Coppola Paving & Landscaping Corp.: New York City Government Payments

as recorded by New York City: COPPOLA PAVING & LANDSCAPING CORP.

Coppola Paving & Landscaping Corp. is the 1,094th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 140th in IOTB CONSTRUCTION spending. Its payments amount to 0.4% of everything the Department of Parks and Recreation has paid vendors in that span. Payments to it fell 3.3% year over year.

Primary spending category: IOTB CONSTRUCTION

$49,568,543total received
580payments
5agencies
Jan 21, 2010Jun 9, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Coppola Paving & Landscaping Corp.. No spam.

Payments by fiscal year

FY 2025$4,593,225
FY 2024$4,750,975
FY 2023$5,459,224
FY 2022$5,518,355
FY 2021$6,455,501
FY 2020$5,319,975
FY 2019$2,297,663
FY 2018$4,743,155
FY 2017$2,702,075
FY 2016$1,497,359
FY 2015$77,549
FY 2014$705,816
FY 2013$655,575
FY 2012$2,210,496
FY 2011$1,987,244
FY 2010$594,355

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Parks and Recreation32$4,593,225
FY 2024Department of Parks and Recreation16$4,750,975
FY 2023Department of Parks and Recreation32$5,256,800
FY 2023Department of Environmental Protection8$182,475
FY 2023Department of Transportation1$19,950
FY 2022Department of Parks and Recreation93$5,518,355
FY 2021Department of Parks and Recreation71$5,284,623
FY 2021Department of Environmental Protection28$1,170,877
FY 2020Department of Parks and Recreation42$3,698,459
FY 2020Department of Environmental Protection7$1,598,213
FY 2020Department of Transportation2$23,302
FY 2019Department of Parks and Recreation35$1,547,450
FY 2019Department of Environmental Protection12$750,213
FY 2018Department of Parks and Recreation44$3,159,529
FY 2018Department of Environmental Protection14$1,557,001
FY 2018Police Department11$26,625
FY 2017Department of Parks and Recreation18$1,612,400
FY 2017Department of Transportation2$442,747
FY 2017Department of Environmental Protection5$401,050
FY 2017Police Department5$245,879
FY 2016Department of Parks and Recreation17$1,228,867
FY 2016Police Department3$229,584
FY 2016Department of Transportation3$34,409
FY 2016Department of Environmental Protection1$4,500
FY 2015Department of Parks and Recreation4$77,549
FY 2014Department of Parks and Recreation5$383,551
FY 2014School Construction Authority2$267,753
FY 2014Police Department3$30,422
FY 2014Department of Environmental Protection2$24,090
FY 2013School Construction Authority6$393,204
FY 2013Department of Environmental Protection16$257,662
FY 2013Police Department2$4,710
FY 2012School Construction Authority8$1,905,460
FY 2012Department of Environmental Protection7$296,900
FY 2012Department of Parks and Recreation1$8,136
FY 2011Department of Environmental Protection14$1,444,248
FY 2011School Construction Authority3$542,996
FY 2010Department of Environmental Protection3$557,152
FY 2010Department of Parks and Recreation2$37,203
Total580$49,568,543

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL3$73,894May 11, 2016 Feb 11, 2025
MAINT & OPER OF INFRASTRUCTURE1$4,885Jul 18, 2012 Jul 18, 2012
IOTB CONSTRUCTION467$45,683,795Jan 21, 2010 Jun 9, 2025
CONSTRUCTION-BUILDINGS41$3,641,922Apr 19, 2011 Sep 6, 2017
PROMPT PAYMENT INTEREST62$2,636Mar 11, 2021 Oct 16, 2024
N/A2$162,462Nov 22, 2016 Mar 1, 2017
<Non-Applicable Expenditure Object>4-$1,050Jul 18, 2012 Nov 2, 2015

