Carollo Engineers Apc is the 177th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in CLEAN WATER PLANNING & DESIGN SERVICES spending. Its payments amount to 0.6% of everything the Non_departmental has paid vendors in that span. Payments to it fell 47.9% year over year.

Primary spending category: CLEAN WATER PLANNING & DESIGN SERVICES

$97,160,572total received
1,877payments
3agencies
Nov 29, 2011Jan 30, 2025first / last payment
Follow this vendorGet an email when Los Angeles publishes new payments to Carollo Engineers Apc. No spam.

Payments by fiscal year

FY 2025$9,197,693
FY 2024$17,648,335
FY 2023$14,266,603
FY 2022$10,846,607
FY 2021$10,094,342
FY 2020$7,604,811
FY 2019$6,722,915
FY 2018$5,326,914
FY 2017$8,566,031
FY 2016$3,792,568
FY 2015$1,877,578
FY 2014$958,045
FY 2013$187,565
FY 2012$70,564

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Non_departmental119$9,197,693
FY 2024Non_departmental260$17,648,335
FY 2023Non_departmental239$14,266,603
FY 2022Non_departmental254$10,826,615
FY 2022Public Works - Sanitation3$19,991
FY 2021Non_departmental243$10,018,160
FY 2021Public Works - Sanitation12$76,182
FY 2020Non_departmental205$7,538,394
FY 2020Public Works - Sanitation6$66,417
FY 2019Non_departmental199$6,722,915
FY 2018Non_departmental133$5,326,914
FY 2017Appropriations to Special Purpose Fund90$8,566,031
FY 2016Appropriations to Special Purpose Fund48$3,792,568
FY 2015Appropriations to Special Purpose Fund30$1,877,578
FY 2014Appropriations to Special Purpose Fund20$958,045
FY 2013Appropriations to Special Purpose Fund10$187,565
FY 2012Appropriations to Special Purpose Fund6$70,564
Total1,877$97,160,572

What the payments were for

Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
WW PLANNING & DESIGN SERVICES101$9,873,720Oct 15, 2014 Sep 14, 2021
BROADWAY STRMWTR GREENWAY6$725,427Apr 18, 2014 Mar 23, 2017
PENMAR WATER QLTY PHASE II30$562,424Nov 1, 2013 Oct 16, 2018
CAPITAL INFRASTRUCTURE11$480,209Dec 24, 2020 Sep 6, 2023
TEMESCAL CANYON PRK PHASE II26$477,543Nov 1, 2013 Jul 23, 2018
OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTS67$4,729,692Nov 23, 2020 Jan 16, 2025
FEASIBILITY STUDIES52$4,470,594Apr 19, 2021 Oct 11, 2024
SAN FERNANDO VALLEY STORMWATER CAPTURE PROJECTS5$438,491Jun 19, 2018 Dec 17, 2018
WW SERVICES DURING CONST37$4,270,998Oct 14, 2015 Nov 15, 2019
PW-SANITATION EXPENSE AND EQUIPMENT112$4,195,666Mar 2, 2017 Oct 29, 2024
SANITATION CONTRACTS59$4,165,667Sep 23, 2016 Oct 28, 2024
CLEAN WATER PLANNING & DESIGN SERVICES833$41,625,206Oct 3, 2018 Jan 30, 2025
MACARTHUR LAKE REHABILITATION PROJECT69$3,921,116Dec 27, 2021 Jan 27, 2025
SANITATION-PROJECT RELATED44$3,218,432Sep 28, 2018 Oct 18, 2024
LOS ANGELES CITY AREA WIDE ASSESSMENT GRANT33$321,586Oct 29, 2015 Apr 14, 2020
PW-SANITATION EXPENSE & EQUIPMENT122$3,084,979Nov 29, 2011 Jan 14, 2025
PROP O OPTIMIZATION45$2,416,524Jan 12, 2015 Sep 12, 2018
STORMWATER CAPTURE PARK PROGRAM67$2,412,909Apr 3, 2020 Jun 18, 2024
BALLONA CREEK LOW FLOW TREATMENT FACILITY25$193,874Jun 21, 2019 Dec 27, 2024
SANITATION-OPERATION RELATED7$189,983Apr 5, 2012 Oct 10, 2012
REGIONAL PROJECT DEVELOPMENT AND REVOLVING FUNDS31$1,638,674Dec 22, 2021 Jan 27, 2025
CONTRACTUAL SERVICES21$162,590Dec 18, 2019 Nov 1, 2021
CLEAN WATER SERVICES DURING CONSTRUCTION39$1,392,361Nov 26, 2018 Jan 18, 2024
SEP KITTYHAWK GREENWAY1$12,799Feb 19, 2020 Feb 19, 2020
EXPENSE AND EQUIPMENT21$1,048,216Nov 9, 2016 Apr 16, 2021
SAN PEDRO TOWER2$104,606Aug 27, 2015 Oct 21, 2015
NPDES PERMIT COMPLIANCE11$1,026,285Mar 8, 2024 Oct 28, 2024

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 119 payments$9,197,693
DateAgencyAmountCategoryPurchase order
Dec 10, 2024Non_departmental$607,717.85CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Jan 29, 2025Non_departmental$566,153.16CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO25145640M
Dec 18, 2024Non_departmental$382,644.57CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Sep 25, 2024Non_departmental$302,986.91SANITATION-PROJECT RELATEDPO SC50CO24124324M
