Manson Construction Co.: Los Angeles Government Payments
as recorded by Los Angeles: MANSON CONSTRUCTION CO.
Manson Construction Co. is the 155th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks 2nd in CAPITALIZED OTHER CONSTRUCTION SVC. spending. Its payments amount to 2.9% of everything the Harbor has paid vendors in that span. Payments to it fell 87% year over year.
Primary spending category: CAPITALIZED OTHER CONSTRUCTION SVC.
Confirm your email to activate this follow.
Check your inbox and click the confirmation link to activate this follow and open your watchlist. The link expires in 20 minutes.
A link was requested recently. Check your inbox, or wait one minute and submit this follow again. This request has not added a follow.
We couldn't send the confirmation. Check the email address and try again. This follow is not active until you confirm it.
Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.
Payments by fiscal year
The payment history
Select a column to see the agencies behind that fiscal year.
14 fiscal years on record. The incoming flows below combine all recorded years.
Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.
Who pays this supplier?
Select a paying agency to inspect the relationship, then open its profile.
Aug 4, 2011 to Apr 30, 2025 · All recorded fiscal years
Showing 1 of 1 positive agencies in these records.
Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $113,662,911.63. Zero and net-negative relationships are excluded from positive flows.
The relationships at a glance
- Total shown
- $113,662,911.63
- Payments represented
- 923
- Paying agencies shown
- 1
- Largest share of supplier total
- 100.0%
Largest displayed relationship: Harbor. Select a flow to explore its details.
Aug 4, 2011 to Apr 30, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.
Manson Construction Co.
$113,662,912from the agencies shownManson Construction Co.
$113,662,912 from the agencies shown
- $113,662,912100.0% of supplier total
This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2025 | Harbor | 5 | $208,938 |
| FY 2024 | Harbor | 36 | $1,613,428 |
| FY 2023 | Harbor | 40 | $3,302,209 |
| FY 2022 | Harbor | 132 | $7,605,921 |
| FY 2021 | Harbor | 232 | $34,338,185 |
| FY 2020 | Harbor | 56 | $4,212,083 |
| FY 2019 | Harbor | 25 | $2,044,843 |
| FY 2018 | Harbor | 69 | $11,572,124 |
| FY 2017 | Harbor | 138 | $15,041,393 |
| FY 2016 | Harbor | 110 | $20,937,621 |
| FY 2015 | Harbor | 44 | $2,868,087 |
| FY 2014 | Harbor | 18 | $715,812 |
| FY 2013 | Harbor | 10 | $5,907,782 |
| FY 2012 | Harbor | 8 | $3,294,486 |
| Total | 923 | $113,662,912 |
What the payments were for
Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| MISCELLANEOUS PROFESSIONAL SERVICES | 1 | $99,871 | Oct 24, 2014 – Oct 24, 2014 |
| OTHER EXPENDITURES | 18 | $9,202,268 | Aug 4, 2011 – Jun 13, 2013 |
| CAPITALIZED OTHER CONSTRUCTION SVC. | 404 | $90,760,435 | Sep 25, 2014 – Apr 10, 2024 |
| MAINT. SVC. - OPEN FACILITY & LAND | 1 | $8,024 | Dec 31, 2018 – Dec 31, 2018 |
| CONSTRUCTION SERVICES | 10 | $789,506 | Jul 17, 2013 – May 2, 2018 |
| MAINT. SVC. - STREETS BRIDGES & RR | 3 | $60,038 | Aug 29, 2022 – Nov 7, 2022 |
| MAINT. SVC. - WHARVES | 6 | $417,943 | Oct 24, 2014 – Jan 26, 2023 |
| MAINT. SVC. - DREDGING | 14 | $2,115,267 | Mar 19, 2015 – Mar 27, 2024 |
| MAINT. SVC. - STREETS, BRIDGES & RR | 1 | $181,550 | Dec 24, 2014 – Dec 24, 2014 |
| GASB49 PRO - CURRENT | 10 | $11,492,258 | May 23, 2017 – Nov 23, 2022 |
| Accounts Payable - Contract Retention | 4 | $0 | Apr 17, 2025 – Apr 30, 2025 |
| CONTRACT RETENTION | 451 | -$1,464,248 | Jul 17, 2013 – Jul 17, 2024 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 5 of 5 payments$208,938
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 17, 2024 | Harbor | $208,937.58 | CONTRACT RETENTION | PO CON2311-33FRR |
| Apr 17, 2025 | Harbor | $121,398.90 | Accounts Payable - Contract Retention | – |
| Apr 30, 2025 | Harbor | $121,398.90 | Accounts Payable - Contract Retention | – |
| Apr 23, 2025 | Harbor | -$121,398.90 | Accounts Payable - Contract Retention | – |
