Ove Arup & Partners: New York City Government Payments
as recorded by New York City: OVE ARUP & PARTNERS
Ove Arup & Partners is the 763rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 21st in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 1.9% of everything the Water Supply has paid vendors in that span. Payments to it fell 19.7% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| CONSTRUCTION-BUILDINGS | 161 | $9,575,617 | Sep 28, 2021 – Jun 23, 2025 |
| DESIGN-BUILD: INFRASTRUCTURE | 34 | $708,991 | Sep 16, 2024 – Jun 9, 2025 |
| PROMPT PAYMENT INTEREST | 2 | $660 | Feb 20, 2024 – Sep 17, 2024 |
| CONTRACTUAL SERVICES GENERAL | 18 | $636,994 | Nov 15, 2010 – Aug 22, 2022 |
| PAYMENTS TO DELEGATE AGENCIES | 1 | $6,000 | Jun 28, 2017 – Jun 28, 2017 |
| DESIGN-CONSULTANT-IOTB | 135 | $47,230,573 | Dec 4, 2017 – Jun 23, 2025 |
| IOTB CONSTRUCTION | 30 | $4,270,045 | Mar 30, 2015 – Dec 16, 2020 |
| PROF SERV ENGINEER & ARCHITECT | 168 | $3,606,991 | May 28, 2013 – Jul 23, 2024 |
| N/A | 14 | $228,494 | Jul 12, 2021 – Feb 25, 2025 |
| DESIGN-CONSULTANT-BUILDINGS | 22 | $2,199,224 | Feb 1, 2022 – Jun 9, 2025 |
| PROF SERV OTHER | 522 | $13,099,515 | Dec 20, 2010 – Sep 21, 2020 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 132 payments$9,182,548
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 17, 2024 | Water Supply | $931,156.76 | DESIGN-CONSULTANT-IOTB | – |
| Nov 1, 2024 | Water Supply | $785,895.61 | DESIGN-CONSULTANT-IOTB | – |
| Oct 18, 2024 | Water Supply | $768,334.65 | DESIGN-CONSULTANT-IOTB | – |
| Aug 28, 2024 | Water Supply | $709,885.63 | DESIGN-CONSULTANT-IOTB | – |
| Dec 2, 2024 | Water Supply | $643,736.61 | DESIGN-CONSULTANT-IOTB | – |
| Jul 29, 2024 | Water Supply | $643,714.23 | DESIGN-CONSULTANT-IOTB | – |
| Jul 8, 2024 | Water Supply | $622,002.11 | DESIGN-CONSULTANT-IOTB | – |
| Jan 22, 2025 | Water Supply | $409,614.02 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2024 | Department of Citywide Administrative Services | $265,659.22 | DESIGN-BUILD: INFRASTRUCTURE | – |
| Feb 19, 2025 | Water Supply | $246,626.09 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2025 | Water Supply | $188,698.77 | DESIGN-CONSULTANT-IOTB | – |
| Sep 17, 2024 | Department of Parks and Recreation | $168,286.98 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2024 | Department of Parks and Recreation | $154,201.19 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 13, 2025 | Water Supply | $145,812.63 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2024 | Department of Parks and Recreation | $103,414.27 | CONSTRUCTION-BUILDINGS | – |
| Nov 6, 2024 | Department of Parks and Recreation | $98,337.79 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 21, 2025 | Department of Parks and Recreation | $96,094.33 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 10, 2025 | Department of Parks and Recreation | $93,257.26 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 30, 2024 | Department of Parks and Recreation | $84,646.87 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 12, 2025 | Department of Parks and Recreation | $76,318.36 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 95 payments$11,438,779
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 15, 2024 | Water Supply | $820,089.28 | DESIGN-CONSULTANT-IOTB | – |
| Feb 23, 2024 | Water Supply | $741,382.82 | DESIGN-CONSULTANT-IOTB | – |
| Aug 3, 2023 | Water Supply | $716,486.83 | DESIGN-CONSULTANT-IOTB | – |
| Mar 19, 2024 | Water Supply | $707,967.44 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2024 | Water Supply | $704,307.92 | DESIGN-CONSULTANT-IOTB | – |
| May 30, 2024 | Water Supply | $692,086.17 | DESIGN-CONSULTANT-IOTB | – |
| Dec 13, 2023 | Water Supply | $560,374.13 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2024 | Department of Parks and Recreation | $505,350.40 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 29, 2024 | Water Supply | $502,238.45 | DESIGN-CONSULTANT-IOTB | – |
