141,580.54 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 14, 2017 | Department of Environmental Protection | $139,773.65 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 4, 2017 | Department of Environmental Protection | $131,787.20 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 14, 2017 | Department of Environmental Protection | $130,013.92 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 2, 2018 | Department of Environmental Protection | $128,240.64 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 9, 2018 | Department of Environmental Protection | $125,882.96 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 4, 2017 | Department of Environmental Protection | $125,137.28 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 10, 2017 | Department of Environmental Protection | $121,479.08 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 2, 2018 | Department of Environmental Protection | $118,729.36 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2017top 20 of 82 payments$4,804,293
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 3, 2017 | Department of Environmental Protection | $263,049.04 | PROF SERV COMPUTER SERVICES | – |
| Jun 26, 2017 | Department of Environmental Protection | $257,982.34 | PROF SERV COMPUTER SERVICES | – |
| Jul 18, 2016 | Department of Environmental Protection | $251,795.48 | PROF SERV COMPUTER SERVICES | – |
| Sep 23, 2016 | Department of Environmental Protection | $241,535.64 | PROF SERV COMPUTER SERVICES | – |
| May 22, 2017 | Department of Environmental Protection | $233,939.35 | PROF SERV COMPUTER SERVICES | – |
| Jan 19, 2017 | Department of Environmental Protection | $228,041.92 | PROF SERV COMPUTER SERVICES | – |
| Mar 6, 2017 | Department of Environmental Protection | $225,966.84 | PROF SERV COMPUTER SERVICES | – |
| Aug 22, 2016 | Department of Environmental Protection | $223,271.36 | PROF SERV COMPUTER SERVICES | – |
| Mar 31, 2017 | Department of Environmental Protection | $218,969.11 | PROF SERV COMPUTER SERVICES | – |
| Dec 29, 2016 | Department of Environmental Protection | $218,422.08 | PROF SERV COMPUTER SERVICES | – |
| Dec 2, 2016 | Department of Environmental Protection | $209,518.80 | PROF SERV COMPUTER SERVICES | – |
| Oct 28, 2016 | Department of Environmental Protection | $177,151.68 | PROF SERV COMPUTER SERVICES | – |
| Aug 3, 2016 | Department of Environmental Protection | $170,589.29 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 19, 2016 | Department of Environmental Protection | $157,016.16 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 2, 2017 | Department of Environmental Protection | $145,983.49 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 21, 2016 | Department of Environmental Protection | $138,215.41 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 2, 2017 | Department of Environmental Protection | $125,822.52 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 29, 2016 | Department of Environmental Protection | $114,497.64 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 11, 2017 | Department of Environmental Protection | $112,805.04 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 11, 2017 | Department of Environmental Protection | $110,306.32 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2016top 20 of 112 payments$6,036,056
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 5, 2015 | Department of Environmental Protection | $417,747.88 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 25, 2016 | Department of Environmental Protection | $250,354.29 | PROF SERV COMPUTER SERVICES | – |
| May 25, 2016 | Department of Environmental Protection | $240,924.38 | PROF SERV COMPUTER SERVICES | – |
| Jun 29, 2016 | Department of Environmental Protection | $240,907.32 | PROF SERV COMPUTER SERVICES | – |
| Sep 18, 2015 | Department of Environmental Protection | $240,405.20 | PROF SERV COMPUTER SERVICES | – |
| Oct 28, 2015 | Department of Environmental Protection | $236,185.49 | PROF SERV COMPUTER SERVICES | – |
| Dec 7, 2015 | Department of Environmental Protection | $235,269.17 | PROF SERV COMPUTER SERVICES | – |
| Jan 28, 2016 | Department of Environmental Protection | $226,583.44 | PROF SERV COMPUTER SERVICES | – |
| Jul 22, 2015 | Department of Environmental Protection | $226,432.63 | PROF SERV COMPUTER SERVICES | – |
| Mar 23, 2016 | Department of Environmental Protection | $222,284.14 | PROF SERV COMPUTER SERVICES | – |
| Feb 22, 2016 | Department of Environmental Protection | $218,037.52 | PROF SERV COMPUTER SERVICES | – |
