KDC Inc is the 150th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in HIGH VOLTAGE CONVERSION PROGRAM spending. Its payments amount to 1.9% of everything the Transportation has paid vendors in that span. Payments to it fell 69.2% year over year.
Primary spending category: HIGH VOLTAGE CONVERSION PROGRAM
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| FASHION DISTRICT STREETSCAPE | 1 | $9,640 | Nov 19, 2018 – Nov 19, 2018 |
| DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | 33 | $8,868,393 | Oct 2, 2017 – Feb 2, 2022 |
| HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNAL | 6 | $881,902 | Nov 2, 2016 – Nov 2, 2017 |
| SIDEWALK REPAIR CONTRACTUAL SERVICES | 1 | $8,686 | Aug 30, 2018 – Aug 30, 2018 |
| ARTHUR SYNDER- N HOLLYWOOD | 1 | $856 | Jun 5, 2013 – Jun 5, 2013 |
| ATSAC WILMINGTON | 25 | $8,337,957 | Sep 16, 2011 – Oct 1, 2014 |
| ATSAC PROJECT FRONT FUNDING | 23 | $7,426,867 | Jan 17, 2012 – Aug 25, 2014 |
| ARRA-TRANSPORTATION PROJECT | 32 | $709,850 | Aug 15, 2011 – May 20, 2013 |
| 11TH ST/SAN PEDRO ST | 1 | $69 | Jun 5, 2013 – Jun 5, 2013 |
| ATSAC CANOGA PARK | 48 | $6,613,159 | Jul 26, 2011 – Feb 6, 2014 |
| HSIP TRAFFIC SIGNAL UPGRADES | 7 | $65,050 | Jun 4, 2013 – Apr 23, 2015 |
| HSIP6-5 NEW SIGNALS IN HW & SP | 12 | $638,590 | Mar 2, 2021 – Apr 27, 2023 |
| HSH DIGESTER EXP | 1 | $6,375,000 | Oct 17, 2012 – Oct 17, 2012 |
| CONTRACTUAL SERVICES | 11 | $614,839 | Feb 16, 2012 – Sep 27, 2021 |
| LINKING SOUTH LA TO DOWNTOWN FIGUEROA CORRIDOR INFILL GR PRJ | 1 | $6,002 | Jan 31, 2019 – Jan 31, 2019 |
| HSIP6-5 NEW SIGNALS | 12 | $600,173 | Mar 2, 2021 – Jul 27, 2023 |
| HOOVER/UNION/23RD STREET TRIANGLE TRAFFIC SIGNALS | 1 | $60,000 | Feb 9, 2017 – Feb 9, 2017 |
| TRAFFIC SIGNAL SAFETY PROJECTS | 41 | $5,918,405 | Dec 12, 2018 – Jan 17, 2023 |
| CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | 12 | $585,645 | Jun 16, 2023 – Jun 20, 2024 |
| N BRAODWAY-SICHEL ST TO AVE 18 | 1 | $57,049 | Mar 21, 2013 – Mar 21, 2013 |
| SIGNAL SUPPLIES AND REPAIRS | 1 | $5,600 | May 29, 2013 – May 29, 2013 |
| HSIP6-TRFIC SGNL MDFCTIONS AT 7 LOCATIONS IN SFV | 6 | $540,740 | Mar 2, 2021 – Jul 18, 2022 |
| HSIP5-TRFIC SGNL,3 RRFBS,1 RSED MDN-W/S LA | 12 | $538,210 | Aug 2, 2017 – Jan 29, 2019 |
| VISION ZERO TRAFFIC SIGNALS | 55 | $5,179,971 | Apr 3, 2019 – Jun 20, 2024 |
| HSIP CYCLE 4-64TH/MAIN ST & OTHER PROJ | 13 | $498,970 | Nov 25, 2013 – Dec 18, 2014 |
| PEDESTRIAN SAFETY DEVICES | 3 | $496,002 | May 28, 2014 – Aug 25, 2014 |
| ATSAC-PAC PALISDADES/CYNS | 1 | $4,800 | Jun 4, 2013 – Jun 4, 2013 |
| OFFICE AND ADMINISTRATIVE | 1 | $4,750 | Jun 17, 2025 – Jun 17, 2025 |
| SAFETEA-LU:NORTHWEST LIGHTING | 6 | $472,231 | Apr 29, 2014 – Nov 21, 2014 |
| DOWNTOWN LA TRANSIT PRIORITY S | 7 | $469,964 | Jul 13, 2012 – Jun 24, 2013 |
| I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADE | 10 | $465,903 | May 6, 2020 – Sep 30, 2022 |
| NEW TRAFFIC SIGNAL CENTRAL AVE AND 33RD STREET | 1 | $40,000 | May 31, 2017 – May 31, 2017 |
| CIEP/ ST LIGHTING PROJ | 5 | $381,948 | Aug 25, 2011 – Jan 3, 2014 |
| ATCS CENTRAL BUSINESS DISTRICT | 20 | $3,792,754 | Oct 19, 2017 – Jul 15, 2019 |
| WILSHIRE BRT PROJECT | 2 | $34,721 | May 10, 2018 – Mar 17, 2020 |
| ATSAC CENTER EQUIPMENT-CITIWID | 1 | $34,325 | Nov 4, 2011 – Nov 4, 2011 |
| METROLINK CROSSNG IMP WOODL AV | 10 | $340,162 | Aug 4, 2014 – Jul 17, 2017 |
| HSIP CYCLE 4-48TH STREET | 6 | $332,298 | Mar 14, 2014 – May 18, 2015 |
| ATCS SANTA MONICA FWY PHASE 1 | 17 | $3,184,543 | Jun 20, 2013 – May 14, 2015 |
| HSIP CYCLE 5 PICO/WOOSTER AND PICO/BEDFORD | 5 | $316,755 | Nov 16, 2016 – Nov 2, 2017 |
| PEDESTRIAN PLAN/PROGRAM | 103 | $3,108,932 | Mar 18, 2013 – Jan 26, 2024 |
| BEL AIR-UNIT 2 HV CONVERSION | 19 | $3,086,071 | May 1, 2018 – Feb 23, 2021 |
| HANJIN-CEN09-5080 WILSHIRE-GRAND REDEVELOPMENT PROJ | 3 | $30,523 | Nov 27, 2019 – Sep 8, 2021 |
| EXPOSITION LIGHT RAIL EXT | 1 | $30,110 | Oct 18, 2011 – Oct 18, 2011 |
| CEDARS-SINAI MEDICAL CTR-ATCS | 2 | $29,549 | May 20, 2013 – Jun 5, 2013 |
| PEDESTRIAN SAFETY PROGRAM | 5 | $292,329 | Jan 14, 2013 – Oct 31, 2013 |
| CONDUIT ONLY UNIT 3 | 17 | $2,882,905 | May 15, 2018 – Aug 10, 2021 |
| ATSAC SYSTEMS MAINTENANCE | 6 | $286,921 | Mar 12, 2018 – Nov 22, 2022 |
| ATCS SANTA MONICA FWY PHASE 2 | 19 | $2,850,038 | Dec 29, 2014 – Dec 29, 2016 |
| ATCS WILSHIRE EAST | 18 | $2,827,020 | Apr 28, 2015 – Jan 5, 2017 |
| HSIP CYCLE 4-GAFFEY | 10 | $282,229 | Dec 27, 2013 – Dec 12, 2014 |
| ATSAC RESEDA | 12 | $280,509 | Jul 26, 2011 – Jan 15, 2013 |
| ATSAC CENTRAL CITY EAST | 19 | $2,711,847 | Mar 6, 2017 – Mar 17, 2020 |
| NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNAL | 5 | $260,032 | Apr 25, 2016 – Jun 19, 2017 |
| RAILROAD CROSSING PROGRAM | 10 | $248,923 | Dec 10, 2014 – May 31, 2016 |
| HIGHWAY-RAIL GR CROSS IMPR PRO | 6 | $243,428 | Dec 12, 2012 – Feb 1, 2021 |
