Central Hudson Gas and Electric Corp: New York City Government Payments

as recorded by New York City: CENTRAL HUDSON GAS AND ELECTRIC CORP

Central Hudson Gas and Electric Corp is the 1,922nd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 7th in HEAT LIGHT & POWER spending. Its payments amount to 0.1% of everything the Department of Citywide Administrative Services has paid vendors in that span. Payments to it rose 4.1% year over year.

Primary spending category: HEAT LIGHT & POWER

$19,808,374total received
484payments
3agencies
Jan 27, 2010Jun 25, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Central Hudson Gas and Electric Corp. No spam.

Payments by fiscal year

FY 2025$1,635,007
FY 2024$1,571,006
FY 2023$2,459,007
FY 2022$790,249
FY 2021$1,372,937
FY 2020$1,011,990
FY 2019$1,151,385
FY 2018$1,081,364
FY 2017$1,058,195
FY 2016$967,538
FY 2015$1,232,407
FY 2014$1,583,622
FY 2013$997,718
FY 2012$1,021,748
FY 2011$1,284,074
FY 2010$590,125

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Citywide Administrative Services62$1,635,007
FY 2024Department of Citywide Administrative Services62$1,571,006
FY 2023Department of Citywide Administrative Services54$2,459,007
FY 2022Department of Citywide Administrative Services13$790,249
FY 2021Department of Citywide Administrative Services17$1,181,244
FY 2021Department of Environmental Protection1$191,693
FY 2020Department of Citywide Administrative Services15$1,011,990
FY 2019Department of Citywide Administrative Services15$1,138,985
FY 2019Department of Environmental Protection1$12,400
FY 2018Department of Citywide Administrative Services18$1,081,364
FY 2017Department of Citywide Administrative Services30$1,058,195
FY 2016Department of Citywide Administrative Services27$918,238
FY 2016Water Supply1$49,300
FY 2015Department of Citywide Administrative Services34$1,232,407
FY 2014Department of Citywide Administrative Services34$1,583,622
FY 2013Department of Citywide Administrative Services29$997,718
FY 2012Department of Citywide Administrative Services38$1,021,748
FY 2011Department of Citywide Administrative Services22$1,278,254
FY 2011Department of Environmental Protection1$5,820
FY 2010Department of Citywide Administrative Services10$590,125
Total484$19,808,374

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL1$5,820Jul 12, 2010 Jul 12, 2010
WATERSHED - LAND ACQUISITION1$49,300Dec 21, 2015 Dec 21, 2015
HEAT LIGHT & POWER480$19,549,161Jan 27, 2010 Jun 25, 2025
IOTB CONSTRUCTION1$191,693Nov 16, 2020 Nov 16, 2020
MAINT & REP GENERAL1$12,400Dec 12, 2018 Dec 12, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 62 payments$1,635,007
DateAgencyAmountCategoryPurchase order
Nov 13, 2024Department of Citywide Administrative Services$172,625.48HEAT LIGHT & POWER
Apr 8, 2025Department of Citywide Administrative Services$91,834.47HEAT LIGHT & POWER
Mar 13, 2025Department of Citywide Administrative Services$79,177.50HEAT LIGHT & POWER
May 5, 2025Department of Citywide Administrative Services$74,619.09HEAT LIGHT & POWER
Dec 16, 2024Department of Citywide Administrative Services$70,120.51HEAT LIGHT & POWER
Feb 18, 2025Department of Citywide Administrative Services$62,684.48HEAT LIGHT & POWER
Jun 5, 2025Department of Citywide Administrative Services$61,983.27HEAT LIGHT & POWER
Jul 1, 2024Department of Citywide Administrative Services$42,947.56HEAT LIGHT & POWER
Nov 12, 2024Department of Citywide Administrative Services$41,015.29HEAT LIGHT & POWER
Jan 13, 2025Department of Citywide Administrative Services$40,944.76HEAT LIGHT & POWER
Nov 4, 2024Department of Citywide Administrative Services$40,287.21HEAT LIGHT & POWER
Jan 21, 2025Department of Citywide Administrative Services$38,232.94HEAT LIGHT & POWER
Jul 30, 2024Department of Citywide Administrative Services$36,790.83HEAT LIGHT & POWER
Feb 26, 2025Department of Citywide Administrative Services$36,196.70HEAT LIGHT & POWER
