Perkins Eastman Architects DPC: New York City Government Payments

as recorded by New York City: PERKINS EASTMAN ARCHITECTS DPC

Perkins Eastman Architects DPC is the 1,140th-largest recipient of New York City government payments tracked by SpendLedger, and ranks first in PROF SERV ENGINEER & ARCHITECT spending. Its payments amount to 0.3% of everything the Mayoralty has paid vendors in that span. Payments to it rose 42.4% year over year.

Primary spending category: PROF SERV ENGINEER & ARCHITECT

$46,284,609total received
578payments
7agencies
Nov 23, 2015Jun 30, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Perkins Eastman Architects DPC. No spam.

Payments by fiscal year

FY 2025$4,631,556
FY 2024$3,251,829
FY 2023$670,387
FY 2022$2,691,482
FY 2021$2,298,689
FY 2020$9,478,007
FY 2019$13,541,170
FY 2018$4,626,809
FY 2017$4,343,933
FY 2016$750,747

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority65$2,040,447
FY 2025Mayoralty9$1,300,475
FY 2025Health and Hospitals Corporation46$1,257,413
FY 2025Department of Design and Construction2$19,950
FY 2025City University Construction Fund1$13,271
FY 2024Health and Hospitals Corporation40$2,932,733
FY 2024School Construction Authority16$315,255
FY 2024City University Construction Fund4$3,841
FY 2023Health and Hospitals Corporation7$466,804
FY 2023School Construction Authority19$137,956
FY 2023City University of New York7$44,431
FY 2023City University Construction Fund12$21,195
FY 2022Health and Hospitals Corporation10$2,456,973
FY 2022School Construction Authority7$110,076
FY 2022City University Construction Fund14$106,273
FY 2022Department of Design and Construction3$9,375
FY 2022City University of New York4$8,785
FY 2021Health and Hospitals Corporation7$1,001,143
FY 2021Mayoralty5$898,789
FY 2021School Construction Authority3$252,759
FY 2021City University Construction Fund17$123,891
FY 2021City University of New York2$22,107
FY 2020Mayoralty19$5,811,130
FY 2020Health and Hospitals Corporation7$2,103,621
FY 2020School Construction Authority25$1,053,017
FY 2020City University Construction Fund24$494,645
FY 2020City University of New York5$15,594
FY 2019Mayoralty23$11,924,994
FY 2019City University Construction Fund22$849,747
FY 2019School Construction Authority14$628,354
FY 2019City University of New York7$138,075
FY 2018City University Construction Fund25$1,776,853
FY 2018School Construction Authority23$1,631,906
FY 2018Mayoralty11$1,180,607
FY 2018Health and Hospitals Corporation2$22,649
FY 2018Department of Citywide Administrative Services1$14,793
FY 2017School Construction Authority12$1,858,067
FY 2017Mayoralty11$1,393,408
FY 2017City University Construction Fund15$1,017,074
FY 2017Health and Hospitals Corporation8$55,982
FY 2017Department of Citywide Administrative Services1$19,402
FY 2016City University Construction Fund7$662,568
FY 2016School Construction Authority9$55,040
FY 2016Department of Citywide Administrative Services2$18,194
FY 2016City University of New York5$14,945
Total578$46,284,609

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROF SERV OTHER3$9,375Nov 29, 2021 Jan 7, 2022