| ALHAMBRA AVENUE SAFETY IMPROVEMENTS | 7 | $236,237 | Mar 22, 2018 – Mar 4, 2019 |
| ATSAC N HOLLYWD-RONALD REAG FW | 3 | $23,532 | Nov 4, 2011 – Jun 18, 2012 |
| EXPR LANE 2 - VISION ZERO I-10 CORR. TRAFFIC S IMPR | 2 | $233,669 | Jul 26, 2018 – Aug 13, 2018 |
| HOLLYWOOD & ORANGE - CIM H&H | 1 | $2,257 | May 20, 2013 – May 20, 2013 |
| SAFETEA-LU/ OSO AVE & VNOWN ST INTRSCTION IMPROVEMENTS | 5 | $216,729 | Nov 2, 2016 – Nov 2, 2017 |
| RESEDA/CANOGA PARK TAXABLE | 4 | $215,369 | Oct 19, 2021 – May 17, 2023 |
| HSIP CYCLE 4-ROXFORD | 8 | $211,485 | Aug 2, 2017 – Jan 4, 2019 |
| SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | 13 | $1,990,255 | Nov 1, 2016 – May 23, 2018 |
| ATCS ECHO PARK/SILVER LAKE PH2 | 12 | $1,968,090 | Apr 25, 2016 – Aug 15, 2017 |
| BICYCLE PLAN/PROGRAM - OTHER | 22 | $1,965,642 | Nov 21, 2018 – Nov 22, 2022 |
| ATSAC SAN PEDRO | 4 | $19,508 | Jul 26, 2011 – May 23, 2012 |
| SIGNAL IMPROVEMENT CONSTRUCTION | 4 | $191,958 | Mar 26, 2015 – Dec 2, 2015 |
| HSIP CYCLE 4-PACIFIC AVE & OTHER PROJ | 10 | $185,012 | Nov 25, 2013 – Dec 12, 2014 |
| REPAIR OF TRANSIT INFRASTRUCTURE ALONG THE S SEPULVEDA BLVD | 2 | $18,210 | Apr 22, 2019 – Sep 14, 2021 |
| ATCS WESTWOOD/WEST LA | 18 | $1,788,833 | Jun 11, 2013 – Dec 12, 2014 |
| MAR VISTA HV CONVERSION | 17 | $1,787,635 | Nov 10, 2016 – Feb 13, 2020 |
| HSIP TRAFFIC SIGNAL INSTALLTN | 7 | $178,376 | Jul 19, 2013 – Apr 23, 2015 |
| ATSAC-PLATT RANCH | 1 | $1,750 | Jan 15, 2013 – Jan 15, 2013 |
| TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | 8 | $1,747,121 | Aug 22, 2023 – Oct 21, 2024 |
| HSIP CYCLE 5 -PED REFUGE,RRFDS, AND SFS ALONG TEMPLE | 8 | $173,308 | Aug 2, 2017 – Jan 4, 2019 |
| VENTURA/CAHUENGA BL CORR SP PL | 32 | $1,730,477 | Aug 10, 2011 – Aug 2, 2013 |
| HSIP TRAFFIC SIGNAL INST WESTE | 8 | $167,823 | Jun 4, 2013 – Apr 23, 2015 |
| HSIP I-5 & ROXFORD ON & OFF RA | 7 | $161,004 | Jul 19, 2013 – Apr 23, 2015 |
| TRAFFIC SIGNAL INSTALLATION | 2 | $154,591 | Sep 15, 2022 – Dec 1, 2022 |
| RESEDA - ARLETA HV CONVERSION | 12 | $1,475,275 | Dec 13, 2016 – Jul 13, 2021 |
| WESTWOOD/WEYBURN/KINROSS TRAFFIC SIGNAL | 4 | $139,583 | Mar 6, 2017 – Jan 26, 2018 |
| STAIRWAY AND WALKWAY LIGHTING UNIT 7 | 2 | $13,809 | Nov 3, 2016 – Apr 3, 2017 |
| SPEED FEEDBACK SIGNS | 1 | $13,000 | May 16, 2014 – May 16, 2014 |
| HSIP TRAFFIC SIGNAL INST DEARB | 9 | $126,282 | Jun 4, 2013 – Apr 23, 2015 |
| HIGH VOLTAGE CONVERSION PROGRAM | 120 | $12,311,467 | Apr 28, 2016 – Jun 6, 2025 |
| LAUSD TRAFFIC MITIGATION MEAS | 1 | $1,211 | Jun 5, 2013 – Jun 5, 2013 |
| WEST LA UNIT 3 - STM | 19 | $1,152,829 | Dec 5, 2011 – Dec 30, 2014 |
| IMPLEMENTATION OF BICYCLE AND PEDESTRIAN PROJECTS | 1 | $111,154 | Jun 12, 2013 – Jun 12, 2013 |
| SUNSET MILLENNIUM TRAFF MITIG | 3 | $109,713 | Apr 26, 2012 – May 23, 2012 |
| GDC-ATSAC COMMUNICATION MAINT | 1 | $10,018 | Aug 2, 2013 – Aug 2, 2013 |
| 3RD ST./RAMPART & ALVARADO ST | 1 | $1 | Jun 5, 2013 – Jun 5, 2013 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 6 of 6 payments$834,664
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 27, 2024 | Transportation | $412,469.33 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Jul 22, 2024 | Transportation | $147,481.23 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Oct 21, 2024 | Transportation | $122,030.40 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| May 14, 2025 | Non_departmental | $84,393.27 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jun 6, 2025 | Non_departmental | $63,540.02 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jun 17, 2025 | Fire | $4,750.00 | OFFICE AND ADMINISTRATIVE | PO GAEAE38AE25380055M |
FY 2024top 20 of 39 payments$2,709,468
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 7, 2024 | Transportation | $414,923.81 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Sep 14, 2023 | Non_departmental | $286,701.70 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | PO SC54CO23137378K |
| Aug 22, 2023 | Transportation | $232,311.53 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Aug 30, 2023 | Non_departmental | $207,832.19 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Mar 11, 2024 | Transportation | $163,196.46 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Sep 13, 2023 | Transportation | $148,307.97 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Dec 22, 2023 | Non_departmental | $111,774.01 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Dec 28, 2023 | Transportation | $106,400.14 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | PO SC94CO24142671K |