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 32 payments$4,593,225
DateAgencyAmountCategoryPurchase order
Dec 12, 2024Department of Parks and Recreation$845,334.08IOTB CONSTRUCTION
Jan 2, 2025Department of Parks and Recreation$792,190.08IOTB CONSTRUCTION
Jul 3, 2024Department of Parks and Recreation$638,644.74IOTB CONSTRUCTION
Aug 1, 2024Department of Parks and Recreation$552,990.25IOTB CONSTRUCTION
Jun 9, 2025Department of Parks and Recreation$474,610.65IOTB CONSTRUCTION
Oct 28, 2024Department of Parks and Recreation$209,631.83IOTB CONSTRUCTION
Apr 21, 2025Department of Parks and Recreation$195,600.00IOTB CONSTRUCTION
Feb 11, 2025Department of Parks and Recreation$191,000.00IOTB CONSTRUCTION
Sep 26, 2024Department of Parks and Recreation$127,734.94IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$100,615.35IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$55,629.15IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$50,182.27IOTB CONSTRUCTION
May 21, 2025Department of Parks and Recreation$46,922.73IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$44,695.90IOTB CONSTRUCTION
May 21, 2025Department of Parks and Recreation$42,554.88IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$37,992.76IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$36,564.91IOTB CONSTRUCTION
Sep 26, 2024Department of Parks and Recreation$28,945.50IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$27,962.85IOTB CONSTRUCTION
May 27, 2025Department of Parks and Recreation$20,491.49IOTB CONSTRUCTION
FY 2024top 16 of 16 payments$4,750,975
DateAgencyAmountCategoryPurchase order
Jul 7, 2023Department of Parks and Recreation$721,761.13IOTB CONSTRUCTION
Jan 10, 2024Department of Parks and Recreation$646,925.80IOTB CONSTRUCTION
Feb 20, 2024Department of Parks and Recreation$499,096.78IOTB CONSTRUCTION
May 23, 2024Department of Parks and Recreation$466,087.29IOTB CONSTRUCTION
Aug 14, 2023Department of Parks and Recreation$440,369.65IOTB CONSTRUCTION
Dec 8, 2023Department of Parks and Recreation$333,933.39IOTB CONSTRUCTION
Mar 19, 2024Department of Parks and Recreation$333,666.81IOTB CONSTRUCTION
Mar 27, 2024Department of Parks and Recreation$281,190.31IOTB CONSTRUCTION
Feb 20, 2024Department of Parks and Recreation$274,975.78IOTB CONSTRUCTION
Sep 18, 2023Department of Parks and Recreation$267,564.65IOTB CONSTRUCTION
Apr 23, 2024Department of Parks and Recreation$199,705.69IOTB CONSTRUCTION
Nov 13, 2023Department of Parks and Recreation$165,902.88IOTB CONSTRUCTION
Jan 10, 2024Department of Parks and Recreation$105,024.22IOTB CONSTRUCTION
Mar 19, 2024Department of Parks and Recreation$13,867.15IOTB CONSTRUCTION
Apr 8, 2024Department of Parks and Recreation$705.33PROMPT PAYMENT INTEREST
Apr 16, 2024Department of Parks and Recreation$197.87PROMPT PAYMENT INTEREST
FY 2023top 20 of 41 payments$5,459,224
DateAgencyAmountCategoryPurchase order
Jul 28, 2022Department of Parks and Recreation$1,911,691.42IOTB CONSTRUCTION
Mar 6, 2023Department of Parks and Recreation$700,758.55IOTB CONSTRUCTION
Sep 21, 2022Department of Parks and Recreation$531,294.25IOTB CONSTRUCTION
Jan 25, 2023Department of Parks and Recreation$435,311.39IOTB CONSTRUCTION
Mar 29, 2023Department of Parks and Recreation$363,792.06IOTB CONSTRUCTION
May 22, 2023Department of Parks and Recreation$352,450.44IOTB CONSTRUCTION
