Abel Bainnson Butz, LLP: New York City Government Payments

as recorded by New York City: ABEL BAINNSON BUTZ, LLP

Abel Bainnson Butz, LLP is the 1,509th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 55th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.2% of everything the Department of Parks and Recreation has paid vendors in that span. Payments to it fell 5.8% year over year.

Primary spending category: DESIGN-CONSULTANT-IOTB

$29,816,760total received
1,497payments
8agencies
Jan 12, 2010Jun 25, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Abel Bainnson Butz, LLP. No spam.

Payments by fiscal year

FY 2025$1,528,923
FY 2024$1,622,174
FY 2023$1,315,240
FY 2022$890,615
FY 2021$2,228,876
FY 2020$2,731,000
FY 2019$3,943,090
FY 2018$2,812,873
FY 2017$2,083,281
FY 2016$1,725,716
FY 2015$1,672,717
FY 2014$756,302
FY 2013$1,174,955
FY 2012$1,768,486
FY 2011$2,312,948
FY 2010$1,249,564

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Parks and Recreation35$1,108,559
FY 2025School Construction Authority31$278,656
FY 2025Department of Transportation2$129,035
FY 2025Department of Environmental Protection1$12,673
FY 2024School Construction Authority54$784,467
FY 2024Department of Parks and Recreation24$776,689
FY 2024Department of Transportation1$55,243
FY 2024Department of Environmental Protection4$5,774
FY 2023Department of Parks and Recreation27$733,960
FY 2023School Construction Authority55$571,130
FY 2023Department of Design and Construction2$6,800
FY 2023Department of Environmental Protection1$3,350
FY 2022Department of Parks and Recreation24$475,359
FY 2022School Construction Authority15$270,632
FY 2022Department of Transportation2$125,200
FY 2022Department of Environmental Protection7$19,424
FY 2021Department of Parks and Recreation29$2,119,312
FY 2021School Construction Authority4$56,440
FY 2021Department of Environmental Protection11$41,786
FY 2021Department of Cultural Affairs1$11,338
FY 2020Department of Parks and Recreation47$1,704,861
FY 2020School Construction Authority49$533,221
FY 2020Department of Transportation4$425,288
FY 2020Department of Cultural Affairs7$39,537
FY 2020Department of Environmental Protection4$20,215
FY 2020Department of Design and Construction1$7,879
FY 2019Department of Parks and Recreation49$3,460,295
FY 2019School Construction Authority44$278,710
FY 2019Department of Environmental Protection13$115,452
FY 2019Department of Transportation1$56,710
FY 2019Department of Cultural Affairs1$31,924
FY 2018Department of Parks and Recreation54$2,285,666
FY 2018School Construction Authority46$441,062
FY 2018Department of Transportation3$86,145
FY 2017Department of Parks and Recreation53$1,446,897
FY 2017School Construction Authority33$445,795
FY 2017Department of Transportation7$174,370
FY 2017Department of Cultural Affairs5$16,220
FY 2016Department of Parks and Recreation42$1,241,139
FY 2016School Construction Authority24$352,548
FY 2016Department of Cultural Affairs24$103,573
FY 2016Department of Transportation1$15,000
FY 2016City University Construction Fund5$13,456
FY 2015School Construction Authority95$867,799
FY 2015Department of Parks and Recreation23$575,236
FY 2015Department of Cultural Affairs34$161,713
