Moretrench American Corp.: New York City Government Payments

as recorded by New York City: MORETRENCH AMERICAN CORP.

Moretrench American Corp. is the 1,235th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 17th in N/A spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it rose 23.8% year over year.

Primary spending category: N/A

$41,315,820total received
250payments
5agencies
Mar 9, 2010Apr 22, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Moretrench American Corp.. No spam.

Payments by fiscal year

FY 2025$2,409,173
FY 2024$1,946,091
FY 2023$2,064,050
FY 2022$7,713,965
FY 2021$3,052,518
FY 2020$3,277,541
FY 2019$2,193,372
FY 2018$3,918,036
FY 2017$8,571,138
FY 2016$4,725,944
FY 2015$876,255
FY 2014$108,805
FY 2013$199,125
FY 2012$151,348
FY 2011$81,635
FY 2010$26,825

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Environmental Protection5$1,338,764
FY 2025Department of Design and Construction1$1,070,409
FY 2024Department of Design and Construction2$1,046,716
FY 2024Department of Environmental Protection10$899,375
FY 2023Department of Environmental Protection15$1,936,271
FY 2023Department of Design and Construction2$127,779
FY 2022Department of Environmental Protection16$6,735,154
FY 2022Department of Design and Construction3$978,811
FY 2021Department of Design and Construction4$2,371,481
FY 2021Department of Environmental Protection3$681,036
FY 2020Department of Parks and Recreation4$2,222,314
FY 2020Department of Design and Construction4$828,209
FY 2020Department of Environmental Protection3$173,632
FY 2020Department of Education3$53,387
FY 2019Department of Parks and Recreation6$1,367,686
FY 2019Department of Design and Construction4$481,439
FY 2019Department of Environmental Protection3$300,402
FY 2019Department of Sanitation1$43,845
FY 2018Department of Environmental Protection4$2,332,900
FY 2018Department of Design and Construction14$1,191,857
FY 2018Department of Sanitation1$204,597
FY 2018Department of Education5$188,681
FY 2017Department of Design and Construction23$5,263,732
FY 2017Department of Environmental Protection16$2,752,118
FY 2017Department of Sanitation4$337,184
FY 2017Department of Education7$218,104
FY 2016Department of Design and Construction7$2,824,229
FY 2016Department of Environmental Protection8$1,557,723
FY 2016Department of Sanitation3$194,940
FY 2016Department of Education3$149,052
FY 2015Department of Design and Construction4$510,721
FY 2015Department of Education6$196,520
FY 2015Department of Sanitation1$169,015
FY 2014Department of Education5$68,665
FY 2014Department of Environmental Protection3$40,140
FY 2013Department of Environmental Protection5$104,588
FY 2013Department of Education7$94,537
FY 2012Department of Education15$151,348
FY 2011Department of Education14$81,635
FY 2010Department of Education6$26,825
Total250$41,315,820

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
N/A165$38,571,409Oct 6, 2014 Apr 22, 2025
CONTRACTUAL SERVICES GENERAL8$144,728May 9, 2013 Mar 10, 2014
OTHR SERV AND CHRGS-GENERAL6$1,370,929Jun 10, 2016 Jul 17, 2017
MAINT & OPER OF INFRASTRUCTURE70$1,228,765Mar 9, 2010 Mar 23, 2020
<Non-Applicable Expenditure Object>1-$11Jul 15, 2011 Jul 15, 2011

