Peraton Inc: New York City Government Payments
as recorded by New York City: PERATON INC
Peraton Inc is the 1,840th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 16th in DATA PROCESSING EQUIPMENT MAINTENANCE spending. Its payments amount to 2.8% of everything the Office of the Comptroller has paid vendors in that span. Payments to it rose 6.1% year over year.
Primary spending category: DATA PROCESSING EQUIPMENT MAINTENANCE
Confirm your email to activate this follow.
Check your inbox and click the confirmation link to activate this follow and open your watchlist. The link expires in 20 minutes.
A link was requested recently. Check your inbox, or wait one minute and submit this follow again. This request has not added a follow.
We couldn't send the confirmation. Check the email address and try again. This follow is not active until you confirm it.
Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.
Payments by fiscal year
The payment history
Select a column to see the agencies behind that fiscal year.
4 fiscal years on record. The incoming flows below combine all recorded years.
Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.
Who pays this supplier?
Select a paying agency to inspect the relationship, then open its profile.
Oct 12, 2021 to Jun 30, 2025 · All recorded fiscal years
Showing 4 of 4 positive agencies in these records.
Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $21,154,225.44. Zero and net-negative relationships are excluded from positive flows.
The relationships at a glance
- Total shown
- $21,154,225.44
- Payments represented
- 337
- Paying agencies shown
- 4
- Largest share of supplier total
- 69.1%
Largest displayed relationship: Office of the Comptroller. Select a flow to explore its details.
Oct 12, 2021 to Jun 30, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.
Peraton Inc
$21,154,225from the agencies shownPeraton Inc
$21,154,225 from the agencies shown
- $14,626,35369.1% of supplier total
- $5,760,07927.2% of supplier total
- $703,1683.3% of supplier total
- $64,6250.3% of supplier total
This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2025 | Office of the Comptroller | 39 | $3,437,094 |
| FY 2025 | Fire Department | 48 | $1,686,913 |
| FY 2025 | Department of Education | 16 | $41,559 |
| FY 2024 | Office of the Comptroller | 37 | $3,591,551 |
| FY 2024 | Fire Department | 46 | $1,254,290 |
| FY 2024 | Department of Education | 2 | $23,067 |
| FY 2023 | Office of the Comptroller | 45 | $4,489,634 |
| FY 2023 | Fire Department | 56 | $1,794,441 |
| FY 2022 | Office of the Comptroller | 21 | $3,108,075 |
| FY 2022 | Fire Department | 23 | $1,024,435 |
| FY 2022 | Department of Citywide Administrative Services | 4 | $703,168 |
| Total | 337 | $21,154,225 |
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| CAPITAL PURCHASED EQUIPMENT | 4 | $703,168 | Feb 15, 2022 – Jun 13, 2022 |
| OTHR SERV AND CHRGS-GENERAL | 24 | $626,443 | Aug 17, 2022 – Feb 11, 2025 |
| PROMPT PAYMENT INTEREST | 23 | $4,372 | Nov 21, 2023 – Jun 20, 2025 |
| PROFESSIONAL SVCS CONTRACTUAL | 1 | $429,956 | May 30, 2025 – May 30, 2025 |
| LEASING OF DATA PROC EQUIP | 16 | $427,299 | Sep 14, 2023 – Jun 9, 2025 |
| PROF SERV COMPUTER SERVICES | 120 | $3,292,321 | Feb 14, 2022 – Jun 30, 2025 |
| SUPPLIES + MATERIALS - GENERAL | 4 | $26,372 | Dec 27, 2023 – Nov 25, 2024 |
| DATA PROCESSING EQUIPMENT MAINTENANCE | 145 | $15,644,295 | Oct 12, 2021 – Jun 30, 2025 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 103 payments$5,165,565
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 30, 2025 | Fire Department | $429,956.00 | PROFESSIONAL SVCS CONTRACTUAL | – |
| Jul 24, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 11, 2025 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 15, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 1, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 26, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 14, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 2, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 25, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 9, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 7, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 7, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Nov 26, 2024 | Office of the Comptroller | $184,676.18 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 16, 2025 | Fire Department | $178,247.42 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 16, 2025 | Fire Department | $165,047.68 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 25, 2025 | Office of the Comptroller | $117,179.34 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 20, 2024 | Fire Department | $94,226.43 | PROF SERV COMPUTER SERVICES | – |
| Jun 30, 2025 | Fire Department | $82,523.82 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Nov 26, 2024 | Office of the Comptroller | $71,877.67 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 19, 2024 | Fire Department | $60,322.37 | PROF SERV COMPUTER SERVICES | – |
FY 2024top 20 of 85 payments$4,868,907
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 1, 2024 | Fire Department | $291,016.44 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 28, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 18, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 28, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 14, 2024 | Office of the Comptroller | $252,444.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 14, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 24, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 8, 2024 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Nov 15, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 19, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 11, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 5, 2024 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 18, 2024 | Office of the Comptroller | $209,609.37 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 15, 2023 | Office of the Comptroller | $135,346.46 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 1, 2024 | Fire Department | $129,916.48 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 15, 2023 | Office of the Comptroller | $109,745.30 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 28, 2023 | Fire Department | $61,096.35 | PROF SERV COMPUTER SERVICES | – |
| Jun 4, 2024 | Fire Department | $56,563.78 | PROF SERV COMPUTER SERVICES | – |
| Jun 7, 2024 | Fire Department | $54,797.12 | PROF SERV COMPUTER SERVICES | – |
| Mar 5, 2024 | Fire Department | $52,080.59 | PROF SERV COMPUTER SERVICES | – |
FY 2023top 20 of 101 payments$6,284,075
