Greeley & Hansen LLC: New York City Government Payments
as recorded by New York City: GREELEY & HANSEN LLC
Greeley & Hansen LLC is the 463rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 6th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.3% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it rose 2.3% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 21 | $868,434 | Feb 7, 2014 – Dec 4, 2018 |
| DESIGN-CONSULTANT-IOTB | 1,399 | $83,910,129 | Jan 12, 2010 – Jun 27, 2025 |
| MAINT & REP GENERAL | 1 | $7,940 | Oct 29, 2019 – Oct 29, 2019 |
| DESIGN-CONSULTANT-BUILDINGS | 636 | $55,641,458 | Jan 27, 2010 – Sep 23, 2022 |
| PROMPT PAYMENT INTEREST | 15 | $4,722 | Feb 2, 2010 – Jun 18, 2025 |
| POLLUTION REMEDIATION OBLIGATIONS | 1 | $4,382 | Jun 25, 2020 – Jun 25, 2020 |
| OFF SVC-MEMBERSHIP DUES & FEES | 1 | $420 | Jun 4, 2018 – Jun 4, 2018 |
| DEMOLITION | 14 | $255,062 | Jul 23, 2013 – Aug 31, 2015 |
| CONTRACTUAL SERVICES GENERAL | 32 | $235,448 | Dec 8, 2014 – Jun 28, 2021 |
| PROF SERV OTHER | 50 | $1,685,659 | Dec 8, 2014 – Jun 16, 2025 |
| IOTB CONSTRUCTION | 188 | $16,421,658 | Jan 2, 2018 – Jun 16, 2025 |
| OTHR SERV AND CHRGS-GENERAL | 1 | $163,875 | Aug 2, 2021 – Aug 2, 2021 |
| MAINT & OPER OF INFRASTRUCTURE | 18 | $114,753 | Oct 5, 2016 – Jul 27, 2017 |
| <Non-Applicable Expenditure Object> | 5 | -$1,750 | Nov 22, 2010 – Apr 16, 2018 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 81 payments$7,717,358
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 13, 2025 | Department of Environmental Protection | $880,186.27 | DESIGN-CONSULTANT-IOTB | – |
| May 29, 2025 | Department of Environmental Protection | $577,201.69 | DESIGN-CONSULTANT-IOTB | – |
| Nov 13, 2024 | Department of Environmental Protection | $434,416.63 | DESIGN-CONSULTANT-IOTB | – |
| Aug 26, 2024 | Department of Environmental Protection | $426,951.47 | IOTB CONSTRUCTION | – |
| Jan 21, 2025 | Department of Environmental Protection | $399,592.64 | IOTB CONSTRUCTION | – |
| Oct 15, 2024 | Department of Environmental Protection | $334,489.94 | DESIGN-CONSULTANT-IOTB | – |
| Sep 9, 2024 | Department of Environmental Protection | $312,157.59 | DESIGN-CONSULTANT-IOTB | – |
| Jul 5, 2024 | Department of Environmental Protection | $292,505.30 | DESIGN-CONSULTANT-IOTB | – |
| May 12, 2025 | Department of Environmental Protection | $265,328.42 | IOTB CONSTRUCTION | – |
| Oct 7, 2024 | Department of Environmental Protection | $258,072.46 | DESIGN-CONSULTANT-IOTB | – |
| Dec 2, 2024 | Department of Environmental Protection | $228,867.89 | DESIGN-CONSULTANT-IOTB | – |
| Dec 23, 2024 | Department of Environmental Protection | $227,922.84 | IOTB CONSTRUCTION | – |
| Dec 9, 2024 | Department of Environmental Protection | $206,262.12 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2025 | Department of Environmental Protection | $202,294.91 | DESIGN-CONSULTANT-IOTB | – |
| Apr 9, 2025 | Department of Environmental Protection | $150,321.51 | DESIGN-CONSULTANT-IOTB | – |
| Jan 28, 2025 | Department of Environmental Protection | $149,026.59 | IOTB CONSTRUCTION | – |
| Mar 24, 2025 | Department of Environmental Protection | $123,577.62 | IOTB CONSTRUCTION | – |
| Jul 22, 2024 | Department of Environmental Protection | $115,924.69 | DESIGN-CONSULTANT-IOTB | – |
| Mar 4, 2025 | Department of Environmental Protection | $103,908.72 | DESIGN-CONSULTANT-IOTB | – |
| Oct 25, 2024 | Department of Environmental Protection | $99,536.88 | DESIGN-CONSULTANT-IOTB | – |
FY 2024top 20 of 101 payments$7,545,789
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 26, 2023 | Department of Environmental Protection | $354,296.11 | IOTB CONSTRUCTION | – |
| May 13, 2024 | Department of Environmental Protection | $282,328.68 | DESIGN-CONSULTANT-IOTB | – |
| Oct 2, 2023 | Department of Environmental Protection | $275,904.54 | IOTB CONSTRUCTION | – |
| Jul 18, 2023 | Department of Environmental Protection | $250,392.24 | PROF SERV OTHER | – |
| Feb 26, 2024 | Department of Environmental Protection | $248,236.78 | DESIGN-CONSULTANT-IOTB | – |
| Feb 1, 2024 | Department of Environmental Protection | $244,653.02 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2024 | Department of Environmental Protection | $236,761.23 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2023 | Department of Environmental Protection | $234,547.39 | IOTB CONSTRUCTION | – |
| Jun 10, 2024 | Department of Environmental Protection | $221,922.82 | IOTB CONSTRUCTION | – |
| May 28, 2024 | Department of Environmental Protection | $214,687.56 | DESIGN-CONSULTANT-IOTB | – |
| Dec 8, 2023 | Department of Environmental Protection | $169,885.88 | IOTB CONSTRUCTION | – |
| Mar 21, 2024 | Department of Environmental Protection | $163,594.22 | DESIGN-CONSULTANT-IOTB | – |