CONSTRUCTION-BUILDINGS216$8,551,147Jun 10, 2016 Jun 23, 2025
OTHER EXPENDITURES-REPORTABLE141$5,069,359Dec 21, 2015 Feb 18, 2025
PROF SERV ENGINEER & ARCHITECT78$22,509,403Jul 12, 2016 Jun 30, 2025
CONTRACTUAL SERVICES GENERAL2$19,950Sep 23, 2024 Oct 22, 2024
DESIGN-CONSULTANT-BUILDINGS138$10,125,375Nov 23, 2015 May 28, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 123 payments$4,631,556
DateAgencyAmountCategoryPurchase order
Jun 23, 2025Mayoralty$474,384.50PROF SERV ENGINEER & ARCHITECT
Nov 20, 2024School Construction Authority$468,022.06CONSTRUCTION-BUILDINGS
Jun 30, 2025Mayoralty$332,404.00PROF SERV ENGINEER & ARCHITECT
Jan 21, 2025Health and Hospitals Corporation$329,723.55DESIGN-CONSULTANT-BUILDINGS
Jun 17, 2025Mayoralty$241,342.00PROF SERV ENGINEER & ARCHITECT
Jul 8, 2024Health and Hospitals Corporation$214,732.36DESIGN-CONSULTANT-BUILDINGS
Oct 4, 2024School Construction Authority$139,036.00CONSTRUCTION-BUILDINGS
Apr 1, 2025School Construction Authority$127,491.12CONSTRUCTION-BUILDINGS
Mar 10, 2025Mayoralty$122,541.10PROF SERV ENGINEER & ARCHITECT
Jul 2, 2024Health and Hospitals Corporation$105,325.00CONSTRUCTION-BUILDINGS
Jul 2, 2024Health and Hospitals Corporation$102,725.00CONSTRUCTION-BUILDINGS
Jul 2, 2024Health and Hospitals Corporation$101,704.63DESIGN-CONSULTANT-BUILDINGS
Nov 20, 2024School Construction Authority$100,290.44CONSTRUCTION-BUILDINGS
Jul 2, 2024Health and Hospitals Corporation$98,494.38DESIGN-CONSULTANT-BUILDINGS
Dec 12, 2024School Construction Authority$90,250.96CONSTRUCTION-BUILDINGS
Jul 2, 2024Health and Hospitals Corporation$85,250.00DESIGN-CONSULTANT-BUILDINGS
Jul 2, 2024Health and Hospitals Corporation$81,840.00DESIGN-CONSULTANT-BUILDINGS
Jan 2, 2025School Construction Authority$65,145.92CONSTRUCTION-BUILDINGS
Jul 22, 2024School Construction Authority$64,274.89CONSTRUCTION-BUILDINGS
Apr 23, 2025Mayoralty$53,713.77PROF SERV ENGINEER & ARCHITECT
FY 2024top 20 of 60 payments$3,251,829
DateAgencyAmountCategoryPurchase order
Apr 1, 2024Health and Hospitals Corporation$366,017.64DESIGN-CONSULTANT-BUILDINGS
Jan 2, 2024Health and Hospitals Corporation$248,406.00DESIGN-CONSULTANT-BUILDINGS
Jun 25, 2024Health and Hospitals Corporation$236,194.50DESIGN-CONSULTANT-BUILDINGS
Apr 1, 2024Health and Hospitals Corporation$234,163.81DESIGN-CONSULTANT-BUILDINGS
Aug 2, 2023Health and Hospitals Corporation$194,016.35DESIGN-CONSULTANT-BUILDINGS
Feb 20, 2024Health and Hospitals Corporation$192,646.96DESIGN-CONSULTANT-BUILDINGS
Jul 10, 2023School Construction Authority$183,030.27CONSTRUCTION-BUILDINGS
Jan 16, 2024Health and Hospitals Corporation$151,254.68DESIGN-CONSULTANT-BUILDINGS
Oct 2, 2023Health and Hospitals Corporation$135,150.00DESIGN-CONSULTANT-BUILDINGS
Oct 2, 2023Health and Hospitals Corporation$135,150.00DESIGN-CONSULTANT-BUILDINGS
Jan 2, 2024Health and Hospitals Corporation$111,384.00DESIGN-CONSULTANT-BUILDINGS
Apr 1, 2024Health and Hospitals Corporation$102,487.50DESIGN-CONSULTANT-BUILDINGS
Apr 1, 2024Health and Hospitals Corporation$100,956.38CONSTRUCTION-BUILDINGS
