Sully Miller Contracting Co: Los Angeles Government Payments

as recorded by Los Angeles: SULLY MILLER CONTRACTING CO

Sully Miller Contracting Co is the 194th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in SAN FERNANDO RD BIKE PATH-PH 3 spending. Its payments amount to 1.4% of everything the Transportation has paid vendors in that span. Payments to it fell 62.2% year over year.

Primary spending category: SAN FERNANDO RD BIKE PATH-PH 3

$86,658,451total received
555payments
7agencies
Aug 24, 2011Jun 17, 2025first / last payment
Follow this vendorGet an email when Los Angeles publishes new payments to Sully Miller Contracting Co. No spam.

Payments by fiscal year

FY 2025$1,435,649
FY 2024$3,793,632
FY 2023$3,197,946
FY 2022$8,360,119
FY 2021$17,604,388
FY 2020$13,701,585
FY 2019$16,773,912
FY 2018$13,967,508
FY 2017$231,180
FY 2016$397,118
FY 2015$2,332,979
FY 2014$3,134,281
FY 2013$1,517,954
FY 2012$210,201

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Transportation12$1,435,649
FY 2024Transportation24$3,793,632
FY 2023Transportation27$2,613,803
FY 2023Non_departmental3$584,143
FY 2022Transportation38$7,151,470
FY 2022Non_departmental6$995,727
FY 2022Economic and Workforce Development Department6$212,922
FY 2021Transportation44$10,663,424
FY 2021Non_departmental12$4,481,437
FY 2021Economic and Workforce Development Department13$2,459,525
FY 2021City Administrative Officer1$2
FY 2020Transportation76$9,393,646
FY 2020Non_departmental11$3,055,244
FY 2020Economic and Workforce Development Department2$572,974
FY 2020Recreation and Parks - Special Accounts4$324,669
FY 2020Recreation and Parks14$237,051
FY 2020City Administrative Officer3$118,001
FY 2019Transportation68$8,504,885
FY 2019Recreation and Parks - Special Accounts13$4,289,722
FY 2019Non_departmental13$2,180,822
FY 2019Recreation and Parks17$1,524,707
FY 2019City Administrative Officer6$273,776
FY 2018Non_departmental14$11,681,640
FY 2018Transportation8$1,734,813
FY 2018Recreation and Parks - Special Accounts7$265,796
FY 2018City Administrative Officer11$224,639
FY 2018Recreation and Parks2$60,621
FY 2017Transportation2$203,708
FY 2017Appropriations to Special Purpose Fund1$27,472
FY 2016Transportation8$350,720
FY 2016Appropriations to Special Purpose Fund1$46,398
FY 2015Transportation38$1,832,883
FY 2015Appropriations to Special Purpose Fund7$500,096
FY 2014Transportation22$3,126,090
FY 2014Appropriations to Special Purpose Fund1$8,191
FY 2013Transportation13$1,517,954
FY 2012Appropriations to Special Purpose Fund7$210,201
Total555$86,658,451

What the payments were for

Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
SAN FERNANDO ROAD BIKE PATH8$959,647Mar 19, 2013 Oct 13, 2015
BICYCLE PLAN/PROGRAM9$958,426Jul 7, 2016 Jan 31, 2024
SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCH9$908,295Jul 14, 2022 Aug 23, 2023
RESEDA/CANOGA PARK TAXABLE4$90,675Sep 16, 2021 Jan 28, 2022
OLYMPIC BLV & MATEO ST PHASE22$90,000Dec 26, 2017 Dec 26, 2017
STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTION26$8,128,300Oct 7, 2019 Jan 11, 2023
RESEDA/CANOGA PARK TAXABLE8$810,122Mar 19, 2021 Sep 16, 2021
BIKEWAYS PROGRAM2$79,507Jun 17, 2015 Jun 23, 2015
BALBOA BLVD AT KNOLLWOOD SHOPPING CENTER PROJECT3$68,182Nov 12, 2014 Sep 29, 2017
HSIP HIGHWAY SAFETY IMPRVMENT10$669,252Nov 30, 2012 Apr 2, 2015
ALBION RIVERSIDE PARK RESTROOM6$66,282Apr 9, 2019 Nov 19, 2019
ALBION RIVERSIDE PARK48$6,545,617Nov 27, 2017 Dec 9, 2019
SUBDIVISION FEES TR/QUIMBY FND2$64,618Nov 5, 2019 Nov 19, 2019
ADELANTE EASTSIDE TAX EXEMPT3$645,000Feb 14, 2020 Jun 23, 2021
8TH ST-IROLO ST LIGHT SYS11$583,879Feb 25, 2014 Aug 28, 2017
PEDESTRIAN PLAN/PROGRAM2$455,185Dec 21, 2021 Oct 11, 2023