FY 2015Department of Transportation2$52,058
FY 2015Department of Homeless Services3$9,490
FY 2015City University Construction Fund1$6,422
FY 2014School Construction Authority39$376,926
FY 2014Department of Parks and Recreation13$212,279
FY 2014Department of Cultural Affairs10$76,677
FY 2014City University Construction Fund3$43,395
FY 2014Department of Transportation8$27,302
FY 2014Department of Environmental Protection2$18,053
FY 2014Department of Homeless Services1$1,671
FY 2013Department of Parks and Recreation25$482,352
FY 2013Department of Cultural Affairs17$303,682
FY 2013School Construction Authority35$253,477
FY 2013Department of Transportation7$61,170
FY 2013Department of Environmental Protection5$44,609
FY 2013Department of Homeless Services2$24,283
FY 2013City University Construction Fund1$5,383
FY 2012Department of Parks and Recreation56$985,693
FY 2012Department of Cultural Affairs10$256,588
FY 2012Department of Environmental Protection15$181,811
FY 2012Department of Transportation11$153,469
FY 2012School Construction Authority25$142,866
FY 2012Department of Homeless Services8$48,059
FY 2011Department of Parks and Recreation82$1,672,262
FY 2011Department of Environmental Protection13$176,865
FY 2011School Construction Authority20$165,145
FY 2011Department of Homeless Services2$106,764
FY 2011Department of Transportation5$99,361
FY 2011Department of Cultural Affairs9$92,551
FY 2010Department of Parks and Recreation50$1,083,513
FY 2010School Construction Authority11$67,745
FY 2010Department of Environmental Protection5$61,521
FY 2010Department of Homeless Services2$36,785
Total1,497$29,816,760

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
IOTB CONSTRUCTION6$95,056Feb 4, 2019 Jul 8, 2024
DESIGN-CONSULTANT-BUILDINGS92$882,153Jan 21, 2010 Mar 2, 2020
OTHER EXPENDITURES-GENERAL2$7,333May 13, 2013 Nov 12, 2013
PROMPT PAYMENT INTEREST8$709Dec 10, 2020 Mar 25, 2025
OTHER EXPENDITURES-REPORTABLE8$61,323Feb 26, 2014 Mar 30, 2016
CONSTRUCTION-BUILDINGS580$5,886,618Feb 2, 2010 Jun 23, 2025
PROF SERV ENGINEER & ARCHITECT3$39,517Sep 18, 2012 Jan 2, 2013
CONTRACTUAL SERVICES GENERAL9$376,951Dec 16, 2014 Feb 18, 2020
DESIGN-CONSULTANT-IOTB786$22,452,422Jan 12, 2010 Jun 25, 2025
N/A3$14,679Aug 1, 2019 May 1, 2023

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 69 payments$1,528,923
DateAgencyAmountCategoryPurchase order
Sep 10, 2024Department of Parks and Recreation$144,532.28DESIGN-CONSULTANT-IOTB
Jun 25, 2025Department of Parks and Recreation$85,280.00DESIGN-CONSULTANT-IOTB
Dec 16, 2024Department of Parks and Recreation$77,733.11DESIGN-CONSULTANT-IOTB
Jul 17, 2024School Construction Authority$65,203.57CONSTRUCTION-BUILDINGS
Aug 5, 2024Department of Transportation$64,958.15DESIGN-CONSULTANT-IOTB
Mar 5, 2025Department of Transportation$64,076.43DESIGN-CONSULTANT-IOTB
Mar 5, 2025Department of Parks and Recreation$63,027.48DESIGN-CONSULTANT-IOTB
Feb 18, 2025Department of Parks and Recreation$62,152.69DESIGN-CONSULTANT-IOTB
Dec 5, 2024Department of Parks and Recreation$58,417.04DESIGN-CONSULTANT-IOTB
Mar 17, 2025Department of Parks and Recreation$57,951.25DESIGN-CONSULTANT-IOTB
Aug 12, 2024School Construction Authority$51,309.33CONSTRUCTION-BUILDINGS
