KDC Inc is the 150th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in HIGH VOLTAGE CONVERSION PROGRAM spending. Its payments amount to 1.9% of everything the Transportation has paid vendors in that span. Payments to it fell 69.2% year over year.

Primary spending category: HIGH VOLTAGE CONVERSION PROGRAM

$115,197,356total received
1,086payments
6agencies
Jul 26, 2011Jun 17, 2025first / last payment
Follow this vendorGet an email when Los Angeles publishes new payments to KDC Inc. No spam.

Payments by fiscal year

FY 2025$834,664
FY 2024$2,709,468
FY 2023$3,874,754
FY 2022$6,745,667
FY 2021$7,846,631
FY 2020$7,865,228
FY 2019$12,705,417
FY 2018$12,118,290
FY 2017$8,150,287
FY 2016$4,051,135
FY 2015$5,644,086
FY 2014$8,640,288
FY 2013$17,027,974
FY 2012$16,983,468

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Transportation3$681,981
FY 2025Non_departmental2$147,933
FY 2025Fire1$4,750
FY 2024Non_departmental26$1,429,267
FY 2024Transportation13$1,280,201
FY 2023Non_departmental36$2,119,996
FY 2023Transportation44$1,751,765
FY 2023Economic and Workforce Development Department1$2,993
FY 2022Non_departmental43$4,904,920
FY 2022Transportation23$1,628,371
FY 2022Economic and Workforce Development Department3$212,376
FY 2021Non_departmental42$5,903,748
FY 2021Transportation32$1,942,883
FY 2020Transportation30$4,617,956
FY 2020Non_departmental30$3,247,272
FY 2019Non_departmental48$8,950,686
FY 2019Transportation44$3,754,731
FY 2018Non_departmental37$6,352,878
FY 2018Transportation65$5,765,412
FY 2017Appropriations to Special Purpose Fund32$4,184,521
FY 2017Transportation40$3,965,765
FY 2016Transportation35$3,269,956
FY 2016Appropriations to Special Purpose Fund3$781,179
FY 2015Transportation60$5,528,643
FY 2015Appropriations to Special Purpose Fund4$115,442
FY 2014Transportation139$8,344,867
FY 2014Appropriations to Special Purpose Fund4$295,421
FY 2013Transportation127$10,452,207
FY 2013Appropriations to Special Purpose Fund5$6,507,039
FY 2013Public Works - Street Lighting3$68,729
FY 2012Transportation98$15,831,907
FY 2012Appropriations to Special Purpose Fund8$666,977
FY 2012Public Works - Street Lighting5$484,585
Total1,086$115,197,356

What the payments were for

Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
FASHION DISTRICT STREETSCAPE1$9,640Nov 19, 2018 Nov 19, 2018
DCT ELECTRICAL POWER SYSTEM MODIFICATIONS33$8,868,393Oct 2, 2017 Feb 2, 2022
HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNAL6$881,902Nov 2, 2016 Nov 2, 2017
SIDEWALK REPAIR CONTRACTUAL SERVICES1$8,686Aug 30, 2018 Aug 30, 2018
ARTHUR SYNDER- N HOLLYWOOD1$856Jun 5, 2013 Jun 5, 2013
ATSAC WILMINGTON25$8,337,957Sep 16, 2011 Oct 1, 2014
ATSAC PROJECT FRONT FUNDING23$7,426,867Jan 17, 2012 Aug 25, 2014
ARRA-TRANSPORTATION PROJECT32$709,850Aug 15, 2011 May 20, 2013
11TH ST/SAN PEDRO ST1$69Jun 5, 2013 Jun 5, 2013
ATSAC CANOGA PARK48$6,613,159Jul 26, 2011 Feb 6, 2014
HSIP TRAFFIC SIGNAL UPGRADES7$65,050Jun 4, 2013 Apr 23, 2015
HSIP6-5 NEW SIGNALS IN HW & SP12$638,590Mar 2, 2021 Apr 27, 2023
HSH DIGESTER EXP1$6,375,000Oct 17, 2012 Oct 17, 2012
CONTRACTUAL SERVICES11$614,839Feb 16, 2012 Sep 27, 2021
LINKING SOUTH LA TO DOWNTOWN FIGUEROA CORRIDOR INFILL GR PRJ1$6,002Jan 31, 2019 Jan 31, 2019
HSIP6-5 NEW SIGNALS12$600,173Mar 2, 2021 Jul 27, 2023
HOOVER/UNION/23RD STREET TRIANGLE TRAFFIC SIGNALS1$60,000Feb 9, 2017 Feb 9, 2017
TRAFFIC SIGNAL SAFETY PROJECTS41$5,918,405Dec 12, 2018 Jan 17, 2023
CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS12$585,645Jun 16, 2023 Jun 20, 2024
N BRAODWAY-SICHEL ST TO AVE 181$57,049Mar 21, 2013 Mar 21, 2013
SIGNAL SUPPLIES AND REPAIRS1$5,600May 29, 2013 May 29, 2013
HSIP6-TRFIC SGNL MDFCTIONS AT 7 LOCATIONS IN SFV6$540,740Mar 2, 2021 Jul 18, 2022
HSIP5-TRFIC SGNL,3 RRFBS,1 RSED MDN-W/S LA12$538,210Aug 2, 2017 Jan 29, 2019
VISION ZERO TRAFFIC SIGNALS55$5,179,971Apr 3, 2019 Jun 20, 2024
HSIP CYCLE 4-64TH/MAIN ST & OTHER PROJ13$498,970Nov 25, 2013 Dec 18, 2014
PEDESTRIAN SAFETY DEVICES3$496,002May 28, 2014 Aug 25, 2014
ATSAC-PAC PALISDADES/CYNS1$4,800Jun 4, 2013 Jun 4, 2013
OFFICE AND ADMINISTRATIVE1$4,750Jun 17, 2025 Jun 17, 2025
SAFETEA-LU:NORTHWEST LIGHTING6$472,231Apr 29, 2014 Nov 21, 2014
DOWNTOWN LA TRANSIT PRIORITY S7$469,964Jul 13, 2012 Jun 24, 2013
I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADE10$465,903May 6, 2020 Sep 30, 2022
NEW TRAFFIC SIGNAL CENTRAL AVE AND 33RD STREET1$40,000May 31, 2017 May 31, 2017