| Oct 25, 2023 | Department of Environmental Protection | $157,481.02 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2023 | Department of Environmental Protection | $156,583.48 | IOTB CONSTRUCTION | – |
| Aug 28, 2023 | Department of Environmental Protection | $149,116.07 | IOTB CONSTRUCTION | – |
| Mar 11, 2024 | Department of Environmental Protection | $148,901.28 | IOTB CONSTRUCTION | – |
| Jul 18, 2023 | Department of Environmental Protection | $136,935.77 | IOTB CONSTRUCTION | – |
| Nov 24, 2023 | Department of Environmental Protection | $134,700.69 | DESIGN-CONSULTANT-IOTB | – |
| Oct 16, 2023 | Department of Environmental Protection | $129,868.48 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2024 | Department of Environmental Protection | $122,726.24 | DESIGN-CONSULTANT-IOTB | – |
FY 2023top 20 of 91 payments$5,052,286
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 13, 2023 | Department of Environmental Protection | $269,251.91 | IOTB CONSTRUCTION | – |
| Jan 3, 2023 | Department of Environmental Protection | $166,006.16 | IOTB CONSTRUCTION | – |
| Jun 20, 2023 | Department of Environmental Protection | $163,454.87 | IOTB CONSTRUCTION | – |
| May 2, 2023 | Department of Environmental Protection | $140,483.60 | IOTB CONSTRUCTION | – |
| Oct 28, 2022 | Department of Environmental Protection | $132,716.32 | IOTB CONSTRUCTION | – |
| Jan 24, 2023 | Department of Environmental Protection | $129,731.99 | IOTB CONSTRUCTION | – |
| Nov 14, 2022 | Department of Environmental Protection | $121,028.87 | IOTB CONSTRUCTION | – |
| Mar 27, 2023 | Department of Environmental Protection | $120,674.76 | IOTB CONSTRUCTION | – |
| Feb 6, 2023 | Department of Environmental Protection | $120,671.55 | IOTB CONSTRUCTION | – |
| May 9, 2023 | Department of Environmental Protection | $120,421.20 | IOTB CONSTRUCTION | – |
| Oct 11, 2022 | Department of Environmental Protection | $117,075.65 | DESIGN-CONSULTANT-IOTB | – |
| May 1, 2023 | Department of Environmental Protection | $113,874.06 | IOTB CONSTRUCTION | – |
| Sep 13, 2022 | Department of Environmental Protection | $109,831.25 | IOTB CONSTRUCTION | – |
| Aug 24, 2022 | Department of Environmental Protection | $108,211.60 | IOTB CONSTRUCTION | – |
| Jun 13, 2023 | Department of Environmental Protection | $106,942.33 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2022 | Department of Environmental Protection | $106,726.51 | IOTB CONSTRUCTION | – |
| Aug 8, 2022 | Department of Environmental Protection | $104,358.53 | IOTB CONSTRUCTION | – |
| Mar 17, 2023 | Department of Environmental Protection | $104,197.02 | DESIGN-CONSULTANT-IOTB | – |
| Aug 24, 2022 | Department of Environmental Protection | $102,272.53 | DESIGN-CONSULTANT-IOTB | – |
| Aug 9, 2022 | Department of Environmental Protection | $100,053.75 | DESIGN-CONSULTANT-IOTB | – |
FY 2022top 20 of 132 payments$6,883,396
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 16, 2022 | Department of Environmental Protection | $234,693.44 | DESIGN-CONSULTANT-IOTB | – |
| Jul 28, 2021 | Department of Environmental Protection | $194,237.43 | DESIGN-CONSULTANT-IOTB | – |
| Mar 9, 2022 | Department of Environmental Protection | $192,433.52 | DESIGN-CONSULTANT-IOTB | – |
| Jun 22, 2022 | Department of Environmental Protection | $186,114.00 | IOTB CONSTRUCTION | – |
| Aug 2, 2021 | Department of Environmental Protection | $163,874.87 | OTHR SERV AND CHRGS-GENERAL | – |
| Jan 18, 2022 | Department of Environmental Protection | $159,618.84 | IOTB CONSTRUCTION | – |
| Dec 27, 2021 | Department of Environmental Protection | $153,202.84 | IOTB CONSTRUCTION | – |
| Apr 13, 2022 | Department of Environmental Protection | $140,189.02 | IOTB CONSTRUCTION | – |
| Oct 25, 2021 | Department of Environmental Protection | $137,702.74 | IOTB CONSTRUCTION | – |
| May 6, 2022 | Department of Environmental Protection | $135,993.37 | IOTB CONSTRUCTION | – |
| Apr 4, 2022 | Department of Environmental Protection | $135,864.93 | IOTB CONSTRUCTION | – |
| Apr 26, 2022 | Department of Environmental Protection | $134,832.58 | IOTB CONSTRUCTION | – |
| Apr 19, 2022 | Department of Sanitation | $133,659.55 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 9, 2021 | Department of Environmental Protection | $132,740.22 | DESIGN-CONSULTANT-IOTB | – |
| Aug 2, 2021 | Department of Environmental Protection | $132,295.19 | DESIGN-CONSULTANT-IOTB | – |
| Dec 10, 2021 | Department of Environmental Protection | $131,826.53 | IOTB CONSTRUCTION | – |
| Aug 24, 2021 | Department of Environmental Protection | $129,569.41 | IOTB CONSTRUCTION | – |
| Jan 31, 2022 | Department of Environmental Protection | $125,798.34 | IOTB CONSTRUCTION | – |
| Feb 16, 2022 | Department of Environmental Protection | $124,606.84 | IOTB CONSTRUCTION | – |
