Ove Arup & Partners: New York City Government Payments

as recorded by New York City: OVE ARUP & PARTNERS

Ove Arup & Partners is the 763rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 21st in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 1.9% of everything the Water Supply has paid vendors in that span. Payments to it fell 19.7% year over year.

Primary spending category: DESIGN-CONSULTANT-IOTB

$81,563,104total received
1,107payments
12agencies
Nov 15, 2010Jun 23, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Ove Arup & Partners. No spam.

Payments by fiscal year

FY 2025$9,182,548
FY 2024$11,438,779
FY 2023$10,860,462
FY 2022$8,029,266
FY 2021$5,254,835
FY 2020$8,785,906
FY 2019$8,763,205
FY 2018$6,779,864
FY 2017$3,749,293
FY 2016$4,049,976
FY 2015$3,481,147
FY 2014$1,081,006
FY 2013$83,514
FY 2011$23,303

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Water Supply11$6,095,477
FY 2025Department of Parks and Recreation62$1,867,552
FY 2025Department of Citywide Administrative Services6$356,563
FY 2025Department of Transportation12$348,285
FY 2025Department of Environmental Protection15$281,495
FY 2025Department of Social Services8$100,045
FY 2025Department of Small Business Services9$71,064
FY 2025Housing Preservation and Development9$62,067
FY 2024Water Supply13$7,528,257
FY 2024Department of Parks and Recreation28$2,859,140
FY 2024Department of Transportation7$342,105
FY 2024Department of Small Business Services8$264,363
FY 2024Department of Environmental Protection23$165,418
FY 2024Department of Social Services9$163,604
FY 2024Housing Preservation and Development7$115,892
FY 2023Water Supply13$6,986,321
FY 2023Department of Parks and Recreation13$2,024,084
FY 2023Department of Transportation6$667,277
FY 2023Department of Environmental Protection13$423,354
FY 2023Department of Social Services5$342,558
FY 2023Department of Small Business Services5$274,691
FY 2023Housing Preservation and Development4$106,949
FY 2023Department of Design and Construction1$35,228
FY 2022Water Supply9$4,474,461
FY 2022Department of Parks and Recreation15$1,323,770
FY 2022Department of Environmental Protection14$998,228
FY 2022Department of Small Business Services5$861,330
FY 2022Department of Social Services3$352,437
FY 2022Department of Transportation1$19,040
FY 2021Water Supply11$5,099,976
FY 2021Department of Transportation8$124,472
FY 2021Department of Environmental Protection2$30,387
FY 2020Water Supply12$7,024,178
FY 2020Department of Transportation67$1,004,010
FY 2020Department of Environmental Protection13$499,877
FY 2020City Council7$245,000
FY 2020Department of Citywide Administrative Services1$12,840
FY 2019Water Supply11$6,602,358
FY 2019Department of Transportation113$1,759,134
FY 2019Department of Environmental Protection6$401,713
FY 2018Department of Transportation146$3,607,050
FY 2018Water Supply7$1,784,591
FY 2018Department of Environmental Protection5$1,368,633
FY 2018Department of Citywide Administrative Services1$19,590
FY 2017Department of Transportation111$3,135,328
FY 2017Department of Environmental Protection6$607,965
FY 2017Mayoralty1$6,000