May 5, 2025Department of Parks and Recreation$48,943.04DESIGN-CONSULTANT-IOTB
Feb 18, 2025Department of Parks and Recreation$46,291.52DESIGN-CONSULTANT-IOTB
Sep 5, 2024Department of Parks and Recreation$46,014.43DESIGN-CONSULTANT-IOTB
Jul 8, 2024Department of Parks and Recreation$45,492.21DESIGN-CONSULTANT-IOTB
Dec 5, 2024Department of Parks and Recreation$41,934.49DESIGN-CONSULTANT-IOTB
Jul 8, 2024Department of Parks and Recreation$41,311.92DESIGN-CONSULTANT-IOTB
May 5, 2025Department of Parks and Recreation$38,776.67DESIGN-CONSULTANT-IOTB
Feb 18, 2025Department of Parks and Recreation$38,502.09DESIGN-CONSULTANT-IOTB
May 13, 2025Department of Parks and Recreation$37,813.11DESIGN-CONSULTANT-IOTB
FY 2024top 20 of 83 payments$1,622,174
DateAgencyAmountCategoryPurchase order
Apr 29, 2024Department of Parks and Recreation$134,885.00DESIGN-CONSULTANT-IOTB
Dec 4, 2023School Construction Authority$109,844.26CONSTRUCTION-BUILDINGS
Jun 24, 2024School Construction Authority$87,875.40CONSTRUCTION-BUILDINGS
Apr 29, 2024Department of Parks and Recreation$82,996.81DESIGN-CONSULTANT-IOTB
Aug 7, 2023Department of Parks and Recreation$82,453.68DESIGN-CONSULTANT-IOTB
Aug 21, 2023School Construction Authority$73,229.50CONSTRUCTION-BUILDINGS
Apr 17, 2024Department of Parks and Recreation$65,651.65DESIGN-CONSULTANT-IOTB
Oct 4, 2023Department of Transportation$55,242.73DESIGN-CONSULTANT-IOTB
Apr 17, 2024Department of Parks and Recreation$54,332.01DESIGN-CONSULTANT-IOTB
Aug 3, 2023School Construction Authority$50,201.48CONSTRUCTION-BUILDINGS
Aug 3, 2023School Construction Authority$40,291.94CONSTRUCTION-BUILDINGS
Jun 6, 2024School Construction Authority$40,161.18CONSTRUCTION-BUILDINGS
Jul 31, 2023School Construction Authority$38,755.93CONSTRUCTION-BUILDINGS
Jan 8, 2024Department of Parks and Recreation$37,954.43DESIGN-CONSULTANT-IOTB
Jul 31, 2023School Construction Authority$34,640.50CONSTRUCTION-BUILDINGS
Feb 12, 2024Department of Parks and Recreation$34,495.82DESIGN-CONSULTANT-IOTB
Jun 17, 2024Department of Parks and Recreation$32,821.51DESIGN-CONSULTANT-IOTB
Sep 7, 2023School Construction Authority$31,073.01CONSTRUCTION-BUILDINGS
Jan 8, 2024Department of Parks and Recreation$29,821.34DESIGN-CONSULTANT-IOTB
May 20, 2024Department of Parks and Recreation$28,865.22DESIGN-CONSULTANT-IOTB
FY 2023top 20 of 85 payments$1,315,240
DateAgencyAmountCategoryPurchase order
Mar 14, 2023Department of Parks and Recreation$103,056.84DESIGN-CONSULTANT-IOTB
Jan 18, 2023School Construction Authority$88,137.92CONSTRUCTION-BUILDINGS
Sep 6, 2022Department of Parks and Recreation$86,715.25DESIGN-CONSULTANT-IOTB
Nov 9, 2022Department of Parks and Recreation$83,192.75DESIGN-CONSULTANT-IOTB
Jul 19, 2022Department of Parks and Recreation$66,152.21DESIGN-CONSULTANT-IOTB
Jun 20, 2023Department of Parks and Recreation$54,140.51DESIGN-CONSULTANT-IOTB
Jul 25, 2022Department of Parks and Recreation$51,978.00DESIGN-CONSULTANT-IOTB
Jan 17, 2023Department of Parks and Recreation$47,480.51DESIGN-CONSULTANT-IOTB
Mar 28, 2023School Construction Authority$42,008.50CONSTRUCTION-BUILDINGS
Feb 9, 2023School Construction Authority$34,820.35CONSTRUCTION-BUILDINGS
Jan 17, 2023Department of Parks and Recreation$33,004.57DESIGN-CONSULTANT-IOTB