| May 6, 2016 | Department of Environmental Protection | $209,962.93 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 23, 2016 | Department of Environmental Protection | $205,367.41 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 25, 2016 | Department of Environmental Protection | $203,872.28 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 23, 2016 | Department of Environmental Protection | $203,287.80 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 28, 2015 | Department of Environmental Protection | $202,601.70 | PROF SERV COMPUTER SERVICES | – |
| Sep 16, 2015 | Department of Environmental Protection | $202,559.03 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Nov 23, 2015 | Department of Environmental Protection | $200,063.60 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 5, 2015 | Department of Environmental Protection | $182,960.72 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 22, 2016 | Department of Environmental Protection | $178,708.73 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2015top 20 of 108 payments$4,629,041
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 29, 2015 | Department of Environmental Protection | $403,355.74 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 1, 2015 | Department of Environmental Protection | $376,274.35 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 29, 2015 | Department of Environmental Protection | $260,552.29 | PROF SERV COMPUTER SERVICES | – |
| Apr 15, 2015 | Department of Environmental Protection | $251,115.14 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Nov 28, 2014 | Department of Environmental Protection | $244,389.67 | PROF SERV COMPUTER SERVICES | – |
| Feb 17, 2015 | Department of Environmental Protection | $243,269.58 | PROF SERV COMPUTER SERVICES | – |
| Oct 27, 2014 | Department of Environmental Protection | $240,183.23 | PROF SERV COMPUTER SERVICES | – |
| May 26, 2015 | Department of Environmental Protection | $230,736.49 | PROF SERV COMPUTER SERVICES | – |
| Feb 9, 2015 | Department of Environmental Protection | $226,859.32 | PROF SERV COMPUTER SERVICES | – |
| Mar 30, 2015 | Department of Environmental Protection | $225,914.36 | PROF SERV COMPUTER SERVICES | – |
| Apr 24, 2015 | Department of Environmental Protection | $209,977.81 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 23, 2015 | Department of Environmental Protection | $209,479.20 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 26, 2014 | Department of Environmental Protection | $188,408.23 | PROF SERV COMPUTER SERVICES | – |
| Jun 22, 2015 | Department of Environmental Protection | $166,860.01 | PROF SERV COMPUTER SERVICES | – |
| Apr 24, 2015 | Department of Environmental Protection | $138,624.97 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 29, 2015 | Department of Environmental Protection | $78,053.23 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 9, 2015 | Department of Environmental Protection | $76,472.70 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 15, 2015 | Department of Environmental Protection | $56,232.55 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 13, 2015 | Department of Environmental Protection | $40,300.80 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 13, 2015 | Department of Environmental Protection | $39,041.40 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2014top 14 of 14 payments$416,200
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2013 | Department of Environmental Protection | $252,622.75 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 25, 2013 | Department of Environmental Protection | $40,935.53 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 4, 2013 | Department of Social Services | $12,705.00 | PROF SERV COMPUTER SERVICES | – |
| May 12, 2014 | Department of Social Services | $12,210.90 | PROF SERV COMPUTER SERVICES | – |
| Sep 9, 2013 | Department of Social Services | $12,148.13 | PROF SERV COMPUTER SERVICES | – |
| Apr 10, 2014 | Department of Social Services | $11,848.20 | PROF SERV COMPUTER SERVICES | – |
| Feb 13, 2014 | Department of Social Services | $11,550.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 27, 2013 | Department of Social Services | $11,446.88 | PROF SERV COMPUTER SERVICES | – |
| Jul 24, 2013 | Department of Social Services | $10,972.50 | PROF SERV COMPUTER SERVICES | – |
| Apr 21, 2014 | Department of Social Services | $10,155.60 | PROF SERV COMPUTER SERVICES | – |
| Jun 19, 2014 | Department of Social Services | $10,095.15 | PROF SERV COMPUTER SERVICES | – |
| Oct 28, 2013 | Department of Social Services | $9,240.00 | PROF SERV COMPUTER SERVICES | – |