Mar 26, 2025Department of Citywide Administrative Services$32,833.65HEAT LIGHT & POWER
Jul 10, 2024Department of Citywide Administrative Services$32,751.66HEAT LIGHT & POWER
Aug 12, 2024Department of Citywide Administrative Services$32,403.73HEAT LIGHT & POWER
Mar 5, 2025Department of Citywide Administrative Services$31,348.53HEAT LIGHT & POWER
Mar 10, 2025Department of Citywide Administrative Services$29,858.78HEAT LIGHT & POWER
Mar 31, 2025Department of Citywide Administrative Services$29,515.18HEAT LIGHT & POWER
FY 2024top 20 of 62 payments$1,571,006
DateAgencyAmountCategoryPurchase order
Jun 10, 2024Department of Citywide Administrative Services$126,184.61HEAT LIGHT & POWER
Feb 28, 2024Department of Citywide Administrative Services$124,153.71HEAT LIGHT & POWER
Jul 3, 2023Department of Citywide Administrative Services$111,505.66HEAT LIGHT & POWER
Nov 22, 2023Department of Citywide Administrative Services$83,793.50HEAT LIGHT & POWER
Dec 4, 2023Department of Citywide Administrative Services$72,388.09HEAT LIGHT & POWER
Mar 26, 2024Department of Citywide Administrative Services$67,346.70HEAT LIGHT & POWER
Jan 9, 2024Department of Citywide Administrative Services$54,585.12HEAT LIGHT & POWER
Feb 12, 2024Department of Citywide Administrative Services$52,980.56HEAT LIGHT & POWER
Dec 20, 2023Department of Citywide Administrative Services$46,385.52HEAT LIGHT & POWER
Mar 13, 2024Department of Citywide Administrative Services$43,946.51HEAT LIGHT & POWER
Dec 11, 2023Department of Citywide Administrative Services$42,269.36HEAT LIGHT & POWER
Apr 8, 2024Department of Citywide Administrative Services$39,474.70HEAT LIGHT & POWER
Oct 17, 2023Department of Citywide Administrative Services$34,137.00HEAT LIGHT & POWER
Oct 2, 2023Department of Citywide Administrative Services$34,055.71HEAT LIGHT & POWER
Jun 17, 2024Department of Citywide Administrative Services$33,419.80HEAT LIGHT & POWER
Aug 1, 2023Department of Citywide Administrative Services$33,369.32HEAT LIGHT & POWER
May 13, 2024Department of Citywide Administrative Services$33,279.69HEAT LIGHT & POWER
Aug 15, 2023Department of Citywide Administrative Services$32,909.83HEAT LIGHT & POWER
Sep 12, 2023Department of Citywide Administrative Services$31,419.60HEAT LIGHT & POWER
Jul 12, 2023Department of Citywide Administrative Services$29,084.25HEAT LIGHT & POWER
FY 2023top 20 of 54 payments$2,459,007
DateAgencyAmountCategoryPurchase order
Sep 27, 2022Department of Citywide Administrative Services$794,870.07HEAT LIGHT & POWER
Oct 3, 2022Department of Citywide Administrative Services$121,475.57HEAT LIGHT & POWER
Mar 27, 2023Department of Citywide Administrative Services$102,870.77HEAT LIGHT & POWER
Feb 27, 2023Department of Citywide Administrative Services$90,487.20HEAT LIGHT & POWER
Sep 27, 2022Department of Citywide Administrative Services$86,656.64HEAT LIGHT & POWER
Apr 10, 2023Department of Citywide Administrative Services$79,211.43HEAT LIGHT & POWER
Jan 31, 2023Department of Citywide Administrative Services$76,656.94HEAT LIGHT & POWER
Jan 10, 2023Department of Citywide Administrative Services$75,433.34HEAT LIGHT & POWER
Jan 11, 2023Department of Citywide Administrative Services$71,890.15HEAT LIGHT & POWER
May 5, 2023Department of Citywide Administrative Services$71,245.41HEAT LIGHT & POWER
Dec 27, 2022Department of Citywide Administrative Services$67,492.51HEAT LIGHT & POWER
Jul 25, 2022Department of Citywide Administrative Services$56,167.26HEAT LIGHT & POWER
Dec 5, 2022Department of Citywide Administrative Services$53,119.99HEAT LIGHT & POWER
Mar 14, 2023Department of Citywide Administrative Services$48,426.00HEAT LIGHT & POWER
Dec 21, 2022Department of Citywide Administrative Services$43,232.27HEAT LIGHT & POWER
Oct 24, 2022Department of Citywide Administrative Services$42,360.08HEAT LIGHT & POWER
Feb 13, 2023Department of Citywide Administrative Services$38,447.39HEAT LIGHT & POWER
Nov 21, 2022Department of Citywide Administrative Services$38,068.40HEAT LIGHT & POWER