SAFETEA LU: BALBOA BL SN FER R4$424,998Oct 10, 2014 Dec 7, 2015
PRJ-RAP: ALBION RIVERSIDE PARK (C212-8)16$416,063Jan 12, 2018 Sep 30, 2020
MCCADDEN PL BEVERLY TO 3RD-PAVEMENT PRESERVATION5$408,306Mar 5, 2018 Jul 11, 2018
SAN FERNANDO RD BIKE PATH4$400,000Dec 16, 2014 Mar 20, 2015
SAFETEALU BALBOA B SN FERNDO I3$37,823Dec 7, 2015 Sep 29, 2017
SR2S-MENLO AVE ES N WEST VERNON AVE ES25$3,751,468Jul 3, 2018 Oct 6, 2021
FED SR2S CYCLE 3 MENO AVE4$369,965Mar 29, 2019 Aug 14, 2019
SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ES17$3,442,293May 30, 2019 Oct 13, 2021
SR2S-SHERIDAN ST ES & BREED ST ES27$3,435,608Sep 6, 2018 Feb 2, 2023
CITY OF LA LITTLE TOKYO PDSTRN SFTY PRJ27$3,021,142Aug 7, 2018 Feb 2, 2023
VERMONT AVE S/O PCH STORM DRAI4$28,620Aug 24, 2011 Jan 12, 2012
SAN FERNANDO RD BIKE PATH PH 26$283,565Mar 20, 2015 Oct 2, 2015
BALBOA BLVD/KNOLLWOOD SHOP PROJ4$282,991Sep 3, 2014 Sep 29, 2017
ATP CYCLE I SRTS BIKE/PED REHABILITATION37$2,691,043Jul 3, 2018 Feb 16, 2022
PROJECTS CASHFLOW1$26,049Mar 7, 2019 Mar 7, 2019
SAFETEA LU PROGRAM SHORTFALL1$21,442Dec 7, 2015 Dec 7, 2015
SAN FERNANDO ROAD BIKE PATH P219$2,024,787Mar 8, 2013 Jun 23, 2015
SAN FERNANDO RD BIKE PATH-PH 379$20,097,338May 27, 2020 Jun 17, 2025
PRJ-RAP:ALBION RIVERSIDE PARK (8TH CYCLE)5$200,355Sep 28, 2017 Jan 12, 2018
SN FERNANDO RD BIKE PATH1$19,036Mar 20, 2015 Mar 20, 2015
DESIGN/CONST OF VERMONT-KAISER3$181,581Aug 24, 2011 Jan 20, 2012
PROJECT MATCH FUNDS32$1,748,002Nov 29, 2018 Apr 8, 2022
RESEDA/CANOGA PARK TAX EXEMPT6$1,699,624Dec 7, 2020 Mar 19, 2021
RAILROAD CROSSING PROGRAM4$1,690,244Jun 8, 2018 Aug 21, 2020
SN FERNANDO RD BIKE PATH PH 210$1,444,400Dec 26, 2013 Jun 23, 2015
ALBION RIVERSIDE PARK IMPROVEMENTS27$14,440,685Sep 20, 2017 Sep 8, 2020
SAN FERNANDO PHASE III BIKE PATH6$1,417,434Dec 12, 2023 May 1, 2024
VISION ZERO TRAFFIC SIGNALS16$1,397,000Apr 28, 2020 Jun 16, 2022
HSIP TRAFFIC SIGNAL AT 11TH ST9$133,605Nov 30, 2012 Apr 2, 2015

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 12 of 12 payments$1,435,649
DateAgencyAmountCategoryPurchase order
May 16, 2025Transportation$744,164.18SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
May 16, 2025Transportation$183,417.48SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Sep 19, 2024Transportation$132,357.91SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Apr 29, 2025Transportation$87,448.62SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jun 2, 2025Transportation$69,104.79SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jul 17, 2024Transportation$53,040.13SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 27, 2025Transportation$36,711.92SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Apr 29, 2025Transportation$34,888.82SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Nov 27, 2024Transportation$34,644.82SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
May 16, 2025Transportation$33,858.34SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jun 17, 2025Transportation$25,228.60SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 27, 2025Transportation$783.75SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
FY 2024top 20 of 24 payments$3,793,632
DateAgencyAmountCategoryPurchase order
May 1, 2024Transportation$686,586.38SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
May 29, 2024Transportation$613,531.48SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Dec 6, 2023Transportation$312,154.42SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Dec 12, 2023Transportation$259,065.00BICYCLE PLAN/PROGRAMPO SC94CO20134117K
Feb 20, 2024Transportation$219,485.01SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