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 6 of 6 payments$2,409,173
DateAgencyAmountCategoryPurchase order
Jul 18, 2024Department of Design and Construction$1,070,408.90N/A
Feb 5, 2025Department of Environmental Protection$489,125.00N/A
Jan 31, 2025Department of Environmental Protection$385,700.00N/A
Feb 26, 2025Department of Environmental Protection$218,625.00N/A
Apr 22, 2025Department of Environmental Protection$173,375.00N/A
Sep 12, 2024Department of Environmental Protection$71,938.75N/A
FY 2024top 12 of 12 payments$1,946,091
DateAgencyAmountCategoryPurchase order
Jun 11, 2024Department of Design and Construction$579,553.79N/A
Apr 9, 2024Department of Design and Construction$467,162.50N/A
May 9, 2024Department of Environmental Protection$290,694.12N/A
Feb 1, 2024Department of Environmental Protection$189,395.21N/A
Mar 12, 2024Department of Environmental Protection$121,742.50N/A
Jul 13, 2023Department of Environmental Protection$114,475.00N/A
Jul 20, 2023Department of Environmental Protection$62,028.35N/A
May 10, 2024Department of Environmental Protection$58,958.65N/A
Aug 31, 2023Department of Environmental Protection$30,566.25N/A
Feb 2, 2024Department of Environmental Protection$16,330.50N/A
Jun 21, 2024Department of Environmental Protection$8,749.50N/A
May 24, 2024Department of Environmental Protection$6,435.11N/A
FY 2023top 17 of 17 payments$2,064,050
DateAgencyAmountCategoryPurchase order
Jul 21, 2022Department of Environmental Protection$251,940.00N/A
Nov 30, 2022Department of Environmental Protection$248,520.00N/A
Jul 28, 2022Department of Environmental Protection$169,489.50N/A
Sep 1, 2022Department of Environmental Protection$152,831.25N/A
Sep 28, 2022Department of Environmental Protection$145,563.75N/A
Jun 26, 2023Department of Environmental Protection$136,325.00N/A
Jan 10, 2023Department of Environmental Protection$135,588.75N/A
Jan 25, 2023Department of Environmental Protection$126,255.00N/A
Apr 4, 2023Department of Environmental Protection$125,970.00N/A
Mar 30, 2023Department of Environmental Protection$122,234.60N/A
Dec 19, 2022Department of Environmental Protection$112,931.25N/A
Jul 6, 2022Department of Design and Construction$78,274.74N/A
May 11, 2023Department of Environmental Protection$74,820.50N/A
Apr 26, 2023Department of Environmental Protection$73,092.05N/A
Apr 11, 2023Department of Environmental Protection$53,004.81N/A
Nov 16, 2022Department of Design and Construction$49,504.07N/A
Apr 26, 2023Department of Environmental Protection$7,704.65N/A
FY 2022top 19 of 19 payments$7,713,965
DateAgencyAmountCategoryPurchase order
Apr 8, 2022Department of Environmental Protection$1,386,864.15N/A
May 2, 2022Department of Environmental Protection$1,209,255.00N/A
Feb 21, 2022Department of Environmental Protection$821,750.00N/A
Jan 17, 2022Department of Environmental Protection$735,359.37N/A
May 12, 2022Department of Design and Construction$614,339.78N/A
Jan 18, 2022Department of Environmental Protection$504,190.65N/A
Jun 9, 2022Department of Environmental Protection$487,509.47N/A
Dec 13, 2021Department of Environmental Protection$410,485.50N/A
Mar 24, 2022Department of Environmental Protection$408,521.85N/A
May 23, 2022Department of Environmental Protection$284,287.50N/A
Aug 11, 2021Department of Design and Construction$245,853.00N/A
Nov 15, 2021Department of Environmental Protection$161,550.35N/A
Aug 30, 2021Department of Environmental Protection$137,928.12N/A
Jul 16, 2021Department of Design and Construction$118,617.86N/A
Oct 5, 2021Department of Environmental Protection$111,150.00N/A
Nov 1, 2021Department of Environmental Protection$38,000.00N/A
Mar 29, 2022Department of Environmental Protection$17,100.00N/A
Nov 30, 2021Department of Environmental Protection$15,045.95N/A
Sep 21, 2021Department of Environmental Protection$6,156.00N/A
FY 2021top 7 of 7 payments$3,052,518
DateAgencyAmountCategoryPurchase order
Feb 22, 2021Department of Design and Construction$1,442,103.22N/A
Apr 27, 2021Department of Design and Construction$624,451.49N/A
Oct 2, 2020Department of Environmental Protection$555,850.00N/A
Mar 12, 2021Department of Design and Construction$257,426.72N/A
Jun 2, 2021Department of Environmental Protection$63,650.00N/A
Jun 23, 2021Department of Environmental Protection$61,536.25N/A
May 19, 2021Department of Design and Construction$47,500.00N/A
FY 2020top 14 of 14 payments$3,277,541
DateAgencyAmountCategoryPurchase order
Jul 9, 2019Department of Parks and Recreation$1,773,311.40N/A
Jun 30, 2020Department of Design and Construction$675,175.81N/A
Aug 23, 2019Department of Parks and Recreation$203,991.72N/A
Nov 13, 2019Department of Parks and Recreation$196,944.33N/A
Nov 12, 2019Department of Design and Construction$149,766.42N/A
Feb 3, 2020Department of Environmental Protection$100,000.00N/A
Sep 13, 2019Department of Environmental Protection$49,026.54N/A
Aug 23, 2019Department of Parks and Recreation$48,066.77N/A
Nov 12, 2019Department of Environmental Protection$24,605.00N/A
Mar 23, 2020Department of Education$17,795.72MAINT & OPER OF INFRASTRUCTURE
Nov 12, 2019Department of Education$17,795.72MAINT & OPER OF INFRASTRUCTURE