Aug 8, 2022Department of Citywide Administrative Services$36,535.74HEAT LIGHT & POWER
Nov 1, 2022Department of Citywide Administrative Services$34,148.09HEAT LIGHT & POWER
FY 2022top 13 of 13 payments$790,249
DateAgencyAmountCategoryPurchase order
Dec 27, 2021Department of Citywide Administrative Services$117,316.58HEAT LIGHT & POWER
May 4, 2022Department of Citywide Administrative Services$111,799.10HEAT LIGHT & POWER
Nov 22, 2021Department of Citywide Administrative Services$97,615.95HEAT LIGHT & POWER
Aug 30, 2021Department of Citywide Administrative Services$86,930.70HEAT LIGHT & POWER
Aug 2, 2021Department of Citywide Administrative Services$80,068.83HEAT LIGHT & POWER
Apr 18, 2022Department of Citywide Administrative Services$72,360.83HEAT LIGHT & POWER
Mar 22, 2022Department of Citywide Administrative Services$62,285.68HEAT LIGHT & POWER
May 31, 2022Department of Citywide Administrative Services$59,555.48HEAT LIGHT & POWER
Feb 28, 2022Department of Citywide Administrative Services$49,074.90HEAT LIGHT & POWER
Jan 31, 2022Department of Citywide Administrative Services$35,631.94HEAT LIGHT & POWER
Aug 30, 2021Department of Citywide Administrative Services$13,332.42HEAT LIGHT & POWER
Aug 30, 2021Department of Citywide Administrative Services$3,956.80HEAT LIGHT & POWER
Aug 2, 2021Department of Citywide Administrative Services$319.58HEAT LIGHT & POWER
FY 2021top 18 of 18 payments$1,372,937
DateAgencyAmountCategoryPurchase order
Nov 16, 2020Department of Environmental Protection$191,693.00IOTB CONSTRUCTION
Apr 7, 2021Department of Citywide Administrative Services$124,399.55HEAT LIGHT & POWER
Feb 17, 2021Department of Citywide Administrative Services$116,476.22HEAT LIGHT & POWER
Mar 10, 2021Department of Citywide Administrative Services$105,883.34HEAT LIGHT & POWER
Apr 26, 2021Department of Citywide Administrative Services$103,801.47HEAT LIGHT & POWER
May 24, 2021Department of Citywide Administrative Services$95,470.94HEAT LIGHT & POWER
Jan 12, 2021Department of Citywide Administrative Services$85,687.15HEAT LIGHT & POWER
Jun 28, 2021Department of Citywide Administrative Services$82,820.79HEAT LIGHT & POWER
Dec 7, 2020Department of Citywide Administrative Services$81,651.67HEAT LIGHT & POWER
Nov 5, 2020Department of Citywide Administrative Services$77,587.43HEAT LIGHT & POWER
Oct 6, 2020Department of Citywide Administrative Services$75,285.67HEAT LIGHT & POWER
Jul 15, 2020Department of Citywide Administrative Services$73,189.53HEAT LIGHT & POWER
Aug 12, 2020Department of Citywide Administrative Services$72,596.03HEAT LIGHT & POWER
Sep 10, 2020Department of Citywide Administrative Services$67,994.08HEAT LIGHT & POWER
Sep 10, 2020Department of Citywide Administrative Services$14,253.24HEAT LIGHT & POWER
Dec 7, 2020Department of Citywide Administrative Services$3,471.91HEAT LIGHT & POWER
Aug 12, 2020Department of Citywide Administrative Services$344.44HEAT LIGHT & POWER
Nov 5, 2020Department of Citywide Administrative Services$330.99HEAT LIGHT & POWER
FY 2020top 15 of 15 payments$1,011,990
DateAgencyAmountCategoryPurchase order
Feb 3, 2020Department of Citywide Administrative Services$106,206.99HEAT LIGHT & POWER
Mar 25, 2020Department of Citywide Administrative Services$100,451.67HEAT LIGHT & POWER
Mar 3, 2020Department of Citywide Administrative Services$94,497.40HEAT LIGHT & POWER
May 14, 2020Department of Citywide Administrative Services$86,534.93HEAT LIGHT & POWER
Jan 6, 2020Department of Citywide Administrative Services$85,239.26HEAT LIGHT & POWER
Oct 1, 2019Department of Citywide Administrative Services$83,177.16HEAT LIGHT & POWER
Jun 18, 2020Department of Citywide Administrative Services$81,760.95HEAT LIGHT & POWER
Oct 30, 2019Department of Citywide Administrative Services$74,565.86HEAT LIGHT & POWER
Nov 26, 2019Department of Citywide Administrative Services$73,316.47HEAT LIGHT & POWER