| Apr 30, 2025 | Harbor | -$121,398.90 | Accounts Payable - Contract Retention | – |
FY 2024top 20 of 36 payments$1,613,428
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 10, 2024 | Harbor | $500,000.00 | CONTRACT RETENTION | PO CON2311-32PRR |
| Jul 31, 2023 | Harbor | $235,560.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2314-10 |
| Mar 27, 2024 | Harbor | $174,111.68 | MAINT. SVC. - DREDGING | PO CON2314-11 |
| Jul 31, 2023 | Harbor | $126,167.47 | MAINT. SVC. - DREDGING | PO CON2314-10 |
| Feb 2, 2024 | Harbor | $100,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Feb 2, 2024 | Harbor | $92,744.10 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Jul 31, 2023 | Harbor | $86,396.85 | MAINT. SVC. - DREDGING | PO CON2314-10 |
| Jul 31, 2023 | Harbor | $86,396.85 | MAINT. SVC. - DREDGING | PO CON2314-10 |
| Jul 31, 2023 | Harbor | $86,396.85 | MAINT. SVC. - DREDGING | PO CON2314-10 |
| Apr 10, 2024 | Harbor | $61,083.78 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-32PRR |
| Feb 2, 2024 | Harbor | $34,731.54 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Feb 2, 2024 | Harbor | $31,501.51 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Jul 31, 2023 | Harbor | $26,157.97 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-29 |
| Jul 31, 2023 | Harbor | $12,525.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-29 |
| Feb 2, 2024 | Harbor | $11,561.93 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Feb 2, 2024 | Harbor | $1,414.91 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Feb 2, 2024 | Harbor | $1,295.52 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Feb 2, 2024 | Harbor | $747.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-31 |
| Apr 10, 2024 | Harbor | $19.36 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-32PRR |
| Apr 10, 2024 | Harbor | $0.14 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-32PRR |
FY 2023top 20 of 40 payments$3,302,209
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 19, 2022 | Harbor | $1,006,827.29 | CONTRACT RETENTION | PO CON2300-35-FINAL |
| Feb 15, 2023 | Harbor | $700,000.00 | CONTRACT RETENTION | PO CON2311-27PRR |
| Dec 5, 2022 | Harbor | $290,785.26 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-26 |
| Aug 29, 2022 | Harbor | $244,288.44 | MAINT. SVC. - DREDGING | PO CON2314-4 |
| Jan 26, 2023 | Harbor | $201,660.44 | MAINT. SVC. - WHARVES | PO CON2314-7 |
| Sep 1, 2022 | Harbor | $150,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-25 |
| Nov 23, 2022 | Harbor | $148,883.62 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-34 |
| Dec 5, 2022 | Harbor | $114,699.30 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-26 |
| Aug 11, 2022 | Harbor | $106,312.70 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-24 |
| Nov 23, 2022 | Harbor | $78,514.00 | GASB49 PRO - CURRENT | PO CON2300-34 |
| Aug 29, 2022 | Harbor | $63,370.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2314-4 |
| Aug 11, 2022 | Harbor | $56,960.39 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-24 |
| Sep 1, 2022 | Harbor | $50,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-25 |
| Sep 1, 2022 | Harbor | $50,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-25 |
| Dec 9, 2022 | Harbor | $34,440.00 | MAINT. SVC. - WHARVES | PO CON2314-6 |
| Aug 29, 2022 | Harbor | $32,829.00 | MAINT. SVC. - STREETS BRIDGES & RR | PO CON2314-4 |
| Nov 7, 2022 | Harbor | $15,009.50 | MAINT. SVC. - STREETS BRIDGES & RR | PO CON2314-5 |
| Nov 23, 2022 | Harbor | $14,322.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-34 |
| Dec 5, 2022 | Harbor | $14,075.55 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-26 |
| Aug 29, 2022 | Harbor | $12,199.50 | MAINT. SVC. - STREETS BRIDGES & RR | PO CON2314-4 |
FY 2022top 20 of 132 payments$7,605,921
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 1, 2022 | Harbor | $805,461.74 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-19 |
| Oct 15, 2021 | Harbor | $689,123.87 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-17 |