Sep 3, 2024Non_departmental$298,463.92CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Nov 19, 2024Non_departmental$260,200.00CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO25124324M
Sep 19, 2024Non_departmental$250,075.49CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Sep 11, 2024Non_departmental$225,277.71CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Jul 11, 2024Non_departmental$206,866.98CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Aug 22, 2024Non_departmental$206,864.16FEASIBILITY STUDIESPO SC50CO24124324M
Sep 25, 2024Non_departmental$195,765.62SANITATION-PROJECT RELATEDPO SC50CO24124324M
Nov 7, 2024Non_departmental$192,570.13CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Aug 22, 2024Non_departmental$184,628.23FEASIBILITY STUDIESPO SC50CO24124324M
Aug 19, 2024Non_departmental$184,389.03CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Oct 28, 2024Non_departmental$183,345.35MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO24124324M
Aug 13, 2024Non_departmental$168,888.52CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Oct 18, 2024Non_departmental$163,953.60CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Oct 11, 2024Non_departmental$153,055.59FEASIBILITY STUDIESPO SC50CO24124324M
Aug 27, 2024Non_departmental$152,322.62CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Sep 3, 2024Non_departmental$149,215.11CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
FY 2024top 20 of 260 payments$17,648,335
DateAgencyAmountCategoryPurchase order
Feb 28, 2024Non_departmental$685,248.04CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Sep 8, 2023Non_departmental$354,558.59FEASIBILITY STUDIESPO SC50CO23124324M
Jun 21, 2024Non_departmental$278,767.32SANITATION-PROJECT RELATEDPO SC50CO24124324M
Sep 8, 2023Non_departmental$259,548.87FEASIBILITY STUDIESPO SC50CO23124324M
May 24, 2024Non_departmental$231,158.93CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Apr 26, 2024Non_departmental$230,425.00FEASIBILITY STUDIESPO SC50CO24124324M
Jun 11, 2024Non_departmental$230,425.00FEASIBILITY STUDIESPO SC50CO24124324M
Sep 8, 2023Non_departmental$230,288.82FEASIBILITY STUDIESPO SC50CO23124324M
May 23, 2024Non_departmental$228,774.07CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Mar 18, 2024Non_departmental$220,205.89CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Mar 14, 2024Non_departmental$215,480.90CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Jun 13, 2024Non_departmental$214,875.49CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Apr 5, 2024Non_departmental$213,552.60CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Apr 8, 2024Non_departmental$211,667.22OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO24124324M
Dec 8, 2023Non_departmental$209,981.14REGIONAL PROJECT DEVELOPMENT AND REVOLVING FUNDSPO SC50CO23124324M
May 1, 2024Non_departmental$208,577.53CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO24124324M
Jun 10, 2024Non_departmental$207,257.27OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO24124324M
Feb 27, 2024Non_departmental$199,745.90MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO24124324M
Feb 27, 2024Non_departmental$197,290.00MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO24124324M
Feb 16, 2024Non_departmental$188,765.93CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
FY 2023top 20 of 239 payments$14,266,603
DateAgencyAmountCategoryPurchase order
Dec 12, 2022Non_departmental$572,036.06FEASIBILITY STUDIESPO SC50CO23124324M
Nov 14, 2022Non_departmental$440,247.06CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Apr 10, 2023Non_departmental$428,443.63CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Apr 28, 2023Non_departmental$384,637.33CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Aug 26, 2022Non_departmental$341,235.45CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Sep 22, 2022Non_departmental$337,295.17CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Dec 9, 2022Non_departmental$336,507.04CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Sep 29, 2022Non_departmental$273,077.53CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