FY 2016Department of Transportation90$2,294,982
FY 2016Department of Environmental Protection9$1,754,994
FY 2015Department of Transportation89$3,288,470
FY 2015Department of Environmental Protection3$192,677
FY 2014Department of Transportation43$1,081,006
FY 2013Department of Buildings4$83,514
FY 2011Department of Buildings7$23,303
Total1,107$81,563,104

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS161$9,575,617Sep 28, 2021 Jun 23, 2025
DESIGN-BUILD: INFRASTRUCTURE34$708,991Sep 16, 2024 Jun 9, 2025
PROMPT PAYMENT INTEREST2$660Feb 20, 2024 Sep 17, 2024
CONTRACTUAL SERVICES GENERAL18$636,994Nov 15, 2010 Aug 22, 2022
PAYMENTS TO DELEGATE AGENCIES1$6,000Jun 28, 2017 Jun 28, 2017
DESIGN-CONSULTANT-IOTB135$47,230,573Dec 4, 2017 Jun 23, 2025
IOTB CONSTRUCTION30$4,270,045Mar 30, 2015 Dec 16, 2020
PROF SERV ENGINEER & ARCHITECT168$3,606,991May 28, 2013 Jul 23, 2024
N/A14$228,494Jul 12, 2021 Feb 25, 2025
DESIGN-CONSULTANT-BUILDINGS22$2,199,224Feb 1, 2022 Jun 9, 2025
PROF SERV OTHER522$13,099,515Dec 20, 2010 Sep 21, 2020

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 132 payments$9,182,548
DateAgencyAmountCategoryPurchase order
Sep 17, 2024Water Supply$931,156.76DESIGN-CONSULTANT-IOTB
Nov 1, 2024Water Supply$785,895.61DESIGN-CONSULTANT-IOTB
Oct 18, 2024Water Supply$768,334.65DESIGN-CONSULTANT-IOTB
Aug 28, 2024Water Supply$709,885.63DESIGN-CONSULTANT-IOTB
Dec 2, 2024Water Supply$643,736.61DESIGN-CONSULTANT-IOTB
Jul 29, 2024Water Supply$643,714.23DESIGN-CONSULTANT-IOTB
Jul 8, 2024Water Supply$622,002.11DESIGN-CONSULTANT-IOTB
Jan 22, 2025Water Supply$409,614.02DESIGN-CONSULTANT-IOTB
Sep 16, 2024Department of Citywide Administrative Services$265,659.22DESIGN-BUILD: INFRASTRUCTURE
Feb 19, 2025Water Supply$246,626.09DESIGN-CONSULTANT-IOTB
Apr 2, 2025Water Supply$188,698.77DESIGN-CONSULTANT-IOTB
Sep 17, 2024Department of Parks and Recreation$168,286.98DESIGN-CONSULTANT-BUILDINGS
Jul 1, 2024Department of Parks and Recreation$154,201.19DESIGN-CONSULTANT-BUILDINGS
May 13, 2025Water Supply$145,812.63DESIGN-CONSULTANT-IOTB
Dec 26, 2024Department of Parks and Recreation$103,414.27CONSTRUCTION-BUILDINGS
Nov 6, 2024Department of Parks and Recreation$98,337.79DESIGN-CONSULTANT-BUILDINGS
Jan 21, 2025Department of Parks and Recreation$96,094.33DESIGN-CONSULTANT-BUILDINGS
Feb 10, 2025Department of Parks and Recreation$93,257.26DESIGN-CONSULTANT-BUILDINGS
Jul 30, 2024Department of Parks and Recreation$84,646.87DESIGN-CONSULTANT-BUILDINGS
Mar 12, 2025Department of Parks and Recreation$76,318.36CONSTRUCTION-BUILDINGS
FY 2024top 20 of 95 payments$11,438,779
DateAgencyAmountCategoryPurchase order
May 15, 2024Water Supply$820,089.28DESIGN-CONSULTANT-IOTB
Feb 23, 2024Water Supply$741,382.82DESIGN-CONSULTANT-IOTB
Aug 3, 2023Water Supply$716,486.83DESIGN-CONSULTANT-IOTB
Mar 19, 2024Water Supply$707,967.44DESIGN-CONSULTANT-IOTB
Apr 29, 2024Water Supply$704,307.92DESIGN-CONSULTANT-IOTB
May 30, 2024Water Supply$692,086.17DESIGN-CONSULTANT-IOTB
Dec 13, 2023Water Supply$560,374.13DESIGN-CONSULTANT-IOTB
Apr 15, 2024Department of Parks and Recreation$505,350.40DESIGN-CONSULTANT-BUILDINGS