| Oct 26, 2023 | Water Supply | $497,986.78 | DESIGN-CONSULTANT-IOTB | – |
| Nov 20, 2023 | Water Supply | $492,659.07 | DESIGN-CONSULTANT-IOTB | – |
| Sep 11, 2023 | Water Supply | $430,567.47 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2023 | Department of Parks and Recreation | $349,730.60 | CONSTRUCTION-BUILDINGS | – |
| Aug 14, 2023 | Water Supply | $335,297.42 | DESIGN-CONSULTANT-IOTB | – |
| Oct 2, 2023 | Water Supply | $326,812.74 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2023 | Department of Parks and Recreation | $219,071.32 | CONSTRUCTION-BUILDINGS | – |
| Aug 7, 2023 | Department of Parks and Recreation | $214,823.89 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2023 | Department of Parks and Recreation | $170,238.65 | CONSTRUCTION-BUILDINGS | – |
| Feb 6, 2024 | Department of Parks and Recreation | $160,417.45 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2024 | Department of Parks and Recreation | $154,597.28 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 60 payments$10,860,462
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 21, 2022 | Water Supply | $782,826.36 | DESIGN-CONSULTANT-IOTB | – |
| Apr 27, 2023 | Water Supply | $674,179.88 | DESIGN-CONSULTANT-IOTB | – |
| Dec 8, 2022 | Water Supply | $654,537.19 | DESIGN-CONSULTANT-IOTB | – |
| Mar 23, 2023 | Water Supply | $644,175.69 | DESIGN-CONSULTANT-IOTB | – |
| Nov 3, 2022 | Water Supply | $539,550.43 | DESIGN-CONSULTANT-IOTB | – |
| May 12, 2023 | Water Supply | $524,134.82 | DESIGN-CONSULTANT-IOTB | – |
| May 30, 2023 | Water Supply | $479,966.34 | DESIGN-CONSULTANT-IOTB | – |
| Jul 19, 2022 | Water Supply | $471,355.22 | DESIGN-CONSULTANT-IOTB | – |
| Jan 5, 2023 | Water Supply | $456,654.78 | DESIGN-CONSULTANT-IOTB | – |
| Feb 15, 2023 | Water Supply | $451,524.14 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2023 | Water Supply | $445,699.14 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2023 | Water Supply | $432,911.27 | DESIGN-CONSULTANT-IOTB | – |
| Jun 15, 2023 | Water Supply | $428,805.60 | DESIGN-CONSULTANT-IOTB | – |
| Jan 9, 2023 | Department of Parks and Recreation | $357,911.22 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2023 | Department of Transportation | $311,376.43 | CONSTRUCTION-BUILDINGS | – |
| Mar 13, 2023 | Department of Parks and Recreation | $260,594.34 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2023 | Department of Parks and Recreation | $241,179.38 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2023 | Department of Parks and Recreation | $225,064.36 | CONSTRUCTION-BUILDINGS | – |
| Apr 26, 2023 | Department of Parks and Recreation | $221,665.62 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2023 | Department of Transportation | $189,937.32 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 47 payments$8,029,266
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 4, 2021 | Water Supply | $747,741.83 | DESIGN-CONSULTANT-IOTB | – |
| Aug 23, 2021 | Water Supply | $578,277.69 | DESIGN-CONSULTANT-IOTB | – |
| Nov 29, 2021 | Water Supply | $562,477.19 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2022 | Water Supply | $550,026.50 | DESIGN-CONSULTANT-IOTB | – |
| Aug 2, 2021 | Water Supply | $539,455.31 | DESIGN-CONSULTANT-IOTB | – |
| Apr 6, 2022 | Water Supply | $470,337.84 | DESIGN-CONSULTANT-IOTB | – |
| Oct 25, 2021 | Water Supply | $409,042.13 | DESIGN-CONSULTANT-IOTB | – |
| Nov 1, 2021 | Department of Small Business Services | $369,618.57 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2022 | Water Supply | $339,481.35 | DESIGN-CONSULTANT-IOTB | – |
| Jan 31, 2022 | Water Supply | $277,620.81 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2022 | Department of Social Services | $253,081.13 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 6, 2022 | Department of Small Business Services | $240,371.56 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2022 | Department of Parks and Recreation | $231,178.71 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2022 | Department of Small Business Services | $226,499.03 | CONSTRUCTION-BUILDINGS | – |