May 10, 2023Non_departmental$261,961.63CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Jul 27, 2022Non_departmental$237,686.41CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Apr 28, 2023Non_departmental$230,930.62CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
May 17, 2023Non_departmental$222,763.72CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Nov 15, 2022Non_departmental$215,395.09CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
May 5, 2023Non_departmental$211,737.51CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Jun 6, 2023Non_departmental$203,437.40CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
May 26, 2023Non_departmental$203,260.36FEASIBILITY STUDIESPO SC50CO23124324M
Aug 26, 2022Non_departmental$201,162.16CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Sep 29, 2022Non_departmental$191,763.27CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Apr 10, 2023Non_departmental$190,443.18CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
Mar 22, 2023Non_departmental$188,575.18CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO23124324M
FY 2022top 20 of 257 payments$10,846,607
DateAgencyAmountCategoryPurchase order
Mar 14, 2022Non_departmental$246,069.89OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Sep 7, 2021Non_departmental$242,006.04CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
May 27, 2022Non_departmental$198,021.00FEASIBILITY STUDIESPO SC50CO22124324M
Jun 1, 2022Non_departmental$195,979.50MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO22124324M
Mar 14, 2022Non_departmental$184,223.20OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Feb 25, 2022Non_departmental$178,003.35CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Jun 6, 2022Non_departmental$167,285.58OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Jul 21, 2021Non_departmental$167,114.82CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Mar 14, 2022Non_departmental$165,512.63OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Dec 6, 2021Non_departmental$163,522.18STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
Mar 14, 2022Non_departmental$162,728.61OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Jun 6, 2022Non_departmental$161,330.49OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Dec 22, 2021Non_departmental$123,360.00REGIONAL PROJECT DEVELOPMENT AND REVOLVING FUNDSPO SC50CO22124324M
Feb 23, 2022Non_departmental$115,551.68CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Mar 2, 2022Non_departmental$115,000.00REGIONAL PROJECT DEVELOPMENT AND REVOLVING FUNDSPO SC50CO22124324M
Oct 18, 2021Non_departmental$114,569.93STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
May 31, 2022Non_departmental$113,813.50CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO22124324M
Dec 27, 2021Non_departmental$110,387.11MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO22124324M
Mar 14, 2022Non_departmental$109,980.43OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO22124324M
Jun 1, 2022Non_departmental$109,506.15MACARTHUR LAKE REHABILITATION PROJECTPO SC50CO22124324M
FY 2021top 20 of 255 payments$10,094,342
DateAgencyAmountCategoryPurchase order
Nov 23, 2020Non_departmental$375,000.00OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSPO SC50CO21124324M
Apr 19, 2021Non_departmental$266,250.00FEASIBILITY STUDIESPO SC50CO21124324M
Mar 12, 2021Non_departmental$225,936.00CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
May 18, 2021Non_departmental$209,023.64CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Aug 18, 2020Non_departmental$183,976.20CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Mar 12, 2021Non_departmental$159,999.95CAPITAL INFRASTRUCTUREPO SC50CO21124324M
Aug 13, 2020Non_departmental$158,022.88STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