Mar 29, 2023Department of Parks and Recreation$249,241.45IOTB CONSTRUCTION
Dec 14, 2022Department of Parks and Recreation$190,000.00IOTB CONSTRUCTION
Jan 25, 2023Department of Parks and Recreation$104,500.00IOTB CONSTRUCTION
Nov 28, 2022Department of Parks and Recreation$96,507.74IOTB CONSTRUCTION
Feb 6, 2023Department of Environmental Protection$96,247.56IOTB CONSTRUCTION
Dec 14, 2022Department of Parks and Recreation$86,779.43IOTB CONSTRUCTION
Jan 25, 2023Department of Parks and Recreation$55,720.57IOTB CONSTRUCTION
Sep 6, 2022Department of Parks and Recreation$49,393.54CONTRACTUAL SERVICES GENERAL
Feb 7, 2023Department of Environmental Protection$28,060.44IOTB CONSTRUCTION
Dec 12, 2022Department of Parks and Recreation$27,271.82IOTB CONSTRUCTION
Nov 28, 2022Department of Parks and Recreation$25,831.80IOTB CONSTRUCTION
Feb 23, 2023Department of Parks and Recreation$20,920.68IOTB CONSTRUCTION
Dec 14, 2022Department of Transportation$19,950.00IOTB CONSTRUCTION
Feb 7, 2023Department of Environmental Protection$18,572.57IOTB CONSTRUCTION
FY 2022top 20 of 93 payments$5,518,355
DateAgencyAmountCategoryPurchase order
Oct 4, 2021Department of Parks and Recreation$1,056,953.79IOTB CONSTRUCTION
Sep 7, 2021Department of Parks and Recreation$953,463.08IOTB CONSTRUCTION
Jan 19, 2022Department of Parks and Recreation$849,222.04IOTB CONSTRUCTION
Nov 1, 2021Department of Parks and Recreation$721,862.57IOTB CONSTRUCTION
Jul 7, 2021Department of Parks and Recreation$694,733.32IOTB CONSTRUCTION
Mar 9, 2022Department of Parks and Recreation$389,338.25IOTB CONSTRUCTION
May 25, 2022Department of Parks and Recreation$302,893.71IOTB CONSTRUCTION
Apr 14, 2022Department of Parks and Recreation$159,570.22IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$87,056.92IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$46,153.16IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$41,014.82IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$38,897.34IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$29,322.35IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$21,766.46IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$20,693.87IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$13,160.26IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$12,037.42IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$10,439.54IOTB CONSTRUCTION
May 31, 2022Department of Parks and Recreation$10,361.19IOTB CONSTRUCTION
Dec 28, 2021Department of Parks and Recreation$7,699.93IOTB CONSTRUCTION
FY 2021top 20 of 99 payments$6,455,501
DateAgencyAmountCategoryPurchase order
Apr 14, 2021Department of Parks and Recreation$876,909.92IOTB CONSTRUCTION
Jan 11, 2021Department of Parks and Recreation$779,281.64IOTB CONSTRUCTION
Feb 19, 2021Department of Parks and Recreation$739,049.37IOTB CONSTRUCTION
Oct 1, 2020Department of Parks and Recreation$557,124.72IOTB CONSTRUCTION
Nov 6, 2020Department of Environmental Protection$533,148.40IOTB CONSTRUCTION
May 19, 2021Department of Parks and Recreation$511,641.88IOTB CONSTRUCTION
Dec 24, 2020Department of Parks and Recreation$393,183.62IOTB CONSTRUCTION
Sep 9, 2020Department of Environmental Protection$213,475.73IOTB CONSTRUCTION
Aug 13, 2020Department of Parks and Recreation$196,862.61IOTB CONSTRUCTION