| Nov 10, 2021 | Department of Parks and Recreation | $196,310.80 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2022 | Department of Environmental Protection | $170,951.50 | DESIGN-CONSULTANT-IOTB | – |
| Nov 9, 2021 | Department of Parks and Recreation | $146,393.57 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2022 | Department of Environmental Protection | $122,835.00 | DESIGN-CONSULTANT-IOTB | – |
| Oct 5, 2021 | Department of Environmental Protection | $117,741.04 | DESIGN-CONSULTANT-IOTB | – |
| Mar 2, 2022 | Department of Parks and Recreation | $117,306.65 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 21 payments$5,254,835
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 28, 2021 | Water Supply | $661,676.98 | DESIGN-CONSULTANT-IOTB | – |
| Apr 8, 2021 | Water Supply | $630,109.83 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2021 | Water Supply | $628,663.47 | DESIGN-CONSULTANT-IOTB | – |
| Feb 11, 2021 | Water Supply | $451,883.04 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2020 | Water Supply | $451,740.66 | DESIGN-CONSULTANT-IOTB | – |
| Oct 1, 2020 | Water Supply | $426,166.22 | DESIGN-CONSULTANT-IOTB | – |
| Dec 7, 2020 | Water Supply | $415,594.63 | DESIGN-CONSULTANT-IOTB | – |
| Aug 13, 2020 | Water Supply | $413,100.11 | DESIGN-CONSULTANT-IOTB | – |
| Mar 16, 2021 | Water Supply | $396,717.97 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2020 | Water Supply | $332,893.70 | DESIGN-CONSULTANT-IOTB | – |
| Jul 20, 2020 | Water Supply | $291,429.37 | DESIGN-CONSULTANT-IOTB | – |
| Aug 7, 2020 | Department of Transportation | $46,451.61 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 1, 2020 | Department of Transportation | $21,530.87 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 1, 2020 | Department of Transportation | $20,823.07 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 6, 2020 | Department of Environmental Protection | $18,170.47 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 16, 2020 | Department of Environmental Protection | $12,216.13 | IOTB CONSTRUCTION | – |
| Aug 7, 2020 | Department of Transportation | $12,204.93 | PROF SERV OTHER | – |
| Sep 21, 2020 | Department of Transportation | $10,978.01 | PROF SERV OTHER | – |
| Jul 28, 2020 | Department of Transportation | $8,352.93 | PROF SERV ENGINEER & ARCHITECT | – |
| Jul 28, 2020 | Department of Transportation | $2,751.21 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2020top 20 of 100 payments$8,785,906
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 1, 2019 | Water Supply | $1,167,030.20 | DESIGN-CONSULTANT-IOTB | – |
| Nov 12, 2019 | Water Supply | $821,819.77 | DESIGN-CONSULTANT-IOTB | – |
| Mar 2, 2020 | Water Supply | $812,623.88 | DESIGN-CONSULTANT-IOTB | – |
| Aug 28, 2019 | Water Supply | $576,292.09 | DESIGN-CONSULTANT-IOTB | – |
| Apr 21, 2020 | Water Supply | $553,282.48 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2019 | Water Supply | $548,631.76 | DESIGN-CONSULTANT-IOTB | – |
| Jul 24, 2019 | Water Supply | $543,908.64 | DESIGN-CONSULTANT-IOTB | – |
| Mar 9, 2020 | Water Supply | $492,503.66 | DESIGN-CONSULTANT-IOTB | – |
| Nov 12, 2019 | Water Supply | $457,068.22 | DESIGN-CONSULTANT-IOTB | – |
| Jan 31, 2020 | Water Supply | $424,128.65 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2020 | Water Supply | $384,334.40 | DESIGN-CONSULTANT-IOTB | – |
| Jun 30, 2020 | Water Supply | $242,554.47 | DESIGN-CONSULTANT-IOTB | – |
| Oct 21, 2019 | Department of Transportation | $176,446.83 | PROF SERV OTHER | – |
| Oct 21, 2019 | Department of Transportation | $136,679.88 | PROF SERV OTHER | – |
| Nov 13, 2019 | Department of Environmental Protection | $69,661.68 | IOTB CONSTRUCTION | – |