| Jan 6, 2014 | Department of Social Services | $9,240.00 | PROF SERV COMPUTER SERVICES | – |
| Jul 25, 2013 | Department of Environmental Protection | $1,028.90 | PROF SERV COMPUTER SERVICES | – |
FY 2013top 20 of 51 payments$4,722,403
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 24, 2012 | Department of Environmental Protection | $566,000.00 | PROF SERV COMPUTER SERVICES | – |
| Feb 13, 2013 | Department of Environmental Protection | $407,019.08 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 4, 2013 | Department of Environmental Protection | $392,247.55 | PROF SERV COMPUTER SERVICES | – |
| Mar 28, 2013 | Department of Environmental Protection | $368,388.21 | PROF SERV COMPUTER SERVICES | – |
| Jun 21, 2013 | Department of Environmental Protection | $314,928.02 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 20, 2013 | Department of Environmental Protection | $307,402.86 | PROF SERV COMPUTER SERVICES | – |
| Jan 4, 2013 | Department of Environmental Protection | $295,073.39 | PROF SERV COMPUTER SERVICES | – |
| Mar 25, 2013 | Department of Environmental Protection | $293,607.11 | PROF SERV COMPUTER SERVICES | – |
| Feb 13, 2013 | Department of Environmental Protection | $273,653.32 | PROF SERV COMPUTER SERVICES | – |
| Jan 4, 2013 | Department of Environmental Protection | $261,598.34 | PROF SERV COMPUTER SERVICES | – |
| May 20, 2013 | Department of Environmental Protection | $183,744.31 | PROF SERV COMPUTER SERVICES | – |
| May 20, 2013 | Department of Environmental Protection | $175,223.97 | PROF SERV COMPUTER SERVICES | – |
| Mar 25, 2013 | Department of Environmental Protection | $154,521.27 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 5, 2012 | Department of Environmental Protection | $136,715.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 13, 2013 | Department of Environmental Protection | $99,059.65 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 5, 2012 | Department of Environmental Protection | $66,022.50 | OTHR SERV AND CHRGS-GENERAL | – |
| Jan 4, 2013 | Department of Environmental Protection | $49,875.96 | PROF SERV COMPUTER SERVICES | – |
| Jul 9, 2012 | Department of Environmental Protection | $48,720.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 9, 2012 | Department of Environmental Protection | $33,977.50 | OTHR SERV AND CHRGS-GENERAL | – |
| Jun 21, 2013 | Department of Environmental Protection | $24,265.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2012top 20 of 23 payments$972,519
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 30, 2012 | Department of Environmental Protection | $307,947.50 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 5, 2012 | Department of Environmental Protection | $108,940.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 23, 2012 | Department of Environmental Protection | $101,870.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 2, 2012 | Department of Environmental Protection | $99,495.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 13, 2012 | Department of Environmental Protection | $92,295.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 5, 2012 | Department of Environmental Protection | $70,750.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 13, 2012 | Department of Environmental Protection | $30,965.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 2, 2012 | Department of Social Services | $12,705.00 | PROF SERV COMPUTER SERVICES | – |
| Jul 29, 2011 | Department of Social Services | $12,313.13 | PROF SERV COMPUTER SERVICES | – |
| Sep 9, 2011 | Department of Social Services | $11,983.13 | PROF SERV COMPUTER SERVICES | – |
| Mar 16, 2012 | Department of Social Services | $11,797.50 | PROF SERV COMPUTER SERVICES | – |
| Oct 7, 2011 | Department of Social Services | $11,550.00 | PROF SERV COMPUTER SERVICES | – |
| Jan 9, 2012 | Department of Social Services | $10,972.50 | PROF SERV COMPUTER SERVICES | – |
| Dec 12, 2011 | Department of Social Services | $10,972.50 | PROF SERV COMPUTER SERVICES | – |
| Jun 4, 2012 | Department of Social Services | $10,972.50 | PROF SERV COMPUTER SERVICES | – |
| Mar 28, 2012 | Department of Social Services | $10,477.50 | PROF SERV COMPUTER SERVICES | – |
| Jul 29, 2011 | Department of Social Services | $10,312.50 | PROF SERV COMPUTER SERVICES | – |
| Nov 16, 2011 | Department of Social Services | $9,817.50 | PROF SERV COMPUTER SERVICES | – |
| Jul 29, 2011 | Department of Social Services | $9,240.00 | PROF SERV COMPUTER SERVICES | – |
| Oct 7, 2011 | Department of Social Services | $8,662.50 | PROF SERV COMPUTER SERVICES | – |
FY 2011top 20 of 29 payments$256,521