Jan 29, 2024Water Supply$502,238.45DESIGN-CONSULTANT-IOTB
Oct 26, 2023Water Supply$497,986.78DESIGN-CONSULTANT-IOTB
Nov 20, 2023Water Supply$492,659.07DESIGN-CONSULTANT-IOTB
Sep 11, 2023Water Supply$430,567.47DESIGN-CONSULTANT-IOTB
Dec 26, 2023Department of Parks and Recreation$349,730.60CONSTRUCTION-BUILDINGS
Aug 14, 2023Water Supply$335,297.42DESIGN-CONSULTANT-IOTB
Oct 2, 2023Water Supply$326,812.74DESIGN-CONSULTANT-IOTB
Dec 26, 2023Department of Parks and Recreation$219,071.32CONSTRUCTION-BUILDINGS
Aug 7, 2023Department of Parks and Recreation$214,823.89CONSTRUCTION-BUILDINGS
Aug 3, 2023Department of Parks and Recreation$170,238.65CONSTRUCTION-BUILDINGS
Feb 6, 2024Department of Parks and Recreation$160,417.45CONSTRUCTION-BUILDINGS
Feb 12, 2024Department of Parks and Recreation$154,597.28CONSTRUCTION-BUILDINGS
FY 2023top 20 of 60 payments$10,860,462
DateAgencyAmountCategoryPurchase order
Sep 21, 2022Water Supply$782,826.36DESIGN-CONSULTANT-IOTB
Apr 27, 2023Water Supply$674,179.88DESIGN-CONSULTANT-IOTB
Dec 8, 2022Water Supply$654,537.19DESIGN-CONSULTANT-IOTB
Mar 23, 2023Water Supply$644,175.69DESIGN-CONSULTANT-IOTB
Nov 3, 2022Water Supply$539,550.43DESIGN-CONSULTANT-IOTB
May 12, 2023Water Supply$524,134.82DESIGN-CONSULTANT-IOTB
May 30, 2023Water Supply$479,966.34DESIGN-CONSULTANT-IOTB
Jul 19, 2022Water Supply$471,355.22DESIGN-CONSULTANT-IOTB
Jan 5, 2023Water Supply$456,654.78DESIGN-CONSULTANT-IOTB
Feb 15, 2023Water Supply$451,524.14DESIGN-CONSULTANT-IOTB
Mar 7, 2023Water Supply$445,699.14DESIGN-CONSULTANT-IOTB
Apr 11, 2023Water Supply$432,911.27DESIGN-CONSULTANT-IOTB
Jun 15, 2023Water Supply$428,805.60DESIGN-CONSULTANT-IOTB
Jan 9, 2023Department of Parks and Recreation$357,911.22CONSTRUCTION-BUILDINGS
Feb 7, 2023Department of Transportation$311,376.43CONSTRUCTION-BUILDINGS
Mar 13, 2023Department of Parks and Recreation$260,594.34CONSTRUCTION-BUILDINGS
Feb 27, 2023Department of Parks and Recreation$241,179.38CONSTRUCTION-BUILDINGS
Jun 6, 2023Department of Parks and Recreation$225,064.36CONSTRUCTION-BUILDINGS
Apr 26, 2023Department of Parks and Recreation$221,665.62CONSTRUCTION-BUILDINGS
Apr 24, 2023Department of Transportation$189,937.32CONSTRUCTION-BUILDINGS
FY 2022top 20 of 47 payments$8,029,266
DateAgencyAmountCategoryPurchase order
Oct 4, 2021Water Supply$747,741.83DESIGN-CONSULTANT-IOTB
Aug 23, 2021Water Supply$578,277.69DESIGN-CONSULTANT-IOTB
Nov 29, 2021Water Supply$562,477.19DESIGN-CONSULTANT-IOTB
Jan 3, 2022Water Supply$550,026.50DESIGN-CONSULTANT-IOTB
Aug 2, 2021Water Supply$539,455.31DESIGN-CONSULTANT-IOTB
Apr 6, 2022Water Supply$470,337.84DESIGN-CONSULTANT-IOTB
Oct 25, 2021Water Supply$409,042.13DESIGN-CONSULTANT-IOTB
Nov 1, 2021Department of Small Business Services$369,618.57CONSTRUCTION-BUILDINGS
Jun 14, 2022Water Supply$339,481.35DESIGN-CONSULTANT-IOTB
Jan 31, 2022Water Supply$277,620.81DESIGN-CONSULTANT-IOTB
Apr 11, 2022Department of Social Services$253,081.13DESIGN-CONSULTANT-BUILDINGS
Jan 6, 2022Department of Small Business Services$240,371.56CONSTRUCTION-BUILDINGS
Mar 9, 2022Department of Parks and Recreation$231,178.71CONSTRUCTION-BUILDINGS