| Aug 16, 2019 | Department of Environmental Protection | $63,250.30 | CONTRACTUAL SERVICES GENERAL | – |
| Mar 16, 2020 | City Council | $51,794.14 | PROF SERV OTHER | – |
| Jan 22, 2020 | City Council | $50,138.18 | PROF SERV OTHER | – |
| Oct 2, 2019 | Department of Environmental Protection | $49,754.55 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 16, 2020 | Department of Environmental Protection | $48,230.48 | IOTB CONSTRUCTION | – |
FY 2019top 20 of 130 payments$8,763,205
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 11, 2019 | Water Supply | $922,106.63 | DESIGN-CONSULTANT-IOTB | – |
| Feb 25, 2019 | Water Supply | $795,634.59 | DESIGN-CONSULTANT-IOTB | – |
| Apr 26, 2019 | Water Supply | $729,796.51 | DESIGN-CONSULTANT-IOTB | – |
| Sep 26, 2018 | Water Supply | $692,433.32 | DESIGN-CONSULTANT-IOTB | – |
| Nov 26, 2018 | Water Supply | $563,914.61 | DESIGN-CONSULTANT-IOTB | – |
| Apr 4, 2019 | Water Supply | $556,171.84 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2019 | Water Supply | $542,143.62 | DESIGN-CONSULTANT-IOTB | – |
| Jan 22, 2019 | Water Supply | $507,308.05 | DESIGN-CONSULTANT-IOTB | – |
| Oct 5, 2018 | Water Supply | $476,175.27 | DESIGN-CONSULTANT-IOTB | – |
| Nov 13, 2018 | Water Supply | $413,020.13 | DESIGN-CONSULTANT-IOTB | – |
| Jul 9, 2018 | Water Supply | $403,653.53 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2019 | Department of Environmental Protection | $179,761.00 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 6, 2018 | Department of Environmental Protection | $110,364.26 | IOTB CONSTRUCTION | – |
| Sep 12, 2018 | Department of Transportation | $105,428.94 | PROF SERV OTHER | – |
| Sep 12, 2018 | Department of Transportation | $72,520.71 | PROF SERV OTHER | – |
| Sep 11, 2018 | Department of Environmental Protection | $49,459.46 | IOTB CONSTRUCTION | – |
| Feb 19, 2019 | Department of Transportation | $46,425.68 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 17, 2018 | Department of Transportation | $41,660.95 | PROF SERV ENGINEER & ARCHITECT | – |
| Aug 20, 2018 | Department of Transportation | $39,230.49 | PROF SERV OTHER | – |
| Aug 20, 2018 | Department of Transportation | $38,130.96 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2018top 20 of 159 payments$6,779,864
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 17, 2017 | Department of Environmental Protection | $635,431.60 | IOTB CONSTRUCTION | – |
| Apr 18, 2018 | Water Supply | $394,998.01 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2018 | Water Supply | $388,893.13 | DESIGN-CONSULTANT-IOTB | – |
| May 14, 2018 | Water Supply | $303,662.57 | DESIGN-CONSULTANT-IOTB | – |
| Jan 22, 2018 | Department of Transportation | $275,232.54 | PROF SERV OTHER | – |
| Aug 7, 2017 | Department of Environmental Protection | $272,536.26 | IOTB CONSTRUCTION | – |
| Oct 18, 2017 | Department of Transportation | $254,265.84 | PROF SERV OTHER | – |
| Jan 10, 2018 | Water Supply | $250,081.86 | DESIGN-CONSULTANT-IOTB | – |
| Nov 27, 2017 | Department of Environmental Protection | $245,387.94 | IOTB CONSTRUCTION | – |
| Feb 12, 2018 | Water Supply | $196,920.59 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2017 | Water Supply | $163,779.82 | DESIGN-CONSULTANT-IOTB | – |
| Feb 5, 2018 | Department of Transportation | $134,808.49 | PROF SERV OTHER | – |
| Feb 20, 2018 | Department of Transportation | $123,711.25 | PROF SERV OTHER | – |
| Jun 26, 2018 | Department of Environmental Protection | $110,070.36 | IOTB CONSTRUCTION | – |
| Jan 8, 2018 | Department of Environmental Protection | $105,206.80 | IOTB CONSTRUCTION | – |
| Sep 5, 2017 | Department of Transportation | $98,089.29 | PROF SERV OTHER | – |
| Jan 16, 2018 | Department of Transportation | $96,037.70 | PROF SERV OTHER | – |
| Jan 16, 2018 | Department of Transportation | $95,239.63 | PROF SERV OTHER | – |
| Sep 5, 2017 | Department of Transportation | $87,644.93 | PROF SERV OTHER | – |