| Jul 15, 2021 | Harbor | $598,708.98 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-15 |
| Jul 15, 2021 | Harbor | $489,675.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-15 |
| Apr 29, 2022 | Harbor | $447,855.40 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-21 |
| Dec 2, 2021 | Harbor | $337,500.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-18 |
| Sep 15, 2021 | Harbor | $334,440.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-16 |
| Sep 15, 2021 | Harbor | $300,169.33 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-16 |
| Sep 15, 2021 | Harbor | $297,433.20 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-16 |
| Jul 15, 2021 | Harbor | $266,258.03 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-15 |
| Dec 2, 2021 | Harbor | $234,991.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-18 |
| Sep 15, 2021 | Harbor | $230,546.80 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-16 |
| Apr 29, 2022 | Harbor | $220,502.28 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-21 |
| Jul 15, 2021 | Harbor | $219,413.09 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-15 |
| Apr 29, 2022 | Harbor | $202,641.92 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-21 |
| Oct 15, 2021 | Harbor | $167,600.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-17 |
| Sep 15, 2021 | Harbor | $159,400.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-16 |
| Jul 15, 2021 | Harbor | $156,886.65 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-15 |
| Jun 7, 2022 | Harbor | $155,734.73 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-22 |
| Feb 1, 2022 | Harbor | $142,332.15 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-19 |
FY 2021top 20 of 232 payments$34,338,185
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 4, 2021 | Harbor | $4,806,420.25 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-11 |
| Aug 25, 2020 | Harbor | $2,059,188.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-5 |
| Apr 8, 2021 | Harbor | $1,988,650.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-12 |
| Nov 23, 2020 | Harbor | $1,902,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-8 |
| Jul 15, 2020 | Harbor | $1,889,362.75 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-4 |
| Mar 4, 2021 | Harbor | $1,811,520.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-11 |
| Aug 25, 2020 | Harbor | $1,804,255.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-5 |
| Apr 8, 2021 | Harbor | $1,621,872.25 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-12 |
| Jun 14, 2021 | Harbor | $1,420,940.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-14 |
| Sep 23, 2020 | Harbor | $1,302,387.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-6 |
| Nov 23, 2020 | Harbor | $1,054,030.18 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-8 |
| Jun 14, 2021 | Harbor | $861,304.66 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-14 |
| Jun 14, 2021 | Harbor | $669,967.28 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-14 |
| May 6, 2021 | Harbor | $660,785.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-13 |
| Jun 14, 2021 | Harbor | $647,930.77 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-14 |
| Sep 23, 2020 | Harbor | $489,050.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-6 |
| Oct 27, 2020 | Harbor | $474,344.75 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-7 |
| May 6, 2021 | Harbor | $466,150.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-13 |
| Oct 27, 2020 | Harbor | $454,099.38 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-7 |
| Apr 8, 2021 | Harbor | $429,024.11 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-12 |
FY 2020top 20 of 56 payments$4,212,083
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 4, 2020 | Harbor | $877,921.35 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 18, 2020 | Harbor | $484,395.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| May 4, 2020 | Harbor | $371,122.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 4, 2020 | Harbor | $366,363.75 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-2 |