Jul 16, 2020Non_departmental$153,354.88STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
Dec 21, 2020Non_departmental$147,074.40CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Feb 23, 2021Non_departmental$140,414.96PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO21124324M
Dec 14, 2020Non_departmental$135,781.81CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Dec 14, 2020Non_departmental$124,219.07CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
May 7, 2021Non_departmental$120,114.44STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
Aug 13, 2020Non_departmental$115,325.75STORMWATER CAPTURE PARK PROGRAMPO SC50CO20129648M
Aug 19, 2020Non_departmental$114,704.28CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Nov 23, 2020Non_departmental$114,250.00EXPENSE AND EQUIPMENTPO SC50CO21124324M
Sep 9, 2020Non_departmental$111,377.86CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Aug 20, 2020Non_departmental$109,347.71CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
Apr 19, 2021Non_departmental$106,250.00FEASIBILITY STUDIESPO SC50CO21124324M
Apr 22, 2021Non_departmental$106,025.80CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO21124324M
FY 2020top 20 of 211 payments$7,604,811
DateAgencyAmountCategoryPurchase order
Dec 20, 2019Non_departmental$574,363.91SANITATION CONTRACTSPO SC50CO20124324M
Dec 18, 2019Non_departmental$421,216.23SANITATION CONTRACTSPO SC50CO20124324M
May 7, 2020Non_departmental$271,078.00CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
May 19, 2020Non_departmental$256,725.63CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Dec 20, 2019Non_departmental$240,060.45SANITATION CONTRACTSPO SC50CO20124324M
Apr 3, 2020Non_departmental$224,397.19CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Apr 3, 2020Non_departmental$189,245.61CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Mar 2, 2020Non_departmental$154,923.58SANITATION CONTRACTSPO SC50CO20124324M
Oct 4, 2019Non_departmental$143,817.95WW SERVICES DURING CONSTPO SC50CO19124324M
Dec 26, 2019Non_departmental$138,093.20SANITATION CONTRACTSPO SC50CO20124324M
Dec 20, 2019Non_departmental$136,774.29SANITATION CONTRACTSPO SC50CO20124324M
Apr 29, 2020Non_departmental$123,256.91CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Aug 12, 2019Non_departmental$112,597.63SANITATION CONTRACTSPO SC50CO19124324M
Oct 10, 2019Non_departmental$108,819.06CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Apr 7, 2020Non_departmental$105,690.86PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO20124324M
Jun 9, 2020Non_departmental$100,772.31CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Apr 30, 2020Non_departmental$95,017.27CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO20124324M
Sep 27, 2019Non_departmental$90,632.37CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Mar 2, 2020Non_departmental$88,292.52PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO20124324M
Dec 9, 2019Non_departmental$85,825.22CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
FY 2019top 20 of 199 payments$6,722,915
DateAgencyAmountCategoryPurchase order
Apr 15, 2019Non_departmental$239,359.30SANITATION CONTRACTSPO SC50CO19124324M
Apr 15, 2019Non_departmental$236,742.03EXPENSE AND EQUIPMENTPO SC50CO19124324M
Oct 4, 2018Non_departmental$185,223.36SANITATION-PROJECT RELATEDPO SC50CO19124324M
Oct 11, 2018Non_departmental$175,456.51CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Apr 30, 2019Non_departmental$170,764.73EXPENSE AND EQUIPMENTPO SC50CO19124324M
Dec 17, 2018Non_departmental$146,733.99SAN FERNANDO VALLEY STORMWATER CAPTURE PROJECTSPO SC50CO18124324M
Oct 4, 2018Non_departmental$129,283.76CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Jun 19, 2019Non_departmental$125,869.80CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Oct 4, 2018Non_departmental$123,577.59PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO18124324M