Dec 9, 2020Department of Environmental Protection$148,159.10IOTB CONSTRUCTION
Oct 16, 2020Department of Parks and Recreation$137,648.36IOTB CONSTRUCTION
Jan 21, 2021Department of Parks and Recreation$130,552.29IOTB CONSTRUCTION
Mar 5, 2021Department of Parks and Recreation$122,826.40IOTB CONSTRUCTION
Oct 5, 2020Department of Environmental Protection$105,508.48IOTB CONSTRUCTION
Sep 17, 2020Department of Parks and Recreation$94,159.49IOTB CONSTRUCTION
Nov 9, 2020Department of Parks and Recreation$85,880.53IOTB CONSTRUCTION
Dec 7, 2020Department of Parks and Recreation$81,873.58IOTB CONSTRUCTION
May 19, 2021Department of Parks and Recreation$77,589.54IOTB CONSTRUCTION
Nov 9, 2020Department of Parks and Recreation$69,347.76IOTB CONSTRUCTION
Dec 7, 2020Department of Parks and Recreation$49,424.13IOTB CONSTRUCTION
FY 2020top 20 of 51 payments$5,319,975
DateAgencyAmountCategoryPurchase order
Jun 29, 2020Department of Parks and Recreation$1,654,081.32IOTB CONSTRUCTION
Dec 2, 2019Department of Environmental Protection$461,804.74IOTB CONSTRUCTION
Mar 25, 2020Department of Parks and Recreation$413,562.83IOTB CONSTRUCTION
Apr 27, 2020Department of Environmental Protection$352,879.07IOTB CONSTRUCTION
Dec 26, 2019Department of Parks and Recreation$267,022.90IOTB CONSTRUCTION
Feb 18, 2020Department of Parks and Recreation$250,044.76IOTB CONSTRUCTION
Jun 22, 2020Department of Environmental Protection$244,364.91IOTB CONSTRUCTION
Nov 13, 2019Department of Environmental Protection$232,508.16IOTB CONSTRUCTION
Jan 13, 2020Department of Parks and Recreation$198,351.42IOTB CONSTRUCTION
Dec 26, 2019Department of Parks and Recreation$192,031.53IOTB CONSTRUCTION
Mar 23, 2020Department of Environmental Protection$170,911.34IOTB CONSTRUCTION
Dec 30, 2019Department of Parks and Recreation$146,298.75IOTB CONSTRUCTION
Mar 23, 2020Department of Environmental Protection$101,457.39IOTB CONSTRUCTION
Mar 16, 2020Department of Parks and Recreation$83,718.64IOTB CONSTRUCTION
Oct 10, 2019Department of Parks and Recreation$78,078.60IOTB CONSTRUCTION
Feb 4, 2020Department of Parks and Recreation$63,461.63IOTB CONSTRUCTION
Jun 29, 2020Department of Parks and Recreation$57,047.86IOTB CONSTRUCTION
Dec 30, 2019Department of Parks and Recreation$35,551.73IOTB CONSTRUCTION
Oct 7, 2019Department of Parks and Recreation$34,414.93IOTB CONSTRUCTION
Jan 29, 2020Department of Environmental Protection$34,287.87IOTB CONSTRUCTION
FY 2019top 20 of 47 payments$2,297,663
DateAgencyAmountCategoryPurchase order
Dec 10, 2018Department of Parks and Recreation$276,656.11IOTB CONSTRUCTION
Jun 10, 2019Department of Environmental Protection$261,957.28IOTB CONSTRUCTION
Oct 1, 2018Department of Parks and Recreation$220,611.59IOTB CONSTRUCTION
Dec 10, 2018Department of Parks and Recreation$217,228.18IOTB CONSTRUCTION
Aug 6, 2018Department of Parks and Recreation$189,722.48IOTB CONSTRUCTION
Jan 22, 2019Department of Parks and Recreation$171,978.78IOTB CONSTRUCTION
Feb 11, 2019Department of Environmental Protection$152,280.49IOTB CONSTRUCTION
Aug 13, 2018Department of Environmental Protection$106,744.51IOTB CONSTRUCTION
Aug 13, 2018Department of Parks and Recreation$101,539.68IOTB CONSTRUCTION
Jan 22, 2019Department of Environmental Protection$99,478.00IOTB CONSTRUCTION
Feb 7, 2019Department of Parks and Recreation$91,512.38IOTB CONSTRUCTION