Apr 1, 2024Health and Hospitals Corporation$100,843.30DESIGN-CONSULTANT-BUILDINGS
Oct 2, 2023Health and Hospitals Corporation$79,975.00DESIGN-CONSULTANT-BUILDINGS
Feb 20, 2024Health and Hospitals Corporation$78,732.00DESIGN-CONSULTANT-BUILDINGS
Aug 15, 2023School Construction Authority$48,575.02CONSTRUCTION-BUILDINGS
Apr 1, 2024Health and Hospitals Corporation$47,950.00DESIGN-CONSULTANT-BUILDINGS
Jun 12, 2024Health and Hospitals Corporation$44,580.00DESIGN-CONSULTANT-BUILDINGS
Aug 2, 2023Health and Hospitals Corporation$36,300.00DESIGN-CONSULTANT-BUILDINGS
FY 2023top 20 of 45 payments$670,387
DateAgencyAmountCategoryPurchase order
Nov 1, 2022Health and Hospitals Corporation$149,978.00DESIGN-CONSULTANT-BUILDINGS
May 22, 2023Health and Hospitals Corporation$127,589.00DESIGN-CONSULTANT-BUILDINGS
Apr 11, 2023Health and Hospitals Corporation$84,205.73DESIGN-CONSULTANT-BUILDINGS
Apr 11, 2023Health and Hospitals Corporation$31,166.79DESIGN-CONSULTANT-BUILDINGS
Nov 1, 2022Health and Hospitals Corporation$30,713.10DESIGN-CONSULTANT-BUILDINGS
May 22, 2023Health and Hospitals Corporation$30,228.00DESIGN-CONSULTANT-BUILDINGS
Feb 15, 2023School Construction Authority$24,553.38CONSTRUCTION-BUILDINGS
Feb 15, 2023School Construction Authority$18,229.10CONSTRUCTION-BUILDINGS
Dec 27, 2022City University of New York$17,636.58DESIGN-CONSULTANT-BUILDINGS
Feb 15, 2023School Construction Authority$16,606.46CONSTRUCTION-BUILDINGS
Feb 15, 2023School Construction Authority$15,909.10CONSTRUCTION-BUILDINGS
Feb 15, 2023School Construction Authority$15,900.00CONSTRUCTION-BUILDINGS
Feb 15, 2023School Construction Authority$15,000.14CONSTRUCTION-BUILDINGS
Dec 27, 2022City University of New York$14,137.20DESIGN-CONSULTANT-BUILDINGS
Apr 11, 2023Health and Hospitals Corporation$12,923.82DESIGN-CONSULTANT-BUILDINGS
Dec 27, 2022City University of New York$5,083.92DESIGN-CONSULTANT-BUILDINGS
Dec 27, 2022City University of New York$5,049.00DESIGN-CONSULTANT-BUILDINGS
Feb 15, 2023School Construction Authority$4,845.36CONSTRUCTION-BUILDINGS
Jul 18, 2022City University Construction Fund$4,792.00OTHER EXPENDITURES-REPORTABLE
Feb 15, 2023School Construction Authority$4,640.00CONSTRUCTION-BUILDINGS
FY 2022top 20 of 38 payments$2,691,482
DateAgencyAmountCategoryPurchase order
Aug 16, 2021Health and Hospitals Corporation$723,582.15DESIGN-CONSULTANT-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$704,762.60DESIGN-CONSULTANT-BUILDINGS
Aug 16, 2021Health and Hospitals Corporation$389,103.04DESIGN-CONSULTANT-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$217,274.19DESIGN-CONSULTANT-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$206,465.87DESIGN-CONSULTANT-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$101,368.25DESIGN-CONSULTANT-BUILDINGS
Jul 27, 2021School Construction Authority$87,422.45CONSTRUCTION-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$74,196.45DESIGN-CONSULTANT-BUILDINGS
Aug 18, 2021Health and Hospitals Corporation$22,450.75DESIGN-CONSULTANT-BUILDINGS