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 7, 2023 | Fire Department | $281,175.37 | PROF SERV COMPUTER SERVICES | – |
| Dec 27, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 25, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 25, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 27, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 23, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 5, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 17, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 8, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 12, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 17, 2023 | Office of the Comptroller | $245,091.76 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 17, 2022 | Office of the Comptroller | $241,599.08 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 27, 2022 | Office of the Comptroller | $237,953.16 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 15, 2023 | Office of the Comptroller | $237,953.16 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 13, 2023 | Office of the Comptroller | $237,953.16 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 3, 2022 | Office of the Comptroller | $227,417.44 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 17, 2023 | Office of the Comptroller | $191,437.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 24, 2022 | Fire Department | $71,938.43 | PROF SERV COMPUTER SERVICES | – |
| Feb 6, 2023 | Fire Department | $65,271.88 | PROF SERV COMPUTER SERVICES | – |
| Mar 21, 2023 | Fire Department | $54,419.12 | PROF SERV COMPUTER SERVICES | – |
FY 2022top 20 of 48 payments$4,835,678
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 15, 2022 | Department of Citywide Administrative Services | $390,564.52 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 16, 2022 | Office of the Comptroller | $365,307.04 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 6, 2021 | Office of the Comptroller | $365,307.04 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 14, 2022 | Fire Department | $271,666.92 | PROF SERV COMPUTER SERVICES | – |
| Jun 21, 2022 | Office of the Comptroller | $265,638.89 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 12, 2021 | Office of the Comptroller | $227,810.58 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 12, 2021 | Office of the Comptroller | $225,710.58 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 12, 2021 | Office of the Comptroller | $225,500.58 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 6, 2021 | Office of the Comptroller | $224,536.11 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 16, 2022 | Office of the Comptroller | $224,536.11 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 12, 2021 | Office of the Comptroller | $224,450.58 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 12, 2021 | Office of the Comptroller | $224,450.58 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 7, 2022 | Office of the Comptroller | $224,214.78 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 15, 2022 | Office of the Comptroller | $224,214.78 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 11, 2022 | Office of the Comptroller | $224,214.78 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 7, 2022 | Office of the Comptroller | $224,214.78 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| May 3, 2022 | Department of Citywide Administrative Services | $209,643.48 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 21, 2022 | Office of the Comptroller | $199,810.60 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 13, 2022 | Office of the Comptroller | $156,779.60 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 14, 2022 | Fire Department | $112,226.80 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Fire Department | $9,975.24 | PROF SERV COMPUTER SERVICES | Contracts |
| Jun 30, 2025 | Fire Department | $82,523.82 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Jun 30, 2025 | Fire Department | $41,261.92 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Jun 20, 2025 | Fire Department | $1,145.33 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 9, 2025 | Office of the Comptroller | $1,722.31 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Jun 9, 2025 | Office of the Comptroller | $21,328.29 | LEASING OF DATA PROC EQUIP | Contracts |
| Jun 9, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Jun 5, 2025 | Fire Department | $230.30 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 5, 2025 | Fire Department | $248.72 | PROMPT PAYMENT INTEREST | Contracts |
| May 30, 2025 | Fire Department | $429,956.00 | PROFESSIONAL SVCS CONTRACTUAL | Contracts |
| May 16, 2025 | Fire Department | $165,047.68 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| May 16, 2025 | Fire Department | $178,247.42 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| May 7, 2025 | Office of the Comptroller | $42,656.58 | LEASING OF DATA PROC EQUIP | Contracts |
| May 7, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| May 7, 2025 | Office of the Comptroller | $5,246.57 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Apr 7, 2025 | Office of the Comptroller | $2,700.00 | LEASING OF DATA PROC EQUIP | Contracts |
| Apr 7, 2025 | Office of the Comptroller | $1,406.56 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Apr 7, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Mar 25, 2025 | Office of the Comptroller | $29,720.60 | LEASING OF DATA PROC EQUIP | Contracts |
| Mar 25, 2025 | Office of the Comptroller | $230,227.45 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Mar 25, 2025 | Office of the Comptroller | $117,179.34 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Mar 7, 2025 | Fire Department | $3,208.64 | PROF SERV COMPUTER SERVICES | Contracts |
| Mar 7, 2025 | Fire Department | $4,057.52 | PROF SERV COMPUTER SERVICES | Contracts |
| Feb 11, 2025 | Office of the Comptroller | $29,720.60 | OTHR SERV AND CHRGS-GENERAL | Contracts |
| Feb 11, 2025 | Office of the Comptroller | $4,103.52 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
Other vendors serving Office of the Comptroller
- The Bank of New York Mellon $23,647,555
- Northrop Grumman Systems Corporation $12,724,727
- Northrop Grumman Systems Corporation $11,512,828
- Northrop Grumman Information Technology Inc $6,393,419
- Mckinsey & Company Inc. Washington, D.C. $1,990,000
- Microsoft Corporation $1,346,846
- Compulink Technologies Inc $1,278,690
- World Wide Technology LLC $1,277,578
- Coranet Corp $1,206,456
- Derive Technologies LLC $1,118,585
VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data