| Dec 22, 2023 | Non_departmental | $99,215.53 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jul 31, 2023 | Transportation | $94,891.21 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Jun 18, 2024 | Non_departmental | $93,416.67 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Sep 20, 2023 | Non_departmental | $93,222.22 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jun 20, 2024 | Non_departmental | $90,345.86 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Jul 26, 2023 | Non_departmental | $68,666.28 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jan 26, 2024 | Transportation | $55,046.32 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Jan 10, 2024 | Non_departmental | $52,020.63 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | PO SC54CO23137378K |
| Sep 7, 2023 | Transportation | $38,652.46 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Jan 10, 2024 | Non_departmental | $35,790.02 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | PO SC54CO23137378K |
| Jul 31, 2023 | Non_departmental | $33,329.01 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Jan 8, 2024 | Non_departmental | $26,860.67 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | PO SC54CO23137378K |
FY 2023top 20 of 81 payments$3,874,754
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 27, 2022 | Non_departmental | $297,852.55 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Jul 7, 2022 | Transportation | $267,706.32 | HSIP6-5 NEW SIGNALS | PO SC94CO21137378K |
| Jan 26, 2023 | Transportation | $205,195.89 | HSIP6-5 NEW SIGNALS IN HW & SP | PO SC94CO21137378K |
| Dec 28, 2022 | Transportation | $132,933.51 | HSIP6-5 NEW SIGNALS IN HW & SP | PO SC94CO21137378K |
| Dec 21, 2022 | Non_departmental | $131,892.30 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jul 20, 2022 | Non_departmental | $129,610.51 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Nov 17, 2022 | Non_departmental | $126,581.59 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Jan 13, 2023 | Non_departmental | $124,054.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Nov 1, 2022 | Non_departmental | $104,285.21 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Apr 19, 2023 | Non_departmental | $101,812.53 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Dec 1, 2022 | Transportation | $101,090.37 | TRAFFIC SIGNAL INSTALLATION | PO SC94CO21137378K |
| Mar 15, 2023 | Non_departmental | $85,125.70 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Aug 15, 2022 | Non_departmental | $83,952.22 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| May 22, 2023 | Non_departmental | $83,616.39 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Dec 20, 2022 | Non_departmental | $78,845.63 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
| Jan 19, 2023 | Non_departmental | $76,524.16 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21137378K |
| Sep 14, 2022 | Transportation | $75,628.26 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Feb 1, 2023 | Transportation | $73,642.17 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Jul 29, 2022 | Transportation | $65,421.55 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Sep 15, 2022 | Transportation | $62,750.08 | HSIP6-5 NEW SIGNALS IN HW & SP | PO SC94CO21137378K |
FY 2022top 20 of 69 payments$6,745,667
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 8, 2021 | Non_departmental | $590,028.85 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Jul 28, 2021 | Non_departmental | $497,716.40 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Jan 12, 2022 | Non_departmental | $471,245.60 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Oct 26, 2021 | Non_departmental | $387,386.25 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Jul 27, 2021 | Non_departmental | $291,767.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Jun 3, 2022 | Transportation | $258,105.99 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Aug 4, 2021 | Non_departmental | $236,546.60 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134347K |
| Mar 10, 2022 | Transportation | $233,688.32 | TRAFFIC SIGNAL SAFETY PROJECTS | – |
| Mar 4, 2022 | Transportation | $233,688.32 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO20134240K |
| Aug 4, 2021 | Non_departmental | $228,559.03 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Nov 2, 2021 | Non_departmental | $224,374.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Jun 22, 2022 | Transportation | $204,431.13 | PEDESTRIAN PLAN/PROGRAM | PO SC94CO21137378K |
| Nov 10, 2021 | Non_departmental | $174,703.10 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Sep 21, 2021 | Non_departmental | $162,181.15 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Aug 19, 2021 | Transportation | $157,433.72 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Oct 19, 2021 | Economic and Workforce Development Department | $155,503.60 | RESEDA/CANOGA PARK TAXABLE | PO SC22CO22134240K |
| Mar 31, 2022 | Transportation | $153,522.43 | HSIP6-TRFIC SGNL MDFCTIONS AT 7 LOCATIONS IN SFV | PO SC94CO21137378K |
| Jan 5, 2022 | Non_departmental | $146,946.47 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134347K |