Aug 23, 2023Transportation$216,850.05SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 11, 2023Transportation$209,583.05PEDESTRIAN PLAN/PROGRAMPO SC94CO18130814K
Dec 12, 2023Transportation$172,621.51SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
Jan 31, 2024Transportation$162,035.34SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
Jul 11, 2023Transportation$140,995.01SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 17, 2023Transportation$123,063.28SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Dec 28, 2023Transportation$107,363.53SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
Sep 6, 2023Transportation$106,527.26SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Aug 23, 2023Transportation$93,173.63SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Mar 27, 2024Transportation$69,342.59SAN FERNANDO PHASE III BIKE PATHPO SC94CO20134117K
Oct 17, 2023Transportation$68,619.94SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 4, 2024Transportation$48,450.00SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Sep 6, 2023Transportation$41,450.81SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Aug 24, 2023Transportation$36,358.87BICYCLE PLAN/PROGRAMPO SC94CO20134117K
Jul 11, 2023Transportation$34,815.11SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
FY 2023top 20 of 30 payments$3,197,946
DateAgencyAmountCategoryPurchase order
Dec 28, 2022Non_departmental$421,910.92STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Sep 2, 2022Transportation$384,676.66SR2S-SHERIDAN ST ES & BREED ST ESPO SC94CO18130814K
May 25, 2023Transportation$332,993.47SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Mar 3, 2023Transportation$331,138.44SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 26, 2023Transportation$199,996.37SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Aug 26, 2022Transportation$154,695.14SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 11, 2023Non_departmental$140,917.24STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
May 26, 2023Transportation$139,799.15BICYCLE PLAN/PROGRAMPO SC94CO20134117K
Aug 24, 2022Transportation$134,330.00SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Apr 21, 2023Transportation$134,330.00SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Oct 27, 2022Transportation$129,532.50SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Aug 26, 2022Transportation$97,122.19SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jul 14, 2022Transportation$88,017.50SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Oct 19, 2022Transportation$80,804.95SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 26, 2023Transportation$72,831.50SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 26, 2023Transportation$70,987.50SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
Jan 20, 2023Transportation$59,346.19SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jul 14, 2022Transportation$53,295.00SAN FERNANDO ROAD BIKE PATH PHASE 3 METROLINK LOCAL MATCHPO SC94CO20134117K
May 25, 2023Transportation$38,095.59SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 31, 2022Transportation$25,056.19SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
FY 2022top 20 of 50 payments$8,360,119
DateAgencyAmountCategoryPurchase order
Aug 5, 2021Transportation$1,119,123.22SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jul 13, 2021Transportation$774,482.61SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Feb 2, 2022Transportation$554,570.76SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 1, 2021Transportation$537,470.00SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