Jul 1, 2019Department of Citywide Administrative Services$73,138.10HEAT LIGHT & POWER
Aug 26, 2019Department of Citywide Administrative Services$68,302.65HEAT LIGHT & POWER
Jul 31, 2019Department of Citywide Administrative Services$67,287.74HEAT LIGHT & POWER
Aug 26, 2019Department of Citywide Administrative Services$14,750.87HEAT LIGHT & POWER
Nov 26, 2019Department of Citywide Administrative Services$2,430.30HEAT LIGHT & POWER
Jul 31, 2019Department of Citywide Administrative Services$330.04HEAT LIGHT & POWER
FY 2019top 16 of 16 payments$1,151,385
DateAgencyAmountCategoryPurchase order
Mar 4, 2019Department of Citywide Administrative Services$118,146.36HEAT LIGHT & POWER
Apr 1, 2019Department of Citywide Administrative Services$107,958.86HEAT LIGHT & POWER
Oct 29, 2018Department of Citywide Administrative Services$102,356.84HEAT LIGHT & POWER
Apr 29, 2019Department of Citywide Administrative Services$97,982.36HEAT LIGHT & POWER
Sep 25, 2018Department of Citywide Administrative Services$97,778.50HEAT LIGHT & POWER
Dec 31, 2018Department of Citywide Administrative Services$94,517.00HEAT LIGHT & POWER
Nov 21, 2018Department of Citywide Administrative Services$90,473.91HEAT LIGHT & POWER
Jul 30, 2018Department of Citywide Administrative Services$87,773.47HEAT LIGHT & POWER
Jul 1, 2018Department of Citywide Administrative Services$85,211.37HEAT LIGHT & POWER
May 28, 2019Department of Citywide Administrative Services$83,047.70HEAT LIGHT & POWER
Jan 28, 2019Department of Citywide Administrative Services$78,048.07HEAT LIGHT & POWER
Sep 4, 2018Department of Citywide Administrative Services$77,547.97HEAT LIGHT & POWER
Sep 4, 2018Department of Citywide Administrative Services$16,174.89HEAT LIGHT & POWER
Dec 12, 2018Department of Environmental Protection$12,400.00MAINT & REP GENERAL
Apr 29, 2019Department of Citywide Administrative Services$1,670.90HEAT LIGHT & POWER
Jul 30, 2018Department of Citywide Administrative Services$296.36HEAT LIGHT & POWER
FY 2018top 18 of 18 payments$1,081,364
DateAgencyAmountCategoryPurchase order
Feb 26, 2018Department of Citywide Administrative Services$146,569.41HEAT LIGHT & POWER
Mar 28, 2018Department of Citywide Administrative Services$126,322.68HEAT LIGHT & POWER
Jan 31, 2018Department of Citywide Administrative Services$113,319.54HEAT LIGHT & POWER
Apr 30, 2018Department of Citywide Administrative Services$102,226.72HEAT LIGHT & POWER
May 29, 2018Department of Citywide Administrative Services$94,653.57HEAT LIGHT & POWER
Dec 26, 2017Department of Citywide Administrative Services$90,788.60HEAT LIGHT & POWER
Oct 2, 2017Department of Citywide Administrative Services$88,517.79HEAT LIGHT & POWER
Jul 31, 2017Department of Citywide Administrative Services$81,396.29HEAT LIGHT & POWER
Nov 27, 2017Department of Citywide Administrative Services$78,537.75HEAT LIGHT & POWER
Oct 25, 2017Department of Citywide Administrative Services$74,353.56HEAT LIGHT & POWER
Sep 11, 2017Department of Citywide Administrative Services$67,708.81HEAT LIGHT & POWER
Sep 11, 2017Department of Citywide Administrative Services$15,487.40HEAT LIGHT & POWER
Sep 11, 2017Department of Citywide Administrative Services$559.08HEAT LIGHT & POWER
Oct 25, 2017Department of Citywide Administrative Services$328.01HEAT LIGHT & POWER
Aug 14, 2017Department of Citywide Administrative Services$241.50HEAT LIGHT & POWER
Aug 14, 2017Department of Citywide Administrative Services$187.83HEAT LIGHT & POWER
Jul 31, 2017Department of Citywide Administrative Services$157.85HEAT LIGHT & POWER
Oct 2, 2017Department of Citywide Administrative Services$8.10HEAT LIGHT & POWER
FY 2017top 20 of 30 payments$1,058,195
DateAgencyAmountCategoryPurchase order
Jan 30, 2017Department of Citywide Administrative Services$106,264.56HEAT LIGHT & POWER
Mar 27, 2017Department of Citywide Administrative Services$99,787.14HEAT LIGHT & POWER
Feb 27, 2017Department of Citywide Administrative Services$97,588.17HEAT LIGHT & POWER