| Sep 7, 2021 | Department of Environmental Protection | $123,598.77 | DESIGN-CONSULTANT-IOTB | – |
FY 2021top 20 of 498 payments$13,490,719
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 4, 2021 | Department of Environmental Protection | $312,454.44 | DESIGN-CONSULTANT-IOTB | – |
| Dec 4, 2020 | Department of Environmental Protection | $288,977.00 | DESIGN-CONSULTANT-IOTB | – |
| Aug 3, 2020 | Department of Environmental Protection | $268,894.96 | DESIGN-CONSULTANT-IOTB | – |
| Mar 29, 2021 | Department of Environmental Protection | $246,187.92 | DESIGN-CONSULTANT-IOTB | – |
| Jul 6, 2020 | Department of Environmental Protection | $245,359.88 | IOTB CONSTRUCTION | – |
| May 6, 2021 | Department of Environmental Protection | $232,337.07 | IOTB CONSTRUCTION | – |
| Apr 5, 2021 | Department of Environmental Protection | $230,238.40 | DESIGN-CONSULTANT-IOTB | – |
| Feb 24, 2021 | Department of Environmental Protection | $229,318.65 | DESIGN-CONSULTANT-IOTB | – |
| Sep 17, 2020 | Department of Environmental Protection | $223,705.16 | DESIGN-CONSULTANT-IOTB | – |
| Dec 14, 2020 | Department of Citywide Administrative Services | $220,189.90 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 29, 2020 | Department of Environmental Protection | $214,216.75 | IOTB CONSTRUCTION | – |
| Nov 18, 2020 | Department of Environmental Protection | $190,942.71 | DESIGN-CONSULTANT-IOTB | – |
| Dec 24, 2020 | Department of Environmental Protection | $187,205.00 | DESIGN-CONSULTANT-IOTB | – |
| Jul 20, 2020 | Department of Environmental Protection | $180,242.89 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2021 | Department of Environmental Protection | $176,053.17 | IOTB CONSTRUCTION | – |
| Dec 3, 2020 | Department of Environmental Protection | $172,591.78 | DESIGN-CONSULTANT-IOTB | – |
| Jan 4, 2021 | Department of Environmental Protection | $164,323.91 | DESIGN-CONSULTANT-IOTB | – |
| Sep 18, 2020 | Department of Environmental Protection | $161,880.99 | IOTB CONSTRUCTION | – |
| Jun 23, 2021 | Department of Environmental Protection | $161,631.06 | DESIGN-CONSULTANT-IOTB | – |
| Oct 28, 2020 | Department of Environmental Protection | $157,774.55 | DESIGN-CONSULTANT-IOTB | – |
FY 2020top 20 of 226 payments$15,144,594
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 22, 2019 | Department of Environmental Protection | $781,475.73 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2020 | Department of Environmental Protection | $480,598.33 | DESIGN-CONSULTANT-IOTB | – |
| Sep 18, 2019 | Department of Environmental Protection | $445,034.00 | DESIGN-CONSULTANT-IOTB | – |
| Jan 17, 2020 | Department of Environmental Protection | $413,178.85 | DESIGN-CONSULTANT-IOTB | – |
| Feb 25, 2020 | Department of Environmental Protection | $401,020.55 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2019 | Department of Environmental Protection | $381,175.00 | DESIGN-CONSULTANT-IOTB | – |
| Nov 18, 2019 | Department of Environmental Protection | $352,097.08 | DESIGN-CONSULTANT-IOTB | – |
| Jun 1, 2020 | Department of Environmental Protection | $335,800.32 | DESIGN-CONSULTANT-IOTB | – |
| May 12, 2020 | Department of Environmental Protection | $335,007.24 | DESIGN-CONSULTANT-IOTB | – |
| Oct 23, 2019 | Department of Environmental Protection | $332,210.00 | DESIGN-CONSULTANT-IOTB | – |
| Nov 27, 2019 | Department of Environmental Protection | $324,151.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 9, 2019 | Department of Environmental Protection | $323,527.61 | DESIGN-CONSULTANT-IOTB | – |
| Oct 18, 2019 | Department of Environmental Protection | $322,633.78 | DESIGN-CONSULTANT-IOTB | – |
| Mar 9, 2020 | Department of Environmental Protection | $307,971.64 | IOTB CONSTRUCTION | – |
| Jun 22, 2020 | Department of Environmental Protection | $299,884.85 | DESIGN-CONSULTANT-IOTB | – |
| Jun 29, 2020 | Department of Environmental Protection | $288,441.10 | DESIGN-CONSULTANT-IOTB | – |
| Feb 26, 2020 | Department of Sanitation | $263,584.87 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 27, 2020 | Department of Sanitation | $243,537.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 7, 2019 | Department of Environmental Protection | $236,511.51 | IOTB CONSTRUCTION | – |
| Jul 15, 2019 | Department of Environmental Protection | $234,363.25 | DESIGN-CONSULTANT-IOTB | – |
FY 2019top 20 of 224 payments$16,958,051
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 6, 2019 | Department of Environmental Protection | $781,079.28 | IOTB CONSTRUCTION | – |
| Nov 7, 2018 | Department of Sanitation | $339,954.79 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 22, 2019 | Department of Environmental Protection | $313,294.14 | DESIGN-CONSULTANT-IOTB | – |