Mar 7, 2022Department of Small Business Services$226,499.03CONSTRUCTION-BUILDINGS
Nov 10, 2021Department of Parks and Recreation$196,310.80CONSTRUCTION-BUILDINGS
Feb 7, 2022Department of Environmental Protection$170,951.50DESIGN-CONSULTANT-IOTB
Nov 9, 2021Department of Parks and Recreation$146,393.57CONSTRUCTION-BUILDINGS
May 23, 2022Department of Environmental Protection$122,835.00DESIGN-CONSULTANT-IOTB
Oct 5, 2021Department of Environmental Protection$117,741.04DESIGN-CONSULTANT-IOTB
Mar 2, 2022Department of Parks and Recreation$117,306.65CONSTRUCTION-BUILDINGS
FY 2021top 20 of 21 payments$5,254,835
DateAgencyAmountCategoryPurchase order
Jun 28, 2021Water Supply$661,676.98DESIGN-CONSULTANT-IOTB
Apr 8, 2021Water Supply$630,109.83DESIGN-CONSULTANT-IOTB
May 26, 2021Water Supply$628,663.47DESIGN-CONSULTANT-IOTB
Feb 11, 2021Water Supply$451,883.04DESIGN-CONSULTANT-IOTB
Nov 4, 2020Water Supply$451,740.66DESIGN-CONSULTANT-IOTB
Oct 1, 2020Water Supply$426,166.22DESIGN-CONSULTANT-IOTB
Dec 7, 2020Water Supply$415,594.63DESIGN-CONSULTANT-IOTB
Aug 13, 2020Water Supply$413,100.11DESIGN-CONSULTANT-IOTB
Mar 16, 2021Water Supply$396,717.97DESIGN-CONSULTANT-IOTB
Dec 30, 2020Water Supply$332,893.70DESIGN-CONSULTANT-IOTB
Jul 20, 2020Water Supply$291,429.37DESIGN-CONSULTANT-IOTB
Aug 7, 2020Department of Transportation$46,451.61PROF SERV ENGINEER & ARCHITECT
Sep 1, 2020Department of Transportation$21,530.87PROF SERV ENGINEER & ARCHITECT
Sep 1, 2020Department of Transportation$20,823.07PROF SERV ENGINEER & ARCHITECT
Nov 6, 2020Department of Environmental Protection$18,170.47CONTRACTUAL SERVICES GENERAL
Dec 16, 2020Department of Environmental Protection$12,216.13IOTB CONSTRUCTION
Aug 7, 2020Department of Transportation$12,204.93PROF SERV OTHER
Sep 21, 2020Department of Transportation$10,978.01PROF SERV OTHER
Jul 28, 2020Department of Transportation$8,352.93PROF SERV ENGINEER & ARCHITECT
Jul 28, 2020Department of Transportation$2,751.21PROF SERV ENGINEER & ARCHITECT
FY 2020top 20 of 100 payments$8,785,906
DateAgencyAmountCategoryPurchase order
Oct 1, 2019Water Supply$1,167,030.20DESIGN-CONSULTANT-IOTB
Nov 12, 2019Water Supply$821,819.77DESIGN-CONSULTANT-IOTB
Mar 2, 2020Water Supply$812,623.88DESIGN-CONSULTANT-IOTB
Aug 28, 2019Water Supply$576,292.09DESIGN-CONSULTANT-IOTB
Apr 21, 2020Water Supply$553,282.48DESIGN-CONSULTANT-IOTB
Dec 26, 2019Water Supply$548,631.76DESIGN-CONSULTANT-IOTB
Jul 24, 2019Water Supply$543,908.64DESIGN-CONSULTANT-IOTB
Mar 9, 2020Water Supply$492,503.66DESIGN-CONSULTANT-IOTB
Nov 12, 2019Water Supply$457,068.22DESIGN-CONSULTANT-IOTB
Jan 31, 2020Water Supply$424,128.65DESIGN-CONSULTANT-IOTB
May 26, 2020Water Supply$384,334.40DESIGN-CONSULTANT-IOTB
Jun 30, 2020Water Supply$242,554.47DESIGN-CONSULTANT-IOTB
Oct 21, 2019Department of Transportation$176,446.83PROF SERV OTHER
Oct 21, 2019Department of Transportation$136,679.88PROF SERV OTHER
Nov 13, 2019Department of Environmental Protection$69,661.68IOTB CONSTRUCTION
Aug 16, 2019Department of Environmental Protection$63,250.30CONTRACTUAL SERVICES GENERAL
Mar 16, 2020City Council$51,794.14PROF SERV OTHER