Oct 26, 2021City University Construction Fund$21,683.78OTHER EXPENDITURES-REPORTABLE
Nov 29, 2021City University Construction Fund$14,600.64OTHER EXPENDITURES-REPORTABLE
Aug 16, 2021Health and Hospitals Corporation$14,184.85DESIGN-CONSULTANT-BUILDINGS
Aug 26, 2021School Construction Authority$12,651.81CONSTRUCTION-BUILDINGS
Jun 8, 2022City University Construction Fund$10,676.73OTHER EXPENDITURES-REPORTABLE
Nov 29, 2021City University Construction Fund$9,877.89OTHER EXPENDITURES-REPORTABLE
May 27, 2022City University Construction Fund$9,422.79OTHER EXPENDITURES-REPORTABLE
Nov 29, 2021City University Construction Fund$9,274.77OTHER EXPENDITURES-REPORTABLE
Aug 23, 2021City University Construction Fund$5,104.00OTHER EXPENDITURES-REPORTABLE
Jan 28, 2022City University Construction Fund$5,104.00OTHER EXPENDITURES-REPORTABLE
Jan 7, 2022Department of Design and Construction$4,740.50PROF SERV OTHER
FY 2021top 20 of 34 payments$2,298,689
DateAgencyAmountCategoryPurchase order
Jul 6, 2020Health and Hospitals Corporation$280,274.87DESIGN-CONSULTANT-BUILDINGS
Nov 30, 2020Mayoralty$251,919.29PROF SERV ENGINEER & ARCHITECT
Sep 1, 2020Mayoralty$244,305.51PROF SERV ENGINEER & ARCHITECT
Feb 4, 2021School Construction Authority$223,535.28CONSTRUCTION-BUILDINGS
Jul 13, 2020Health and Hospitals Corporation$197,480.55DESIGN-CONSULTANT-BUILDINGS
Sep 1, 2020Mayoralty$157,596.41PROF SERV ENGINEER & ARCHITECT
Dec 28, 2020Health and Hospitals Corporation$152,149.12DESIGN-CONSULTANT-BUILDINGS
Nov 24, 2020Mayoralty$135,034.01PROF SERV ENGINEER & ARCHITECT
Dec 28, 2020Health and Hospitals Corporation$131,862.58DESIGN-CONSULTANT-BUILDINGS
Nov 27, 2020Mayoralty$109,934.19PROF SERV ENGINEER & ARCHITECT
Nov 20, 2020Health and Hospitals Corporation$107,095.74DESIGN-CONSULTANT-BUILDINGS
Dec 2, 2020Health and Hospitals Corporation$80,426.53DESIGN-CONSULTANT-BUILDINGS
Dec 28, 2020Health and Hospitals Corporation$51,853.53DESIGN-CONSULTANT-BUILDINGS
Feb 24, 2021School Construction Authority$27,408.76CONSTRUCTION-BUILDINGS
Jul 6, 2020City University of New York$21,921.22DESIGN-CONSULTANT-BUILDINGS
Nov 23, 2020City University Construction Fund$16,251.41OTHER EXPENDITURES-REPORTABLE
Nov 25, 2020City University Construction Fund$10,689.50OTHER EXPENDITURES-REPORTABLE
Nov 25, 2020City University Construction Fund$10,556.00OTHER EXPENDITURES-REPORTABLE
Dec 24, 2020City University Construction Fund$9,115.00OTHER EXPENDITURES-REPORTABLE
Aug 24, 2020City University Construction Fund$8,204.40OTHER EXPENDITURES-REPORTABLE
FY 2020top 20 of 80 payments$9,478,007
DateAgencyAmountCategoryPurchase order
Feb 3, 2020Mayoralty$925,061.77PROF SERV ENGINEER & ARCHITECT
Jan 29, 2020Mayoralty$616,148.10PROF SERV ENGINEER & ARCHITECT
Jul 2, 2019Mayoralty$507,667.50PROF SERV ENGINEER & ARCHITECT
Feb 18, 2020Health and Hospitals Corporation$493,246.64DESIGN-CONSULTANT-BUILDINGS
Jan 6, 2020Mayoralty$461,215.13PROF SERV ENGINEER & ARCHITECT
Nov 18, 2019Mayoralty$460,056.60PROF SERV ENGINEER & ARCHITECT
May 19, 2020Mayoralty$450,809.00PROF SERV ENGINEER & ARCHITECT
Jan 6, 2020Health and Hospitals Corporation$443,167.25DESIGN-CONSULTANT-BUILDINGS