| Nov 7, 2018 | Department of Sanitation | $289,836.73 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 17, 2018 | Department of Environmental Protection | $260,645.10 | IOTB CONSTRUCTION | – |
| Apr 10, 2019 | Department of Environmental Protection | $258,897.25 | DESIGN-CONSULTANT-IOTB | – |
| Jul 1, 2018 | Department of Sanitation | $240,354.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 11, 2019 | Department of Environmental Protection | $240,130.52 | DESIGN-CONSULTANT-IOTB | – |
| Jan 7, 2019 | Department of Environmental Protection | $231,697.51 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2019 | Department of Environmental Protection | $228,823.36 | DESIGN-CONSULTANT-IOTB | – |
| Nov 30, 2018 | Department of Environmental Protection | $226,012.31 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2019 | Department of Environmental Protection | $217,857.09 | DESIGN-CONSULTANT-IOTB | – |
| May 6, 2019 | Department of Environmental Protection | $217,649.83 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2019 | Department of Environmental Protection | $209,850.48 | IOTB CONSTRUCTION | – |
| Apr 8, 2019 | Department of Environmental Protection | $202,613.30 | DESIGN-CONSULTANT-IOTB | – |
| Apr 10, 2019 | Department of Environmental Protection | $201,062.71 | DESIGN-CONSULTANT-IOTB | – |
| Aug 14, 2018 | Department of Environmental Protection | $200,935.80 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2019 | Department of Environmental Protection | $200,222.00 | DESIGN-CONSULTANT-IOTB | – |
| Feb 15, 2019 | Department of Sanitation | $199,191.40 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 8, 2019 | Department of Environmental Protection | $197,850.00 | DESIGN-CONSULTANT-IOTB | – |
FY 2018top 20 of 224 payments$11,985,167
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 7, 2018 | Department of Sanitation | $510,685.83 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 30, 2017 | Department of Sanitation | $359,476.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2017 | Department of Sanitation | $326,872.33 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 26, 2017 | Department of Environmental Protection | $305,774.12 | DESIGN-CONSULTANT-IOTB | – |
| Sep 5, 2017 | Department of Environmental Protection | $280,529.17 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2018 | Department of Sanitation | $264,768.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2017 | Department of Sanitation | $256,514.37 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 13, 2018 | Department of Environmental Protection | $242,628.58 | DESIGN-CONSULTANT-IOTB | – |
| Jul 31, 2017 | Department of Sanitation | $240,793.71 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 14, 2017 | Department of Environmental Protection | $229,158.93 | DESIGN-CONSULTANT-IOTB | – |
| Feb 16, 2018 | Department of Environmental Protection | $213,636.50 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2017 | Department of Sanitation | $207,984.19 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2017 | Department of Sanitation | $203,838.81 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 4, 2017 | Department of Sanitation | $200,197.25 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 2, 2018 | Department of Environmental Protection | $198,575.18 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2018 | Department of Sanitation | $194,768.56 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 14, 2018 | Department of Environmental Protection | $190,346.44 | DESIGN-CONSULTANT-IOTB | – |
| Apr 23, 2018 | Department of Environmental Protection | $177,326.61 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2018 | Department of Sanitation | $174,172.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 4, 2017 | Department of Sanitation | $171,878.61 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2017top 20 of 175 payments$13,840,158
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 14, 2016 | Department of Sanitation | $1,485,668.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 30, 2016 | Department of Sanitation | $713,032.34 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 11, 2016 | Department of Sanitation | $368,790.76 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 14, 2016 | Department of Environmental Protection | $298,813.11 | DESIGN-CONSULTANT-IOTB | – |
| Oct 24, 2016 | Department of Environmental Protection | $297,738.70 | DESIGN-CONSULTANT-IOTB | – |
| Jul 11, 2016 | Department of Environmental Protection | $294,520.27 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2016 | Department of Environmental Protection | $262,292.63 | DESIGN-CONSULTANT-IOTB | – |
| Mar 23, 2017 | Department of Environmental Protection | $252,055.86 | DESIGN-CONSULTANT-IOTB | – |