Feb 14, 2019Non_departmental$121,181.60CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Jun 20, 2019Non_departmental$120,034.50CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Apr 30, 2019Non_departmental$118,629.26EXPENSE AND EQUIPMENTPO SC50CO19124324M
Nov 26, 2018Non_departmental$118,622.47CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Jan 18, 2019Non_departmental$118,589.95PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO18124324M
Nov 13, 2018Non_departmental$117,777.36PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO18124324M
Feb 14, 2019Non_departmental$113,827.43CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Jun 19, 2019Non_departmental$110,855.20CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Mar 14, 2019Non_departmental$109,440.13CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Jun 17, 2019Non_departmental$104,139.95CLEAN WATER PLANNING & DESIGN SERVICESPO SC50CO19124324M
Sep 4, 2018Non_departmental$103,213.79PW-SANITATION EXPENSE & EQUIPMENTPO SC50CO18124324M
FY 2018top 20 of 133 payments$5,326,914
DateAgencyAmountCategoryPurchase order
Dec 22, 2017Non_departmental$273,148.27WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Jan 2, 2018Non_departmental$265,624.59WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Aug 28, 2017Non_departmental$231,201.95WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Oct 10, 2017Non_departmental$217,254.65WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Oct 10, 2017Non_departmental$199,616.90WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Dec 22, 2017Non_departmental$177,745.50WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Feb 21, 2018Non_departmental$173,539.22WW PLANNING & DESIGN SERVICESPO SC50CO18124324M
Sep 8, 2017Non_departmental$140,116.67WW SERVICES DURING CONSTPO SC50MSACO14120707M
May 4, 2018Non_departmental$136,517.87WW PLANNING & DESIGN SERVICESPO SC50CO18124324M
Aug 14, 2017Non_departmental$134,081.32WW SERVICES DURING CONSTPO SC50MSACO14120707M
Dec 20, 2017Non_departmental$133,827.73PROP O OPTIMIZATIONPO SC50MSACO16124324MC
Sep 28, 2017Non_departmental$118,142.13WW PLANNING & DESIGN SERVICESPO SC50MSACO17124324M
Nov 9, 2017Non_departmental$116,224.55PROP O OPTIMIZATIONPO SC50MSACO16124324MC
Dec 6, 2017Non_departmental$100,408.41PW-SANITATION EXPENSE AND EQUIPMENTPO SC50MSACO17124324M
Jun 19, 2018Non_departmental$99,022.50SAN FERNANDO VALLEY STORMWATER CAPTURE PROJECTSPO SC50CO18124324M
Feb 15, 2018Non_departmental$98,355.63PW-SANITATION EXPENSE AND EQUIPMENTPO SC50MSACO17124324M
Jan 2, 2018Non_departmental$92,780.83WW PLANNING & DESIGN SERVICESPO SC50CO18124324M
Apr 17, 2018Non_departmental$83,330.23PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO18124324M
Dec 6, 2017Non_departmental$80,188.54PW-SANITATION EXPENSE AND EQUIPMENTPO SC50MSACO17124324M
Dec 13, 2017Non_departmental$80,178.55SANITATION CONTRACTSPO SC50MSACO17124324M
FY 2017top 20 of 90 payments$8,566,031
DateAgencyAmountCategoryPurchase order
Mar 24, 2017Appropriations to Special Purpose Fund$446,877.53WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Oct 14, 2016Appropriations to Special Purpose Fund$436,691.85WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Oct 20, 2016Appropriations to Special Purpose Fund$402,640.83WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jan 4, 2017Appropriations to Special Purpose Fund$354,980.96WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jun 27, 2017Appropriations to Special Purpose Fund$333,093.06WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Jun 23, 2017Appropriations to Special Purpose Fund$318,245.19WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Feb 8, 2017Appropriations to Special Purpose Fund$305,104.37WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Jun 27, 2017Appropriations to Special Purpose Fund$296,278.83WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Apr 4, 2017Appropriations to Special Purpose Fund$294,180.00WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Jul 20, 2016Appropriations to Special Purpose Fund$284,070.33WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jan 13, 2017Appropriations to Special Purpose Fund$281,998.69WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Sep 7, 2016Appropriations to Special Purpose Fund$241,121.00WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jun 27, 2017Appropriations to Special Purpose Fund$232,296.27WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Feb 8, 2017Appropriations to Special Purpose Fund$229,543.97WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