CIEP/ ST LIGHTING PROJ5$381,948Aug 25, 2011 Jan 3, 2014
ATCS CENTRAL BUSINESS DISTRICT20$3,792,754Oct 19, 2017 Jul 15, 2019
WILSHIRE BRT PROJECT2$34,721May 10, 2018 Mar 17, 2020
ATSAC CENTER EQUIPMENT-CITIWID1$34,325Nov 4, 2011 Nov 4, 2011
METROLINK CROSSNG IMP WOODL AV10$340,162Aug 4, 2014 Jul 17, 2017
HSIP CYCLE 4-48TH STREET6$332,298Mar 14, 2014 May 18, 2015
ATCS SANTA MONICA FWY PHASE 117$3,184,543Jun 20, 2013 May 14, 2015
HSIP CYCLE 5 PICO/WOOSTER AND PICO/BEDFORD5$316,755Nov 16, 2016 Nov 2, 2017
PEDESTRIAN PLAN/PROGRAM103$3,108,932Mar 18, 2013 Jan 26, 2024
BEL AIR-UNIT 2 HV CONVERSION19$3,086,071May 1, 2018 Feb 23, 2021
HANJIN-CEN09-5080 WILSHIRE-GRAND REDEVELOPMENT PROJ3$30,523Nov 27, 2019 Sep 8, 2021
EXPOSITION LIGHT RAIL EXT1$30,110Oct 18, 2011 Oct 18, 2011
CEDARS-SINAI MEDICAL CTR-ATCS2$29,549May 20, 2013 Jun 5, 2013
PEDESTRIAN SAFETY PROGRAM5$292,329Jan 14, 2013 Oct 31, 2013
CONDUIT ONLY UNIT 317$2,882,905May 15, 2018 Aug 10, 2021
ATSAC SYSTEMS MAINTENANCE6$286,921Mar 12, 2018 Nov 22, 2022
ATCS SANTA MONICA FWY PHASE 219$2,850,038Dec 29, 2014 Dec 29, 2016
ATCS WILSHIRE EAST18$2,827,020Apr 28, 2015 Jan 5, 2017
HSIP CYCLE 4-GAFFEY10$282,229Dec 27, 2013 Dec 12, 2014
ATSAC RESEDA12$280,509Jul 26, 2011 Jan 15, 2013
ATSAC CENTRAL CITY EAST19$2,711,847Mar 6, 2017 Mar 17, 2020
NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNAL5$260,032Apr 25, 2016 Jun 19, 2017
RAILROAD CROSSING PROGRAM10$248,923Dec 10, 2014 May 31, 2016
HIGHWAY-RAIL GR CROSS IMPR PRO6$243,428Dec 12, 2012 Feb 1, 2021
ALHAMBRA AVENUE SAFETY IMPROVEMENTS7$236,237Mar 22, 2018 Mar 4, 2019
ATSAC N HOLLYWD-RONALD REAG FW3$23,532Nov 4, 2011 Jun 18, 2012
EXPR LANE 2 - VISION ZERO I-10 CORR. TRAFFIC S IMPR2$233,669Jul 26, 2018 Aug 13, 2018
HOLLYWOOD & ORANGE - CIM H&H1$2,257May 20, 2013 May 20, 2013
SAFETEA-LU/ OSO AVE & VNOWN ST INTRSCTION IMPROVEMENTS5$216,729Nov 2, 2016 Nov 2, 2017
RESEDA/CANOGA PARK TAXABLE4$215,369Oct 19, 2021 May 17, 2023
HSIP CYCLE 4-ROXFORD8$211,485Aug 2, 2017 Jan 4, 2019
SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION13$1,990,255Nov 1, 2016 May 23, 2018
ATCS ECHO PARK/SILVER LAKE PH212$1,968,090Apr 25, 2016 Aug 15, 2017
BICYCLE PLAN/PROGRAM - OTHER22$1,965,642Nov 21, 2018 Nov 22, 2022
ATSAC SAN PEDRO4$19,508Jul 26, 2011 May 23, 2012
SIGNAL IMPROVEMENT CONSTRUCTION4$191,958Mar 26, 2015 Dec 2, 2015
HSIP CYCLE 4-PACIFIC AVE & OTHER PROJ10$185,012Nov 25, 2013 Dec 12, 2014
REPAIR OF TRANSIT INFRASTRUCTURE ALONG THE S SEPULVEDA BLVD2$18,210Apr 22, 2019 Sep 14, 2021
ATCS WESTWOOD/WEST LA18$1,788,833Jun 11, 2013 Dec 12, 2014
MAR VISTA HV CONVERSION17$1,787,635Nov 10, 2016 Feb 13, 2020
HSIP TRAFFIC SIGNAL INSTALLTN7$178,376Jul 19, 2013 Apr 23, 2015
ATSAC-PLATT RANCH1$1,750Jan 15, 2013 Jan 15, 2013
TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS8$1,747,121Aug 22, 2023 Oct 21, 2024
HSIP CYCLE 5 -PED REFUGE,RRFDS, AND SFS ALONG TEMPLE8$173,308Aug 2, 2017 Jan 4, 2019
VENTURA/CAHUENGA BL CORR SP PL32$1,730,477Aug 10, 2011 Aug 2, 2013
HSIP TRAFFIC SIGNAL INST WESTE8$167,823Jun 4, 2013 Apr 23, 2015
HSIP I-5 & ROXFORD ON & OFF RA7$161,004Jul 19, 2013 Apr 23, 2015
TRAFFIC SIGNAL INSTALLATION2$154,591Sep 15, 2022 Dec 1, 2022
RESEDA - ARLETA HV CONVERSION12$1,475,275Dec 13, 2016 Jul 13, 2021
WESTWOOD/WEYBURN/KINROSS TRAFFIC SIGNAL4$139,583Mar 6, 2017 Jan 26, 2018
STAIRWAY AND WALKWAY LIGHTING UNIT 72$13,809Nov 3, 2016 Apr 3, 2017
SPEED FEEDBACK SIGNS1$13,000May 16, 2014 May 16, 2014
HSIP TRAFFIC SIGNAL INST DEARB9$126,282Jun 4, 2013 Apr 23, 2015
HIGH VOLTAGE CONVERSION PROGRAM120$12,311,467Apr 28, 2016 Jun 6, 2025
LAUSD TRAFFIC MITIGATION MEAS1$1,211Jun 5, 2013 Jun 5, 2013
WEST LA UNIT 3 - STM19$1,152,829Dec 5, 2011 Dec 30, 2014
IMPLEMENTATION OF BICYCLE AND PEDESTRIAN PROJECTS1$111,154Jun 12, 2013 Jun 12, 2013
SUNSET MILLENNIUM TRAFF MITIG3$109,713Apr 26, 2012 May 23, 2012
GDC-ATSAC COMMUNICATION MAINT1$10,018Aug 2, 2013 Aug 2, 2013
3RD ST./RAMPART & ALVARADO ST1$1Jun 5, 2013 Jun 5, 2013

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 6 of 6 payments$834,664
DateAgencyAmountCategoryPurchase order
Aug 27, 2024Transportation$412,469.33TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Jul 22, 2024Transportation$147,481.23TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Oct 21, 2024Transportation$122,030.40TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