Feb 6, 2023Department of Parks and Recreation$32,436.50DESIGN-CONSULTANT-IOTB
Mar 28, 2023School Construction Authority$30,821.76CONSTRUCTION-BUILDINGS
Nov 23, 2022Department of Parks and Recreation$27,484.56DESIGN-CONSULTANT-IOTB
May 10, 2023Department of Parks and Recreation$27,484.56DESIGN-CONSULTANT-IOTB
Apr 3, 2023Department of Parks and Recreation$27,484.56DESIGN-CONSULTANT-IOTB
Mar 13, 2023School Construction Authority$26,657.62CONSTRUCTION-BUILDINGS
Oct 11, 2022Department of Parks and Recreation$21,676.70DESIGN-CONSULTANT-IOTB
Mar 20, 2023Department of Parks and Recreation$21,676.69DESIGN-CONSULTANT-IOTB
Jan 18, 2023School Construction Authority$18,375.74CONSTRUCTION-BUILDINGS
FY 2022top 20 of 48 payments$890,615
DateAgencyAmountCategoryPurchase order
Mar 7, 2022Department of Parks and Recreation$99,228.29DESIGN-CONSULTANT-IOTB
Nov 8, 2021Department of Parks and Recreation$71,623.01DESIGN-CONSULTANT-IOTB
Aug 9, 2021Department of Transportation$63,086.60DESIGN-CONSULTANT-IOTB
Feb 15, 2022Department of Transportation$62,113.00DESIGN-CONSULTANT-IOTB
Aug 2, 2021Department of Parks and Recreation$52,137.50DESIGN-CONSULTANT-IOTB
Aug 13, 2021School Construction Authority$50,957.22CONSTRUCTION-BUILDINGS
Aug 13, 2021School Construction Authority$50,521.28CONSTRUCTION-BUILDINGS
Aug 2, 2021Department of Parks and Recreation$40,823.15DESIGN-CONSULTANT-IOTB
Feb 18, 2022School Construction Authority$40,765.77CONSTRUCTION-BUILDINGS
Jul 13, 2021School Construction Authority$26,657.62CONSTRUCTION-BUILDINGS
Jan 18, 2022Department of Parks and Recreation$25,871.87DESIGN-CONSULTANT-IOTB
Mar 28, 2022Department of Parks and Recreation$25,871.87DESIGN-CONSULTANT-IOTB
Jan 12, 2022School Construction Authority$25,646.48CONSTRUCTION-BUILDINGS
Feb 28, 2022Department of Parks and Recreation$25,529.75DESIGN-CONSULTANT-IOTB
Dec 22, 2021Department of Parks and Recreation$21,895.66DESIGN-CONSULTANT-IOTB
Oct 12, 2021Department of Parks and Recreation$20,424.50DESIGN-CONSULTANT-IOTB
Jan 12, 2022School Construction Authority$18,711.58CONSTRUCTION-BUILDINGS
Jul 7, 2021Department of Parks and Recreation$16,150.36DESIGN-CONSULTANT-IOTB
Jul 6, 2021Department of Parks and Recreation$15,599.95DESIGN-CONSULTANT-IOTB
Mar 9, 2022Department of Parks and Recreation$12,260.00DESIGN-CONSULTANT-IOTB
FY 2021top 20 of 45 payments$2,228,876
DateAgencyAmountCategoryPurchase order
Aug 5, 2020Department of Parks and Recreation$334,102.02DESIGN-CONSULTANT-IOTB
Dec 7, 2020Department of Parks and Recreation$274,358.66DESIGN-CONSULTANT-IOTB
Aug 21, 2020Department of Parks and Recreation$235,659.02DESIGN-CONSULTANT-IOTB
May 24, 2021Department of Parks and Recreation$197,954.02DESIGN-CONSULTANT-IOTB
Feb 18, 2021Department of Parks and Recreation$194,619.02DESIGN-CONSULTANT-IOTB
Sep 15, 2020Department of Parks and Recreation$166,246.02DESIGN-CONSULTANT-IOTB
Feb 16, 2021Department of Parks and Recreation$152,807.47DESIGN-CONSULTANT-IOTB
Oct 19, 2020Department of Parks and Recreation$72,044.15DESIGN-CONSULTANT-IOTB
Dec 24, 2020Department of Parks and Recreation$68,991.65DESIGN-CONSULTANT-IOTB
Aug 19, 2020Department of Parks and Recreation$62,605.30DESIGN-CONSULTANT-IOTB