| Oct 22, 2021 | Transportation | $141,288.27 | I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADE | PO SC94CO20134240K |
| May 18, 2022 | Non_departmental | $140,364.68 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO22139923K |
FY 2021top 20 of 74 payments$7,846,631
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 24, 2020 | Non_departmental | $678,911.77 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Sep 22, 2020 | Non_departmental | $565,618.05 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Oct 21, 2020 | Non_departmental | $563,075.93 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Sep 17, 2020 | Non_departmental | $349,555.94 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Dec 21, 2020 | Non_departmental | $301,320.53 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Apr 5, 2021 | Non_departmental | $276,486.10 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136673K |
| Aug 11, 2020 | Transportation | $271,206.48 | VISION ZERO TRAFFIC SIGNALS | PO SC94CO20134240K |
| Jul 21, 2020 | Transportation | $264,463.49 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO20134240K |
| Jan 6, 2021 | Non_departmental | $254,314.05 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| Sep 4, 2020 | Non_departmental | $243,509.19 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Mar 4, 2021 | Non_departmental | $213,289.25 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Mar 3, 2021 | Non_departmental | $190,380.00 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Oct 29, 2020 | Non_departmental | $178,298.82 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Jun 1, 2021 | Non_departmental | $177,197.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Jul 8, 2020 | Non_departmental | $173,664.75 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Mar 30, 2021 | Non_departmental | $167,661.70 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO21136736K |
| Aug 11, 2020 | Transportation | $155,990.00 | ATSAC SYSTEMS MAINTENANCE | PO SC94CO20134240K |
| Jan 25, 2021 | Non_departmental | $150,511.11 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Oct 2, 2020 | Non_departmental | $148,760.14 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
| Apr 8, 2021 | Non_departmental | $126,792.88 | VISION ZERO TRAFFIC SIGNALS | PO SC50CO21134240K |
FY 2020top 20 of 60 payments$7,865,228
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 23, 2019 | Transportation | $872,112.94 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Aug 23, 2019 | Transportation | $556,343.66 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Sep 4, 2019 | Non_departmental | $440,808.42 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Dec 20, 2019 | Transportation | $408,985.71 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| Feb 28, 2020 | Non_departmental | $401,194.50 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Sep 6, 2019 | Non_departmental | $392,273.53 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Dec 2, 2019 | Transportation | $389,623.50 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| Sep 27, 2019 | Transportation | $350,140.93 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Feb 12, 2020 | Non_departmental | $285,384.84 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jun 4, 2020 | Transportation | $264,468.33 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO20134240K |
| Oct 21, 2019 | Transportation | $264,152.61 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Dec 2, 2019 | Transportation | $239,439.51 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| Jul 23, 2019 | Transportation | $218,664.50 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| Feb 19, 2020 | Transportation | $199,001.40 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| Aug 8, 2019 | Non_departmental | $194,353.76 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| Jun 23, 2020 | Transportation | $176,143.12 | I-5 NORTH CONSTRUCTION IMPACT MITIGATION ITS UPGRADE | PO SC94CO20134240K |
| Feb 10, 2020 | Non_departmental | $171,339.15 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134348K |
| Feb 19, 2020 | Transportation | $146,780.40 | BICYCLE PLAN/PROGRAM - OTHER | PO SC94CO19131594K |
| May 21, 2020 | Non_departmental | $130,846.01 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
| Jan 2, 2020 | Non_departmental | $129,868.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO SC50CO20134347K |
FY 2019top 20 of 92 payments$12,705,417
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 24, 2018 | Non_departmental | $887,843.19 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jun 13, 2019 | Transportation | $619,638.63 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Oct 2, 2018 | Non_departmental | $516,955.37 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