May 14, 2025Non_departmental$84,393.27HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jun 6, 2025Non_departmental$63,540.02HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jun 17, 2025Fire$4,750.00OFFICE AND ADMINISTRATIVEPO GAEAE38AE25380055M
FY 2024top 20 of 39 payments$2,709,468
DateAgencyAmountCategoryPurchase order
Jun 7, 2024Transportation$414,923.81TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Sep 14, 2023Non_departmental$286,701.70CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSPO SC54CO23137378K
Aug 22, 2023Transportation$232,311.53TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Aug 30, 2023Non_departmental$207,832.19VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Mar 11, 2024Transportation$163,196.46TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Sep 13, 2023Transportation$148,307.97TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Dec 22, 2023Non_departmental$111,774.01VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Dec 28, 2023Transportation$106,400.14TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSPO SC94CO24142671K
Dec 22, 2023Non_departmental$99,215.53HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jul 31, 2023Transportation$94,891.21PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Jun 18, 2024Non_departmental$93,416.67VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Sep 20, 2023Non_departmental$93,222.22HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jun 20, 2024Non_departmental$90,345.86VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Jul 26, 2023Non_departmental$68,666.28HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jan 26, 2024Transportation$55,046.32PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Jan 10, 2024Non_departmental$52,020.63CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSPO SC54CO23137378K
Sep 7, 2023Transportation$38,652.46PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Jan 10, 2024Non_departmental$35,790.02CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSPO SC54CO23137378K
Jul 31, 2023Non_departmental$33,329.01VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Jan 8, 2024Non_departmental$26,860.67CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSPO SC54CO23137378K
FY 2023top 20 of 81 payments$3,874,754
DateAgencyAmountCategoryPurchase order
Sep 27, 2022Non_departmental$297,852.55HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Jul 7, 2022Transportation$267,706.32HSIP6-5 NEW SIGNALSPO SC94CO21137378K
Jan 26, 2023Transportation$205,195.89HSIP6-5 NEW SIGNALS IN HW & SPPO SC94CO21137378K
Dec 28, 2022Transportation$132,933.51HSIP6-5 NEW SIGNALS IN HW & SPPO SC94CO21137378K
Dec 21, 2022Non_departmental$131,892.30HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jul 20, 2022Non_departmental$129,610.51HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Nov 17, 2022Non_departmental$126,581.59VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Jan 13, 2023Non_departmental$124,054.80HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Nov 1, 2022Non_departmental$104,285.21HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Apr 19, 2023Non_departmental$101,812.53HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Dec 1, 2022Transportation$101,090.37TRAFFIC SIGNAL INSTALLATIONPO SC94CO21137378K
Mar 15, 2023Non_departmental$85,125.70HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Aug 15, 2022Non_departmental$83,952.22HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
May 22, 2023Non_departmental$83,616.39HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Dec 20, 2022Non_departmental$78,845.63HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
Jan 19, 2023Non_departmental$76,524.16VISION ZERO TRAFFIC SIGNALSPO SC50CO21137378K
Sep 14, 2022Transportation$75,628.26PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Feb 1, 2023Transportation$73,642.17PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Jul 29, 2022Transportation$65,421.55PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Sep 15, 2022Transportation$62,750.08HSIP6-5 NEW SIGNALS IN HW & SPPO SC94CO21137378K
FY 2022top 20 of 69 payments$6,745,667
DateAgencyAmountCategoryPurchase order
Jul 8, 2021Non_departmental$590,028.85HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Jul 28, 2021Non_departmental$497,716.40HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Jan 12, 2022Non_departmental$471,245.60HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Oct 26, 2021Non_departmental$387,386.25HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Jul 27, 2021Non_departmental$291,767.80HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Jun 3, 2022Transportation$258,105.99PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Aug 4, 2021Non_departmental$236,546.60HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134347K