Sep 26, 2016Department of Citywide Administrative Services$96,723.95HEAT LIGHT & POWER
Apr 24, 2017Department of Citywide Administrative Services$91,487.26HEAT LIGHT & POWER
Oct 24, 2016Department of Citywide Administrative Services$90,823.47HEAT LIGHT & POWER
Dec 27, 2016Department of Citywide Administrative Services$86,007.23HEAT LIGHT & POWER
May 30, 2017Department of Citywide Administrative Services$83,803.77HEAT LIGHT & POWER
Jun 26, 2017Department of Citywide Administrative Services$79,905.38HEAT LIGHT & POWER
Jul 27, 2016Department of Citywide Administrative Services$73,784.28HEAT LIGHT & POWER
Aug 29, 2016Department of Citywide Administrative Services$71,986.30HEAT LIGHT & POWER
Nov 28, 2016Department of Citywide Administrative Services$61,974.26HEAT LIGHT & POWER
Aug 29, 2016Department of Citywide Administrative Services$10,917.09HEAT LIGHT & POWER
Aug 29, 2016Department of Citywide Administrative Services$6,274.30HEAT LIGHT & POWER
Jul 27, 2016Department of Citywide Administrative Services$233.23HEAT LIGHT & POWER
Jul 27, 2016Department of Citywide Administrative Services$82.37HEAT LIGHT & POWER
Jan 30, 2017Department of Citywide Administrative Services$64.09HEAT LIGHT & POWER
May 23, 2017Department of Citywide Administrative Services$51.19HEAT LIGHT & POWER
Mar 27, 2017Department of Citywide Administrative Services$47.46HEAT LIGHT & POWER
Sep 26, 2016Department of Citywide Administrative Services$47.41HEAT LIGHT & POWER
FY 2016top 20 of 28 payments$967,538
DateAgencyAmountCategoryPurchase order
Mar 23, 2016Department of Citywide Administrative Services$88,974.99HEAT LIGHT & POWER
Oct 27, 2015Department of Citywide Administrative Services$87,157.19HEAT LIGHT & POWER
Sep 23, 2015Department of Citywide Administrative Services$79,140.53HEAT LIGHT & POWER
Feb 29, 2016Department of Citywide Administrative Services$78,893.67HEAT LIGHT & POWER
Nov 30, 2015Department of Citywide Administrative Services$76,594.24HEAT LIGHT & POWER
May 23, 2016Department of Citywide Administrative Services$72,855.32HEAT LIGHT & POWER
Dec 28, 2015Department of Citywide Administrative Services$72,473.32HEAT LIGHT & POWER
Apr 25, 2016Department of Citywide Administrative Services$71,146.02HEAT LIGHT & POWER
Aug 3, 2015Department of Citywide Administrative Services$70,353.72HEAT LIGHT & POWER
Feb 2, 2016Department of Citywide Administrative Services$69,129.02HEAT LIGHT & POWER
Aug 25, 2015Department of Citywide Administrative Services$68,537.14HEAT LIGHT & POWER
Jun 27, 2016Department of Citywide Administrative Services$64,555.71HEAT LIGHT & POWER
Dec 21, 2015Water Supply$49,300.00WATERSHED - LAND ACQUISITION
Aug 25, 2015Department of Citywide Administrative Services$17,186.67HEAT LIGHT & POWER
Aug 3, 2015Department of Citywide Administrative Services$299.52HEAT LIGHT & POWER
Sep 23, 2015Department of Citywide Administrative Services$204.57HEAT LIGHT & POWER
Sep 23, 2015Department of Citywide Administrative Services$92.79HEAT LIGHT & POWER
May 23, 2016Department of Citywide Administrative Services$89.05HEAT LIGHT & POWER
Mar 21, 2016Department of Citywide Administrative Services$88.83HEAT LIGHT & POWER
Nov 23, 2015Department of Citywide Administrative Services$87.37HEAT LIGHT & POWER
FY 2015top 20 of 34 payments$1,232,407
DateAgencyAmountCategoryPurchase order
Mar 30, 2015Department of Citywide Administrative Services$160,307.08HEAT LIGHT & POWER
Apr 28, 2015Department of Citywide Administrative Services$133,766.94HEAT LIGHT & POWER
Mar 3, 2015Department of Citywide Administrative Services$114,726.39HEAT LIGHT & POWER
Sep 24, 2014Department of Citywide Administrative Services$104,111.99HEAT LIGHT & POWER
Oct 28, 2014Department of Citywide Administrative Services$97,759.57HEAT LIGHT & POWER
Nov 26, 2014Department of Citywide Administrative Services$97,725.13HEAT LIGHT & POWER
Dec 29, 2014Department of Citywide Administrative Services$93,758.67HEAT LIGHT & POWER