| Aug 17, 2018 | Non_departmental | $508,781.16 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jun 12, 2019 | Transportation | $486,710.30 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Oct 2, 2018 | Non_departmental | $480,265.82 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Nov 19, 2018 | Non_departmental | $416,594.76 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jul 26, 2018 | Transportation | $353,566.20 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| Apr 19, 2019 | Non_departmental | $344,575.30 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| Oct 2, 2018 | Non_departmental | $328,771.10 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| Apr 15, 2019 | Transportation | $306,271.83 | TRAFFIC SIGNAL SAFETY PROJECTS | PO SC94CO19131594K |
| Jan 30, 2019 | Non_departmental | $300,921.82 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jul 3, 2018 | Non_departmental | $280,028.65 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
| Nov 9, 2018 | Non_departmental | $279,000.20 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
| Jan 31, 2019 | Non_departmental | $278,900.05 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| May 15, 2019 | Non_departmental | $278,661.28 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jan 30, 2019 | Non_departmental | $242,100.70 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jun 24, 2019 | Non_departmental | $220,188.24 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| Mar 8, 2019 | Non_departmental | $214,052.10 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| May 8, 2019 | Non_departmental | $206,659.72 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
FY 2018top 20 of 102 payments$12,118,290
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 18, 2017 | Non_departmental | $887,114.38 | RESEDA - ARLETA HV CONVERSION | PO SC50MSACO17128054K |
| Mar 27, 2018 | Non_departmental | $728,393.23 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Sep 1, 2017 | Transportation | $574,329.45 | ATSAC CENTRAL CITY EAST | PO SC94MSACO17127985K |
| Apr 18, 2018 | Non_departmental | $556,117.54 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Jun 25, 2018 | Non_departmental | $531,747.99 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Dec 4, 2017 | Transportation | $471,739.36 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| May 21, 2018 | Non_departmental | $467,961.70 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Mar 27, 2018 | Transportation | $467,184.41 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| Oct 19, 2017 | Transportation | $423,727.88 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| May 15, 2018 | Non_departmental | $362,398.93 | CONDUIT ONLY UNIT 3 | PO SC50CO18130853K |
| May 4, 2018 | Transportation | $339,149.77 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| Apr 27, 2018 | Non_departmental | $325,100.45 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO SC50MSACO17128028K |
| Feb 27, 2018 | Non_departmental | $295,999.89 | DCT ELECTRICAL POWER SYSTEM MODIFICATIONS | PO SC50CO18129307K |
| Oct 31, 2017 | Transportation | $260,020.37 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| Jul 25, 2017 | Transportation | $256,986.78 | ATSAC CENTRAL CITY EAST | PO SC94MSACO17127985K |
| May 29, 2018 | Non_departmental | $255,323.90 | BEL AIR-UNIT 2 HV CONVERSION | PO SC50CO18130834K |
| Apr 18, 2018 | Transportation | $254,159.58 | ATCS CENTRAL BUSINESS DISTRICT | PO SC94CO18129230K |
| Nov 2, 2017 | Transportation | $233,089.60 | ATSAC CENTRAL CITY EAST | PO SC94MSACO17127985K |
| Jul 28, 2017 | Non_departmental | $226,349.85 | MAR VISTA HV CONVERSION | PO SC50MSACO17128029K |
| Aug 2, 2017 | Transportation | $219,686.74 | ATSAC CENTRAL CITY EAST | PO SC94MSACO17127985K |
FY 2017top 20 of 72 payments$8,150,287
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 4, 2017 | Transportation | $438,137.14 | ATSAC CENTRAL CITY EAST | PO GAE94CO17127985K |
| Jul 7, 2016 | Transportation | $353,830.80 | ATCS ECHO PARK/SILVER LAKE PH2 | PO GAE94CO16126654K |
| Nov 16, 2016 | Transportation | $339,420.89 | HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNAL | PO GAE94CO17127925K |
| Aug 10, 2016 | Transportation | $311,122.27 | ATCS ECHO PARK/SILVER LAKE PH2 | PO GAE94CO16126654K |
| May 24, 2017 | Appropriations to Special Purpose Fund | $306,359.80 | MAR VISTA HV CONVERSION | PO GAE50CO17128029K |
| Jun 22, 2017 | Appropriations to Special Purpose Fund | $305,650.77 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO17128332K |
| Sep 1, 2016 | Appropriations to Special Purpose Fund | $255,591.80 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO16126998K |
| Jun 26, 2017 | Appropriations to Special Purpose Fund | $254,595.25 | MAR VISTA HV CONVERSION | PO GAE50CO17128029K |