Mar 10, 2022Transportation$233,688.32TRAFFIC SIGNAL SAFETY PROJECTS
Mar 4, 2022Transportation$233,688.32TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO20134240K
Aug 4, 2021Non_departmental$228,559.03DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Nov 2, 2021Non_departmental$224,374.80HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Jun 22, 2022Transportation$204,431.13PEDESTRIAN PLAN/PROGRAMPO SC94CO21137378K
Nov 10, 2021Non_departmental$174,703.10HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Sep 21, 2021Non_departmental$162,181.15HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Aug 19, 2021Transportation$157,433.72TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Oct 19, 2021Economic and Workforce Development Department$155,503.60RESEDA/CANOGA PARK TAXABLEPO SC22CO22134240K
Mar 31, 2022Transportation$153,522.43HSIP6-TRFIC SGNL MDFCTIONS AT 7 LOCATIONS IN SFVPO SC94CO21137378K
Jan 5, 2022Non_departmental$146,946.47HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134347K
Oct 22, 2021Transportation$141,288.27I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADEPO SC94CO20134240K
May 18, 2022Non_departmental$140,364.68HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO22139923K
FY 2021top 20 of 74 payments$7,846,631
DateAgencyAmountCategoryPurchase order
Nov 24, 2020Non_departmental$678,911.77VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Sep 22, 2020Non_departmental$565,618.05VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Oct 21, 2020Non_departmental$563,075.93VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Sep 17, 2020Non_departmental$349,555.94VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Dec 21, 2020Non_departmental$301,320.53VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Apr 5, 2021Non_departmental$276,486.10HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136673K
Aug 11, 2020Transportation$271,206.48VISION ZERO TRAFFIC SIGNALSPO SC94CO20134240K
Jul 21, 2020Transportation$264,463.49TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO20134240K
Jan 6, 2021Non_departmental$254,314.05CONDUIT ONLY UNIT 3PO SC50CO18130853K
Sep 4, 2020Non_departmental$243,509.19VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Mar 4, 2021Non_departmental$213,289.25HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Mar 3, 2021Non_departmental$190,380.00HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Oct 29, 2020Non_departmental$178,298.82VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Jun 1, 2021Non_departmental$177,197.80HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Jul 8, 2020Non_departmental$173,664.75HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Mar 30, 2021Non_departmental$167,661.70HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO21136736K
Aug 11, 2020Transportation$155,990.00ATSAC SYSTEMS MAINTENANCEPO SC94CO20134240K
Jan 25, 2021Non_departmental$150,511.11VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Oct 2, 2020Non_departmental$148,760.14VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
Apr 8, 2021Non_departmental$126,792.88VISION ZERO TRAFFIC SIGNALSPO SC50CO21134240K
FY 2020top 20 of 60 payments$7,865,228
DateAgencyAmountCategoryPurchase order
Aug 23, 2019Transportation$872,112.94TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Aug 23, 2019Transportation$556,343.66TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Sep 4, 2019Non_departmental$440,808.42DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Dec 20, 2019Transportation$408,985.71BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
Feb 28, 2020Non_departmental$401,194.50HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Sep 6, 2019Non_departmental$392,273.53DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Dec 2, 2019Transportation$389,623.50BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
Sep 27, 2019Transportation$350,140.93TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Feb 12, 2020Non_departmental$285,384.84DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jun 4, 2020Transportation$264,468.33TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO20134240K