Apr 7, 2021Department of Parks and Recreation$61,549.14DESIGN-CONSULTANT-IOTB
Feb 16, 2021Department of Parks and Recreation$51,824.28DESIGN-CONSULTANT-IOTB
Apr 7, 2021Department of Parks and Recreation$51,743.73DESIGN-CONSULTANT-IOTB
Aug 5, 2020Department of Parks and Recreation$46,000.00DESIGN-CONSULTANT-IOTB
Oct 7, 2020School Construction Authority$25,802.97CONSTRUCTION-BUILDINGS
Oct 7, 2020School Construction Authority$19,980.00CONSTRUCTION-BUILDINGS
Mar 4, 2021Department of Parks and Recreation$17,985.88DESIGN-CONSULTANT-IOTB
Jun 16, 2021Department of Parks and Recreation$16,900.36DESIGN-CONSULTANT-IOTB
May 17, 2021Department of Parks and Recreation$16,846.83DESIGN-CONSULTANT-IOTB
Jun 21, 2021Department of Parks and Recreation$16,846.83DESIGN-CONSULTANT-IOTB
FY 2020top 20 of 112 payments$2,731,000
DateAgencyAmountCategoryPurchase order
Jul 1, 2019Department of Parks and Recreation$501,153.03DESIGN-CONSULTANT-IOTB
Nov 12, 2019Department of Transportation$193,016.15DESIGN-CONSULTANT-IOTB
Jun 11, 2020Department of Parks and Recreation$139,981.02DESIGN-CONSULTANT-IOTB
Feb 19, 2020Department of Parks and Recreation$135,524.41DESIGN-CONSULTANT-IOTB
Feb 11, 2020Department of Transportation$100,953.75DESIGN-CONSULTANT-IOTB
Nov 13, 2019Department of Parks and Recreation$100,894.15DESIGN-CONSULTANT-IOTB
Mar 2, 2020Department of Parks and Recreation$93,586.24DESIGN-CONSULTANT-IOTB
Aug 26, 2019Department of Transportation$93,319.15DESIGN-CONSULTANT-IOTB
Nov 18, 2019School Construction Authority$85,760.58CONSTRUCTION-BUILDINGS
Aug 19, 2019Department of Parks and Recreation$84,243.17DESIGN-CONSULTANT-IOTB
Aug 29, 2019School Construction Authority$75,437.31CONSTRUCTION-BUILDINGS
Sep 30, 2019Department of Parks and Recreation$60,554.54DESIGN-CONSULTANT-IOTB
Mar 23, 2020Department of Parks and Recreation$59,010.93DESIGN-CONSULTANT-IOTB
Jun 16, 2020School Construction Authority$57,020.83CONSTRUCTION-BUILDINGS
Mar 4, 2020Department of Parks and Recreation$50,451.08DESIGN-CONSULTANT-IOTB
Sep 24, 2019Department of Parks and Recreation$47,550.96DESIGN-CONSULTANT-IOTB
Jun 1, 2020Department of Parks and Recreation$45,993.11DESIGN-CONSULTANT-IOTB
May 4, 2020Department of Parks and Recreation$42,930.00DESIGN-CONSULTANT-IOTB
May 27, 2020Department of Transportation$37,999.15DESIGN-CONSULTANT-IOTB
Jul 3, 2019School Construction Authority$37,948.65CONSTRUCTION-BUILDINGS
FY 2019top 20 of 108 payments$3,943,090
DateAgencyAmountCategoryPurchase order
Jan 29, 2019Department of Parks and Recreation$677,903.42DESIGN-CONSULTANT-IOTB
Apr 8, 2019Department of Parks and Recreation$622,218.46DESIGN-CONSULTANT-IOTB
Aug 22, 2018Department of Parks and Recreation$501,153.03DESIGN-CONSULTANT-IOTB
Aug 6, 2018Department of Parks and Recreation$312,022.77DESIGN-CONSULTANT-IOTB
Sep 24, 2018Department of Parks and Recreation$260,388.48DESIGN-CONSULTANT-IOTB
Oct 23, 2018Department of Parks and Recreation$247,412.24DESIGN-CONSULTANT-IOTB
Jun 24, 2019Department of Parks and Recreation$228,126.72DESIGN-CONSULTANT-IOTB
Feb 4, 2019Department of Parks and Recreation$126,080.20DESIGN-CONSULTANT-IOTB
Jul 16, 2018Department of Parks and Recreation$120,981.50DESIGN-CONSULTANT-IOTB
Aug 20, 2018Department of Transportation$56,709.66DESIGN-CONSULTANT-IOTB
Feb 26, 2019Department of Parks and Recreation$43,791.31DESIGN-CONSULTANT-IOTB
Sep 13, 2018School Construction Authority$38,110.76CONSTRUCTION-BUILDINGS
Sep 11, 2018Department of Parks and Recreation$36,861.41DESIGN-CONSULTANT-IOTB
Feb 4, 2019Department of Cultural Affairs$31,924.30IOTB CONSTRUCTION
Feb 4, 2019Department of Environmental Protection$28,000.00DESIGN-CONSULTANT-IOTB
Jul 30, 2018Department of Parks and Recreation$26,844.60DESIGN-CONSULTANT-IOTB
Sep 11, 2018Department of Parks and Recreation$26,844.60DESIGN-CONSULTANT-IOTB
Jul 30, 2018Department of Parks and Recreation$26,650.78DESIGN-CONSULTANT-IOTB
Feb 8, 2019School Construction Authority$25,145.77CONSTRUCTION-BUILDINGS
Sep 4, 2018Department of Environmental Protection$19,372.21DESIGN-CONSULTANT-IOTB
FY 2018top 20 of 103 payments$2,812,873
DateAgencyAmountCategoryPurchase order
Mar 26, 2018Department of Parks and Recreation$437,080.46DESIGN-CONSULTANT-IOTB
Dec 6, 2017Department of Parks and Recreation$321,479.16DESIGN-CONSULTANT-IOTB
Apr 9, 2018Department of Parks and Recreation$167,051.00DESIGN-CONSULTANT-IOTB
May 21, 2018Department of Parks and Recreation$155,309.99DESIGN-CONSULTANT-IOTB
Apr 23, 2018Department of Parks and Recreation$108,431.98DESIGN-CONSULTANT-IOTB
Oct 31, 2017Department of Parks and Recreation$77,987.29DESIGN-CONSULTANT-IOTB
Dec 6, 2017Department of Parks and Recreation$77,042.62DESIGN-CONSULTANT-IOTB
Aug 28, 2017School Construction Authority$70,963.00CONSTRUCTION-BUILDINGS
Jul 12, 2017Department of Parks and Recreation$61,048.13DESIGN-CONSULTANT-IOTB
Jan 31, 2018Department of Parks and Recreation$58,463.10DESIGN-CONSULTANT-IOTB
Feb 12, 2018Department of Parks and Recreation$58,415.49DESIGN-CONSULTANT-IOTB
Jul 31, 2017Department of Parks and Recreation$53,119.67DESIGN-CONSULTANT-IOTB
Oct 25, 2017Department of Parks and Recreation$50,198.51DESIGN-CONSULTANT-IOTB
Feb 28, 2018School Construction Authority$47,435.81CONSTRUCTION-BUILDINGS
Apr 4, 2018Department of Transportation$46,287.59DESIGN-CONSULTANT-IOTB
Aug 14, 2017Department of Parks and Recreation$44,586.77DESIGN-CONSULTANT-IOTB
Aug 10, 2017School Construction Authority$35,950.60CONSTRUCTION-BUILDINGS
Jul 10, 2017Department of Parks and Recreation$33,010.85DESIGN-CONSULTANT-IOTB
Aug 28, 2017School Construction Authority$31,623.87CONSTRUCTION-BUILDINGS
Nov 8, 2017School Construction Authority$31,073.01CONSTRUCTION-BUILDINGS
FY 2017top 20 of 98 payments$2,083,281
DateAgencyAmountCategoryPurchase order
Aug 1, 2016School Construction Authority$145,954.04CONSTRUCTION-BUILDINGS
Aug 10, 2016Department of Parks and Recreation$105,932.78DESIGN-CONSULTANT-IOTB
Jun 28, 2017Department of Parks and Recreation$99,502.50DESIGN-CONSULTANT-IOTB
Aug 16, 2016Department of Parks and Recreation$77,025.31DESIGN-CONSULTANT-IOTB
Sep 13, 2016School Construction Authority$74,761.65CONSTRUCTION-BUILDINGS
Nov 1, 2016Department of Parks and Recreation$74,629.40DESIGN-CONSULTANT-IOTB
Jan 9, 2017Department of Parks and Recreation$74,347.88DESIGN-CONSULTANT-IOTB
Oct 31, 2016Department of Parks and Recreation$72,248.06DESIGN-CONSULTANT-IOTB
May 15, 2017Department of Parks and Recreation$64,520.60DESIGN-CONSULTANT-IOTB