| Nov 2, 2016 | Transportation | $244,732.78 | HSIP CYCLE 5 SFV-LT PHASING & ONE NEW TRAFIC SIGNAL | PO GAE94CO17127925K |
| Mar 24, 2017 | Appropriations to Special Purpose Fund | $227,110.06 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| Apr 26, 2017 | Appropriations to Special Purpose Fund | $215,255.29 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| May 30, 2017 | Appropriations to Special Purpose Fund | $203,487.20 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| Dec 13, 2016 | Appropriations to Special Purpose Fund | $202,903.85 | RESEDA - ARLETA HV CONVERSION | PO GAE50CO17128054K |
| Nov 1, 2016 | Appropriations to Special Purpose Fund | $198,753.30 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| Jun 26, 2017 | Appropriations to Special Purpose Fund | $188,202.59 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| Jul 25, 2016 | Appropriations to Special Purpose Fund | $179,266.90 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO16126998K |
| Nov 16, 2016 | Transportation | $161,455.64 | HSIP CYCLE 5 PICO/WOOSTER AND PICO/BEDFORD | PO GAE94CO17127925K |
| Feb 27, 2017 | Appropriations to Special Purpose Fund | $154,204.88 | SUN VALLEY - NORTH HOLLYWOOD HV CONVERSION | PO GAE50CO17128028K |
| Feb 9, 2017 | Appropriations to Special Purpose Fund | $153,860.10 | MAR VISTA HV CONVERSION | PO GAE50CO17128029K |
| Mar 6, 2017 | Transportation | $145,926.44 | ATSAC CENTRAL CITY EAST | PO GAE94CO17127985K |
FY 2016top 20 of 38 payments$4,051,135
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 28, 2015 | Transportation | $474,896.27 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| May 9, 2016 | Transportation | $445,361.23 | ATCS ECHO PARK/SILVER LAKE PH2 | PO GAE94CO16126654K |
| Apr 25, 2016 | Transportation | $327,101.35 | ATCS ECHO PARK/SILVER LAKE PH2 | PO GAE94CO16126654K |
| Jul 10, 2015 | Transportation | $316,098.28 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Jun 8, 2016 | Appropriations to Special Purpose Fund | $272,806.75 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO16126998K |
| Jun 27, 2016 | Appropriations to Special Purpose Fund | $257,729.30 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO16126998K |
| Apr 28, 2016 | Appropriations to Special Purpose Fund | $250,643.25 | HIGH VOLTAGE CONVERSION PROGRAM | PO GAE50CO16126998K |
| Sep 10, 2015 | Transportation | $244,148.64 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| Jun 20, 2016 | Transportation | $196,716.21 | ATCS ECHO PARK/SILVER LAKE PH2 | PO GAE94CO16126654K |
| Oct 19, 2015 | Transportation | $150,532.82 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| Oct 9, 2015 | Transportation | $121,137.51 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Dec 2, 2015 | Transportation | $119,253.30 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| May 9, 2016 | Transportation | $108,195.75 | NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNAL | PO GAE94CO16126654K |
| May 31, 2016 | Transportation | $86,606.19 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Apr 25, 2016 | Transportation | $84,152.25 | NORTH FIGUEROA/AVENUE 55 TRAFFIC SIGNAL | PO GAE94CO16126654K |
| Oct 9, 2015 | Transportation | $81,463.65 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Oct 9, 2015 | Transportation | $59,946.00 | RAILROAD CROSSING PROGRAM | PO GAE94CO15124556K |
| Jun 9, 2016 | Transportation | $54,932.10 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Jan 11, 2016 | Transportation | $51,665.69 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| Dec 2, 2015 | Transportation | $48,800.00 | CONTRACTUAL SERVICES | PO GAE94CO16124973K |
FY 2015top 20 of 64 payments$5,644,086
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 24, 2015 | Transportation | $546,925.84 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| Jun 22, 2015 | Transportation | $506,573.12 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Mar 26, 2015 | Transportation | $447,922.15 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Oct 1, 2014 | Transportation | $361,985.30 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| May 27, 2015 | Transportation | $357,115.19 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| Aug 25, 2014 | Transportation | $349,353.22 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Jun 16, 2015 | Transportation | $344,719.10 | ATCS WILSHIRE EAST | PO GAE94CO15124973K |
| May 28, 2015 | Transportation | $329,546.82 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Jan 20, 2015 | Transportation | $278,003.30 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| May 11, 2015 | Transportation | $239,332.58 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Mar 24, 2015 | Transportation | $237,718.86 | ATCS SANTA MONICA FWY PHASE 2 | PO GAE94CO15124556K |
| Apr 13, 2015 | Transportation | $191,442.86 | METROLINK CROSSNG IMP WOODL AV | PO GAE94CO15123393K |