| May 4, 2020 | Harbor | $361,500.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 18, 2020 | Harbor | $325,523.77 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| May 4, 2020 | Harbor | $289,268.75 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 18, 2020 | Harbor | $235,862.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| Jun 18, 2020 | Harbor | $212,835.25 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| Jun 4, 2020 | Harbor | $127,368.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-2 |
| Jun 4, 2020 | Harbor | $119,100.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-2 |
| May 4, 2020 | Harbor | $117,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 18, 2020 | Harbor | $102,746.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| May 4, 2020 | Harbor | $84,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 4, 2020 | Harbor | $74,052.80 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-2 |
| Jun 4, 2020 | Harbor | $68,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-2 |
| May 4, 2020 | Harbor | $53,070.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
| Jun 18, 2020 | Harbor | $40,865.55 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| Jun 18, 2020 | Harbor | $31,500.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-3 |
| May 4, 2020 | Harbor | $23,800.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2311-1 |
FY 2019top 20 of 25 payments$2,044,843
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 26, 2018 | Harbor | $546,975.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-31 |
| Dec 31, 2018 | Harbor | $488,544.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-32 |
| Sep 18, 2018 | Harbor | $302,100.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-29 |
| Jul 20, 2018 | Harbor | $208,590.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-27 |
| Feb 4, 2019 | Harbor | $175,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-33 |
| Oct 25, 2018 | Harbor | $142,989.40 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-30 |
| Aug 28, 2018 | Harbor | $105,506.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-28 |
| Sep 18, 2018 | Harbor | $69,114.88 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-29 |
| Jul 20, 2018 | Harbor | $62,256.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-27 |
| Jul 20, 2018 | Harbor | $24,300.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-27 |
| Mar 28, 2019 | Harbor | $19,066.90 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-21 |
| Dec 31, 2018 | Harbor | $8,024.06 | MAINT. SVC. - OPEN FACILITY & LAND | PO CON2300-32 |
| Mar 28, 2019 | Harbor | $0.01 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-21 |
| Dec 31, 2018 | Harbor | -$401.20 | CONTRACT RETENTION | PO CON2300-32 |
| Mar 28, 2019 | Harbor | -$953.35 | CONTRACT RETENTION | PO CON2297-21 |
| Jul 20, 2018 | Harbor | -$1,215.00 | CONTRACT RETENTION | PO CON2300-27 |
| Jul 20, 2018 | Harbor | -$3,112.80 | CONTRACT RETENTION | PO CON2300-27 |
| Sep 18, 2018 | Harbor | -$3,455.74 | CONTRACT RETENTION | PO CON2300-29 |
| Aug 28, 2018 | Harbor | -$5,275.30 | CONTRACT RETENTION | PO CON2300-28 |
| Oct 25, 2018 | Harbor | -$7,149.47 | CONTRACT RETENTION | PO CON2300-30 |
FY 2018top 20 of 69 payments$11,572,124
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 18, 2017 | Harbor | $3,248,386.89 | GASB49 PRO - CURRENT | PO CON2300-15 |
| Sep 29, 2017 | Harbor | $2,283,371.56 | GASB49 PRO - CURRENT | PO CON2300-17 |
| Oct 27, 2017 | Harbor | $927,210.00 | GASB49 PRO - CURRENT | PO CON2300-18 |
| Aug 21, 2017 | Harbor | $836,006.15 | GASB49 PRO - CURRENT | PO CON2300-16 |
| Jan 29, 2018 | Harbor | $481,807.39 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-21 |
| Jan 29, 2018 | Harbor | $475,245.00 | GASB49 PRO - CURRENT | PO CON2300-21 |
| Nov 20, 2017 | Harbor | $383,227.00 | GASB49 PRO - CURRENT | PO CON2300-19 |