Jul 8, 2016Appropriations to Special Purpose Fund$221,186.18WW SERVICES DURING CONSTPO GAE50CO14120707M
Jun 27, 2017Appropriations to Special Purpose Fund$212,266.90WW PLANNING & DESIGN SERVICESPO GAE50CO17124324M
May 4, 2017Appropriations to Special Purpose Fund$185,950.39WW SERVICES DURING CONSTPO GAE50CO14120707M
Feb 9, 2017Appropriations to Special Purpose Fund$182,910.49WW SERVICES DURING CONSTPO GAE50CO14120707M
Oct 6, 2016Appropriations to Special Purpose Fund$175,548.80WW SERVICES DURING CONSTPO GAE50CO14120707M
May 5, 2017Appropriations to Special Purpose Fund$168,223.21WW SERVICES DURING CONSTPO GAE50CO14120707M
FY 2016top 20 of 48 payments$3,792,568
DateAgencyAmountCategoryPurchase order
Sep 16, 2015Appropriations to Special Purpose Fund$269,694.47BROADWAY STRMWTR GREENWAYPO GAE50CO13120707M
May 31, 2016Appropriations to Special Purpose Fund$193,754.55WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jul 16, 2015Appropriations to Special Purpose Fund$175,887.99PROP O OPTIMIZATIONPO GAE50CO15114267K
May 13, 2016Appropriations to Special Purpose Fund$173,607.23WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Dec 22, 2015Appropriations to Special Purpose Fund$168,879.14WW SERVICES DURING CONSTPO GAE50CO14120707M
May 20, 2016Appropriations to Special Purpose Fund$158,730.00WW SERVICES DURING CONSTPO GAE50CO14120707M
Oct 14, 2015Appropriations to Special Purpose Fund$150,759.98WW SERVICES DURING CONSTPO GAE50CO14120707M
Jul 13, 2015Appropriations to Special Purpose Fund$147,172.75WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Aug 18, 2015Appropriations to Special Purpose Fund$132,242.19WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Feb 18, 2016Appropriations to Special Purpose Fund$132,083.47WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Nov 20, 2015Appropriations to Special Purpose Fund$121,535.65WW SERVICES DURING CONSTPO GAE50CO14120707M
Dec 3, 2015Appropriations to Special Purpose Fund$117,945.53BROADWAY STRMWTR GREENWAYPO GAE50CO13120707M
Feb 23, 2016Appropriations to Special Purpose Fund$113,264.22WW SERVICES DURING CONSTPO GAE50CO14120707M
Apr 26, 2016Appropriations to Special Purpose Fund$108,139.56WW SERVICES DURING CONSTPO GAE50CO14120707M
Jan 20, 2016Appropriations to Special Purpose Fund$104,257.76WW SERVICES DURING CONSTPO GAE50CO14120707M
Sep 11, 2015Appropriations to Special Purpose Fund$104,038.24PROP O OPTIMIZATIONPO GAE50CO15114267K
Dec 28, 2015Appropriations to Special Purpose Fund$94,739.00PENMAR WATER QLTY PHASE IIPO GAE50CO13120707M
Apr 4, 2016Appropriations to Special Purpose Fund$93,901.83WW PLANNING & DESIGN SERVICESPO GAE50CO16124324M
Jul 13, 2015Appropriations to Special Purpose Fund$92,661.16WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Dec 28, 2015Appropriations to Special Purpose Fund$89,842.00TEMESCAL CANYON PRK PHASE IIPO GAE50CO13120707M
FY 2015top 20 of 30 payments$1,877,578
DateAgencyAmountCategoryPurchase order
Jan 22, 2015Appropriations to Special Purpose Fund$178,908.17PROP O OPTIMIZATIONPO GAE50CO15114267K
Jun 25, 2015Appropriations to Special Purpose Fund$171,586.93WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Oct 27, 2014Appropriations to Special Purpose Fund$106,868.58WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Jan 22, 2015Appropriations to Special Purpose Fund$102,880.91PROP O OPTIMIZATIONPO GAE50CO15114267K