May 12, 2022Transportation$410,412.42SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 11, 2022Transportation$341,321.46SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jul 1, 2021Transportation$314,013.46CITY OF LA LITTLE TOKYO PDSTRN SFTY PRJPO SC94CO18130814K
Apr 28, 2022Transportation$307,667.86SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 14, 2021Non_departmental$285,403.73STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Sep 7, 2021Transportation$270,713.97SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 27, 2021Transportation$260,642.38SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 11, 2022Transportation$256,900.85SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Feb 24, 2022Transportation$250,366.25SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Dec 21, 2021Transportation$245,601.77PEDESTRIAN PLAN/PROGRAMPO SC94CO18130814K
Jul 1, 2021Transportation$213,945.40SR2S-SHERIDAN ST ES & BREED ST ESPO SC94CO18130814K
Aug 20, 2021Transportation$213,183.01PROJECT MATCH FUNDSPO SC94CO18130813K
Jul 7, 2021Non_departmental$173,715.12STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Oct 21, 2021Non_departmental$165,980.07STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Oct 27, 2021Transportation$162,293.82SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Mar 24, 2022Non_departmental$149,956.15STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
FY 2021top 20 of 70 payments$17,604,388
DateAgencyAmountCategoryPurchase order
Mar 2, 2021Transportation$1,833,497.69SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Feb 12, 2021Transportation$914,165.34SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jun 21, 2021Transportation$870,479.55SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 7, 2020Non_departmental$807,763.57STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Sep 9, 2020Non_departmental$729,646.35STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Jul 30, 2020Transportation$720,728.45SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 28, 2021Transportation$666,381.80SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Sep 1, 2020Non_departmental$635,369.94STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Oct 30, 2020Non_departmental$624,639.63STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Aug 31, 2020Non_departmental$612,781.34STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Apr 15, 2021Transportation$565,882.21SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
May 20, 2021Transportation$554,330.35SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Oct 7, 2020Transportation$537,122.77SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Dec 7, 2020Economic and Workforce Development Department$533,653.75RESEDA/CANOGA PARK TAX EXEMPTPO SC22CO21135159Y
Dec 18, 2020Transportation$506,429.72SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jan 11, 2021Non_departmental$442,230.77STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Dec 23, 2020Economic and Workforce Development Department$372,912.03RESEDA/CANOGA PARK TAX EXEMPTPO SC22CO21135159Y
Sep 10, 2020Transportation$362,700.52VISION ZERO TRAFFIC SIGNALSPO SC94CO20133392K
Oct 30, 2020Transportation$344,293.31SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
May 20, 2021Transportation$291,840.00SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
FY 2020top 20 of 110 payments$13,701,585
DateAgencyAmountCategoryPurchase order
Jun 22, 2020Transportation$621,248.08SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Jun 1, 2020Non_departmental$591,515.39STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Sep 17, 2019Transportation$560,185.08SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ESPO SC94CO18130813K