Jan 22, 2020City Council$50,138.18PROF SERV OTHER
Oct 2, 2019Department of Environmental Protection$49,754.55CONTRACTUAL SERVICES GENERAL
Jun 16, 2020Department of Environmental Protection$48,230.48IOTB CONSTRUCTION
FY 2019top 20 of 130 payments$8,763,205
DateAgencyAmountCategoryPurchase order
Mar 11, 2019Water Supply$922,106.63DESIGN-CONSULTANT-IOTB
Feb 25, 2019Water Supply$795,634.59DESIGN-CONSULTANT-IOTB
Apr 26, 2019Water Supply$729,796.51DESIGN-CONSULTANT-IOTB
Sep 26, 2018Water Supply$692,433.32DESIGN-CONSULTANT-IOTB
Nov 26, 2018Water Supply$563,914.61DESIGN-CONSULTANT-IOTB
Apr 4, 2019Water Supply$556,171.84DESIGN-CONSULTANT-IOTB
May 28, 2019Water Supply$542,143.62DESIGN-CONSULTANT-IOTB
Jan 22, 2019Water Supply$507,308.05DESIGN-CONSULTANT-IOTB
Oct 5, 2018Water Supply$476,175.27DESIGN-CONSULTANT-IOTB
Nov 13, 2018Water Supply$413,020.13DESIGN-CONSULTANT-IOTB
Jul 9, 2018Water Supply$403,653.53DESIGN-CONSULTANT-IOTB
Jun 24, 2019Department of Environmental Protection$179,761.00CONTRACTUAL SERVICES GENERAL
Aug 6, 2018Department of Environmental Protection$110,364.26IOTB CONSTRUCTION
Sep 12, 2018Department of Transportation$105,428.94PROF SERV OTHER
Sep 12, 2018Department of Transportation$72,520.71PROF SERV OTHER
Sep 11, 2018Department of Environmental Protection$49,459.46IOTB CONSTRUCTION
Feb 19, 2019Department of Transportation$46,425.68PROF SERV ENGINEER & ARCHITECT
Sep 17, 2018Department of Transportation$41,660.95PROF SERV ENGINEER & ARCHITECT
Aug 20, 2018Department of Transportation$39,230.49PROF SERV OTHER
Aug 20, 2018Department of Transportation$38,130.96PROF SERV ENGINEER & ARCHITECT
FY 2018top 20 of 159 payments$6,779,864
DateAgencyAmountCategoryPurchase order
Jul 17, 2017Department of Environmental Protection$635,431.60IOTB CONSTRUCTION
Apr 18, 2018Water Supply$394,998.01DESIGN-CONSULTANT-IOTB
Jun 4, 2018Water Supply$388,893.13DESIGN-CONSULTANT-IOTB
May 14, 2018Water Supply$303,662.57DESIGN-CONSULTANT-IOTB
Jan 22, 2018Department of Transportation$275,232.54PROF SERV OTHER
Aug 7, 2017Department of Environmental Protection$272,536.26IOTB CONSTRUCTION
Oct 18, 2017Department of Transportation$254,265.84PROF SERV OTHER
Jan 10, 2018Water Supply$250,081.86DESIGN-CONSULTANT-IOTB
Nov 27, 2017Department of Environmental Protection$245,387.94IOTB CONSTRUCTION
Feb 12, 2018Water Supply$196,920.59DESIGN-CONSULTANT-IOTB
Dec 26, 2017Water Supply$163,779.82DESIGN-CONSULTANT-IOTB
Feb 5, 2018Department of Transportation$134,808.49PROF SERV OTHER
Feb 20, 2018Department of Transportation$123,711.25PROF SERV OTHER
Jun 26, 2018Department of Environmental Protection$110,070.36IOTB CONSTRUCTION
Jan 8, 2018Department of Environmental Protection$105,206.80IOTB CONSTRUCTION
Sep 5, 2017Department of Transportation$98,089.29PROF SERV OTHER
Jan 16, 2018Department of Transportation$96,037.70PROF SERV OTHER
Jan 16, 2018Department of Transportation$95,239.63PROF SERV OTHER
Sep 5, 2017Department of Transportation$87,644.93PROF SERV OTHER
Dec 4, 2017Water Supply$86,255.45DESIGN-CONSULTANT-IOTB
FY 2017top 20 of 118 payments$3,749,293
DateAgencyAmountCategoryPurchase order