Nov 7, 2018Department of Environmental Protection$71,095.77IOTB CONSTRUCTION
Oct 1, 2018Department of Parks and Recreation$58,347.43IOTB CONSTRUCTION
Oct 9, 2018Department of Parks and Recreation$53,336.54IOTB CONSTRUCTION
May 20, 2019Department of Parks and Recreation$27,237.31IOTB CONSTRUCTION
May 21, 2019Department of Environmental Protection$23,263.37IOTB CONSTRUCTION
May 21, 2019Department of Parks and Recreation$15,800.00IOTB CONSTRUCTION
May 21, 2019Department of Environmental Protection$15,665.47IOTB CONSTRUCTION
Oct 1, 2018Department of Parks and Recreation$15,109.73IOTB CONSTRUCTION
May 21, 2019Department of Parks and Recreation$13,426.53IOTB CONSTRUCTION
FY 2018top 20 of 69 payments$4,743,155
DateAgencyAmountCategoryPurchase order
Aug 30, 2017Department of Environmental Protection$442,004.06IOTB CONSTRUCTION
May 7, 2018Department of Parks and Recreation$329,899.58IOTB CONSTRUCTION
Jun 27, 2018Department of Parks and Recreation$300,200.00IOTB CONSTRUCTION
Oct 30, 2017Department of Environmental Protection$297,643.88IOTB CONSTRUCTION
Sep 18, 2017Department of Parks and Recreation$292,793.45IOTB CONSTRUCTION
Mar 5, 2018Department of Parks and Recreation$270,628.30IOTB CONSTRUCTION
Mar 27, 2018Department of Parks and Recreation$252,132.82IOTB CONSTRUCTION
Oct 30, 2017Department of Parks and Recreation$247,759.49IOTB CONSTRUCTION
Jun 27, 2018Department of Parks and Recreation$223,292.93IOTB CONSTRUCTION
Feb 6, 2018Department of Parks and Recreation$222,050.08IOTB CONSTRUCTION
Feb 6, 2018Department of Parks and Recreation$142,316.40IOTB CONSTRUCTION
Mar 26, 2018Department of Parks and Recreation$141,330.82IOTB CONSTRUCTION
Jan 16, 2018Department of Environmental Protection$141,072.58IOTB CONSTRUCTION
Dec 5, 2017Department of Parks and Recreation$118,631.54IOTB CONSTRUCTION
May 14, 2018Department of Environmental Protection$115,159.00IOTB CONSTRUCTION
Jun 11, 2018Department of Parks and Recreation$104,072.50IOTB CONSTRUCTION
Jul 3, 2017Department of Parks and Recreation$102,391.48IOTB CONSTRUCTION
Jan 16, 2018Department of Environmental Protection$94,933.52IOTB CONSTRUCTION
Nov 13, 2017Department of Environmental Protection$87,695.13IOTB CONSTRUCTION
Sep 27, 2017Department of Environmental Protection$80,993.49IOTB CONSTRUCTION
FY 2017top 20 of 30 payments$2,702,075
DateAgencyAmountCategoryPurchase order
May 8, 2017Department of Transportation$249,900.59IOTB CONSTRUCTION
Sep 12, 2016Department of Parks and Recreation$227,889.21IOTB CONSTRUCTION
Sep 21, 2016Department of Parks and Recreation$205,867.21IOTB CONSTRUCTION
May 30, 2017Department of Transportation$192,845.96IOTB CONSTRUCTION
May 2, 2017Department of Environmental Protection$171,001.38IOTB CONSTRUCTION
May 30, 2017Department of Parks and Recreation$162,234.50IOTB CONSTRUCTION
Jul 11, 2016Department of Parks and Recreation$162,106.35IOTB CONSTRUCTION
Jul 20, 2016Department of Parks and Recreation$153,649.61IOTB CONSTRUCTION
Jul 5, 2016Police Department$146,746.81CONSTRUCTION-BUILDINGS
Jul 20, 2016Department of Parks and Recreation$134,184.15IOTB CONSTRUCTION
Feb 28, 2017Department of Environmental Protection$133,712.50IOTB CONSTRUCTION
Mar 1, 2017Department of Parks and Recreation$102,764.36N/A
Jun 20, 2017Department of Environmental Protection$81,732.30IOTB CONSTRUCTION
Nov 14, 2016Department of Parks and Recreation$75,380.19IOTB CONSTRUCTION