| Dec 4, 2017 | Water Supply | $86,255.45 | DESIGN-CONSULTANT-IOTB | – |
FY 2017top 20 of 118 payments$3,749,293
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2016 | Department of Environmental Protection | $369,772.77 | IOTB CONSTRUCTION | – |
| Apr 26, 2017 | Department of Transportation | $173,660.25 | PROF SERV OTHER | – |
| Oct 26, 2016 | Department of Transportation | $144,625.15 | PROF SERV OTHER | – |
| Jun 5, 2017 | Department of Transportation | $95,483.90 | PROF SERV OTHER | – |
| Nov 21, 2016 | Department of Transportation | $94,870.19 | PROF SERV OTHER | – |
| Jan 12, 2017 | Department of Transportation | $86,595.10 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 27, 2016 | Department of Environmental Protection | $84,806.89 | IOTB CONSTRUCTION | – |
| Mar 23, 2017 | Department of Transportation | $83,698.96 | PROF SERV OTHER | – |
| Apr 10, 2017 | Department of Transportation | $82,288.82 | PROF SERV OTHER | – |
| Dec 14, 2016 | Department of Transportation | $77,067.20 | PROF SERV OTHER | – |
| Mar 27, 2017 | Department of Transportation | $69,329.15 | PROF SERV OTHER | – |
| Dec 19, 2016 | Department of Transportation | $65,131.88 | PROF SERV OTHER | – |
| Oct 11, 2016 | Department of Transportation | $63,591.29 | PROF SERV OTHER | – |
| Sep 6, 2016 | Department of Transportation | $57,282.89 | PROF SERV OTHER | – |
| May 10, 2017 | Department of Transportation | $56,892.35 | PROF SERV OTHER | – |
| Sep 12, 2016 | Department of Transportation | $55,423.71 | PROF SERV OTHER | – |
| Nov 18, 2016 | Department of Transportation | $54,686.49 | PROF SERV OTHER | – |
| Dec 19, 2016 | Department of Transportation | $53,562.34 | PROF SERV OTHER | – |
| Nov 30, 2016 | Department of Environmental Protection | $51,769.16 | IOTB CONSTRUCTION | – |
| Jan 17, 2017 | Department of Transportation | $48,817.63 | PROF SERV OTHER | – |
FY 2016top 20 of 99 payments$4,049,976
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 18, 2016 | Department of Environmental Protection | $652,418.47 | IOTB CONSTRUCTION | – |
| Apr 27, 2016 | Department of Environmental Protection | $326,796.66 | IOTB CONSTRUCTION | – |
| Dec 7, 2015 | Department of Environmental Protection | $317,120.12 | IOTB CONSTRUCTION | – |
| Feb 29, 2016 | Department of Environmental Protection | $210,681.52 | IOTB CONSTRUCTION | – |
| Aug 26, 2015 | Department of Transportation | $188,037.98 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 21, 2015 | Department of Transportation | $140,360.10 | PROF SERV OTHER | – |
| Aug 24, 2015 | Department of Transportation | $130,806.11 | PROF SERV OTHER | – |
| Nov 2, 2015 | Department of Transportation | $117,696.20 | PROF SERV OTHER | – |
| Aug 21, 2015 | Department of Transportation | $110,661.36 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 13, 2015 | Department of Transportation | $109,930.37 | PROF SERV OTHER | – |
| Jul 29, 2015 | Department of Transportation | $99,696.16 | PROF SERV OTHER | – |
| Sep 21, 2015 | Department of Environmental Protection | $88,874.00 | IOTB CONSTRUCTION | – |
| Aug 21, 2015 | Department of Transportation | $87,521.81 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 23, 2015 | Department of Transportation | $74,700.97 | PROF SERV OTHER | – |
| Aug 21, 2015 | Department of Transportation | $70,609.71 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 21, 2015 | Department of Environmental Protection | $55,121.00 | IOTB CONSTRUCTION | – |
| Jul 27, 2015 | Department of Transportation | $51,860.87 | PROF SERV OTHER | – |
| Nov 10, 2015 | Department of Environmental Protection | $38,992.43 | IOTB CONSTRUCTION | – |
| Aug 21, 2015 | Department of Transportation | $37,876.58 | PROF SERV OTHER | – |
| Feb 29, 2016 | Department of Environmental Protection | $36,232.50 | IOTB CONSTRUCTION | – |
FY 2015top 20 of 92 payments$3,481,147
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 26, 2014 | Department of Transportation | $189,151.34 | PROF SERV OTHER | – |