Aug 8, 2016Department of Environmental Protection$369,772.77IOTB CONSTRUCTION
Apr 26, 2017Department of Transportation$173,660.25PROF SERV OTHER
Oct 26, 2016Department of Transportation$144,625.15PROF SERV OTHER
Jun 5, 2017Department of Transportation$95,483.90PROF SERV OTHER
Nov 21, 2016Department of Transportation$94,870.19PROF SERV OTHER
Jan 12, 2017Department of Transportation$86,595.10PROF SERV ENGINEER & ARCHITECT
Dec 27, 2016Department of Environmental Protection$84,806.89IOTB CONSTRUCTION
Mar 23, 2017Department of Transportation$83,698.96PROF SERV OTHER
Apr 10, 2017Department of Transportation$82,288.82PROF SERV OTHER
Dec 14, 2016Department of Transportation$77,067.20PROF SERV OTHER
Mar 27, 2017Department of Transportation$69,329.15PROF SERV OTHER
Dec 19, 2016Department of Transportation$65,131.88PROF SERV OTHER
Oct 11, 2016Department of Transportation$63,591.29PROF SERV OTHER
Sep 6, 2016Department of Transportation$57,282.89PROF SERV OTHER
May 10, 2017Department of Transportation$56,892.35PROF SERV OTHER
Sep 12, 2016Department of Transportation$55,423.71PROF SERV OTHER
Nov 18, 2016Department of Transportation$54,686.49PROF SERV OTHER
Dec 19, 2016Department of Transportation$53,562.34PROF SERV OTHER
Nov 30, 2016Department of Environmental Protection$51,769.16IOTB CONSTRUCTION
Jan 17, 2017Department of Transportation$48,817.63PROF SERV OTHER
FY 2016top 20 of 99 payments$4,049,976
DateAgencyAmountCategoryPurchase order
May 18, 2016Department of Environmental Protection$652,418.47IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$326,796.66IOTB CONSTRUCTION
Dec 7, 2015Department of Environmental Protection$317,120.12IOTB CONSTRUCTION
Feb 29, 2016Department of Environmental Protection$210,681.52IOTB CONSTRUCTION
Aug 26, 2015Department of Transportation$188,037.98PROF SERV ENGINEER & ARCHITECT
Dec 21, 2015Department of Transportation$140,360.10PROF SERV OTHER
Aug 24, 2015Department of Transportation$130,806.11PROF SERV OTHER
Nov 2, 2015Department of Transportation$117,696.20PROF SERV OTHER
Aug 21, 2015Department of Transportation$110,661.36PROF SERV ENGINEER & ARCHITECT
Oct 13, 2015Department of Transportation$109,930.37PROF SERV OTHER
Jul 29, 2015Department of Transportation$99,696.16PROF SERV OTHER
Sep 21, 2015Department of Environmental Protection$88,874.00IOTB CONSTRUCTION
Aug 21, 2015Department of Transportation$87,521.81PROF SERV ENGINEER & ARCHITECT
Nov 23, 2015Department of Transportation$74,700.97PROF SERV OTHER
Aug 21, 2015Department of Transportation$70,609.71PROF SERV ENGINEER & ARCHITECT
Sep 21, 2015Department of Environmental Protection$55,121.00IOTB CONSTRUCTION
Jul 27, 2015Department of Transportation$51,860.87PROF SERV OTHER
Nov 10, 2015Department of Environmental Protection$38,992.43IOTB CONSTRUCTION
Aug 21, 2015Department of Transportation$37,876.58PROF SERV OTHER
Feb 29, 2016Department of Environmental Protection$36,232.50IOTB CONSTRUCTION
FY 2015top 20 of 92 payments$3,481,147
DateAgencyAmountCategoryPurchase order
Nov 26, 2014Department of Transportation$189,151.34PROF SERV OTHER
Dec 17, 2014Department of Transportation$109,463.50PROF SERV OTHER