Aug 22, 2016Police Department$63,357.46CONSTRUCTION-BUILDINGS
Nov 22, 2016Department of Parks and Recreation$59,697.17N/A
Nov 14, 2016Department of Parks and Recreation$56,272.45IOTB CONSTRUCTION
Jul 11, 2016Department of Parks and Recreation$48,208.88IOTB CONSTRUCTION
Jan 9, 2017Department of Parks and Recreation$45,200.20IOTB CONSTRUCTION
Jul 20, 2016Department of Parks and Recreation$41,986.16IOTB CONSTRUCTION
FY 2016top 20 of 24 payments$1,497,359
DateAgencyAmountCategoryPurchase order
May 11, 2016Department of Parks and Recreation$190,757.05IOTB CONSTRUCTION
May 23, 2016Department of Parks and Recreation$189,914.45IOTB CONSTRUCTION
May 11, 2016Department of Parks and Recreation$175,946.01IOTB CONSTRUCTION
Feb 16, 2016Department of Parks and Recreation$167,284.68IOTB CONSTRUCTION
Jan 11, 2016Department of Parks and Recreation$116,445.35IOTB CONSTRUCTION
Mar 14, 2016Police Department$109,196.80CONSTRUCTION-BUILDINGS
May 11, 2016Department of Parks and Recreation$93,705.14IOTB CONSTRUCTION
Jul 22, 2015Department of Parks and Recreation$80,750.00IOTB CONSTRUCTION
May 11, 2016Department of Parks and Recreation$68,208.86IOTB CONSTRUCTION
Apr 20, 2016Police Department$64,977.97CONSTRUCTION-BUILDINGS
Dec 9, 2015Police Department$55,408.75CONSTRUCTION-BUILDINGS
Nov 23, 2015Department of Parks and Recreation$49,506.46IOTB CONSTRUCTION
Jan 11, 2016Department of Parks and Recreation$29,879.19IOTB CONSTRUCTION
Feb 16, 2016Department of Parks and Recreation$24,213.12IOTB CONSTRUCTION
Nov 2, 2015Department of Transportation$21,081.48IOTB CONSTRUCTION
Jul 22, 2015Department of Parks and Recreation$19,189.96IOTB CONSTRUCTION
Feb 16, 2016Department of Parks and Recreation$16,150.00IOTB CONSTRUCTION
Nov 2, 2015Department of Transportation$12,708.15IOTB CONSTRUCTION
May 11, 2016Department of Parks and Recreation$4,500.00CONTRACTUAL SERVICES GENERAL
Nov 23, 2015Department of Environmental Protection$4,499.64IOTB CONSTRUCTION
FY 2015top 4 of 4 payments$77,549
DateAgencyAmountCategoryPurchase order
Apr 21, 2015Department of Parks and Recreation$39,673.07IOTB CONSTRUCTION
Apr 21, 2015Department of Parks and Recreation$20,099.99IOTB CONSTRUCTION
Apr 21, 2015Department of Parks and Recreation$17,363.26IOTB CONSTRUCTION
Apr 21, 2015Department of Parks and Recreation$412.61IOTB CONSTRUCTION
FY 2014top 12 of 12 payments$705,816
DateAgencyAmountCategoryPurchase order
Sep 25, 2013School Construction Authority$258,424.39CONSTRUCTION-BUILDINGS
Nov 26, 2013Department of Parks and Recreation$182,286.95IOTB CONSTRUCTION
Oct 2, 2013Department of Parks and Recreation$180,900.01IOTB CONSTRUCTION
Mar 24, 2014Department of Environmental Protection$22,930.50IOTB CONSTRUCTION
Jul 15, 2013Police Department$19,589.00CONSTRUCTION-BUILDINGS
Mar 31, 2014Department of Parks and Recreation$16,825.51IOTB CONSTRUCTION
Mar 4, 2014School Construction Authority$9,328.25CONSTRUCTION-BUILDINGS
Dec 18, 2013Police Department$8,042.57CONSTRUCTION-BUILDINGS
Oct 2, 2013Department of Parks and Recreation$3,713.48IOTB CONSTRUCTION
Dec 18, 2013Police Department$2,790.28CONSTRUCTION-BUILDINGS
Mar 24, 2014Department of Environmental Protection$1,159.96IOTB CONSTRUCTION
Oct 2, 2013Department of Parks and Recreation-$175.00<Non-Applicable Expenditure Object>
FY 2013top 20 of 24 payments$655,575
DateAgencyAmountCategoryPurchase order