| May 11, 2015 | Transportation | $120,000.00 | SIGNAL IMPROVEMENT CONSTRUCTION | PO GAE94CO15124556K |
| Jan 6, 2015 | Transportation | $111,201.75 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Jan 16, 2015 | Transportation | $100,000.00 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Dec 12, 2014 | Transportation | $74,525.34 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Aug 7, 2014 | Appropriations to Special Purpose Fund | $73,668.68 | WEST LA UNIT 3 - STM | PO GAE50CO12119002K |
| Dec 29, 2014 | Transportation | $72,756.18 | RAILROAD CROSSING PROGRAM | PO GAE94CO15124556K |
| Aug 25, 2014 | Transportation | $68,220.70 | PEDESTRIAN SAFETY DEVICES | PO GAE94CO12119656K |
| Jun 15, 2015 | Transportation | $67,448.26 | METROLINK CROSSNG IMP WOODL AV | PO GAE94CO15123393K |
FY 2014top 20 of 143 payments$8,640,288
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2013 | Transportation | $552,077.35 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Jan 16, 2014 | Transportation | $505,531.97 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Aug 28, 2013 | Transportation | $406,947.39 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Nov 6, 2013 | Transportation | $309,709.31 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Apr 28, 2014 | Transportation | $279,122.92 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| May 28, 2014 | Transportation | $262,367.92 | PEDESTRIAN SAFETY DEVICES | PO GAE94CO12119656K |
| Apr 28, 2014 | Transportation | $240,077.84 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Sep 20, 2013 | Transportation | $233,907.78 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Dec 2, 2013 | Transportation | $226,746.66 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Apr 16, 2014 | Transportation | $207,694.68 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Nov 6, 2013 | Transportation | $192,439.89 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Dec 3, 2013 | Transportation | $183,465.83 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Feb 7, 2014 | Transportation | $180,054.17 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Aug 27, 2013 | Transportation | $179,236.18 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Aug 27, 2013 | Transportation | $175,373.27 | ATCS WESTWOOD/WEST LA | PO GAE94CO13121861K |
| Feb 7, 2014 | Transportation | $174,309.28 | ATCS SANTA MONICA FWY PHASE 1 | PO GAE94CO13121860K |
| Jun 2, 2014 | Transportation | $171,161.02 | SAFETEA-LU:NORTHWEST LIGHTING | PO GAE94CO14123531K |
| Mar 14, 2014 | Transportation | $169,023.81 | HSIP CYCLE 4-48TH STREET | PO GAE94CO14122760K |
| May 28, 2014 | Transportation | $165,413.10 | PEDESTRIAN SAFETY DEVICES | PO GAE94CO12119656K |
| Jun 4, 2014 | Appropriations to Special Purpose Fund | $164,847.87 | WEST LA UNIT 3 - STM | PO GAE50CO12119002K |
FY 2013top 20 of 135 payments$17,027,974
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 17, 2012 | Appropriations to Special Purpose Fund | $6,375,000.00 | HSH DIGESTER EXP | PO GAENV50CF13092850M |
| Oct 11, 2012 | Transportation | $1,082,575.82 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Jul 17, 2012 | Transportation | $937,415.64 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Jul 20, 2012 | Transportation | $917,692.40 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Nov 7, 2012 | Transportation | $804,688.19 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Sep 18, 2012 | Transportation | $475,418.15 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Sep 24, 2012 | Transportation | $449,163.12 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Jul 23, 2012 | Transportation | $418,415.21 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Jul 23, 2012 | Transportation | $396,188.69 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Aug 23, 2012 | Transportation | $374,633.35 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Feb 8, 2013 | Transportation | $352,336.34 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Oct 22, 2012 | Transportation | $341,648.97 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Aug 14, 2012 | Transportation | $223,544.02 | DOWNTOWN LA TRANSIT PRIORITY S | PO GAE94CO12120305M |
| Aug 23, 2012 | Transportation | $223,375.86 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Aug 20, 2012 | Transportation | $179,050.24 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Dec 12, 2012 | Transportation | $163,800.00 | HIGHWAY-RAIL GR CROSS IMPR PRO | PO GAE94CO12118832K |
| Aug 14, 2012 | Transportation | $141,955.65 | DOWNTOWN LA TRANSIT PRIORITY S | PO GAE94CO12120305M |
| Aug 23, 2012 | Transportation | $136,487.51 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Oct 11, 2012 | Transportation | $132,545.03 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Jan 14, 2013 | Transportation | $131,101.00 | PEDESTRIAN SAFETY PROGRAM | PO GAE94CO12118832K |