Jul 2, 2019Mayoralty$430,311.60PROF SERV ENGINEER & ARCHITECT
Feb 18, 2020Health and Hospitals Corporation$418,169.40DESIGN-CONSULTANT-BUILDINGS
May 29, 2020Health and Hospitals Corporation$392,885.12DESIGN-CONSULTANT-BUILDINGS
Dec 2, 2019Mayoralty$294,595.20PROF SERV ENGINEER & ARCHITECT
May 19, 2020Mayoralty$279,753.11PROF SERV ENGINEER & ARCHITECT
Aug 6, 2019Mayoralty$251,488.80PROF SERV ENGINEER & ARCHITECT
Jan 6, 2020Mayoralty$198,349.87PROF SERV ENGINEER & ARCHITECT
Sep 3, 2019School Construction Authority$191,879.00CONSTRUCTION-BUILDINGS
Aug 13, 2019Mayoralty$191,516.94PROF SERV ENGINEER & ARCHITECT
May 19, 2020Mayoralty$180,339.59PROF SERV ENGINEER & ARCHITECT
Aug 5, 2019School Construction Authority$167,768.15CONSTRUCTION-BUILDINGS
Feb 18, 2020Health and Hospitals Corporation$163,160.40DESIGN-CONSULTANT-BUILDINGS
FY 2019top 20 of 66 payments$13,541,170
DateAgencyAmountCategoryPurchase order
Jul 23, 2018Mayoralty$2,371,016.70PROF SERV ENGINEER & ARCHITECT
Mar 4, 2019Mayoralty$1,801,258.20PROF SERV ENGINEER & ARCHITECT
Feb 11, 2019Mayoralty$1,167,681.31PROF SERV ENGINEER & ARCHITECT
Oct 3, 2018Mayoralty$1,086,514.70PROF SERV ENGINEER & ARCHITECT
Apr 1, 2019Mayoralty$778,139.10PROF SERV ENGINEER & ARCHITECT
Nov 28, 2018Mayoralty$736,018.20PROF SERV ENGINEER & ARCHITECT
Nov 13, 2018Mayoralty$610,201.80PROF SERV ENGINEER & ARCHITECT
May 7, 2019Mayoralty$575,458.00PROF SERV ENGINEER & ARCHITECT
Oct 29, 2018Mayoralty$520,676.10PROF SERV ENGINEER & ARCHITECT
Jun 10, 2019Mayoralty$475,020.00PROF SERV ENGINEER & ARCHITECT
Jan 23, 2019Mayoralty$324,884.70PROF SERV ENGINEER & ARCHITECT
Jun 3, 2019Mayoralty$303,792.73PROF SERV ENGINEER & ARCHITECT
Aug 22, 2018Mayoralty$212,592.60PROF SERV ENGINEER & ARCHITECT
Sep 4, 2018Mayoralty$182,194.00PROF SERV ENGINEER & ARCHITECT
Jun 11, 2019School Construction Authority$180,839.45CONSTRUCTION-BUILDINGS
Apr 29, 2019City University Construction Fund$155,334.79OTHER EXPENDITURES-REPORTABLE
Oct 3, 2018Mayoralty$145,393.60PROF SERV ENGINEER & ARCHITECT
Jul 23, 2018Mayoralty$145,067.60PROF SERV ENGINEER & ARCHITECT
Dec 13, 2018School Construction Authority$144,671.56CONSTRUCTION-BUILDINGS
Feb 4, 2019Mayoralty$137,604.60PROF SERV ENGINEER & ARCHITECT
FY 2018top 20 of 62 payments$4,626,809
DateAgencyAmountCategoryPurchase order
Oct 23, 2017School Construction Authority$581,250.00CONSTRUCTION-BUILDINGS
Jan 10, 2018School Construction Authority$465,751.00CONSTRUCTION-BUILDINGS
Nov 1, 2017Mayoralty$276,440.22PROF SERV ENGINEER & ARCHITECT
Nov 27, 2017Mayoralty$253,852.20PROF SERV ENGINEER & ARCHITECT
Jan 29, 2018Mayoralty$224,018.42PROF SERV ENGINEER & ARCHITECT
May 9, 2018School Construction Authority$191,879.00CONSTRUCTION-BUILDINGS
Oct 24, 2017City University Construction Fund$185,322.57OTHER EXPENDITURES-REPORTABLE
Jan 16, 2018City University Construction Fund$141,511.99OTHER EXPENDITURES-REPORTABLE
Jul 10, 2017Mayoralty$139,915.98PROF SERV ENGINEER & ARCHITECT
Feb 14, 2018City University Construction Fund$130,471.16OTHER EXPENDITURES-REPORTABLE