| Dec 17, 2014 | Department of Transportation | $109,463.50 | PROF SERV OTHER | – |
| Nov 7, 2014 | Department of Transportation | $104,955.43 | PROF SERV OTHER | – |
| Nov 14, 2014 | Department of Transportation | $103,322.63 | PROF SERV OTHER | – |
| May 7, 2015 | Department of Transportation | $101,344.33 | PROF SERV OTHER | – |
| Sep 23, 2014 | Department of Transportation | $94,293.25 | PROF SERV OTHER | – |
| Oct 1, 2014 | Department of Transportation | $91,701.04 | PROF SERV OTHER | – |
| Dec 8, 2014 | Department of Transportation | $91,473.94 | PROF SERV OTHER | – |
| Apr 27, 2015 | Department of Environmental Protection | $88,607.45 | IOTB CONSTRUCTION | – |
| Jul 9, 2014 | Department of Transportation | $82,474.46 | PROF SERV ENGINEER & ARCHITECT | – |
| May 14, 2015 | Department of Transportation | $74,301.41 | PROF SERV OTHER | – |
| Jun 19, 2015 | Department of Transportation | $69,739.03 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 22, 2014 | Department of Transportation | $69,497.06 | PROF SERV OTHER | – |
| Aug 11, 2014 | Department of Transportation | $67,619.67 | PROF SERV OTHER | – |
| May 26, 2015 | Department of Environmental Protection | $67,573.06 | IOTB CONSTRUCTION | – |
| Nov 26, 2014 | Department of Transportation | $67,205.03 | PROF SERV OTHER | – |
| Sep 23, 2014 | Department of Transportation | $66,526.03 | PROF SERV OTHER | – |
| Dec 29, 2014 | Department of Transportation | $66,156.66 | PROF SERV OTHER | – |
| Dec 29, 2014 | Department of Transportation | $64,352.10 | PROF SERV OTHER | – |
| Jun 15, 2015 | Department of Transportation | $63,326.09 | PROF SERV OTHER | – |
FY 2014top 20 of 43 payments$1,081,006
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 3, 2013 | Department of Transportation | $147,595.22 | PROF SERV OTHER | – |
| Nov 8, 2013 | Department of Transportation | $112,820.99 | PROF SERV OTHER | – |
| Feb 6, 2014 | Department of Transportation | $103,382.04 | PROF SERV OTHER | – |
| Oct 22, 2013 | Department of Transportation | $67,545.24 | PROF SERV OTHER | – |
| Dec 26, 2013 | Department of Transportation | $59,910.32 | PROF SERV OTHER | – |
| Oct 31, 2013 | Department of Transportation | $54,822.69 | PROF SERV OTHER | – |
| Apr 16, 2014 | Department of Transportation | $53,805.49 | PROF SERV OTHER | – |
| Mar 12, 2014 | Department of Transportation | $51,738.52 | PROF SERV OTHER | – |
| Jun 2, 2014 | Department of Transportation | $41,286.59 | PROF SERV ENGINEER & ARCHITECT | – |
| May 9, 2014 | Department of Transportation | $38,112.38 | PROF SERV OTHER | – |
| May 7, 2014 | Department of Transportation | $37,921.04 | PROF SERV ENGINEER & ARCHITECT | – |
| Feb 3, 2014 | Department of Transportation | $37,679.26 | PROF SERV OTHER | – |
| Oct 31, 2013 | Department of Transportation | $27,958.16 | PROF SERV OTHER | – |
| Oct 31, 2013 | Department of Transportation | $23,349.95 | PROF SERV OTHER | – |
| Dec 9, 2013 | Department of Transportation | $21,705.07 | PROF SERV OTHER | – |
| Jun 2, 2014 | Department of Transportation | $21,142.74 | PROF SERV OTHER | – |
| Jan 13, 2014 | Department of Transportation | $19,622.11 | PROF SERV OTHER | – |
| Mar 19, 2014 | Department of Transportation | $17,181.38 | PROF SERV OTHER | – |
| Sep 23, 2013 | Department of Transportation | $15,599.07 | PROF SERV OTHER | – |
| Jun 17, 2014 | Department of Transportation | $15,396.82 | PROF SERV OTHER | – |
FY 2013top 4 of 4 payments$83,514
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 28, 2013 | Department of Buildings | $77,365.00 | PROF SERV ENGINEER & ARCHITECT | – |
| May 28, 2013 | Department of Buildings | $5,580.00 | PROF SERV ENGINEER & ARCHITECT | – |
| May 28, 2013 | Department of Buildings | $560.73 | PROF SERV ENGINEER & ARCHITECT | – |
| May 28, 2013 | Department of Buildings | $8.00 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2011top 7 of 7 payments$23,303