Nov 7, 2014Department of Transportation$104,955.43PROF SERV OTHER
Nov 14, 2014Department of Transportation$103,322.63PROF SERV OTHER
May 7, 2015Department of Transportation$101,344.33PROF SERV OTHER
Sep 23, 2014Department of Transportation$94,293.25PROF SERV OTHER
Oct 1, 2014Department of Transportation$91,701.04PROF SERV OTHER
Dec 8, 2014Department of Transportation$91,473.94PROF SERV OTHER
Apr 27, 2015Department of Environmental Protection$88,607.45IOTB CONSTRUCTION
Jul 9, 2014Department of Transportation$82,474.46PROF SERV ENGINEER & ARCHITECT
May 14, 2015Department of Transportation$74,301.41PROF SERV OTHER
Jun 19, 2015Department of Transportation$69,739.03PROF SERV ENGINEER & ARCHITECT
Dec 22, 2014Department of Transportation$69,497.06PROF SERV OTHER
Aug 11, 2014Department of Transportation$67,619.67PROF SERV OTHER
May 26, 2015Department of Environmental Protection$67,573.06IOTB CONSTRUCTION
Nov 26, 2014Department of Transportation$67,205.03PROF SERV OTHER
Sep 23, 2014Department of Transportation$66,526.03PROF SERV OTHER
Dec 29, 2014Department of Transportation$66,156.66PROF SERV OTHER
Dec 29, 2014Department of Transportation$64,352.10PROF SERV OTHER
Jun 15, 2015Department of Transportation$63,326.09PROF SERV OTHER
FY 2014top 20 of 43 payments$1,081,006
DateAgencyAmountCategoryPurchase order
Sep 3, 2013Department of Transportation$147,595.22PROF SERV OTHER
Nov 8, 2013Department of Transportation$112,820.99PROF SERV OTHER
Feb 6, 2014Department of Transportation$103,382.04PROF SERV OTHER
Oct 22, 2013Department of Transportation$67,545.24PROF SERV OTHER
Dec 26, 2013Department of Transportation$59,910.32PROF SERV OTHER
Oct 31, 2013Department of Transportation$54,822.69PROF SERV OTHER
Apr 16, 2014Department of Transportation$53,805.49PROF SERV OTHER
Mar 12, 2014Department of Transportation$51,738.52PROF SERV OTHER
Jun 2, 2014Department of Transportation$41,286.59PROF SERV ENGINEER & ARCHITECT
May 9, 2014Department of Transportation$38,112.38PROF SERV OTHER
May 7, 2014Department of Transportation$37,921.04PROF SERV ENGINEER & ARCHITECT
Feb 3, 2014Department of Transportation$37,679.26PROF SERV OTHER
Oct 31, 2013Department of Transportation$27,958.16PROF SERV OTHER
Oct 31, 2013Department of Transportation$23,349.95PROF SERV OTHER
Dec 9, 2013Department of Transportation$21,705.07PROF SERV OTHER
Jun 2, 2014Department of Transportation$21,142.74PROF SERV OTHER
Jan 13, 2014Department of Transportation$19,622.11PROF SERV OTHER
Mar 19, 2014Department of Transportation$17,181.38PROF SERV OTHER
Sep 23, 2013Department of Transportation$15,599.07PROF SERV OTHER
Jun 17, 2014Department of Transportation$15,396.82PROF SERV OTHER
FY 2013top 4 of 4 payments$83,514
DateAgencyAmountCategoryPurchase order
May 28, 2013Department of Buildings$77,365.00PROF SERV ENGINEER & ARCHITECT
May 28, 2013Department of Buildings$5,580.00PROF SERV ENGINEER & ARCHITECT
May 28, 2013Department of Buildings$560.73PROF SERV ENGINEER & ARCHITECT
May 28, 2013Department of Buildings$8.00PROF SERV ENGINEER & ARCHITECT
FY 2011top 7 of 7 payments$23,303
DateAgencyAmountCategoryPurchase order