Sep 20, 2017City University Construction Fund$109,783.70OTHER EXPENDITURES-REPORTABLE
Jan 16, 2018City University Construction Fund$109,127.67OTHER EXPENDITURES-REPORTABLE
Sep 6, 2017City University Construction Fund$107,514.41OTHER EXPENDITURES-REPORTABLE
Nov 15, 2017City University Construction Fund$105,374.96OTHER EXPENDITURES-REPORTABLE
Mar 19, 2018City University Construction Fund$102,435.81OTHER EXPENDITURES-REPORTABLE
Aug 8, 2017City University Construction Fund$101,437.40OTHER EXPENDITURES-REPORTABLE
Jun 6, 2018Mayoralty$99,531.90PROF SERV ENGINEER & ARCHITECT
May 29, 2018City University Construction Fund$94,962.06OTHER EXPENDITURES-REPORTABLE
Apr 27, 2018City University Construction Fund$92,461.73OTHER EXPENDITURES-REPORTABLE
Jun 21, 2018City University Construction Fund$86,166.74OTHER EXPENDITURES-REPORTABLE
FY 2017top 20 of 47 payments$4,343,933
DateAgencyAmountCategoryPurchase order
Jun 8, 2017School Construction Authority$871,875.00CONSTRUCTION-BUILDINGS
Jun 26, 2017Mayoralty$485,215.20PROF SERV ENGINEER & ARCHITECT
Mar 27, 2017Mayoralty$316,065.60PROF SERV ENGINEER & ARCHITECT
Apr 5, 2017School Construction Authority$290,625.00CONSTRUCTION-BUILDINGS
Apr 5, 2017School Construction Authority$290,625.00CONSTRUCTION-BUILDINGS
Aug 15, 2016City University Construction Fund$168,552.97OTHER EXPENDITURES-REPORTABLE
Feb 13, 2017Mayoralty$151,591.50PROF SERV ENGINEER & ARCHITECT
Jan 3, 2017Mayoralty$142,272.00PROF SERV ENGINEER & ARCHITECT
Apr 5, 2017School Construction Authority$131,719.00CONSTRUCTION-BUILDINGS
Aug 30, 2016City University Construction Fund$106,023.87OTHER EXPENDITURES-REPORTABLE
May 17, 2017Mayoralty$103,015.80PROF SERV ENGINEER & ARCHITECT
Mar 27, 2017City University Construction Fund$101,675.62OTHER EXPENDITURES-REPORTABLE
Dec 5, 2016School Construction Authority$87,813.00CONSTRUCTION-BUILDINGS
Apr 26, 2017City University Construction Fund$76,883.35OTHER EXPENDITURES-REPORTABLE
Feb 13, 2017City University Construction Fund$75,863.80OTHER EXPENDITURES-REPORTABLE
May 15, 2017City University Construction Fund$72,780.81OTHER EXPENDITURES-REPORTABLE
Dec 19, 2016City University Construction Fund$70,751.73OTHER EXPENDITURES-REPORTABLE
Jun 8, 2017School Construction Authority$65,859.00CONSTRUCTION-BUILDINGS
Feb 13, 2017City University Construction Fund$61,537.35OTHER EXPENDITURES-REPORTABLE
Jul 12, 2016Mayoralty$58,266.00PROF SERV ENGINEER & ARCHITECT
FY 2016top 20 of 23 payments$750,747
DateAgencyAmountCategoryPurchase order
Mar 23, 2016City University Construction Fund$121,345.75OTHER EXPENDITURES-REPORTABLE
May 23, 2016City University Construction Fund$114,041.20OTHER EXPENDITURES-REPORTABLE
May 9, 2016City University Construction Fund$107,289.90OTHER EXPENDITURES-REPORTABLE
Jun 14, 2016City University Construction Fund$105,876.19OTHER EXPENDITURES-REPORTABLE
Dec 21, 2015City University Construction Fund$102,123.89OTHER EXPENDITURES-REPORTABLE
Feb 9, 2016City University Construction Fund$70,191.78OTHER EXPENDITURES-REPORTABLE
Jan 19, 2016City University Construction Fund$41,699.59OTHER EXPENDITURES-REPORTABLE