May 22, 2020Non_departmental$535,809.53STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
May 27, 2020Transportation$491,758.56SAN FERNANDO RD BIKE PATH-PH 3PO SC94CO20134117K
Aug 14, 2019Transportation$488,237.35SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ESPO SC94CO18130813K
Sep 11, 2019Transportation$446,600.29SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ESPO SC94CO18130813K
Dec 10, 2019Non_departmental$416,941.04STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Dec 13, 2019Transportation$411,300.74SR2S-SHERIDAN ST ES & BREED ST ESPO SC94CO18130814K
Apr 20, 2020Non_departmental$398,217.57STREET RECONSTRUCTION/VISION ZERO PROJECT CONSTRUCTIONPO SC50CO20133392K
Oct 24, 2019Transportation$376,918.16SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ESPO SC94CO18130813K
Feb 14, 2020Economic and Workforce Development Department$365,845.50ADELANTE EASTSIDE TAX EXEMPTPO SC22CO20130814K
Oct 9, 2019Transportation$365,518.88SR2S-SHERIDAN ST ES & BREED ST ESPO SC94CO18130814K
Nov 4, 2019Non_departmental$339,091.16ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Oct 9, 2019Transportation$286,820.69CITY OF LA LITTLE TOKYO PDSTRN SFTY PRJPO SC94CO18130814K
Sep 24, 2019Non_departmental$277,260.75ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Oct 24, 2019Transportation$275,893.65CITY OF LA LITTLE TOKYO PDSTRN SFTY PRJPO SC94CO18130814K
Dec 2, 2019Transportation$258,901.74SR2S-DOLORES HUERTA ES,28TH ST ES,QUINCY JONES ESPO SC94CO18130813K
Dec 13, 2019Transportation$252,169.42CITY OF LA LITTLE TOKYO PDSTRN SFTY PRJPO SC94CO18130814K
Jun 22, 2020Non_departmental$248,322.25ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
FY 2019top 20 of 117 payments$16,773,912
DateAgencyAmountCategoryPurchase order
Nov 19, 2018Recreation and Parks - Special Accounts$705,147.18ALBION RIVERSIDE PARKPO SC89CO19129088K
Jan 30, 2019Recreation and Parks - Special Accounts$639,921.26ALBION RIVERSIDE PARKPO SC89CO19129088K
Dec 20, 2018Recreation and Parks$486,969.97ALBION RIVERSIDE PARKPO SC88CO18129088K
Sep 10, 2018Recreation and Parks - Special Accounts$484,582.36ALBION RIVERSIDE PARKPO SC89CO19129088K
Aug 20, 2018Transportation$410,161.44SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
Mar 26, 2019Recreation and Parks - Special Accounts$409,911.53ALBION RIVERSIDE PARKPO SC89CO19129088K
May 20, 2019Recreation and Parks - Special Accounts$402,659.94ALBION RIVERSIDE PARKPO SC89CO19129088K
Jun 12, 2019Transportation$395,429.71SR2S-SHERIDAN ST ES & BREED ST ESPO SC94CO18130814K
Apr 5, 2019Recreation and Parks - Special Accounts$392,229.68ALBION RIVERSIDE PARKPO SC89CO19129088K
Oct 4, 2018Non_departmental$376,484.01ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Feb 22, 2019Transportation$352,797.42SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
May 30, 2019Transportation$349,865.08SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
Mar 29, 2019Transportation$344,510.38SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
Feb 6, 2019Recreation and Parks - Special Accounts$335,015.98ALBION RIVERSIDE PARKPO SC89CO19129088K
Feb 21, 2019Non_departmental$313,438.83ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Nov 1, 2018Transportation$312,159.55SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
Aug 10, 2018Non_departmental$303,235.56ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Sep 28, 2018Non_departmental$299,467.33ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Feb 21, 2019Non_departmental$276,608.25ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Jan 17, 2019Transportation$265,602.90SR2S-MENLO AVE ES N WEST VERNON AVE ESPO SC94CO18130813K