Sep 19, 2012School Construction Authority$179,707.05CONSTRUCTION-BUILDINGS
Jul 9, 2012Department of Environmental Protection$88,939.75IOTB CONSTRUCTION
Jul 5, 2012School Construction Authority$82,555.95CONSTRUCTION-BUILDINGS
Oct 25, 2012School Construction Authority$68,419.75CONSTRUCTION-BUILDINGS
Dec 11, 2012School Construction Authority$40,233.82CONSTRUCTION-BUILDINGS
Nov 13, 2012Department of Environmental Protection$34,159.65IOTB CONSTRUCTION
Jan 15, 2013Department of Environmental Protection$25,788.49IOTB CONSTRUCTION
Mar 21, 2013School Construction Authority$16,670.00CONSTRUCTION-BUILDINGS
Jul 10, 2012Department of Environmental Protection$15,419.11IOTB CONSTRUCTION
Oct 26, 2012Department of Environmental Protection$14,137.24IOTB CONSTRUCTION
Oct 26, 2012Department of Environmental Protection$13,819.69IOTB CONSTRUCTION
Jul 10, 2012Department of Environmental Protection$12,765.65IOTB CONSTRUCTION
Jul 10, 2012Department of Environmental Protection$10,925.16IOTB CONSTRUCTION
Jul 10, 2012Department of Environmental Protection$9,498.46IOTB CONSTRUCTION
Oct 26, 2012Department of Environmental Protection$8,244.21IOTB CONSTRUCTION
Jul 10, 2012Department of Environmental Protection$7,059.67IOTB CONSTRUCTION
Mar 21, 2013School Construction Authority$5,617.07CONSTRUCTION-BUILDINGS
Oct 26, 2012Department of Environmental Protection$5,354.29IOTB CONSTRUCTION
Jul 10, 2012Department of Environmental Protection$5,346.27IOTB CONSTRUCTION
Jul 18, 2012Police Department$4,885.00MAINT & OPER OF INFRASTRUCTURE
FY 2012top 16 of 16 payments$2,210,496
DateAgencyAmountCategoryPurchase order
Nov 29, 2011School Construction Authority$381,858.20CONSTRUCTION-BUILDINGS
Nov 2, 2011School Construction Authority$366,068.72CONSTRUCTION-BUILDINGS
Dec 20, 2011School Construction Authority$327,566.18CONSTRUCTION-BUILDINGS
Jul 22, 2011School Construction Authority$318,825.32CONSTRUCTION-BUILDINGS
Sep 28, 2011School Construction Authority$158,977.75CONSTRUCTION-BUILDINGS
Sep 6, 2011School Construction Authority$155,543.50CONSTRUCTION-BUILDINGS
Jan 6, 2012Department of Environmental Protection$152,640.66IOTB CONSTRUCTION
Feb 2, 2012School Construction Authority$109,835.20CONSTRUCTION-BUILDINGS
Apr 27, 2012School Construction Authority$86,785.31CONSTRUCTION-BUILDINGS
Jan 6, 2012Department of Environmental Protection$42,158.11IOTB CONSTRUCTION
Aug 15, 2011Department of Environmental Protection$34,325.82IOTB CONSTRUCTION
Jan 6, 2012Department of Environmental Protection$29,251.96IOTB CONSTRUCTION
Jan 6, 2012Department of Environmental Protection$27,188.34IOTB CONSTRUCTION
Apr 3, 2012Department of Parks and Recreation$8,136.19IOTB CONSTRUCTION
Jan 6, 2012Department of Environmental Protection$7,006.06IOTB CONSTRUCTION
Jan 6, 2012Department of Environmental Protection$4,329.01IOTB CONSTRUCTION
FY 2011top 17 of 17 payments$1,987,244
DateAgencyAmountCategoryPurchase order
Jun 28, 2011School Construction Authority$402,496.00CONSTRUCTION-BUILDINGS
Dec 20, 2010Department of Environmental Protection$364,218.02IOTB CONSTRUCTION
Aug 23, 2010Department of Environmental Protection$292,963.08IOTB CONSTRUCTION
Jun 6, 2011Department of Environmental Protection$261,068.60IOTB CONSTRUCTION
Jul 20, 2010Department of Environmental Protection$193,175.00IOTB CONSTRUCTION
May 17, 2011School Construction Authority$105,188.18CONSTRUCTION-BUILDINGS