Mar 23, 2020Department of Education$17,795.72MAINT & OPER OF INFRASTRUCTURE
Jan 30, 2020Department of Design and Construction$3,197.91N/A
Jul 2, 2019Department of Design and Construction$68.40N/A
FY 2019top 14 of 14 payments$2,193,372
DateAgencyAmountCategoryPurchase order
Feb 22, 2019Department of Parks and Recreation$607,923.85N/A
Dec 4, 2018Department of Parks and Recreation$309,375.00N/A
Sep 18, 2018Department of Parks and Recreation$281,464.28N/A
Nov 5, 2018Department of Design and Construction$261,580.50N/A
Jan 4, 2019Department of Design and Construction$214,976.60N/A
Oct 18, 2018Department of Environmental Protection$175,370.00N/A
Jul 16, 2018Department of Parks and Recreation$126,989.42N/A
Sep 20, 2018Department of Environmental Protection$90,650.00N/A
Oct 17, 2018Department of Sanitation$43,844.87N/A
Feb 4, 2019Department of Parks and Recreation$41,933.23N/A
Sep 6, 2018Department of Environmental Protection$34,382.41N/A
Sep 5, 2018Department of Design and Construction$4,881.89N/A
Aug 24, 2018Department of Design and Construction$0.00N/A
Feb 4, 2019Department of Parks and Recreation$0.00N/A
FY 2018top 20 of 24 payments$3,918,036
DateAgencyAmountCategoryPurchase order
Dec 18, 2017Department of Environmental Protection$2,001,479.00N/A
Jul 21, 2017Department of Design and Construction$213,736.31N/A
Jun 27, 2018Department of Sanitation$204,596.75N/A
Sep 13, 2017Department of Environmental Protection$176,550.00N/A
Oct 14, 2017Department of Design and Construction$168,000.00N/A
Sep 13, 2017Department of Environmental Protection$141,158.82N/A
Jul 28, 2017Department of Design and Construction$135,000.00N/A
Aug 25, 2017Department of Design and Construction$130,000.00N/A
May 16, 2018Department of Education$118,027.47MAINT & OPER OF INFRASTRUCTURE
Sep 28, 2017Department of Design and Construction$108,599.98N/A
Jan 24, 2018Department of Design and Construction$94,531.72N/A
Apr 6, 2018Department of Design and Construction$92,755.99N/A
Aug 30, 2017Department of Design and Construction$75,030.90N/A
Dec 22, 2017Department of Design and Construction$51,618.16N/A
Dec 6, 2017Department of Design and Construction$50,000.00N/A
Nov 15, 2017Department of Design and Construction$28,450.00N/A
Sep 28, 2017Department of Design and Construction$20,274.20N/A
Aug 4, 2017Department of Design and Construction$20,000.00N/A
Dec 26, 2017Department of Education$17,795.72MAINT & OPER OF INFRASTRUCTURE
May 16, 2018Department of Education$17,795.72MAINT & OPER OF INFRASTRUCTURE
FY 2017top 20 of 50 payments$8,571,138
DateAgencyAmountCategoryPurchase order
Aug 23, 2016Department of Environmental Protection$1,110,390.94OTHR SERV AND CHRGS-GENERAL
Jun 16, 2017Department of Design and Construction$1,097,150.57N/A
Nov 11, 2016Department of Design and Construction$694,807.86N/A
Dec 13, 2016Department of Environmental Protection$592,850.00N/A
Feb 22, 2017Department of Environmental Protection$444,443.24N/A
May 19, 2017Department of Design and Construction$373,676.33N/A
Apr 5, 2017Department of Design and Construction$361,666.28N/A
Jan 27, 2017Department of Design and Construction$353,265.87N/A
Feb 17, 2017Department of Design and Construction$350,000.00N/A
Jun 29, 2017Department of Sanitation$263,891.00N/A
Oct 20, 2016Department of Design and Construction$250,000.00N/A
Sep 16, 2016Department of Design and Construction$250,000.00N/A
Sep 16, 2016Department of Design and Construction$250,000.00N/A
Dec 21, 2016Department of Environmental Protection$247,289.75N/A
Mar 30, 2017Department of Design and Construction$203,881.47N/A
Oct 7, 2016Department of Design and Construction$187,078.86N/A
Mar 29, 2017Department of Design and Construction$180,183.65N/A
Apr 28, 2017Department of Design and Construction$135,000.00N/A
May 31, 2017Department of Design and Construction$135,000.00N/A
Jun 29, 2017Department of Design and Construction$135,000.00N/A
FY 2016top 20 of 21 payments$4,725,944
DateAgencyAmountCategoryPurchase order
May 31, 2016Department of Design and Construction$1,069,234.93N/A
Feb 12, 2016Department of Design and Construction$604,321.10N/A
May 20, 2016Department of Environmental Protection$567,000.00N/A
Apr 22, 2016Department of Design and Construction$484,295.30N/A
Aug 7, 2015Department of Design and Construction$353,813.77N/A
Mar 3, 2016Department of Environmental Protection$233,127.90N/A
Oct 21, 2015Department of Environmental Protection$201,240.00N/A
Jun 2, 2016Department of Environmental Protection$189,872.10N/A
Jun 10, 2016Department of Environmental Protection$180,417.81OTHR SERV AND CHRGS-GENERAL
Oct 30, 2015Department of Environmental Protection$163,875.00N/A
Feb 17, 2016Department of Design and Construction$138,785.84N/A
Jul 28, 2015Department of Sanitation$124,260.00N/A
Dec 7, 2015Department of Education$114,519.87MAINT & OPER OF INFRASTRUCTURE
Oct 14, 2015Department of Design and Construction$88,537.62N/A
Jul 29, 2015Department of Design and Construction$85,240.65N/A
Aug 31, 2015Department of Sanitation$70,680.00N/A
Jul 13, 2015Department of Education$17,266.85MAINT & OPER OF INFRASTRUCTURE
Sep 8, 2015Department of Education$17,265.13MAINT & OPER OF INFRASTRUCTURE