Oct 15, 2014Appropriations to Special Purpose Fund$95,812.93WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Dec 18, 2014Appropriations to Special Purpose Fund$93,205.41WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Feb 19, 2015Appropriations to Special Purpose Fund$92,229.34PROP O OPTIMIZATIONPO GAE50CO15114267K
May 14, 2015Appropriations to Special Purpose Fund$87,622.97PROP O OPTIMIZATIONPO GAE50CO15114267K
Jan 30, 2015Appropriations to Special Purpose Fund$84,880.27PROP O OPTIMIZATIONPO GAE50CO15114267K
Oct 20, 2014Appropriations to Special Purpose Fund$78,038.65WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Apr 16, 2015Appropriations to Special Purpose Fund$75,102.24PROP O OPTIMIZATIONPO GAE50CO15114267K
Oct 20, 2014Appropriations to Special Purpose Fund$74,951.55WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Jan 12, 2015Appropriations to Special Purpose Fund$74,276.95PROP O OPTIMIZATIONPO GAE50CO15114267K
Jun 16, 2015Appropriations to Special Purpose Fund$55,756.37PROP O OPTIMIZATIONPO GAE50CO15114267K
Oct 20, 2014Appropriations to Special Purpose Fund$52,676.83WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Mar 10, 2015Appropriations to Special Purpose Fund$51,947.42WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Nov 17, 2014Appropriations to Special Purpose Fund$50,377.55PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Nov 4, 2014Appropriations to Special Purpose Fund$48,307.58WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Jan 15, 2015Appropriations to Special Purpose Fund$47,928.99WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
Mar 3, 2015Appropriations to Special Purpose Fund$42,932.15WW PLANNING & DESIGN SERVICESPO GAE50CO14120707M
FY 2014top 20 of 20 payments$958,045
DateAgencyAmountCategoryPurchase order
Apr 18, 2014Appropriations to Special Purpose Fund$208,535.73BROADWAY STRMWTR GREENWAYPO GAE50CO13120707M
Dec 5, 2013Appropriations to Special Purpose Fund$117,998.34PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Nov 1, 2013Appropriations to Special Purpose Fund$92,567.50TEMESCAL CANYON PRK PHASE IIPO GAE50CO13120707M
Nov 1, 2013Appropriations to Special Purpose Fund$92,567.50PENMAR WATER QLTY PHASE IIPO GAE50CO13120707M
Apr 16, 2014Appropriations to Special Purpose Fund$62,737.50PENMAR WATER QLTY PHASE IIPO GAE50CO13120707M
Apr 16, 2014Appropriations to Special Purpose Fund$60,237.50TEMESCAL CANYON PRK PHASE IIPO GAE50CO13120707M
Jan 16, 2014Appropriations to Special Purpose Fund$55,540.50TEMESCAL CANYON PRK PHASE IIPO GAE50CO13120707M
Jan 16, 2014Appropriations to Special Purpose Fund$55,540.50PENMAR WATER QLTY PHASE IIPO GAE50CO13120707M
Jan 17, 2014Appropriations to Special Purpose Fund$37,438.28PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Sep 6, 2013Appropriations to Special Purpose Fund$30,020.63PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Jan 15, 2014Appropriations to Special Purpose Fund$28,677.08PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Mar 14, 2014Appropriations to Special Purpose Fund$25,274.20PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Sep 6, 2013Appropriations to Special Purpose Fund$24,822.62PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Jan 27, 2014Appropriations to Special Purpose Fund$14,814.94PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Sep 6, 2013Appropriations to Special Purpose Fund$12,847.32PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Sep 6, 2013Appropriations to Special Purpose Fund$11,228.70PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Jul 29, 2013Appropriations to Special Purpose Fund$9,950.68PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Dec 19, 2013Appropriations to Special Purpose Fund$7,031.19PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Mar 27, 2014Appropriations to Special Purpose Fund$6,454.71PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
Mar 27, 2014Appropriations to Special Purpose Fund$3,759.91PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO14114267M
FY 2013top 10 of 10 payments$187,565