Jun 8, 2011Department of Environmental Protection$101,731.46IOTB CONSTRUCTION
Oct 25, 2010Department of Environmental Protection$101,578.98IOTB CONSTRUCTION
Mar 11, 2011Department of Environmental Protection$45,371.77IOTB CONSTRUCTION
Apr 19, 2011School Construction Authority$35,311.50CONSTRUCTION-BUILDINGS
Mar 11, 2011Department of Environmental Protection$23,996.71IOTB CONSTRUCTION
Jul 20, 2010Department of Environmental Protection$23,096.43IOTB CONSTRUCTION
Jul 20, 2010Department of Environmental Protection$19,987.93IOTB CONSTRUCTION
Mar 11, 2011Department of Environmental Protection$7,921.46IOTB CONSTRUCTION
Jun 6, 2011Department of Environmental Protection$5,204.64IOTB CONSTRUCTION
Jun 6, 2011Department of Environmental Protection$2,334.33IOTB CONSTRUCTION
Mar 11, 2011Department of Environmental Protection$1,600.00IOTB CONSTRUCTION
FY 2010top 5 of 5 payments$594,355
DateAgencyAmountCategoryPurchase order
Jun 28, 2010Department of Environmental Protection$242,547.48IOTB CONSTRUCTION
Apr 19, 2010Department of Environmental Protection$180,470.72IOTB CONSTRUCTION
May 25, 2010Department of Environmental Protection$134,133.71IOTB CONSTRUCTION
Jan 21, 2010Department of Parks and Recreation$32,276.44IOTB CONSTRUCTION
Jan 25, 2010Department of Parks and Recreation$4,926.69IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Jun 9, 2025Department of Parks and Recreation$474,610.65IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$27,962.85IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$5,079.35IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$729.85IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$50,182.27IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$1,359.57IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$36,564.91IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$20,491.49IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$55,629.15IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$37,992.76IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$4,083.66IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$100,615.35IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$14,891.10IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$44,695.90IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$8,398.42IOTB CONSTRUCTIONCapital Contracts
May 27, 2025Department of Parks and Recreation$18,033.33IOTB CONSTRUCTIONCapital Contracts
May 21, 2025Department of Parks and Recreation$46,922.73IOTB CONSTRUCTIONCapital Contracts
May 21, 2025Department of Parks and Recreation$42,554.88IOTB CONSTRUCTIONCapital Contracts
Apr 21, 2025Department of Parks and Recreation$195,600.00IOTB CONSTRUCTIONCapital Contracts
Apr 21, 2025Department of Parks and Recreation$16.10IOTB CONSTRUCTIONCapital Contracts
Feb 11, 2025Department of Parks and Recreation$118.88IOTB CONSTRUCTIONCapital Contracts
Feb 11, 2025Department of Parks and Recreation$191,000.00IOTB CONSTRUCTIONCapital Contracts
Feb 11, 2025Department of Parks and Recreation$20,000.00CONTRACTUAL SERVICES GENERALContracts
Jan 2, 2025Department of Parks and Recreation$792,190.08IOTB CONSTRUCTIONCapital Contracts
Dec 12, 2024Department of Parks and Recreation$845,334.08IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Parks and Recreation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data