| Jan 3, 2018 | Harbor | $310,861.35 | GASB49 PRO - CURRENT | PO CON2300-20 |
| Sep 29, 2017 | Harbor | $295,016.15 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-17 |
| Nov 20, 2017 | Harbor | $282,712.88 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-19 |
| May 2, 2018 | Harbor | $273,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-24 |
| Jul 18, 2017 | Harbor | $245,280.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-15 |
| Mar 6, 2018 | Harbor | $216,986.30 | CONTRACT RETENTION | PO CON2280-25 |
| May 25, 2018 | Harbor | $202,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-25 |
| Aug 21, 2017 | Harbor | $199,777.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-16 |
| May 25, 2018 | Harbor | $190,862.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-25 |
| Mar 2, 2018 | Harbor | $164,946.30 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-22 |
| Jun 21, 2018 | Harbor | $161,410.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-26 |
| May 2, 2018 | Harbor | $159,968.60 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-24 |
| Oct 27, 2017 | Harbor | $140,925.10 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-18 |
FY 2017top 20 of 138 payments$15,041,393
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 23, 2017 | Harbor | $2,567,919.00 | GASB49 PRO - CURRENT | PO CON2300-14 |
| Jun 26, 2017 | Harbor | $974,889.56 | CONTRACT RETENTION | PO CON2297-20 |
| Aug 23, 2016 | Harbor | $823,820.60 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-10 |
| Feb 27, 2017 | Harbor | $660,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-16 |
| May 11, 2017 | Harbor | $634,853.30 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-18 |
| Jan 30, 2017 | Harbor | $597,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-15 |
| Jul 28, 2016 | Harbor | $534,800.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-9 |
| Mar 31, 2017 | Harbor | $531,200.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-17 |
| Mar 31, 2017 | Harbor | $504,623.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-17 |
| Feb 27, 2017 | Harbor | $440,797.76 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-16 |
| Jun 6, 2017 | Harbor | $420,309.04 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-19 |
| May 11, 2017 | Harbor | $400,925.32 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-18 |
| Aug 31, 2016 | Harbor | $382,427.79 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-23 |
| May 23, 2017 | Harbor | $381,517.00 | GASB49 PRO - CURRENT | PO CON2300-13 |
| Mar 31, 2017 | Harbor | $347,662.14 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-17 |
| Aug 23, 2016 | Harbor | $307,069.68 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-10 |
| Feb 27, 2017 | Harbor | $298,187.30 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-16 |
| Sep 26, 2016 | Harbor | $294,353.40 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-11 |
| Aug 23, 2016 | Harbor | $281,750.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-10 |
| Sep 26, 2016 | Harbor | $274,660.09 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-11 |
FY 2016top 20 of 110 payments$20,937,621
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 24, 2016 | Harbor | $5,650,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-7 |
| May 24, 2016 | Harbor | $3,150,410.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-7 |
| Jun 10, 2016 | Harbor | $1,407,529.40 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-8 |
| Apr 18, 2016 | Harbor | $1,302,300.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-6 |
| Feb 29, 2016 | Harbor | $1,074,728.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-4 |
| Mar 21, 2016 | Harbor | $987,120.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-5 |
| May 2, 2016 | Harbor | $788,045.34 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-1 |
| May 24, 2016 | Harbor | $726,081.60 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-7 |
| Jun 10, 2016 | Harbor | $694,071.84 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-8 |