Oct 21, 2019Transportation$264,152.61TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Dec 2, 2019Transportation$239,439.51BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
Jul 23, 2019Transportation$218,664.50BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
Feb 19, 2020Transportation$199,001.40BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
Aug 8, 2019Non_departmental$194,353.76CONDUIT ONLY UNIT 3PO SC50CO18130853K
Jun 23, 2020Transportation$176,143.12I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADEPO SC94CO20134240K
Feb 10, 2020Non_departmental$171,339.15HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134348K
Feb 19, 2020Transportation$146,780.40BICYCLE PLAN/PROGRAM - OTHERPO SC94CO19131594K
May 21, 2020Non_departmental$130,846.01BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
Jan 2, 2020Non_departmental$129,868.80HIGH VOLTAGE CONVERSION PROGRAMPO SC50CO20134347K
FY 2019top 20 of 92 payments$12,705,417
DateAgencyAmountCategoryPurchase order
Aug 24, 2018Non_departmental$887,843.19DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jun 13, 2019Transportation$619,638.63TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Oct 2, 2018Non_departmental$516,955.37BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
Aug 17, 2018Non_departmental$508,781.16DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jun 12, 2019Transportation$486,710.30TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Oct 2, 2018Non_departmental$480,265.82DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Nov 19, 2018Non_departmental$416,594.76DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jul 26, 2018Transportation$353,566.20ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
Apr 19, 2019Non_departmental$344,575.30CONDUIT ONLY UNIT 3PO SC50CO18130853K
Oct 2, 2018Non_departmental$328,771.10CONDUIT ONLY UNIT 3PO SC50CO18130853K
Apr 15, 2019Transportation$306,271.83TRAFFIC SIGNAL SAFETY PROJECTSPO SC94CO19131594K
Jan 30, 2019Non_departmental$300,921.82DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jul 3, 2018Non_departmental$280,028.65BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
Nov 9, 2018Non_departmental$279,000.20BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
Jan 31, 2019Non_departmental$278,900.05CONDUIT ONLY UNIT 3PO SC50CO18130853K
May 15, 2019Non_departmental$278,661.28DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jan 30, 2019Non_departmental$242,100.70DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jun 24, 2019Non_departmental$220,188.24CONDUIT ONLY UNIT 3PO SC50CO18130853K
Mar 8, 2019Non_departmental$214,052.10CONDUIT ONLY UNIT 3PO SC50CO18130853K
May 8, 2019Non_departmental$206,659.72BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
FY 2018top 20 of 102 payments$12,118,290
DateAgencyAmountCategoryPurchase order
Jul 18, 2017Non_departmental$887,114.38RESEDA - ARLETA HV CONVERSIONPO SC50MSACO17128054K
Mar 27, 2018Non_departmental$728,393.23DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Sep 1, 2017Transportation$574,329.45ATSAC CENTRAL CITY EASTPO SC94MSACO17127985K
Apr 18, 2018Non_departmental$556,117.54DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Jun 25, 2018Non_departmental$531,747.99DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Dec 4, 2017Transportation$471,739.36ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
May 21, 2018Non_departmental$467,961.70DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Mar 27, 2018Transportation$467,184.41ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
Oct 19, 2017Transportation$423,727.88ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
May 15, 2018Non_departmental$362,398.93CONDUIT ONLY UNIT 3PO SC50CO18130853K
May 4, 2018Transportation$339,149.77ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
Apr 27, 2018Non_departmental$325,100.45SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO SC50MSACO17128028K
Feb 27, 2018Non_departmental$295,999.89DCT ELECTRICAL POWER SYSTEM MODIFICATIONSPO SC50CO18129307K
Oct 31, 2017Transportation$260,020.37ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
Jul 25, 2017Transportation$256,986.78ATSAC CENTRAL CITY EASTPO SC94MSACO17127985K
May 29, 2018Non_departmental$255,323.90BEL AIR-UNIT 2 HV CONVERSIONPO SC50CO18130834K
Apr 18, 2018Transportation$254,159.58ATCS CENTRAL BUSINESS DISTRICTPO SC94CO18129230K
Nov 2, 2017Transportation$233,089.60ATSAC CENTRAL CITY EASTPO SC94MSACO17127985K