Nov 25, 2015Department of Environmental Protection$12,690.00N/A
Sep 30, 2015Department of Environmental Protection$9,500.00N/A
FY 2015top 11 of 11 payments$876,255
DateAgencyAmountCategoryPurchase order
Apr 8, 2015Department of Design and Construction$247,180.00N/A
Oct 6, 2014Department of Sanitation$169,014.50N/A
Jun 10, 2015Department of Design and Construction$150,173.00N/A
Dec 10, 2014Department of Education$114,519.87MAINT & OPER OF INFRASTRUCTURE
Jun 19, 2015Department of Design and Construction$100,367.50N/A
Dec 10, 2014Department of Education$17,266.85MAINT & OPER OF INFRASTRUCTURE
Mar 30, 2015Department of Education$17,266.85MAINT & OPER OF INFRASTRUCTURE
Dec 22, 2014Department of Education$17,266.85MAINT & OPER OF INFRASTRUCTURE
Aug 11, 2014Department of Education$17,000.00MAINT & OPER OF INFRASTRUCTURE
Aug 11, 2014Department of Education$13,200.00MAINT & OPER OF INFRASTRUCTURE
Nov 21, 2014Department of Design and Construction$13,000.00N/A
FY 2014top 8 of 8 payments$108,805
DateAgencyAmountCategoryPurchase order
Mar 10, 2014Department of Environmental Protection$28,892.94CONTRACTUAL SERVICES GENERAL
Mar 24, 2014Department of Education$17,500.00MAINT & OPER OF INFRASTRUCTURE
Mar 24, 2014Department of Education$17,000.00MAINT & OPER OF INFRASTRUCTURE
Jun 23, 2014Department of Education$17,000.00MAINT & OPER OF INFRASTRUCTURE
Mar 24, 2014Department of Education$17,000.00MAINT & OPER OF INFRASTRUCTURE
Jul 29, 2013Department of Environmental Protection$5,925.54CONTRACTUAL SERVICES GENERAL
Sep 10, 2013Department of Environmental Protection$5,321.14CONTRACTUAL SERVICES GENERAL
Mar 24, 2014Department of Education$165.00MAINT & OPER OF INFRASTRUCTURE
FY 2013top 12 of 12 payments$199,125
DateAgencyAmountCategoryPurchase order
Jun 17, 2013Department of Environmental Protection$62,991.88CONTRACTUAL SERVICES GENERAL
Sep 4, 2012Department of Education$53,267.73MAINT & OPER OF INFRASTRUCTURE
May 9, 2013Department of Environmental Protection$18,593.66CONTRACTUAL SERVICES GENERAL
Sep 4, 2012Department of Education$13,997.85MAINT & OPER OF INFRASTRUCTURE
Jun 10, 2013Department of Environmental Protection$8,658.40CONTRACTUAL SERVICES GENERAL
May 9, 2013Department of Environmental Protection$7,529.94CONTRACTUAL SERVICES GENERAL
Jun 4, 2013Department of Environmental Protection$6,814.03CONTRACTUAL SERVICES GENERAL
Sep 10, 2012Department of Education$5,833.68MAINT & OPER OF INFRASTRUCTURE
Sep 4, 2012Department of Education$5,833.68MAINT & OPER OF INFRASTRUCTURE
Sep 4, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Sep 4, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Sep 10, 2012Department of Education$4,437.52MAINT & OPER OF INFRASTRUCTURE
FY 2012top 15 of 15 payments$151,348
DateAgencyAmountCategoryPurchase order
Sep 6, 2011Department of Education$59,724.83MAINT & OPER OF INFRASTRUCTURE
Dec 19, 2011Department of Education$27,842.83MAINT & OPER OF INFRASTRUCTURE
Jul 15, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Apr 9, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Apr 9, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Nov 9, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Aug 29, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Apr 16, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Oct 24, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Aug 29, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Apr 9, 2012Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Dec 19, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Jul 15, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Apr 16, 2012Department of Education$2,376.88MAINT & OPER OF INFRASTRUCTURE
Jul 15, 2011Department of Education-$10.50<Non-Applicable Expenditure Object>
FY 2011top 14 of 14 payments$81,635
DateAgencyAmountCategoryPurchase order
Aug 9, 2010Department of Education$11,040.56MAINT & OPER OF INFRASTRUCTURE
May 23, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Mar 7, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
May 23, 2011Department of Education$5,583.10MAINT & OPER OF INFRASTRUCTURE
Aug 30, 2010Department of Education$5,365.10MAINT & OPER OF INFRASTRUCTURE
Aug 9, 2010Department of Education$5,365.10MAINT & OPER OF INFRASTRUCTURE
Nov 15, 2010Department of Education$5,365.10MAINT & OPER OF INFRASTRUCTURE
Aug 9, 2010Department of Education$5,365.10MAINT & OPER OF INFRASTRUCTURE
Jan 10, 2011Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
Nov 15, 2010Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
Nov 15, 2010Department of Education$5,363.10MAINT & OPER OF INFRASTRUCTURE
Nov 15, 2010Department of Education$5,125.01MAINT & OPER OF INFRASTRUCTURE
FY 2010top 6 of 6 payments$26,825
DateAgencyAmountCategoryPurchase order
Mar 9, 2010Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2010Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
May 3, 2010Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2010Department of Education$5,365.01MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2010Department of Education$2,965.01MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2010Department of Education$2,400.00MAINT & OPER OF INFRASTRUCTURE