Jan 28, 2015Department of Citywide Administrative Services$90,846.78HEAT LIGHT & POWER
May 26, 2015Department of Citywide Administrative Services$85,037.63HEAT LIGHT & POWER
Aug 4, 2014Department of Citywide Administrative Services$83,842.91HEAT LIGHT & POWER
Aug 27, 2014Department of Citywide Administrative Services$82,989.98HEAT LIGHT & POWER
Jun 24, 2015Department of Citywide Administrative Services$64,804.65HEAT LIGHT & POWER
Aug 27, 2014Department of Citywide Administrative Services$20,021.95HEAT LIGHT & POWER
Feb 24, 2015Department of Citywide Administrative Services$971.71HEAT LIGHT & POWER
Sep 24, 2014Department of Citywide Administrative Services$384.21HEAT LIGHT & POWER
Aug 4, 2014Department of Citywide Administrative Services$230.31HEAT LIGHT & POWER
Mar 30, 2015Department of Citywide Administrative Services$94.77HEAT LIGHT & POWER
Jan 28, 2015Department of Citywide Administrative Services$92.40HEAT LIGHT & POWER
Sep 23, 2014Department of Citywide Administrative Services$91.19HEAT LIGHT & POWER
Nov 26, 2014Department of Citywide Administrative Services$90.73HEAT LIGHT & POWER
FY 2014top 20 of 34 payments$1,583,622
DateAgencyAmountCategoryPurchase order
Mar 25, 2014Department of Citywide Administrative Services$229,833.45HEAT LIGHT & POWER
Apr 23, 2014Department of Citywide Administrative Services$191,479.01HEAT LIGHT & POWER
Jan 28, 2014Department of Citywide Administrative Services$161,367.82HEAT LIGHT & POWER
Mar 3, 2014Department of Citywide Administrative Services$154,672.94HEAT LIGHT & POWER
Jun 2, 2014Department of Citywide Administrative Services$132,775.17HEAT LIGHT & POWER
Dec 23, 2013Department of Citywide Administrative Services$100,779.39HEAT LIGHT & POWER
Jun 24, 2014Department of Citywide Administrative Services$97,603.44HEAT LIGHT & POWER
Nov 25, 2013Department of Citywide Administrative Services$87,383.79HEAT LIGHT & POWER
Nov 6, 2013Department of Citywide Administrative Services$85,920.61HEAT LIGHT & POWER
Jul 24, 2013Department of Citywide Administrative Services$82,889.27HEAT LIGHT & POWER
Sep 24, 2013Department of Citywide Administrative Services$75,283.13HEAT LIGHT & POWER
Aug 26, 2013Department of Citywide Administrative Services$75,161.90HEAT LIGHT & POWER
Jul 1, 2013Department of Citywide Administrative Services$73,013.80HEAT LIGHT & POWER
Aug 26, 2013Department of Citywide Administrative Services$21,123.51HEAT LIGHT & POWER
Aug 26, 2013Department of Citywide Administrative Services$12,383.14HEAT LIGHT & POWER
Aug 26, 2013Department of Citywide Administrative Services$650.83HEAT LIGHT & POWER
Sep 24, 2013Department of Citywide Administrative Services$301.70HEAT LIGHT & POWER
Mar 25, 2014Department of Citywide Administrative Services$94.43HEAT LIGHT & POWER
May 27, 2014Department of Citywide Administrative Services$92.16HEAT LIGHT & POWER
Nov 18, 2013Department of Citywide Administrative Services$87.29HEAT LIGHT & POWER
FY 2013top 20 of 29 payments$997,718
DateAgencyAmountCategoryPurchase order
Mar 26, 2013Department of Citywide Administrative Services$132,873.44HEAT LIGHT & POWER
Mar 4, 2013Department of Citywide Administrative Services$109,874.17HEAT LIGHT & POWER
Apr 29, 2013Department of Citywide Administrative Services$94,179.03HEAT LIGHT & POWER
May 28, 2013Department of Citywide Administrative Services$90,510.31HEAT LIGHT & POWER
Sep 24, 2012Department of Citywide Administrative Services$90,147.56HEAT LIGHT & POWER
Jan 28, 2013Department of Citywide Administrative Services$87,898.68HEAT LIGHT & POWER
Jul 30, 2012Department of Citywide Administrative Services$80,220.56HEAT LIGHT & POWER
Oct 23, 2012Department of Citywide Administrative Services$77,389.80HEAT LIGHT & POWER
Dec 24, 2012Department of Citywide Administrative Services$74,396.87HEAT LIGHT & POWER
Nov 26, 2012Department of Citywide Administrative Services$72,890.70HEAT LIGHT & POWER
Aug 27, 2012Department of Citywide Administrative Services$62,628.69HEAT LIGHT & POWER