FY 2018top 20 of 42 payments$13,967,508
DateAgencyAmountCategoryPurchase order
Jan 11, 2018Non_departmental$2,630,899.68ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Feb 6, 2018Non_departmental$1,449,512.28ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Jan 2, 2018Non_departmental$1,418,651.43ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Jun 8, 2018Transportation$1,343,508.50RAILROAD CROSSING PROGRAMPO SC94CO18128133K
Jun 7, 2018Non_departmental$1,324,709.59ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Nov 1, 2017Non_departmental$1,071,903.01ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Oct 12, 2017Non_departmental$971,260.84ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Apr 17, 2018Non_departmental$919,424.48ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Mar 5, 2018Non_departmental$722,934.12ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Jun 7, 2018Non_departmental$569,613.95ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Aug 15, 2017Transportation$269,718.36BICYCLE PLAN/PROGRAMPO SC94MSACO16120829K
Sep 20, 2017Non_departmental$244,010.01ALBION RIVERSIDE PARK IMPROVEMENTSPO SC50MSACO17129088KO
Mar 5, 2018Non_departmental$179,602.55MCCADDEN PL BEVERLY TO 3RD-PAVEMENT PRESERVATIONPO SC50CO18129557M
Mar 30, 2018Non_departmental$173,543.62MCCADDEN PL BEVERLY TO 3RD-PAVEMENT PRESERVATIONPO SC50CO18129557M
Sep 28, 2017City Administrative Officer$128,527.71PRJ-RAP:ALBION RIVERSIDE PARK (8TH CYCLE)PO SC10CO18129088KC
Nov 27, 2017Recreation and Parks - Special Accounts$120,000.00ALBION RIVERSIDE PARKPO SC89CO18129088K
Dec 26, 2017Transportation$87,050.00OLYMPIC BLV & MATEO ST PHASE2PO SC94MSACO17129277K
Feb 6, 2018Recreation and Parks - Special Accounts$38,000.00ALBION RIVERSIDE PARKPO SC89CO18129088K
Jan 29, 2018Recreation and Parks$35,000.32ALBION RIVERSIDE PARKPO SC88CO18129088K
Feb 6, 2018Recreation and Parks - Special Accounts$35,000.00ALBION RIVERSIDE PARKPO SC89CO18129088K
FY 2017top 3 of 3 payments$231,180
DateAgencyAmountCategoryPurchase order
Jul 7, 2016Transportation$111,759.31BICYCLE PLAN/PROGRAMPO GAE94CO16120829K
Jul 22, 2016Transportation$91,948.44BICYCLE PLAN/PROGRAMPO GAE94CO16120829K
Aug 15, 2016Appropriations to Special Purpose Fund$27,472.078TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
FY 2016top 9 of 9 payments$397,118
DateAgencyAmountCategoryPurchase order
Dec 7, 2015Transportation$145,181.46SAFETEA LU: BALBOA BL SN FER RPO GAE94CO15123891K
Oct 2, 2015Transportation$73,399.36SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Oct 2, 2015Transportation$56,884.59SAN FERNANDO RD BIKE PATH PH 2PO GAE94CO14120829K
Feb 10, 2016Appropriations to Special Purpose Fund$46,398.248TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
Dec 7, 2015Transportation$21,442.03SAFETEA LU PROGRAM SHORTFALLPO GAE94CO15123891K
Oct 13, 2015Transportation$19,198.53SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Dec 7, 2015Transportation$18,483.89SAFETEALU BALBOA B SN FERNDO IPO GAE94CO15123891K
Jan 11, 2016Transportation$14,710.75SAFETEALU BALBOA B SN FERNDO IPO GAE94CO15123891K
Aug 14, 2015Transportation$1,419.30SAN FERNANDO RD BIKE PATH PH 2PO GAE94CO14120829K
FY 2015top 20 of 45 payments$2,332,979
DateAgencyAmountCategoryPurchase order
Feb 25, 2015Appropriations to Special Purpose Fund$205,622.378TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
May 15, 2015Transportation$146,975.94SAFETEA LU: BALBOA BL SN FER RPO GAE94CO15123891K
Feb 9, 2015Transportation$146,636.92SAN FERNANDO RD BIKE PATHPO GAE94CO14120829K