| Apr 24, 2017 | Department of Environmental Protection | $246,548.91 | DESIGN-CONSULTANT-IOTB | – |
| May 5, 2017 | Department of Environmental Protection | $236,118.43 | DESIGN-CONSULTANT-IOTB | – |
| Dec 1, 2016 | Department of Environmental Protection | $223,233.01 | DESIGN-CONSULTANT-IOTB | – |
| Nov 16, 2016 | Department of Environmental Protection | $217,626.02 | DESIGN-CONSULTANT-IOTB | – |
| Oct 26, 2016 | Department of Environmental Protection | $217,527.93 | DESIGN-CONSULTANT-IOTB | – |
| Nov 7, 2016 | Department of Environmental Protection | $214,741.76 | DESIGN-CONSULTANT-IOTB | – |
| May 19, 2017 | Department of Environmental Protection | $206,497.22 | DESIGN-CONSULTANT-IOTB | – |
| Aug 8, 2016 | Department of Environmental Protection | $197,262.92 | DESIGN-CONSULTANT-IOTB | – |
| Aug 15, 2016 | Department of Sanitation | $196,108.93 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 3, 2016 | Department of Environmental Protection | $194,216.25 | DESIGN-CONSULTANT-IOTB | – |
| Feb 27, 2017 | Department of Environmental Protection | $192,643.29 | DESIGN-CONSULTANT-IOTB | – |
| Dec 19, 2016 | Department of Sanitation | $185,491.81 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2016top 20 of 150 payments$13,261,691
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 11, 2016 | Department of Environmental Protection | $845,446.00 | DESIGN-CONSULTANT-IOTB | – |
| Aug 31, 2015 | Department of Sanitation | $629,115.92 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 31, 2015 | Department of Sanitation | $475,040.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 4, 2015 | Department of Citywide Administrative Services | $436,997.82 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 13, 2015 | Department of Environmental Protection | $419,871.98 | DESIGN-CONSULTANT-IOTB | – |
| Dec 28, 2015 | Department of Environmental Protection | $362,636.33 | DESIGN-CONSULTANT-IOTB | – |
| Jul 13, 2015 | Department of Sanitation | $340,455.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 31, 2015 | Department of Sanitation | $338,339.44 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 9, 2016 | Department of Sanitation | $315,673.58 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 20, 2016 | Department of Sanitation | $289,741.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 29, 2015 | Department of Environmental Protection | $284,854.88 | DESIGN-CONSULTANT-IOTB | – |
| Mar 21, 2016 | Department of Sanitation | $276,236.40 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 2, 2015 | Department of Environmental Protection | $274,757.17 | DESIGN-CONSULTANT-IOTB | – |
| Jul 13, 2015 | Department of Sanitation | $271,813.78 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 17, 2016 | Department of Sanitation | $266,459.34 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 9, 2016 | Department of Sanitation | $245,429.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 1, 2016 | Department of Environmental Protection | $243,722.05 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2015 | Department of Sanitation | $242,586.86 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 20, 2015 | Department of Environmental Protection | $240,808.60 | DESIGN-CONSULTANT-IOTB | – |
| Jul 20, 2015 | Department of Environmental Protection | $230,941.58 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 142 payments$11,653,542
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 15, 2015 | Department of Environmental Protection | $1,107,945.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 4, 2014 | Department of Environmental Protection | $713,508.00 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2014 | Department of Environmental Protection | $668,681.26 | DESIGN-CONSULTANT-IOTB | – |
| Dec 15, 2014 | Department of Sanitation | $512,729.55 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 25, 2014 | Department of Environmental Protection | $455,365.15 | DESIGN-CONSULTANT-IOTB | – |
| Feb 26, 2015 | Department of Sanitation | $318,118.36 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 24, 2015 | Department of Sanitation | $302,978.90 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 11, 2014 | Department of Environmental Protection | $282,732.50 | DESIGN-CONSULTANT-IOTB | – |
| Aug 25, 2014 | Department of Environmental Protection | $275,506.59 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2014 | Department of Environmental Protection | $271,390.00 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2015 | Department of Environmental Protection | $258,045.74 | DESIGN-CONSULTANT-IOTB | – |
| Feb 26, 2015 | Department of Sanitation | $243,406.08 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 23, 2015 | Department of Environmental Protection | $240,869.63 | DESIGN-CONSULTANT-IOTB | – |