Jul 28, 2017Non_departmental$226,349.85MAR VISTA HV CONVERSIONPO SC50MSACO17128029K
Aug 2, 2017Transportation$219,686.74ATSAC CENTRAL CITY EASTPO SC94MSACO17127985K
FY 2017top 20 of 72 payments$8,150,287
DateAgencyAmountCategoryPurchase order
Apr 4, 2017Transportation$438,137.14ATSAC CENTRAL CITY EASTPO GAE94CO17127985K
Jul 7, 2016Transportation$353,830.80ATCS ECHO PARK/SILVER LAKE PH2PO GAE94CO16126654K
Nov 16, 2016Transportation$339,420.89HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNALPO GAE94CO17127925K
Aug 10, 2016Transportation$311,122.27ATCS ECHO PARK/SILVER LAKE PH2PO GAE94CO16126654K
May 24, 2017Appropriations to Special Purpose Fund$306,359.80MAR VISTA HV CONVERSIONPO GAE50CO17128029K
Jun 22, 2017Appropriations to Special Purpose Fund$305,650.77HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO17128332K
Sep 1, 2016Appropriations to Special Purpose Fund$255,591.80HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO16126998K
Jun 26, 2017Appropriations to Special Purpose Fund$254,595.25MAR VISTA HV CONVERSIONPO GAE50CO17128029K
Nov 2, 2016Transportation$244,732.78HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNALPO GAE94CO17127925K
Mar 24, 2017Appropriations to Special Purpose Fund$227,110.06SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
Apr 26, 2017Appropriations to Special Purpose Fund$215,255.29SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
May 30, 2017Appropriations to Special Purpose Fund$203,487.20SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
Dec 13, 2016Appropriations to Special Purpose Fund$202,903.85RESEDA - ARLETA HV CONVERSIONPO GAE50CO17128054K
Nov 1, 2016Appropriations to Special Purpose Fund$198,753.30SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
Jun 26, 2017Appropriations to Special Purpose Fund$188,202.59SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
Jul 25, 2016Appropriations to Special Purpose Fund$179,266.90HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO16126998K
Nov 16, 2016Transportation$161,455.64HSIP CYCLE 5 PICO/WOOSTER AND PICO/BEDFORDPO GAE94CO17127925K
Feb 27, 2017Appropriations to Special Purpose Fund$154,204.88SUN VALLEY - NORTH HOLLYWOOD HV CONVERSIONPO GAE50CO17128028K
Feb 9, 2017Appropriations to Special Purpose Fund$153,860.10MAR VISTA HV CONVERSIONPO GAE50CO17128029K
Mar 6, 2017Transportation$145,926.44ATSAC CENTRAL CITY EASTPO GAE94CO17127985K
FY 2016top 20 of 38 payments$4,051,135
DateAgencyAmountCategoryPurchase order
Aug 28, 2015Transportation$474,896.27ATCS WILSHIRE EASTPO GAE94CO15124973K
May 9, 2016Transportation$445,361.23ATCS ECHO PARK/SILVER LAKE PH2PO GAE94CO16126654K
Apr 25, 2016Transportation$327,101.35ATCS ECHO PARK/SILVER LAKE PH2PO GAE94CO16126654K
Jul 10, 2015Transportation$316,098.28ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Jun 8, 2016Appropriations to Special Purpose Fund$272,806.75HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO16126998K
Jun 27, 2016Appropriations to Special Purpose Fund$257,729.30HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO16126998K
Apr 28, 2016Appropriations to Special Purpose Fund$250,643.25HIGH VOLTAGE CONVERSION PROGRAMPO GAE50CO16126998K
Sep 10, 2015Transportation$244,148.64ATCS WILSHIRE EASTPO GAE94CO15124973K
Jun 20, 2016Transportation$196,716.21ATCS ECHO PARK/SILVER LAKE PH2PO GAE94CO16126654K
Oct 19, 2015Transportation$150,532.82ATCS WILSHIRE EASTPO GAE94CO15124973K
Oct 9, 2015Transportation$121,137.51ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Dec 2, 2015Transportation$119,253.30ATCS WILSHIRE EASTPO GAE94CO15124973K
May 9, 2016Transportation$108,195.75NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNALPO GAE94CO16126654K
May 31, 2016Transportation$86,606.19ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Apr 25, 2016Transportation$84,152.25NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNALPO GAE94CO16126654K
Oct 9, 2015Transportation$81,463.65ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Oct 9, 2015Transportation$59,946.00RAILROAD CROSSING PROGRAMPO GAE94CO15124556K
Jun 9, 2016Transportation$54,932.10ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Jan 11, 2016Transportation$51,665.69ATCS WILSHIRE EASTPO GAE94CO15124973K
Dec 2, 2015Transportation$48,800.00CONTRACTUAL SERVICESPO GAE94CO16124973K
FY 2015top 20 of 64 payments$5,644,086
DateAgencyAmountCategoryPurchase order
Jun 24, 2015Transportation$546,925.84ATCS WILSHIRE EASTPO GAE94CO15124973K