Aug 27, 2012Department of Citywide Administrative Services$23,427.74HEAT LIGHT & POWER
Sep 24, 2012Department of Citywide Administrative Services$266.87HEAT LIGHT & POWER
Sep 17, 2012Department of Citywide Administrative Services$91.47HEAT LIGHT & POWER
Jul 11, 2012Department of Citywide Administrative Services$89.78HEAT LIGHT & POWER
Apr 1, 2013Department of Citywide Administrative Services$86.89HEAT LIGHT & POWER
Jan 28, 2013Department of Citywide Administrative Services$83.78HEAT LIGHT & POWER
Dec 10, 2012Department of Citywide Administrative Services$82.68HEAT LIGHT & POWER
Sep 26, 2012Department of Citywide Administrative Services$81.78HEAT LIGHT & POWER
May 28, 2013Department of Citywide Administrative Services$81.50HEAT LIGHT & POWER
FY 2012top 20 of 38 payments$1,021,748
DateAgencyAmountCategoryPurchase order
Oct 5, 2011Department of Citywide Administrative Services$107,539.05HEAT LIGHT & POWER
Feb 28, 2012Department of Citywide Administrative Services$91,838.29HEAT LIGHT & POWER
May 29, 2012Department of Citywide Administrative Services$91,090.19HEAT LIGHT & POWER
Apr 2, 2012Department of Citywide Administrative Services$88,999.16HEAT LIGHT & POWER
Oct 25, 2011Department of Citywide Administrative Services$85,564.81HEAT LIGHT & POWER
Jan 30, 2012Department of Citywide Administrative Services$80,415.48HEAT LIGHT & POWER
Apr 24, 2012Department of Citywide Administrative Services$78,631.92HEAT LIGHT & POWER
Jul 27, 2011Department of Citywide Administrative Services$73,906.57HEAT LIGHT & POWER
Dec 7, 2011Department of Citywide Administrative Services$72,759.84HEAT LIGHT & POWER
Jun 27, 2012Department of Citywide Administrative Services$72,681.42HEAT LIGHT & POWER
Sep 6, 2011Department of Citywide Administrative Services$61,687.99HEAT LIGHT & POWER
Dec 27, 2011Department of Citywide Administrative Services$60,214.24HEAT LIGHT & POWER
Sep 6, 2011Department of Citywide Administrative Services$18,889.53HEAT LIGHT & POWER
Jan 4, 2012Department of Citywide Administrative Services$8,821.62HEAT LIGHT & POWER
Dec 7, 2011Department of Citywide Administrative Services$8,694.04HEAT LIGHT & POWER
Mar 19, 2012Department of Citywide Administrative Services$5,447.55HEAT LIGHT & POWER
Feb 15, 2012Department of Citywide Administrative Services$3,307.15HEAT LIGHT & POWER
Jan 18, 2012Department of Citywide Administrative Services$3,290.75HEAT LIGHT & POWER
Apr 16, 2012Department of Citywide Administrative Services$3,213.68HEAT LIGHT & POWER
Jan 4, 2012Department of Citywide Administrative Services$1,508.46HEAT LIGHT & POWER
FY 2011top 20 of 23 payments$1,284,074
DateAgencyAmountCategoryPurchase order
Mar 28, 2011Department of Citywide Administrative Services$144,700.95HEAT LIGHT & POWER
Mar 2, 2011Department of Citywide Administrative Services$137,323.54HEAT LIGHT & POWER
Oct 4, 2010Department of Citywide Administrative Services$120,158.81HEAT LIGHT & POWER
Nov 1, 2010Department of Citywide Administrative Services$117,047.08HEAT LIGHT & POWER
Feb 1, 2011Department of Citywide Administrative Services$107,287.32HEAT LIGHT & POWER
May 4, 2011Department of Citywide Administrative Services$99,840.21HEAT LIGHT & POWER
May 31, 2011Department of Citywide Administrative Services$94,415.55HEAT LIGHT & POWER
Jan 4, 2011Department of Citywide Administrative Services$92,785.05HEAT LIGHT & POWER
Dec 6, 2010Department of Citywide Administrative Services$91,362.40HEAT LIGHT & POWER
Aug 2, 2010Department of Citywide Administrative Services$81,153.16HEAT LIGHT & POWER
Sep 7, 2010Department of Citywide Administrative Services$77,050.84HEAT LIGHT & POWER
Jun 30, 2011Department of Citywide Administrative Services$74,185.69HEAT LIGHT & POWER
Sep 7, 2010Department of Citywide Administrative Services$39,957.29HEAT LIGHT & POWER
Jul 12, 2010Department of Environmental Protection$5,820.21CONTRACTUAL SERVICES GENERAL
Oct 4, 2010Department of Citywide Administrative Services$382.74HEAT LIGHT & POWER