| Jun 15, 2015 | Department of Environmental Protection | $238,160.53 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2015 | Department of Environmental Protection | $216,139.82 | DESIGN-CONSULTANT-IOTB | – |
| Jul 2, 2014 | Department of Environmental Protection | $213,829.85 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2014 | Department of Sanitation | $201,425.68 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 8, 2015 | Department of Environmental Protection | $200,740.50 | DESIGN-CONSULTANT-IOTB | – |
| Apr 24, 2015 | Department of Sanitation | $199,047.17 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 16, 2014 | Department of Sanitation | $192,168.48 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2014top 20 of 111 payments$13,475,938
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 14, 2014 | Department of Environmental Protection | $696,286.18 | DESIGN-CONSULTANT-IOTB | – |
| Apr 14, 2014 | Department of Environmental Protection | $608,548.00 | DESIGN-CONSULTANT-IOTB | – |
| May 20, 2014 | Department of Sanitation | $593,398.58 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 6, 2013 | Department of Sanitation | $585,952.85 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 26, 2013 | Department of Sanitation | $565,806.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 19, 2014 | Department of Environmental Protection | $561,388.60 | DESIGN-CONSULTANT-IOTB | – |
| Jun 17, 2014 | Department of Environmental Protection | $539,301.00 | DESIGN-CONSULTANT-IOTB | – |
| Jul 23, 2013 | Department of Sanitation | $479,936.38 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 9, 2013 | Department of Sanitation | $401,828.45 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 23, 2013 | Department of Environmental Protection | $373,593.75 | DESIGN-CONSULTANT-IOTB | – |
| Nov 18, 2013 | Department of Environmental Protection | $336,156.12 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2013 | Department of Sanitation | $307,121.83 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 15, 2013 | Department of Environmental Protection | $287,032.07 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2014 | Department of Environmental Protection | $277,040.84 | DESIGN-CONSULTANT-IOTB | – |
| Feb 3, 2014 | Department of Environmental Protection | $248,787.30 | DESIGN-CONSULTANT-IOTB | – |
| Mar 3, 2014 | Department of Sanitation | $248,274.46 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 23, 2013 | Department of Environmental Protection | $247,277.34 | DESIGN-CONSULTANT-IOTB | – |
| Apr 7, 2014 | Department of Sanitation | $247,253.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 12, 2014 | Department of Environmental Protection | $233,722.27 | DESIGN-CONSULTANT-IOTB | – |
| Jan 6, 2014 | Department of Sanitation | $225,292.43 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2013top 20 of 76 payments$7,795,670
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 14, 2013 | Department of Sanitation | $741,236.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 24, 2012 | Department of Sanitation | $449,757.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 12, 2013 | Department of Sanitation | $438,725.54 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 10, 2013 | Department of Sanitation | $412,856.37 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 13, 2012 | Department of Sanitation | $378,386.69 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 11, 2012 | Department of Sanitation | $337,744.19 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 13, 2012 | Department of Sanitation | $335,866.13 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 11, 2012 | Department of Sanitation | $333,073.59 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 11, 2012 | Department of Sanitation | $328,433.87 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 2, 2013 | Department of Sanitation | $314,209.33 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 28, 2012 | Department of Sanitation | $290,416.56 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 14, 2013 | Department of Sanitation | $246,002.85 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 13, 2013 | Department of Sanitation | $232,045.92 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 24, 2013 | Department of Sanitation | $229,798.95 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 12, 2013 | Department of Sanitation | $208,111.62 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 2, 2013 | Department of Sanitation | $196,149.40 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 15, 2013 | Department of Sanitation | $180,766.66 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 23, 2012 | Department of Sanitation | $144,391.72 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 11, 2012 | Department of Sanitation | $138,672.51 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 4, 2012 | Department of Sanitation | $130,177.83 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2012top 20 of 54 payments$5,677,885