Recent payments

DateAgencyAmountCategoryMethod
Apr 22, 2025Department of Environmental Protection$173,375.00N/AContracts
Feb 26, 2025Department of Environmental Protection$218,625.00N/AContracts
Feb 5, 2025Department of Environmental Protection$489,125.00N/AContracts
Jan 31, 2025Department of Environmental Protection$385,700.00N/AContracts
Sep 12, 2024Department of Environmental Protection$71,938.75N/AContracts
Jul 18, 2024Department of Design and Construction$1,070,408.90N/AContracts
Jun 21, 2024Department of Environmental Protection$8,749.50N/AContracts
Jun 11, 2024Department of Design and Construction$579,553.79N/AContracts
May 24, 2024Department of Environmental Protection$6,435.11N/AContracts
May 10, 2024Department of Environmental Protection$58,958.65N/AContracts
May 9, 2024Department of Environmental Protection$290,694.12N/AContracts
Apr 9, 2024Department of Design and Construction$467,162.50N/AContracts
Mar 12, 2024Department of Environmental Protection$121,742.50N/AContracts
Feb 2, 2024Department of Environmental Protection$16,330.50N/AContracts
Feb 1, 2024Department of Environmental Protection$189,395.21N/AContracts
Aug 31, 2023Department of Environmental Protection$30,566.25N/AContracts
Jul 20, 2023Department of Environmental Protection$62,028.35N/AContracts
Jul 13, 2023Department of Environmental Protection$114,475.00N/AContracts
Jun 26, 2023Department of Environmental Protection$136,325.00N/AContracts
May 11, 2023Department of Environmental Protection$74,820.50N/AContracts
Apr 26, 2023Department of Environmental Protection$73,092.05N/AContracts
Apr 26, 2023Department of Environmental Protection$7,704.65N/AContracts
Apr 11, 2023Department of Environmental Protection$53,004.81N/AContracts
Apr 4, 2023Department of Environmental Protection$125,970.00N/AContracts
Mar 30, 2023Department of Environmental Protection$122,234.60N/AContracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data