Sep 3, 2014Transportation$132,965.73BALBOA BLVD/KNOLLWOOD SHOP PROJPO GAE94CO15123891K
Mar 20, 2015Transportation$128,439.43SAN FERNANDO RD BIKE PATH PH 2PO GAE94CO14120829K
Mar 20, 2015Transportation$96,941.66SAN FERNANDO RD BIKE PATHPO GAE94CO14120829K
Dec 24, 2014Transportation$93,852.85SAN FERNANDO RD BIKE PATHPO GAE94CO14120829K
Mar 16, 2015Transportation$93,491.15SAFETEA LU: BALBOA BL SN FER RPO GAE94CO15123891K
Apr 1, 2015Appropriations to Special Purpose Fund$81,671.418TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
Jun 23, 2015Transportation$78,516.03SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Jun 23, 2015Transportation$75,241.85BIKEWAYS PROGRAMPO GAE94CO14120829K
Oct 10, 2014Transportation$74,315.71BALBOA BLVD/KNOLLWOOD SHOP PROJPO GAE94CO15123891K
Sep 2, 2014Appropriations to Special Purpose Fund$67,266.468TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
Nov 12, 2014Transportation$64,313.24BALBOA BLVD/KNOLLWOOD SHOP PROJPO GAE94CO15123891K
Jul 22, 2014Appropriations to Special Purpose Fund$64,271.498TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
Dec 16, 2014Transportation$62,568.57SAN FERNANDO RD BIKE PATHPO GAE94CO14120829K
Oct 10, 2014Transportation$59,676.59SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Sep 15, 2014Transportation$59,247.11SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Jul 2, 2014Appropriations to Special Purpose Fund$55,227.518TH ST-IROLO ST LIGHT SYSPO GAE50CO14123137K
Apr 3, 2015Transportation$53,429.42SAN FERNANDO RD BIKE PATH PH 2PO GAE94CO14120829K
FY 2014top 20 of 23 payments$3,134,281
DateAgencyAmountCategoryPurchase order
Dec 13, 2013Transportation$901,303.13SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Dec 26, 2013Transportation$782,652.99SN FERNANDO RD BIKE PATH PH 2PO GAE94CO13120829K
Apr 29, 2014Transportation$227,498.29SN FERNANDO RD BIKE PATH PH 2PO GAE94CO13120829K
Apr 28, 2014Transportation$214,358.16SN FERNANDO RD BIKE PATH PH 2PO GAE94CO13120829K
Jun 16, 2014Transportation$169,949.22SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Oct 11, 2013Transportation$142,052.48SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Jun 19, 2014Transportation$98,475.35SN FERNANDO RD BIKE PATH PH 2PO GAE94CO13120829K
Aug 29, 2013Transportation$78,777.93SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Dec 26, 2013Transportation$77,708.45HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Mar 21, 2014Transportation$67,387.04SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Dec 13, 2013Transportation$63,788.54SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Sep 20, 2013Transportation$57,960.89SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Aug 12, 2013Transportation$52,003.88SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Apr 29, 2014Transportation$42,342.27SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Jan 23, 2014Transportation$42,298.01SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Dec 26, 2013Transportation$21,574.13HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Aug 2, 2013Transportation$21,337.95HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Apr 28, 2014Transportation$20,015.27SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Jan 9, 2014Transportation$15,218.15HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Dec 26, 2013Transportation$14,094.96HSIP TRAFFIC SIGNAL AT 11TH STPO GAE94CO13120306M
FY 2013top 13 of 13 payments$1,517,954
DateAgencyAmountCategoryPurchase order