Aug 2, 2010Department of Citywide Administrative Services$157.22HEAT LIGHT & POWER
Jan 26, 2011Department of Citywide Administrative Services$78.38HEAT LIGHT & POWER
Nov 22, 2010Department of Citywide Administrative Services$77.69HEAT LIGHT & POWER
Mar 28, 2011Department of Citywide Administrative Services$75.40HEAT LIGHT & POWER
Sep 21, 2010Department of Citywide Administrative Services$75.18HEAT LIGHT & POWER
FY 2010top 10 of 10 payments$590,125
DateAgencyAmountCategoryPurchase order
Mar 3, 2010Department of Citywide Administrative Services$122,203.31HEAT LIGHT & POWER
Apr 27, 2010Department of Citywide Administrative Services$117,658.88HEAT LIGHT & POWER
May 25, 2010Department of Citywide Administrative Services$99,247.75HEAT LIGHT & POWER
Mar 30, 2010Department of Citywide Administrative Services$94,444.26HEAT LIGHT & POWER
Jun 23, 2010Department of Citywide Administrative Services$87,301.01HEAT LIGHT & POWER
Feb 2, 2010Department of Citywide Administrative Services$68,996.00HEAT LIGHT & POWER
Mar 10, 2010Department of Citywide Administrative Services$72.25HEAT LIGHT & POWER
Jan 27, 2010Department of Citywide Administrative Services$68.63HEAT LIGHT & POWER
Mar 24, 2010Department of Citywide Administrative Services$68.05HEAT LIGHT & POWER
May 24, 2010Department of Citywide Administrative Services$65.24HEAT LIGHT & POWER

Recent payments

DateAgencyAmountCategoryMethod
Jun 25, 2025Department of Citywide Administrative Services$20,656.23HEAT LIGHT & POWERContracts
Jun 23, 2025Department of Citywide Administrative Services$3,652.31HEAT LIGHT & POWERContracts
Jun 23, 2025Department of Citywide Administrative Services$20,788.27HEAT LIGHT & POWERContracts
Jun 11, 2025Department of Citywide Administrative Services$13,685.58HEAT LIGHT & POWERContracts
Jun 5, 2025Department of Citywide Administrative Services$61,983.27HEAT LIGHT & POWERContracts
Jun 2, 2025Department of Citywide Administrative Services$19,629.72HEAT LIGHT & POWERContracts
May 29, 2025Department of Citywide Administrative Services$25,301.94HEAT LIGHT & POWERContracts
May 27, 2025Department of Citywide Administrative Services$3,616.32HEAT LIGHT & POWERContracts
May 5, 2025Department of Citywide Administrative Services$12,386.87HEAT LIGHT & POWERContracts
May 5, 2025Department of Citywide Administrative Services$74,619.09HEAT LIGHT & POWERContracts
Apr 21, 2025Department of Citywide Administrative Services$28,731.67HEAT LIGHT & POWERContracts
Apr 21, 2025Department of Citywide Administrative Services$20,105.76HEAT LIGHT & POWERContracts
Apr 21, 2025Department of Citywide Administrative Services$3,104.20HEAT LIGHT & POWERContracts
Apr 8, 2025Department of Citywide Administrative Services$91,834.47HEAT LIGHT & POWERContracts
Apr 8, 2025Department of Citywide Administrative Services$15,676.80HEAT LIGHT & POWERContracts
Mar 31, 2025Department of Citywide Administrative Services$2,333.10HEAT LIGHT & POWERContracts
Mar 31, 2025Department of Citywide Administrative Services$29,515.18HEAT LIGHT & POWERContracts
Mar 26, 2025Department of Citywide Administrative Services$32,833.65HEAT LIGHT & POWERContracts
Mar 17, 2025Department of Citywide Administrative Services$21,919.90HEAT LIGHT & POWERContracts
Mar 13, 2025Department of Citywide Administrative Services$79,177.50HEAT LIGHT & POWERContracts
Mar 10, 2025Department of Citywide Administrative Services$29,858.78HEAT LIGHT & POWERContracts
Mar 5, 2025Department of Citywide Administrative Services$31,348.53HEAT LIGHT & POWERContracts
Feb 26, 2025Department of Citywide Administrative Services$36,196.70HEAT LIGHT & POWERContracts
Feb 18, 2025Department of Citywide Administrative Services$2,778.57HEAT LIGHT & POWERContracts
Feb 18, 2025Department of Citywide Administrative Services$62,684.48HEAT LIGHT & POWERContracts

Other vendors serving Department of Citywide Administrative Services

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data