FY 2012top 20 of 111 payments$16,983,468
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 27, 2012 | Transportation | $735,086.06 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Feb 29, 2012 | Transportation | $709,284.03 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Jun 18, 2012 | Transportation | $697,879.21 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Jan 10, 2012 | Transportation | $662,091.86 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Nov 23, 2011 | Transportation | $661,685.06 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Apr 16, 2012 | Transportation | $651,010.09 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Dec 28, 2011 | Transportation | $629,365.77 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| May 11, 2012 | Transportation | $624,696.10 | ATSAC PROJECT FRONT FUNDING | PO GAE94CO12119656K |
| Jan 17, 2012 | Transportation | $614,151.93 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Jun 18, 2012 | Transportation | $602,871.53 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Apr 26, 2012 | Transportation | $529,297.35 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| May 22, 2012 | Transportation | $526,337.87 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Nov 23, 2011 | Transportation | $504,762.00 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Apr 26, 2012 | Transportation | $493,711.25 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| May 23, 2012 | Transportation | $471,627.55 | ATSAC WILMINGTON | PO GAE94CO12118833K |
| Feb 22, 2012 | Transportation | $468,461.34 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Mar 23, 2012 | Transportation | $465,645.29 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Sep 26, 2011 | Transportation | $426,634.23 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Jan 31, 2012 | Transportation | $384,894.09 | ATSAC CANOGA PARK | PO GAE94CO12118832K |
| Oct 18, 2011 | Transportation | $370,894.38 | ATSAC WILMINGTON | PO GAE94CO12118833K |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 17, 2025 | Fire | $4,750.00 | OFFICE AND ADMINISTRATIVE | CHECK |
| Jun 6, 2025 | Non_departmental | $63,540.02 | HIGH VOLTAGE CONVERSION PROGRAM | CHECK |
| May 14, 2025 | Non_departmental | $84,393.27 | HIGH VOLTAGE CONVERSION PROGRAM | CHECK |
| Oct 21, 2024 | Transportation | $122,030.40 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Aug 27, 2024 | Transportation | $412,469.33 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Jul 22, 2024 | Transportation | $147,481.23 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Jun 20, 2024 | Non_departmental | $26,850.38 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jun 20, 2024 | Non_departmental | $13,998.52 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jun 20, 2024 | Non_departmental | $1,966.61 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jun 20, 2024 | Non_departmental | $90,345.86 | VISION ZERO TRAFFIC SIGNALS | CHECK |
| Jun 18, 2024 | Non_departmental | $93,416.67 | VISION ZERO TRAFFIC SIGNALS | CHECK |
| Jun 7, 2024 | Transportation | $414,923.81 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Mar 11, 2024 | Transportation | $163,196.46 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Jan 26, 2024 | Transportation | $55,046.32 | PEDESTRIAN PLAN/PROGRAM | CHECK |
| Jan 12, 2024 | Transportation | $402.56 | PEDESTRIAN PLAN/PROGRAM | CHECK |
| Jan 12, 2024 | Transportation | $4,691.38 | PEDESTRIAN PLAN/PROGRAM | CHECK |
| Jan 10, 2024 | Non_departmental | $52,020.63 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jan 10, 2024 | Non_departmental | $35,790.02 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jan 10, 2024 | Non_departmental | $12,680.12 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jan 8, 2024 | Non_departmental | $26,860.67 | CURB RAMPS WITH SIGNAL CONSTRUCTION & CITYWIDE CURB PROJECTS | CHECK |
| Jan 4, 2024 | Non_departmental | $15,538.45 | VISION ZERO TRAFFIC SIGNALS | CHECK |
| Dec 28, 2023 | Transportation | $106,400.14 | TRANSFORMATIVE CLIMATE COMMUNITIES-WALKBIKE WATTS | CHECK |
| Dec 28, 2023 | Non_departmental | $17,775.25 | VISION ZERO TRAFFIC SIGNALS | CHECK |
| Dec 22, 2023 | Non_departmental | $10,151.08 | VISION ZERO TRAFFIC SIGNALS | CHECK |
| Dec 22, 2023 | Non_departmental | $99,215.53 | HIGH VOLTAGE CONVERSION PROGRAM | CHECK |
Other vendors serving Transportation
- MV Transportation Inc $640,087,984
- Lacmta $312,362,919
- MV Public Transportation Inc. $257,490,765
- L a County Treasurer $204,786,080
- Conduent State & Local Solutions, Inc $127,141,324
- Ips Group Inc $113,869,558
- Xerox State & Local Solutions Inc $85,330,643
- Motor Coach Industries Inc $82,559,405
- Veolia Transportation Services Inc $81,853,173
- Transdev Services Inc $78,095,946
VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data