Jun 22, 2015Transportation$506,573.12ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Mar 26, 2015Transportation$447,922.15ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Oct 1, 2014Transportation$361,985.30ATSAC WILMINGTONPO GAE94CO12118833K
May 27, 2015Transportation$357,115.19ATCS WILSHIRE EASTPO GAE94CO15124973K
Aug 25, 2014Transportation$349,353.22ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Jun 16, 2015Transportation$344,719.10ATCS WILSHIRE EASTPO GAE94CO15124973K
May 28, 2015Transportation$329,546.82ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Jan 20, 2015Transportation$278,003.30ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
May 11, 2015Transportation$239,332.58ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Mar 24, 2015Transportation$237,718.86ATCS SANTA MONICA FWY PHASE 2PO GAE94CO15124556K
Apr 13, 2015Transportation$191,442.86METROLINK CROSSNG IMP WOODL AVPO GAE94CO15123393K
May 11, 2015Transportation$120,000.00SIGNAL IMPROVEMENT CONSTRUCTIONPO GAE94CO15124556K
Jan 6, 2015Transportation$111,201.75ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Jan 16, 2015Transportation$100,000.00ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Dec 12, 2014Transportation$74,525.34ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Aug 7, 2014Appropriations to Special Purpose Fund$73,668.68WEST LA UNIT 3 - STMPO GAE50CO12119002K
Dec 29, 2014Transportation$72,756.18RAILROAD CROSSING PROGRAMPO GAE94CO15124556K
Aug 25, 2014Transportation$68,220.70PEDESTRIAN SAFETY DEVICESPO GAE94CO12119656K
Jun 15, 2015Transportation$67,448.26METROLINK CROSSNG IMP WOODL AVPO GAE94CO15123393K
FY 2014top 20 of 143 payments$8,640,288
DateAgencyAmountCategoryPurchase order
Sep 20, 2013Transportation$552,077.35ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Jan 16, 2014Transportation$505,531.97ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Aug 28, 2013Transportation$406,947.39ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Nov 6, 2013Transportation$309,709.31ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Apr 28, 2014Transportation$279,122.92ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
May 28, 2014Transportation$262,367.92PEDESTRIAN SAFETY DEVICESPO GAE94CO12119656K
Apr 28, 2014Transportation$240,077.84ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Sep 20, 2013Transportation$233,907.78ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Dec 2, 2013Transportation$226,746.66ATSAC CANOGA PARKPO GAE94CO12118832K
Apr 16, 2014Transportation$207,694.68ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Nov 6, 2013Transportation$192,439.89ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Dec 3, 2013Transportation$183,465.83ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Feb 7, 2014Transportation$180,054.17ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Aug 27, 2013Transportation$179,236.18ATSAC CANOGA PARKPO GAE94CO12118832K
Aug 27, 2013Transportation$175,373.27ATCS WESTWOOD/WEST LAPO GAE94CO13121861K
Feb 7, 2014Transportation$174,309.28ATCS SANTA MONICA FWY PHASE 1PO GAE94CO13121860K
Jun 2, 2014Transportation$171,161.02SAFETEA-LU:NORTHWEST LIGHTINGPO GAE94CO14123531K
Mar 14, 2014Transportation$169,023.81HSIP CYCLE 4-48TH STREETPO GAE94CO14122760K
May 28, 2014Transportation$165,413.10PEDESTRIAN SAFETY DEVICESPO GAE94CO12119656K
Jun 4, 2014Appropriations to Special Purpose Fund$164,847.87WEST LA UNIT 3 - STMPO GAE50CO12119002K
FY 2013top 20 of 135 payments$17,027,974
DateAgencyAmountCategoryPurchase order
Oct 17, 2012Appropriations to Special Purpose Fund$6,375,000.00HSH DIGESTER EXPPO GAENV50CF13092850M
Oct 11, 2012Transportation$1,082,575.82ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Jul 17, 2012Transportation$937,415.64ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Jul 20, 2012Transportation$917,692.40ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Nov 7, 2012Transportation$804,688.19ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Sep 18, 2012Transportation$475,418.15ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Sep 24, 2012Transportation$449,163.12ATSAC WILMINGTONPO GAE94CO12118833K
Jul 23, 2012Transportation$418,415.21ATSAC CANOGA PARKPO GAE94CO12118832K
Jul 23, 2012Transportation$396,188.69ATSAC WILMINGTONPO GAE94CO12118833K