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 17, 2011 | Department of Environmental Protection | $508,339.38 | DESIGN-CONSULTANT-IOTB | – |
| Aug 10, 2011 | Department of Sanitation | $446,476.11 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 1, 2011 | Department of Sanitation | $423,138.21 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 30, 2012 | Department of Sanitation | $404,617.61 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 21, 2012 | Department of Sanitation | $348,073.80 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 11, 2011 | Department of Sanitation | $334,485.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 31, 2011 | Department of Sanitation | $321,013.42 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 10, 2012 | Department of Environmental Protection | $317,497.07 | DESIGN-CONSULTANT-IOTB | – |
| Mar 26, 2012 | Department of Sanitation | $270,844.30 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 21, 2011 | Department of Sanitation | $183,938.77 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 30, 2012 | Department of Sanitation | $181,340.32 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 28, 2011 | Department of Sanitation | $179,142.54 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 30, 2012 | Department of Sanitation | $178,771.84 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 28, 2011 | Department of Sanitation | $167,981.32 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 17, 2012 | Department of Sanitation | $153,569.10 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 11, 2011 | Department of Sanitation | $150,677.42 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 21, 2012 | Department of Sanitation | $137,678.12 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 21, 2011 | Department of Sanitation | $129,757.91 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 17, 2012 | Department of Sanitation | $128,863.19 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 29, 2011 | Department of Sanitation | $113,493.46 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2011top 20 of 76 payments$7,220,876
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 2, 2011 | Department of Sanitation | $564,517.03 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 19, 2011 | Department of Sanitation | $559,036.47 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 28, 2011 | Department of Sanitation | $495,931.48 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 12, 2010 | Department of Sanitation | $460,607.01 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 6, 2010 | Department of Sanitation | $455,107.78 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 11, 2011 | Department of Sanitation | $435,211.19 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 27, 2011 | Department of Sanitation | $431,177.06 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 31, 2011 | Department of Sanitation | $412,486.77 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 10, 2011 | Department of Sanitation | $404,150.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 20, 2010 | Department of Sanitation | $382,679.92 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 9, 2010 | Department of Sanitation | $367,633.66 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 3, 2010 | Department of Sanitation | $341,826.72 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 28, 2010 | Department of Sanitation | $289,252.01 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 28, 2010 | Department of Sanitation | $270,589.51 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 9, 2010 | Department of Environmental Protection | $267,727.15 | DESIGN-CONSULTANT-IOTB | – |
| Nov 8, 2010 | Department of Sanitation | $194,504.25 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 20, 2010 | Department of Sanitation | $172,738.44 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 12, 2010 | Department of Sanitation | $164,169.72 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 25, 2010 | Department of Sanitation | $158,721.89 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 8, 2010 | Department of Sanitation | $151,913.45 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2010top 20 of 21 payments$1,609,069