DateAgencyAmountCategoryPurchase order
Jul 12, 2012Appropriations to Special Purpose Fund$65,522.57SANITATION-OPERATION RELATEDPO GAE50CO12114267M
Aug 13, 2012Appropriations to Special Purpose Fund$52,030.05SANITATION-OPERATION RELATEDPO GAE50CO12114267M
Sep 5, 2012Appropriations to Special Purpose Fund$23,527.86SANITATION-OPERATION RELATEDPO GAE50CO12114267M
Dec 13, 2012Appropriations to Special Purpose Fund$14,302.09PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Mar 27, 2013Appropriations to Special Purpose Fund$11,268.21PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Apr 25, 2013Appropriations to Special Purpose Fund$8,571.38PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Dec 13, 2012Appropriations to Special Purpose Fund$7,468.51PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
May 31, 2013Appropriations to Special Purpose Fund$1,897.74PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Jun 14, 2013Appropriations to Special Purpose Fund$1,537.98PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO13114267M
Oct 10, 2012Appropriations to Special Purpose Fund$1,438.89SANITATION-OPERATION RELATEDPO GAE50CO12114267M
FY 2012top 6 of 6 payments$70,564
DateAgencyAmountCategoryPurchase order
Jun 4, 2012Appropriations to Special Purpose Fund$26,245.62SANITATION-OPERATION RELATEDPO GAE50CO12114267M
May 9, 2012Appropriations to Special Purpose Fund$14,901.00SANITATION-OPERATION RELATEDPO GAE50CO12114267M
Jan 25, 2012Appropriations to Special Purpose Fund$9,000.00PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO12114267M
Nov 29, 2011Appropriations to Special Purpose Fund$8,100.00PW-SANITATION EXPENSE & EQUIPMENTPO GAE50FMISCO1114267M
Apr 5, 2012Appropriations to Special Purpose Fund$6,317.46SANITATION-OPERATION RELATEDPO GAE50CO12114267M
Jan 25, 2012Appropriations to Special Purpose Fund$6,000.00PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO12114267M

Recent payments

DateAgencyAmountCategoryMethod
Jan 30, 2025Non_departmental$71,979.47CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 29, 2025Non_departmental$566,153.16CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 27, 2025Non_departmental$21,983.42REGIONAL PROJECT DEVELOPMENT AND REVOLVING FUNDSEFT
Jan 27, 2025Non_departmental$15,273.48MACARTHUR LAKE REHABILITATION PROJECTEFT
Jan 22, 2025Non_departmental$133,979.24CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 21, 2025Non_departmental$50,521.29CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 17, 2025Non_departmental$61,100.00CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 16, 2025Non_departmental$33,693.48CLEAN WATER PLANNING & DESIGN SERVICESEFT
Jan 16, 2025Non_departmental$82,009.36OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSEFT
Jan 15, 2025Non_departmental$4,599.50MACARTHUR LAKE REHABILITATION PROJECTEFT
Jan 14, 2025Non_departmental$10,596.55PW-SANITATION EXPENSE & EQUIPMENTEFT
Jan 14, 2025Non_departmental$10,403.90PW-SANITATION EXPENSE & EQUIPMENTEFT
Dec 27, 2024Non_departmental$10,048.43BALLONA CREEK LOW FLOW TREATMENT FACILITYEFT
Dec 27, 2024Non_departmental$15,428.74BALLONA CREEK LOW FLOW TREATMENT FACILITYEFT
Dec 18, 2024Non_departmental$382,644.57CLEAN WATER PLANNING & DESIGN SERVICESEFT
Dec 10, 2024Non_departmental$607,717.85CLEAN WATER PLANNING & DESIGN SERVICESEFT
Nov 19, 2024Non_departmental$15,804.17PW-SANITATION EXPENSE & EQUIPMENTEFT
Nov 19, 2024Non_departmental$4,681.71CLEAN WATER PLANNING & DESIGN SERVICESEFT
Nov 19, 2024Non_departmental$260,200.00CLEAN WATER PLANNING & DESIGN SERVICESEFT
Nov 7, 2024Non_departmental$192,570.13CLEAN WATER PLANNING & DESIGN SERVICESEFT
Oct 29, 2024Non_departmental$8,299.11PW-SANITATION EXPENSE AND EQUIPMENTEFT
Oct 28, 2024Non_departmental$56,285.18NPDES PERMIT COMPLIANCEEFT
Oct 28, 2024Non_departmental$73,954.25MACARTHUR LAKE REHABILITATION PROJECTEFT
Oct 28, 2024Non_departmental$35,838.46SANITATION CONTRACTSEFT
Oct 28, 2024Non_departmental$60,812.57OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTSEFT