Cca Civil Inc: New York City Government Payments

as recorded by New York City: CCA CIVIL INC

Cca Civil Inc is the 475th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 68th in IOTB CONSTRUCTION spending. Its payments amount to 0.8% of everything the Department of Transportation has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$153,178,566total received
583payments
1agency
May 13, 2013Apr 25, 2023first / last payment
Follow this vendorGet an email when New York City publishes new payments to Cca Civil Inc. No spam.

Payments by fiscal year

FY 2023$72,715
FY 2021$1,207,302
FY 2020$8,146,052
FY 2019$20,203,471
FY 2018$31,346,428
FY 2017$39,718,541
FY 2016$19,390,692
FY 2015$12,430,251
FY 2014$16,517,836
FY 2013$4,145,278

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2023Department of Transportation1$72,715
FY 2021Department of Transportation8$1,207,302
FY 2020Department of Transportation94$8,146,052
FY 2019Department of Transportation133$20,203,471
FY 2018Department of Transportation115$31,346,428
FY 2017Department of Transportation82$39,718,541
FY 2016Department of Transportation63$19,390,692
FY 2015Department of Transportation44$12,430,251
FY 2014Department of Transportation37$16,517,836
FY 2013Department of Transportation6$4,145,278
Total583$153,178,566

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
DESIGN-CONSULTANT-IOTB1$78,480Aug 27, 2018 Aug 27, 2018
POLLUTION REMEDIATION OBLIGATIONS26$3,100,636Aug 7, 2017 Jun 23, 2020
IOTB CONSTRUCTION556$149,999,450May 13, 2013 Apr 25, 2023

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2023top 1 of 1 payments$72,715
DateAgencyAmountCategoryPurchase order
Apr 25, 2023Department of Transportation$72,715.00IOTB CONSTRUCTION
FY 2021top 8 of 8 payments$1,207,302
DateAgencyAmountCategoryPurchase order
Aug 13, 2020Department of Transportation$543,866.70IOTB CONSTRUCTION
Nov 27, 2020Department of Transportation$469,659.31IOTB CONSTRUCTION
Jul 28, 2020Department of Transportation$87,180.80IOTB CONSTRUCTION
Sep 15, 2020Department of Transportation$67,840.00IOTB CONSTRUCTION
Jul 28, 2020Department of Transportation$16,346.40IOTB CONSTRUCTION
Sep 15, 2020Department of Transportation$12,720.00IOTB CONSTRUCTION
Jul 28, 2020Department of Transportation$5,448.80IOTB CONSTRUCTION
Sep 15, 2020Department of Transportation$4,240.00IOTB CONSTRUCTION
FY 2020top 20 of 94 payments$8,146,052
DateAgencyAmountCategoryPurchase order
Oct 28, 2019Department of Transportation$1,036,905.20IOTB CONSTRUCTION
Jul 8, 2019Department of Transportation$740,097.28IOTB CONSTRUCTION
Sep 23, 2019Department of Transportation$604,975.90IOTB CONSTRUCTION
Dec 2, 2019Department of Transportation$557,866.40IOTB CONSTRUCTION
Dec 18, 2019Department of Transportation$496,323.00IOTB CONSTRUCTION
Jan 15, 2020Department of Transportation$450,000.00IOTB CONSTRUCTION
Dec 18, 2019Department of Transportation$421,244.45IOTB CONSTRUCTION
Jun 23, 2020Department of Transportation$319,595.29IOTB CONSTRUCTION
Sep 23, 2019Department of Transportation$312,458.45IOTB CONSTRUCTION
Aug 19, 2019Department of Transportation$295,361.60IOTB CONSTRUCTION
Jun 23, 2020Department of Transportation$216,712.67IOTB CONSTRUCTION
Jun 23, 2020Department of Transportation$211,131.81POLLUTION REMEDIATION OBLIGATIONS
Oct 28, 2019Department of Transportation$197,822.70IOTB CONSTRUCTION
Apr 14, 2020Department of Transportation$154,617.55IOTB CONSTRUCTION
Jul 8, 2019Department of Transportation$138,768.24IOTB CONSTRUCTION
Oct 22, 2019Department of Transportation$133,173.27IOTB CONSTRUCTION
Jul 15, 2019Department of Transportation$117,903.33IOTB CONSTRUCTION
Sep 23, 2019Department of Transportation$113,432.96IOTB CONSTRUCTION
Oct 15, 2019Department of Transportation$90,000.00IOTB CONSTRUCTION
Dec 9, 2019Department of Transportation$88,000.00IOTB CONSTRUCTION
FY 2019top 20 of 133 payments$20,203,471
DateAgencyAmountCategoryPurchase order
Jul 30, 2018Department of Transportation$1,501,179.49IOTB CONSTRUCTION
Sep 19, 2018Department of Transportation$1,212,172.21IOTB CONSTRUCTION
Oct 23, 2018Department of Transportation$1,035,141.99IOTB CONSTRUCTION
Mar 18, 2019Department of Transportation$962,445.60IOTB CONSTRUCTION
Nov 5, 2018Department of Transportation$851,988.80IOTB CONSTRUCTION
Apr 15, 2019Department of Transportation$792,000.00IOTB CONSTRUCTION
Jun 11, 2019Department of Transportation$788,141.20IOTB CONSTRUCTION
Dec 5, 2018Department of Transportation$780,063.80IOTB CONSTRUCTION
Mar 4, 2019Department of Transportation$662,121.04IOTB CONSTRUCTION
Sep 17, 2018Department of Transportation$646,992.24IOTB CONSTRUCTION
Apr 29, 2019Department of Transportation$642,740.38IOTB CONSTRUCTION
Aug 13, 2018Department of Transportation$624,178.95IOTB CONSTRUCTION
Jul 18, 2018Department of Transportation$573,427.52IOTB CONSTRUCTION
Jan 14, 2019Department of Transportation$556,604.64IOTB CONSTRUCTION
Feb 11, 2019Department of Transportation$378,566.24IOTB CONSTRUCTION
Apr 8, 2019Department of Transportation$377,736.48IOTB CONSTRUCTION
Dec 24, 2018Department of Transportation$371,363.12IOTB CONSTRUCTION
May 7, 2019Department of Transportation$351,644.48IOTB CONSTRUCTION
Feb 4, 2019Department of Transportation$312,437.92IOTB CONSTRUCTION
Jul 30, 2018Department of Transportation$281,471.16IOTB CONSTRUCTION
FY 2018top 20 of 115 payments$31,346,428
DateAgencyAmountCategoryPurchase order
Jan 4, 2018Department of Transportation$3,888,538.94IOTB CONSTRUCTION
May 17, 2018Department of Transportation$1,465,238.18IOTB CONSTRUCTION
Mar 15, 2018Department of Transportation$1,334,958.50IOTB CONSTRUCTION
Feb 20, 2018Department of Transportation$1,320,637.32IOTB CONSTRUCTION
Apr 12, 2018Department of Transportation$1,216,972.25IOTB CONSTRUCTION
Sep 20, 2017Department of Transportation$1,184,623.31IOTB CONSTRUCTION
Aug 7, 2017Department of Transportation$1,156,278.47IOTB CONSTRUCTION
Dec 14, 2017Department of Transportation$959,936.30IOTB CONSTRUCTION
Aug 23, 2017Department of Transportation$914,450.92IOTB CONSTRUCTION
Oct 18, 2017Department of Transportation$768,345.99POLLUTION REMEDIATION OBLIGATIONS
Sep 18, 2017Department of Transportation$753,900.00IOTB CONSTRUCTION
Oct 16, 2017Department of Transportation$695,846.40IOTB CONSTRUCTION
Jan 8, 2018Department of Transportation$664,743.33IOTB CONSTRUCTION
Jan 4, 2018Department of Transportation$661,523.05IOTB CONSTRUCTION
Sep 18, 2017Department of Transportation$644,311.85POLLUTION REMEDIATION OBLIGATIONS
Dec 4, 2017Department of Transportation$640,429.61POLLUTION REMEDIATION OBLIGATIONS
Nov 8, 2017Department of Transportation$624,729.34IOTB CONSTRUCTION
Mar 28, 2018Department of Transportation$616,221.26IOTB CONSTRUCTION
Dec 18, 2017Department of Transportation$607,778.00IOTB CONSTRUCTION
Feb 5, 2018Department of Transportation$606,640.72IOTB CONSTRUCTION
FY 2017top 20 of 82 payments$39,718,541
DateAgencyAmountCategoryPurchase order
May 17, 2017Department of Transportation$3,608,375.40IOTB CONSTRUCTION
Mar 21, 2017Department of Transportation$2,889,589.68IOTB CONSTRUCTION
Jun 19, 2017Department of Transportation$2,467,590.67IOTB CONSTRUCTION
Apr 17, 2017Department of Transportation$2,426,540.98IOTB CONSTRUCTION
Oct 5, 2016Department of Transportation$2,402,639.90IOTB CONSTRUCTION
Feb 22, 2017Department of Transportation$1,658,753.60IOTB CONSTRUCTION
Feb 28, 2017Department of Transportation$1,582,567.17IOTB CONSTRUCTION
Nov 7, 2016Department of Transportation$1,565,920.00IOTB CONSTRUCTION
Nov 28, 2016Department of Transportation$1,499,722.52IOTB CONSTRUCTION
Aug 15, 2016Department of Transportation$1,456,958.00IOTB CONSTRUCTION
Dec 27, 2016Department of Transportation$1,370,722.21IOTB CONSTRUCTION
Aug 29, 2016Department of Transportation$1,121,733.18IOTB CONSTRUCTION
Jul 5, 2016Department of Transportation$1,095,462.96IOTB CONSTRUCTION
Dec 19, 2016Department of Transportation$946,284.80IOTB CONSTRUCTION
Nov 28, 2016Department of Transportation$919,232.00IOTB CONSTRUCTION
Jan 11, 2017Department of Transportation$903,200.00IOTB CONSTRUCTION
Jul 5, 2016Department of Transportation$742,894.00IOTB CONSTRUCTION
Aug 1, 2016Department of Transportation$706,713.60IOTB CONSTRUCTION
Feb 6, 2017Department of Transportation$695,751.74IOTB CONSTRUCTION
May 17, 2017Department of Transportation$676,570.39IOTB CONSTRUCTION
FY 2016top 20 of 63 payments$19,390,692
DateAgencyAmountCategoryPurchase order
May 9, 2016Department of Transportation$3,394,005.55IOTB CONSTRUCTION
Jun 7, 2016Department of Transportation$1,865,549.56IOTB CONSTRUCTION
Dec 21, 2015Department of Transportation$1,312,160.37IOTB CONSTRUCTION
Jan 11, 2016Department of Transportation$1,283,724.18IOTB CONSTRUCTION
Nov 6, 2015Department of Transportation$944,851.26IOTB CONSTRUCTION
Sep 17, 2015Department of Transportation$868,325.49IOTB CONSTRUCTION
Apr 7, 2016Department of Transportation$753,754.15IOTB CONSTRUCTION
May 23, 2016Department of Transportation$750,196.00IOTB CONSTRUCTION
Feb 2, 2016Department of Transportation$703,425.82IOTB CONSTRUCTION
May 9, 2016Department of Transportation$636,376.04IOTB CONSTRUCTION
Apr 18, 2016Department of Transportation$583,520.00IOTB CONSTRUCTION
Mar 11, 2016Department of Transportation$550,338.00IOTB CONSTRUCTION
Jan 11, 2016Department of Transportation$437,326.00IOTB CONSTRUCTION
Dec 7, 2015Department of Transportation$428,000.00IOTB CONSTRUCTION
Aug 18, 2015Department of Transportation$425,277.23IOTB CONSTRUCTION
Mar 11, 2016Department of Transportation$392,214.90IOTB CONSTRUCTION
Jun 7, 2016Department of Transportation$335,469.29IOTB CONSTRUCTION
Mar 10, 2016Department of Transportation$275,792.00IOTB CONSTRUCTION
Jan 19, 2016Department of Transportation$275,792.00IOTB CONSTRUCTION
Dec 21, 2015Department of Transportation$246,030.07IOTB CONSTRUCTION
FY 2015top 20 of 44 payments$12,430,251
DateAgencyAmountCategoryPurchase order
May 26, 2015Department of Transportation$1,174,137.15IOTB CONSTRUCTION
Apr 14, 2015Department of Transportation$1,098,391.02IOTB CONSTRUCTION
Jul 14, 2014Department of Transportation$1,084,746.86IOTB CONSTRUCTION
Oct 3, 2014Department of Transportation$1,023,002.77IOTB CONSTRUCTION
Jun 10, 2015Department of Transportation$865,978.14IOTB CONSTRUCTION
Aug 11, 2014Department of Transportation$863,930.58IOTB CONSTRUCTION
Jun 22, 2015Department of Transportation$756,530.84IOTB CONSTRUCTION
Dec 29, 2014Department of Transportation$620,188.84IOTB CONSTRUCTION
Aug 26, 2014Department of Transportation$602,515.33IOTB CONSTRUCTION
Feb 6, 2015Department of Transportation$575,447.50IOTB CONSTRUCTION
Oct 28, 2014Department of Transportation$347,748.02IOTB CONSTRUCTION
Aug 29, 2014Department of Transportation$301,980.00IOTB CONSTRUCTION
Mar 23, 2015Department of Transportation$277,848.00IOTB CONSTRUCTION
Aug 29, 2014Department of Transportation$212,826.29IOTB CONSTRUCTION
Apr 14, 2015Department of Transportation$198,598.32IOTB CONSTRUCTION
May 26, 2015Department of Transportation$196,525.72IOTB CONSTRUCTION
Jul 14, 2014Department of Transportation$193,574.63IOTB CONSTRUCTION
Oct 3, 2014Department of Transportation$184,441.50IOTB CONSTRUCTION
Mar 5, 2015Department of Transportation$168,566.89IOTB CONSTRUCTION
Aug 11, 2014Department of Transportation$129,645.19IOTB CONSTRUCTION
FY 2014top 20 of 37 payments$16,517,836
DateAgencyAmountCategoryPurchase order
Sep 18, 2013Department of Transportation$2,326,746.22IOTB CONSTRUCTION
Oct 22, 2013Department of Transportation$2,132,515.09IOTB CONSTRUCTION
Jan 30, 2014Department of Transportation$1,537,505.16IOTB CONSTRUCTION
Apr 7, 2014Department of Transportation$1,534,553.24IOTB CONSTRUCTION
Dec 2, 2013Department of Transportation$1,268,549.80IOTB CONSTRUCTION
Feb 26, 2014Department of Transportation$890,281.48IOTB CONSTRUCTION
Dec 13, 2013Department of Transportation$818,070.00IOTB CONSTRUCTION
Aug 28, 2013Department of Transportation$816,322.56IOTB CONSTRUCTION
Dec 26, 2013Department of Transportation$740,865.52IOTB CONSTRUCTION
Sep 18, 2013Department of Transportation$436,264.92IOTB CONSTRUCTION
Oct 22, 2013Department of Transportation$399,846.58IOTB CONSTRUCTION
May 27, 2014Department of Transportation$386,833.14IOTB CONSTRUCTION
May 21, 2014Department of Transportation$352,069.03IOTB CONSTRUCTION
Apr 7, 2014Department of Transportation$287,728.73IOTB CONSTRUCTION
Jan 30, 2014Department of Transportation$272,082.22IOTB CONSTRUCTION
Jul 15, 2013Department of Transportation$263,472.60IOTB CONSTRUCTION
Dec 2, 2013Department of Transportation$227,053.09IOTB CONSTRUCTION
Mar 28, 2014Department of Transportation$167,806.10IOTB CONSTRUCTION
Feb 26, 2014Department of Transportation$166,927.78IOTB CONSTRUCTION
Dec 13, 2013Department of Transportation$153,388.12IOTB CONSTRUCTION
FY 2013top 6 of 6 payments$4,145,278
DateAgencyAmountCategoryPurchase order
May 13, 2013Department of Transportation$3,103,288.00IOTB CONSTRUCTION
May 13, 2013Department of Transportation$581,866.50IOTB CONSTRUCTION
Jun 4, 2013Department of Transportation$212,934.40IOTB CONSTRUCTION
May 13, 2013Department of Transportation$193,955.50IOTB CONSTRUCTION
Jun 4, 2013Department of Transportation$39,925.20IOTB CONSTRUCTION
Jun 4, 2013Department of Transportation$13,308.40IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Apr 25, 2023Department of Transportation$72,715.00IOTB CONSTRUCTIONCapital Contracts
Nov 27, 2020Department of Transportation$469,659.31IOTB CONSTRUCTIONCapital Contracts
Sep 15, 2020Department of Transportation$4,240.00IOTB CONSTRUCTIONCapital Contracts
Sep 15, 2020Department of Transportation$12,720.00IOTB CONSTRUCTIONCapital Contracts
Sep 15, 2020Department of Transportation$67,840.00IOTB CONSTRUCTIONCapital Contracts
Aug 13, 2020Department of Transportation$543,866.70IOTB CONSTRUCTIONCapital Contracts
Jul 28, 2020Department of Transportation$87,180.80IOTB CONSTRUCTIONCapital Contracts
Jul 28, 2020Department of Transportation$5,448.80IOTB CONSTRUCTIONCapital Contracts
Jul 28, 2020Department of Transportation$16,346.40IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$319,595.29IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$5,642.40IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$16,927.23IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$5,009.25IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$44,250.36IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$14,750.12IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$1,669.75IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$3,481.52IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$1,160.50IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$211,131.81POLLUTION REMEDIATION OBLIGATIONSCapital Contracts
Jun 23, 2020Department of Transportation$51,969.29IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$22,624.83IOTB CONSTRUCTIONCapital Contracts
Jun 23, 2020Department of Transportation$216,712.67IOTB CONSTRUCTIONCapital Contracts
Apr 14, 2020Department of Transportation$154,617.55IOTB CONSTRUCTIONCapital Contracts
Mar 16, 2020Department of Transportation$5,821.20IOTB CONSTRUCTIONCapital Contracts
Mar 16, 2020Department of Transportation$31,046.40IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Transportation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data