Jun 10, 2016School Construction Authority$14,253.90CONSTRUCTION-BUILDINGS
Nov 23, 2015Department of Citywide Administrative Services$11,634.13DESIGN-CONSULTANT-BUILDINGS
Jun 10, 2016School Construction Authority$11,000.00CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$8,218.41CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$6,850.03CONSTRUCTION-BUILDINGS
Jan 4, 2016Department of Citywide Administrative Services$6,559.91DESIGN-CONSULTANT-BUILDINGS
Jun 10, 2016School Construction Authority$5,501.25CONSTRUCTION-BUILDINGS
Jan 19, 2016City University of New York$4,404.75DESIGN-CONSULTANT-BUILDINGS
Jun 10, 2016School Construction Authority$3,633.65CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$3,607.21CONSTRUCTION-BUILDINGS
Feb 16, 2016City University of New York$3,146.25DESIGN-CONSULTANT-BUILDINGS
Mar 28, 2016City University of New York$3,146.25DESIGN-CONSULTANT-BUILDINGS
Dec 14, 2015City University of New York$2,674.32DESIGN-CONSULTANT-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 30, 2025Mayoralty$332,404.00PROF SERV ENGINEER & ARCHITECTContracts
Jun 23, 2025School Construction Authority$12,904.74CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$6,645.73CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025Mayoralty$474,384.50PROF SERV ENGINEER & ARCHITECTContracts
Jun 20, 2025School Construction Authority$2,018.19CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$6,971.92CONSTRUCTION-BUILDINGSCapital Contracts
Jun 17, 2025School Construction Authority$1,300.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 17, 2025Mayoralty$241,342.00PROF SERV ENGINEER & ARCHITECTContracts
Jun 13, 2025School Construction Authority$40,195.83CONSTRUCTION-BUILDINGSCapital Contracts
Jun 13, 2025School Construction Authority$19,298.38CONSTRUCTION-BUILDINGSCapital Contracts
Jun 13, 2025School Construction Authority$20,512.86CONSTRUCTION-BUILDINGSCapital Contracts
Jun 13, 2025School Construction Authority$7,612.78CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$16,286.48CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025School Construction Authority$1,500.00CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$15,306.38CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$1,500.00CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025Health and Hospitals Corporation$3,931.94DESIGN-CONSULTANT-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$3,138.43CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$1,186.02CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$47,771.84CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$7,857.44CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025Health and Hospitals Corporation$29,091.69DESIGN-CONSULTANT-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$1,522.22CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$3,500.00CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$24,347.59CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving Mayoralty

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data