Jun 3, 2013Transportation$311,534.00SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Apr 16, 2013Transportation$273,484.00SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Nov 30, 2012Transportation$180,479.63HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Mar 19, 2013Transportation$158,773.50SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Apr 9, 2013Transportation$156,859.25HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Nov 30, 2012Transportation$141,687.37HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Mar 8, 2013Transportation$112,150.00SAN FERNANDO ROAD BIKE PATH P2PO GAE94CO13120829K
Nov 30, 2012Transportation$74,513.25HSIP TRAFFIC SIGNAL AT 11TH STPO GAE94CO13120306M
Jun 4, 2013Transportation$44,495.54SAN FERNANDO ROAD BIKE PATHPO GAE94CO13120829K
Jan 22, 2013Transportation$37,610.35HSIP HIGHWAY SAFETY IMPRVMENTPO GAE94CO13120306M
Apr 9, 2013Transportation$18,613.35HSIP TRAFFIC SIGNAL AT 11TH STPO GAE94CO13120306M
Nov 30, 2012Transportation$4,522.00HSIP TRAFFIC SIGNAL AT 11TH STPO GAE94CO13120306M
Jan 22, 2013Transportation$3,231.90HSIP TRAFFIC SIGNAL AT 11TH STPO GAE94CO13120306M
FY 2012top 7 of 7 payments$210,201
DateAgencyAmountCategoryPurchase order
Aug 24, 2011Appropriations to Special Purpose Fund$76,489.90DESIGN/CONST OF VERMONT-KAISERPO GAE50FMISCO0113191K
Aug 24, 2011Appropriations to Special Purpose Fund$63,445.71DESIGN/CONST OF VERMONT-KAISERPO GAE50FMISCO0113191K
Jan 20, 2012Appropriations to Special Purpose Fund$41,645.01DESIGN/CONST OF VERMONT-KAISERPO GAE50FMISCO0113191K
Aug 24, 2011Appropriations to Special Purpose Fund$14,635.31VERMONT AVE S/O PCH STORM DRAIPO GAE50FMISCO8113191K
Aug 24, 2011Appropriations to Special Purpose Fund$9,445.00VERMONT AVE S/O PCH STORM DRAIPO GAE50FMISCO8113191K
Jan 12, 2012Appropriations to Special Purpose Fund$3,039.13VERMONT AVE S/O PCH STORM DRAIPO GAE50FMISCO8113191K
Sep 27, 2011Appropriations to Special Purpose Fund$1,500.57VERMONT AVE S/O PCH STORM DRAIPO GAE50FMISCO8113191K

Recent payments

DateAgencyAmountCategoryMethod
Jun 17, 2025Transportation$25,228.60SAN FERNANDO RD BIKE PATH-PH 3EFT
Jun 2, 2025Transportation$69,104.79SAN FERNANDO RD BIKE PATH-PH 3EFT
May 16, 2025Transportation$183,417.48SAN FERNANDO RD BIKE PATH-PH 3EFT
May 16, 2025Transportation$33,858.34SAN FERNANDO RD BIKE PATH-PH 3EFT
May 16, 2025Transportation$744,164.18SAN FERNANDO RD BIKE PATH-PH 3EFT
Apr 29, 2025Transportation$87,448.62SAN FERNANDO RD BIKE PATH-PH 3EFT
Apr 29, 2025Transportation$34,888.82SAN FERNANDO RD BIKE PATH-PH 3EFT
Jan 27, 2025Transportation$783.75SAN FERNANDO RD BIKE PATH-PH 3EFT
Jan 27, 2025Transportation$36,711.92SAN FERNANDO RD BIKE PATH-PH 3EFT
Nov 27, 2024Transportation$34,644.82SAN FERNANDO RD BIKE PATH-PH 3EFT
Sep 19, 2024Transportation$132,357.91SAN FERNANDO RD BIKE PATH-PH 3EFT
Jul 17, 2024Transportation$53,040.13SAN FERNANDO RD BIKE PATH-PH 3EFT
May 29, 2024Transportation$613,531.48SAN FERNANDO RD BIKE PATH-PH 3EFT
May 1, 2024Transportation$686,586.38SAN FERNANDO PHASE III BIKE PATHEFT
Mar 27, 2024Transportation$69,342.59SAN FERNANDO PHASE III BIKE PATHEFT
Feb 20, 2024Transportation$219,485.01SAN FERNANDO PHASE III BIKE PATHEFT
Jan 31, 2024Transportation$7,207.92BICYCLE PLAN/PROGRAMEFT
Jan 31, 2024Transportation$162,035.34SAN FERNANDO PHASE III BIKE PATHEFT
Jan 4, 2024Transportation$48,450.00SAN FERNANDO RD BIKE PATH-PH 3EFT
Dec 28, 2023Transportation$107,363.53SAN FERNANDO PHASE III BIKE PATHEFT
Dec 12, 2023Transportation$259,065.00BICYCLE PLAN/PROGRAMEFT
Dec 12, 2023Transportation$172,621.51SAN FERNANDO PHASE III BIKE PATHEFT
Dec 6, 2023Transportation$312,154.42SAN FERNANDO RD BIKE PATH-PH 3EFT
Nov 3, 2023Transportation$28,538.95SAN FERNANDO RD BIKE PATH-PH 3EFT
Oct 18, 2023Transportation$32,569.06BICYCLE PLAN/PROGRAMEFT

Other vendors serving Transportation

VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data