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 15, 2010 | Department of Buildings | $11,080.00 | CONTRACTUAL SERVICES GENERAL | – |
| May 2, 2011 | Department of Buildings | $7,125.00 | PROF SERV OTHER | – |
| Mar 11, 2011 | Department of Buildings | $2,200.00 | PROF SERV OTHER | – |
| May 2, 2011 | Department of Buildings | $1,675.00 | PROF SERV OTHER | – |
| Dec 20, 2010 | Department of Buildings | $825.00 | PROF SERV OTHER | – |
| Mar 11, 2011 | Department of Buildings | $300.00 | PROF SERV OTHER | – |
| Mar 14, 2011 | Department of Buildings | $98.00 | CONTRACTUAL SERVICES GENERAL | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 23, 2025 | Department of Transportation | $41,908.13 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | Department of Environmental Protection | $17,328.94 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 10, 2025 | Housing Preservation and Development | $30,041.23 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 9, 2025 | Department of Parks and Recreation | $3,662.31 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Jun 9, 2025 | Department of Citywide Administrative Services | $1,872.00 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Jun 9, 2025 | Department of Parks and Recreation | $48,689.69 | DESIGN-CONSULTANT-BUILDINGS | Capital Contracts |
| Jun 9, 2025 | Department of Parks and Recreation | $3,597.66 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Jun 9, 2025 | Department of Parks and Recreation | $3,633.49 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Jun 9, 2025 | Department of Parks and Recreation | $9,611.86 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| May 13, 2025 | Department of Parks and Recreation | $29,348.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 13, 2025 | Department of Small Business Services | $5,888.77 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 13, 2025 | Water Supply | $145,812.63 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 30, 2025 | Department of Environmental Protection | $46,526.77 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 23, 2025 | Department of Parks and Recreation | $21,055.53 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 21, 2025 | Department of Parks and Recreation | $12,750.87 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 16, 2025 | Department of Parks and Recreation | $30,726.25 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 15, 2025 | Department of Small Business Services | $6,461.91 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 14, 2025 | Department of Parks and Recreation | $6,132.78 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Apr 14, 2025 | Department of Parks and Recreation | $2,245.52 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Apr 14, 2025 | Department of Social Services | $10,817.05 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 14, 2025 | Department of Transportation | $29,954.49 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 14, 2025 | Department of Parks and Recreation | $2,449.66 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Apr 14, 2025 | Department of Parks and Recreation | $2,238.54 | DESIGN-BUILD: INFRASTRUCTURE | Capital Contracts |
| Apr 14, 2025 | Housing Preservation and Development | $6,607.36 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 9, 2025 | Department of Parks and Recreation | $23,563.35 | DESIGN-CONSULTANT-BUILDINGS | Capital Contracts |
Other vendors serving Water Supply
- Kiewit-Shea Constructors, Ajv $670,428,311
- Schiavone Construction Co LLC $293,854,715
- Picone/Schiavone/Frontier- Kemper/Dragados JV $182,010,198
- Parsons Main of New York Inc $80,618,686
- HMM Ny, Inc & Malcolm Pirnie, Inc - a Joint Venture $47,771,800
- Hazen & Sawyer $44,061,705
- Yonkers Contracting Co Inc $43,763,691
- Skanska ECCO III HVR JV $41,184,423
- John Picone Inc $38,922,164
- B&v-G&h-Haks - a Joint Venture $27,245,828
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data