| Dec 8, 2015 | Harbor | $573,685.31 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-1 |
| Apr 18, 2016 | Harbor | $408,103.63 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-6 |
| Jun 10, 2016 | Harbor | $376,840.84 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-8 |
| Jul 30, 2015 | Harbor | $320,500.00 | MAINT. SVC. - DREDGING | PO CON2280-20 |
| Feb 29, 2016 | Harbor | $293,301.43 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-4 |
| May 2, 2016 | Harbor | $286,136.66 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-1 |
| Dec 23, 2015 | Harbor | $267,890.15 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-2 |
| Jun 10, 2016 | Harbor | $231,899.60 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-8 |
| Apr 18, 2016 | Harbor | $227,524.80 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2297-6 |
| Jul 30, 2015 | Harbor | $226,490.74 | MAINT. SVC. - DREDGING | PO CON2280-20 |
| May 23, 2016 | Harbor | $219,927.53 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2300-2 |
FY 2015top 20 of 44 payments$2,868,087
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 19, 2015 | Harbor | $342,113.00 | MAINT. SVC. - DREDGING | PO CON2280-16 |
| Jun 18, 2015 | Harbor | $251,600.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-19 |
| Mar 19, 2015 | Harbor | $181,923.80 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-16 |
| Dec 24, 2014 | Harbor | $181,550.00 | MAINT. SVC. - STREETS, BRIDGES & RR | PO CON2280-15 |
| Oct 30, 2014 | Harbor | $181,196.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| Oct 31, 2014 | Harbor | $181,196.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| Sep 25, 2014 | Harbor | $181,196.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| May 27, 2015 | Harbor | $174,139.60 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-18 |
| Nov 19, 2014 | Harbor | $166,440.48 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-14 |
| Apr 20, 2015 | Harbor | $165,869.25 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-17 |
| Jun 18, 2015 | Harbor | $164,500.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-19 |
| Oct 24, 2014 | Harbor | $122,320.00 | MAINT. SVC. - WHARVES | PO CON2280-13 |
| Apr 20, 2015 | Harbor | $112,613.28 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-17 |
| Oct 24, 2014 | Harbor | $99,870.93 | MISCELLANEOUS PROFESSIONAL SERVICES | PO CON2280-13 |
| May 27, 2015 | Harbor | $99,273.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-18 |
| May 27, 2015 | Harbor | $81,300.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-18 |
| Oct 30, 2014 | Harbor | $72,622.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| Oct 31, 2014 | Harbor | $72,622.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| Sep 25, 2014 | Harbor | $72,622.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-12 |
| Jun 18, 2015 | Harbor | $69,600.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | PO CON2280-19 |
FY 2014top 18 of 18 payments$715,812
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 18, 2013 | Harbor | $155,316.78 | CONSTRUCTION SERVICES | PO CON2280-8 |
| Jul 17, 2013 | Harbor | $155,316.56 | CONSTRUCTION SERVICES | PO CON2280-7 |
| Sep 18, 2013 | Harbor | $94,562.52 | CONSTRUCTION SERVICES | PO CON2280-8 |
| Apr 23, 2014 | Harbor | $86,290.42 | CONSTRUCTION SERVICES | PO CON2280-9 |
| May 5, 2014 | Harbor | $79,166.67 | CONSTRUCTION SERVICES | PO CON2280-10 |
| Sep 18, 2013 | Harbor | $64,350.00 | CONSTRUCTION SERVICES | PO CON2280-8 |
| May 28, 2014 | Harbor | $64,133.00 | CONSTRUCTION SERVICES | PO CON2280-11 |
| Jul 17, 2013 | Harbor | $39,350.00 | CONSTRUCTION SERVICES | PO CON2280-7 |
| Apr 23, 2014 | Harbor | $15,000.00 | CONSTRUCTION SERVICES | PO CON2280-9 |
| Apr 23, 2014 | Harbor | -$750.00 | CONTRACT RETENTION | PO CON2280-9 |
| Jul 17, 2013 | Harbor | -$1,967.50 | CONTRACT RETENTION | PO CON2280-7 |
| May 28, 2014 | Harbor | -$3,206.65 | CONTRACT RETENTION | PO CON2280-11 |
| Sep 18, 2013 | Harbor | -$3,217.50 | CONTRACT RETENTION | PO CON2280-8 |