Nov 15, 2010Department of Buildings$11,080.00CONTRACTUAL SERVICES GENERAL
May 2, 2011Department of Buildings$7,125.00PROF SERV OTHER
Mar 11, 2011Department of Buildings$2,200.00PROF SERV OTHER
May 2, 2011Department of Buildings$1,675.00PROF SERV OTHER
Dec 20, 2010Department of Buildings$825.00PROF SERV OTHER
Mar 11, 2011Department of Buildings$300.00PROF SERV OTHER
Mar 14, 2011Department of Buildings$98.00CONTRACTUAL SERVICES GENERAL

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025Department of Transportation$41,908.13CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025Department of Environmental Protection$17,328.94DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 10, 2025Housing Preservation and Development$30,041.23CONSTRUCTION-BUILDINGSCapital Contracts
Jun 9, 2025Department of Parks and Recreation$3,662.31DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Jun 9, 2025Department of Citywide Administrative Services$1,872.00DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Jun 9, 2025Department of Parks and Recreation$48,689.69DESIGN-CONSULTANT-BUILDINGSCapital Contracts
Jun 9, 2025Department of Parks and Recreation$3,597.66DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Jun 9, 2025Department of Parks and Recreation$3,633.49DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Jun 9, 2025Department of Parks and Recreation$9,611.86DESIGN-BUILD: INFRASTRUCTURECapital Contracts
May 13, 2025Department of Parks and Recreation$29,348.93CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025Department of Small Business Services$5,888.77CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025Water Supply$145,812.63DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 30, 2025Department of Environmental Protection$46,526.77DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 23, 2025Department of Parks and Recreation$21,055.53CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025Department of Parks and Recreation$12,750.87CONSTRUCTION-BUILDINGSCapital Contracts
Apr 16, 2025Department of Parks and Recreation$30,726.25CONSTRUCTION-BUILDINGSCapital Contracts
Apr 15, 2025Department of Small Business Services$6,461.91CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025Department of Parks and Recreation$6,132.78DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Apr 14, 2025Department of Parks and Recreation$2,245.52DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Apr 14, 2025Department of Social Services$10,817.05CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025Department of Transportation$29,954.49CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025Department of Parks and Recreation$2,449.66DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Apr 14, 2025Department of Parks and Recreation$2,238.54DESIGN-BUILD: INFRASTRUCTURECapital Contracts
Apr 14, 2025Housing Preservation and Development$6,607.36CONSTRUCTION-BUILDINGSCapital Contracts
Apr 9, 2025Department of Parks and Recreation$23,563.35DESIGN-CONSULTANT-BUILDINGSCapital Contracts

Other vendors serving Water Supply

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data