Aug 23, 2012Transportation$374,633.35ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Feb 8, 2013Transportation$352,336.34ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Oct 22, 2012Transportation$341,648.97ATSAC WILMINGTONPO GAE94CO12118833K
Aug 14, 2012Transportation$223,544.02DOWNTOWN LA TRANSIT PRIORITY SPO GAE94CO12120305M
Aug 23, 2012Transportation$223,375.86ATSAC WILMINGTONPO GAE94CO12118833K
Aug 20, 2012Transportation$179,050.24ATSAC CANOGA PARKPO GAE94CO12118832K
Dec 12, 2012Transportation$163,800.00HIGHWAY-RAIL GR CROSS IMPR PROPO GAE94CO12118832K
Aug 14, 2012Transportation$141,955.65DOWNTOWN LA TRANSIT PRIORITY SPO GAE94CO12120305M
Aug 23, 2012Transportation$136,487.51ATSAC WILMINGTONPO GAE94CO12118833K
Oct 11, 2012Transportation$132,545.03ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Jan 14, 2013Transportation$131,101.00PEDESTRIAN SAFETY PROGRAMPO GAE94CO12118832K
FY 2012top 20 of 111 payments$16,983,468
DateAgencyAmountCategoryPurchase order
Mar 27, 2012Transportation$735,086.06ATSAC WILMINGTONPO GAE94CO12118833K
Feb 29, 2012Transportation$709,284.03ATSAC WILMINGTONPO GAE94CO12118833K
Jun 18, 2012Transportation$697,879.21ATSAC WILMINGTONPO GAE94CO12118833K
Jan 10, 2012Transportation$662,091.86ATSAC WILMINGTONPO GAE94CO12118833K
Nov 23, 2011Transportation$661,685.06ATSAC WILMINGTONPO GAE94CO12118833K
Apr 16, 2012Transportation$651,010.09ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Dec 28, 2011Transportation$629,365.77ATSAC CANOGA PARKPO GAE94CO12118832K
May 11, 2012Transportation$624,696.10ATSAC PROJECT FRONT FUNDINGPO GAE94CO12119656K
Jan 17, 2012Transportation$614,151.93ATSAC WILMINGTONPO GAE94CO12118833K
Jun 18, 2012Transportation$602,871.53ATSAC CANOGA PARKPO GAE94CO12118832K
Apr 26, 2012Transportation$529,297.35ATSAC WILMINGTONPO GAE94CO12118833K
May 22, 2012Transportation$526,337.87ATSAC CANOGA PARKPO GAE94CO12118832K
Nov 23, 2011Transportation$504,762.00ATSAC CANOGA PARKPO GAE94CO12118832K
Apr 26, 2012Transportation$493,711.25ATSAC CANOGA PARKPO GAE94CO12118832K
May 23, 2012Transportation$471,627.55ATSAC WILMINGTONPO GAE94CO12118833K
Feb 22, 2012Transportation$468,461.34ATSAC CANOGA PARKPO GAE94CO12118832K
Mar 23, 2012Transportation$465,645.29ATSAC CANOGA PARKPO GAE94CO12118832K
Sep 26, 2011Transportation$426,634.23ATSAC CANOGA PARKPO GAE94CO12118832K
Jan 31, 2012Transportation$384,894.09ATSAC CANOGA PARKPO GAE94CO12118832K
Oct 18, 2011Transportation$370,894.38ATSAC WILMINGTONPO GAE94CO12118833K

Recent payments

DateAgencyAmountCategoryMethod
Jun 17, 2025Fire$4,750.00OFFICE AND ADMINISTRATIVECHECK
Jun 6, 2025Non_departmental$63,540.02HIGH VOLTAGE CONVERSION PROGRAMCHECK
May 14, 2025Non_departmental$84,393.27HIGH VOLTAGE CONVERSION PROGRAMCHECK
Oct 21, 2024Transportation$122,030.40TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Aug 27, 2024Transportation$412,469.33TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Jul 22, 2024Transportation$147,481.23TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Jun 20, 2024Non_departmental$26,850.38CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jun 20, 2024Non_departmental$13,998.52CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jun 20, 2024Non_departmental$1,966.61CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jun 20, 2024Non_departmental$90,345.86VISION ZERO TRAFFIC SIGNALSCHECK
Jun 18, 2024Non_departmental$93,416.67VISION ZERO TRAFFIC SIGNALSCHECK
Jun 7, 2024Transportation$414,923.81TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Mar 11, 2024Transportation$163,196.46TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Jan 26, 2024Transportation$55,046.32PEDESTRIAN PLAN/PROGRAMCHECK
Jan 12, 2024Transportation$402.56PEDESTRIAN PLAN/PROGRAMCHECK
Jan 12, 2024Transportation$4,691.38PEDESTRIAN PLAN/PROGRAMCHECK
Jan 10, 2024Non_departmental$52,020.63CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jan 10, 2024Non_departmental$35,790.02CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jan 10, 2024Non_departmental$12,680.12CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jan 8, 2024Non_departmental$26,860.67CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTSCHECK
Jan 4, 2024Non_departmental$15,538.45VISION ZERO TRAFFIC SIGNALSCHECK
Dec 28, 2023Transportation$106,400.14TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTSCHECK
Dec 28, 2023Non_departmental$17,775.25VISION ZERO TRAFFIC SIGNALSCHECK
Dec 22, 2023Non_departmental$10,151.08VISION ZERO TRAFFIC SIGNALSCHECK
Dec 22, 2023Non_departmental$99,215.53HIGH VOLTAGE CONVERSION PROGRAMCHECK