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 4, 2010 | Department of Social Services | $12,375.00 | PROF SERV COMPUTER SERVICES | – |
| Feb 4, 2011 | Department of Social Services | $11,756.25 | PROF SERV COMPUTER SERVICES | – |
| Jul 16, 2010 | Department of Social Services | $11,550.00 | PROF SERV COMPUTER SERVICES | – |
| Dec 22, 2010 | Department of Social Services | $11,385.00 | PROF SERV COMPUTER SERVICES | – |
| Mar 24, 2011 | Department of Social Services | $11,364.38 | PROF SERV COMPUTER SERVICES | – |
| Mar 31, 2011 | Department of Social Services | $10,972.50 | PROF SERV COMPUTER SERVICES | – |
| Jan 18, 2011 | Department of Social Services | $10,601.25 | PROF SERV COMPUTER SERVICES | – |
| Apr 15, 2011 | Department of Education | $10,545.50 | PROF SERV COMPUTER SERVICES | – |
| Jul 9, 2010 | Department of Education | $10,218.00 | PROF SERV COMPUTER SERVICES | – |
| Jul 16, 2010 | Department of Education | $10,087.00 | PROF SERV COMPUTER SERVICES | – |
| Sep 27, 2010 | Department of Social Services | $9,817.50 | PROF SERV COMPUTER SERVICES | – |
| Sep 15, 2010 | Department of Education | $9,644.88 | PROF SERV COMPUTER SERVICES | – |
| Jul 9, 2010 | Department of Education | $9,628.50 | PROF SERV COMPUTER SERVICES | – |
| Aug 30, 2010 | Department of Education | $9,628.50 | PROF SERV COMPUTER SERVICES | – |
| Jan 12, 2011 | Department of Education | $9,628.50 | PROF SERV COMPUTER SERVICES | – |
| Nov 19, 2010 | Department of Social Services | $9,405.00 | PROF SERV COMPUTER SERVICES | – |
| Jul 9, 2010 | Department of Education | $9,170.04 | PROF SERV COMPUTER SERVICES | – |
| May 16, 2011 | Department of Education | $9,170.00 | PROF SERV COMPUTER SERVICES | – |
| Feb 17, 2011 | Department of Education | $9,170.00 | PROF SERV COMPUTER SERVICES | – |
| Jul 9, 2010 | Department of Education | $8,711.50 | PROF SERV COMPUTER SERVICES | – |
FY 2010top 9 of 9 payments$396,294
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 24, 2010 | Department of Environmental Protection | $245,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 1, 2010 | Department of Environmental Protection | $99,000.00 | DESIGN-CONSULTANT-IOTB | – |
| Jun 1, 2010 | Department of Social Services | $11,550.00 | PROF SERV COMPUTER SERVICES | – |
| May 4, 2010 | Department of Social Services | $11,467.50 | PROF SERV COMPUTER SERVICES | – |
| Feb 8, 2010 | Department of Social Services | $10,271.25 | PROF SERV COMPUTER SERVICES | – |
| Apr 13, 2010 | Department of Social Services | $8,600.63 | PROF SERV COMPUTER SERVICES | – |
| Mar 22, 2010 | Department of Social Services | $6,359.34 | PROF SERV COMPUTER SERVICES | – |
| Mar 22, 2010 | Department of Social Services | $3,045.66 | PROF SERV COMPUTER SERVICES | – |
| May 24, 2010 | Department of Environmental Protection | $1,000.00 | DESIGN-CONSULTANT-IOTB | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Department of Social Services | $9,960.00 | PROF SERV COMPUTER SERVICES | Contracts |
| Jun 26, 2025 | School Construction Authority | $20,022.70 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $15,402.08 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $17,455.60 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $38,146.60 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $18,289.96 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $18,120.00 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $10,571.33 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $6,738.41 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $40,264.94 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $40,264.92 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $17,327.34 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $5,775.78 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $16,783.20 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $19,252.58 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $17,214.00 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $5,268.62 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $18,289.97 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $19,252.60 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $16,308.00 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $17,760.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $18,120.00 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $19,252.60 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $15,053.20 | ADMINISTRATIVE EXPENSES | Capital Contracts |
| Jun 26, 2025 | School Construction Authority | $16,872.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data