| May 5, 2014 | Harbor | -$3,958.33 | CONTRACT RETENTION | PO CON2280-10 |
| Apr 23, 2014 | Harbor | -$4,314.52 | CONTRACT RETENTION | PO CON2280-9 |
| Sep 18, 2013 | Harbor | -$4,728.13 | CONTRACT RETENTION | PO CON2280-8 |
| Jul 17, 2013 | Harbor | -$7,765.83 | CONTRACT RETENTION | PO CON2280-7 |
| Sep 18, 2013 | Harbor | -$7,765.84 | CONTRACT RETENTION | PO CON2280-8 |
FY 2013top 10 of 10 payments$5,907,782
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 21, 2013 | Harbor | $1,214,383.67 | OTHER EXPENDITURES | – |
| May 30, 2013 | Harbor | $973,106.92 | OTHER EXPENDITURES | – |
| Jul 25, 2012 | Harbor | $965,482.15 | OTHER EXPENDITURES | – |
| Feb 11, 2013 | Harbor | $717,314.88 | OTHER EXPENDITURES | – |
| Mar 4, 2013 | Harbor | $490,937.86 | OTHER EXPENDITURES | – |
| Jun 13, 2013 | Harbor | $480,347.57 | OTHER EXPENDITURES | – |
| May 2, 2013 | Harbor | $425,588.05 | OTHER EXPENDITURES | – |
| Dec 27, 2012 | Harbor | $392,333.01 | OTHER EXPENDITURES | – |
| Sep 12, 2012 | Harbor | $168,330.00 | OTHER EXPENDITURES | – |
| Mar 28, 2013 | Harbor | $79,958.30 | OTHER EXPENDITURES | – |
FY 2012top 8 of 8 payments$3,294,486
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 25, 2012 | Harbor | $705,465.11 | OTHER EXPENDITURES | – |
| Mar 8, 2012 | Harbor | $570,073.46 | OTHER EXPENDITURES | – |
| Sep 6, 2011 | Harbor | $498,919.99 | OTHER EXPENDITURES | – |
| Aug 4, 2011 | Harbor | $423,536.07 | OTHER EXPENDITURES | – |
| May 31, 2012 | Harbor | $389,961.61 | OTHER EXPENDITURES | – |
| Nov 9, 2011 | Harbor | $327,668.20 | OTHER EXPENDITURES | – |
| May 15, 2012 | Harbor | $206,869.40 | OTHER EXPENDITURES | – |
| Dec 20, 2011 | Harbor | $171,991.66 | OTHER EXPENDITURES | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Apr 30, 2025 | Harbor | -$121,398.90 | Accounts Payable - Contract Retention | Check |
| Apr 30, 2025 | Harbor | $121,398.90 | Accounts Payable - Contract Retention | Check |
| Apr 23, 2025 | Harbor | -$121,398.90 | Accounts Payable - Contract Retention | Check |
| Apr 17, 2025 | Harbor | $121,398.90 | Accounts Payable - Contract Retention | Check |
| Jul 17, 2024 | Harbor | $208,937.58 | CONTRACT RETENTION | CHECK |
| Apr 10, 2024 | Harbor | $500,000.00 | CONTRACT RETENTION | CHECK |
| Apr 10, 2024 | Harbor | $0.14 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Apr 10, 2024 | Harbor | $19.36 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Apr 10, 2024 | Harbor | $61,083.78 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Mar 27, 2024 | Harbor | $174,111.68 | MAINT. SVC. - DREDGING | CHECK |
| Mar 27, 2024 | Harbor | -$8,705.58 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | -$70.75 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | -$578.10 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | -$5,000.00 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | $31,501.51 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | $92,744.10 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | $11,561.93 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | -$64.78 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | $1,295.52 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | $747.50 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | -$1,575.08 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | $1,414.91 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | -$1,736.58 | CONTRACT RETENTION | CHECK |
| Feb 2, 2024 | Harbor | $100,000.00 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
| Feb 2, 2024 | Harbor | $34,731.54 | CAPITALIZED OTHER CONSTRUCTION SVC. | CHECK |
Other vendors serving Harbor
- US Bank $617,402,811
- U.S. Bank National Association $397,660,880
- Griffith Company $206,028,007
- Sully-Miller Contracting Co. $97,319,849
- US Bank National Association $95,555,255
- Herzog Contracting Corp. $87,037,853
- Dynalectric $86,060,175
- U.S. Bank Trust, N.a. $83,137,992
- City of Long Beach $25,458,900
- Motorola Solutions Inc $20,904,208
VerifiedData refreshed Sep 24, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data