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 10, 2010 | Department of Sanitation | $655,185.15 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 10, 2010 | Department of Sanitation | $442,789.94 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 21, 2010 | Department of Sanitation | $270,817.10 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 27, 2010 | Department of Sanitation | $137,653.83 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 24, 2010 | Department of Sanitation | $130,714.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 24, 2010 | Department of Sanitation | $89,084.57 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 27, 2010 | Department of Sanitation | $70,843.81 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 11, 2010 | Department of Environmental Protection | $68,704.31 | DESIGN-CONSULTANT-IOTB | – |
| Jan 12, 2010 | Department of Environmental Protection | $59,897.53 | DESIGN-CONSULTANT-IOTB | – |
| Feb 24, 2010 | Department of Sanitation | $59,647.66 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 2, 2010 | Department of Environmental Protection | $44,052.82 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2010 | Department of Environmental Protection | $18,864.31 | DESIGN-CONSULTANT-IOTB | – |
| Apr 12, 2010 | Department of Sanitation | $5,451.30 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 27, 2010 | Department of Sanitation | $5,063.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 2, 2010 | Department of Environmental Protection | $67.93 | PROMPT PAYMENT INTEREST | – |
| Feb 24, 2010 | Department of Sanitation | -$1,271.73 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 24, 2010 | Department of Sanitation | -$5,890.05 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 24, 2010 | Department of Sanitation | -$8,188.42 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 21, 2010 | Department of Sanitation | -$125,156.73 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 10, 2010 | Department of Sanitation | -$151,402.25 | DESIGN-CONSULTANT-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 27, 2025 | Department of Environmental Protection | $17,235.54 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 18, 2025 | Department of Environmental Protection | $74.94 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 16, 2025 | Department of Environmental Protection | $96,560.23 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 16, 2025 | Department of Environmental Protection | $49,730.42 | PROF SERV OTHER | Contracts |
| Jun 16, 2025 | Department of Environmental Protection | $84,112.06 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 16, 2025 | Department of Environmental Protection | $11,092.03 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 6, 2025 | Department of Environmental Protection | $5,135.50 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 29, 2025 | Department of Environmental Protection | $577,201.69 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 29, 2025 | Department of Environmental Protection | $59,080.94 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 20, 2025 | Department of Environmental Protection | $47,735.35 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 19, 2025 | Department of Environmental Protection | $38,761.46 | PROF SERV OTHER | Contracts |
| May 14, 2025 | Department of Environmental Protection | $30,540.21 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 13, 2025 | Department of Environmental Protection | $880,186.27 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 13, 2025 | Department of Environmental Protection | $54,464.92 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 12, 2025 | Department of Environmental Protection | $265,328.42 | IOTB CONSTRUCTION | Capital Contracts |
| Apr 30, 2025 | Department of Environmental Protection | $26,305.26 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 29, 2025 | Department of Environmental Protection | $915.28 | PROMPT PAYMENT INTEREST | Contracts |
| Apr 29, 2025 | Department of Environmental Protection | $116.65 | PROMPT PAYMENT INTEREST | Contracts |
| Apr 29, 2025 | Department of Environmental Protection | $33,904.01 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 28, 2025 | Department of Environmental Protection | $42,620.35 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 15, 2025 | Department of Environmental Protection | $36,452.45 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 10, 2025 | Department of Environmental Protection | $73,281.13 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 9, 2025 | Department of Environmental Protection | $19,158.88 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 9, 2025 | Department of Environmental Protection | $150,321.51 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 9, 2025 | Department of Environmental Protection | $21,680.88 | PROF SERV OTHER | Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data