Feb 13, 2017Department of Transportation$60,430.70DESIGN-CONSULTANT-IOTB
May 30, 2017Department of Parks and Recreation$55,972.06DESIGN-CONSULTANT-IOTB
Jan 17, 2017Department of Parks and Recreation$52,007.23DESIGN-CONSULTANT-IOTB
Mar 15, 2017Department of Transportation$44,666.45DESIGN-CONSULTANT-IOTB
May 30, 2017Department of Parks and Recreation$44,187.45DESIGN-CONSULTANT-IOTB
Dec 27, 2016Department of Parks and Recreation$42,878.71DESIGN-CONSULTANT-IOTB
Aug 24, 2016Department of Parks and Recreation$38,225.98DESIGN-CONSULTANT-IOTB
Jul 5, 2016Department of Parks and Recreation$36,025.98DESIGN-CONSULTANT-IOTB
May 8, 2017Department of Parks and Recreation$35,413.11DESIGN-CONSULTANT-IOTB
Jan 10, 2017Department of Parks and Recreation$33,440.08DESIGN-CONSULTANT-IOTB
Jul 20, 2016Department of Parks and Recreation$33,440.08DESIGN-CONSULTANT-IOTB
FY 2016top 20 of 96 payments$1,725,716
DateAgencyAmountCategoryPurchase order
Aug 27, 2015School Construction Authority$115,357.85CONSTRUCTION-BUILDINGS
Sep 29, 2015Department of Parks and Recreation$114,647.00CONTRACTUAL SERVICES GENERAL
Dec 16, 2015Department of Parks and Recreation$112,543.08DESIGN-CONSULTANT-IOTB
Jun 6, 2016School Construction Authority$108,436.37CONSTRUCTION-BUILDINGS
Jul 13, 2015Department of Parks and Recreation$84,916.01DESIGN-CONSULTANT-IOTB
Dec 23, 2015Department of Parks and Recreation$68,068.01DESIGN-CONSULTANT-IOTB
Feb 17, 2016Department of Parks and Recreation$62,197.45DESIGN-CONSULTANT-IOTB
Jul 20, 2015Department of Parks and Recreation$51,051.01DESIGN-CONSULTANT-IOTB
Jan 27, 2016Department of Parks and Recreation$40,854.57DESIGN-CONSULTANT-IOTB
Mar 7, 2016Department of Parks and Recreation$39,725.00CONTRACTUAL SERVICES GENERAL
Oct 21, 2015Department of Parks and Recreation$38,489.11DESIGN-CONSULTANT-IOTB
Nov 30, 2015Department of Parks and Recreation$38,407.56DESIGN-CONSULTANT-IOTB
Apr 20, 2016Department of Parks and Recreation$37,314.70DESIGN-CONSULTANT-IOTB
Apr 18, 2016Department of Parks and Recreation$36,025.98DESIGN-CONSULTANT-IOTB
Sep 8, 2015Department of Parks and Recreation$35,095.99DESIGN-CONSULTANT-IOTB
Apr 27, 2016Department of Parks and Recreation$33,461.42DESIGN-CONSULTANT-IOTB
Aug 24, 2015Department of Cultural Affairs$32,184.53DESIGN-CONSULTANT-BUILDINGS
May 4, 2016Department of Parks and Recreation$31,771.84DESIGN-CONSULTANT-IOTB
Sep 21, 2015Department of Parks and Recreation$31,771.84DESIGN-CONSULTANT-IOTB
Jan 27, 2016Department of Parks and Recreation$30,791.29DESIGN-CONSULTANT-IOTB
FY 2015top 20 of 158 payments$1,672,717
DateAgencyAmountCategoryPurchase order
Sep 8, 2014School Construction Authority$83,675.13CONSTRUCTION-BUILDINGS
Aug 11, 2014School Construction Authority$74,890.74CONSTRUCTION-BUILDINGS
Apr 3, 2015School Construction Authority$72,800.00CONSTRUCTION-BUILDINGS
Mar 23, 2015Department of Parks and Recreation$68,068.01DESIGN-CONSULTANT-IOTB
Nov 21, 2014School Construction Authority$63,805.67CONSTRUCTION-BUILDINGS
May 19, 2015School Construction Authority$59,977.33CONSTRUCTION-BUILDINGS
Jan 26, 2015Department of Parks and Recreation$59,654.80CONTRACTUAL SERVICES GENERAL
Jun 10, 2015Department of Parks and Recreation$52,158.71CONTRACTUAL SERVICES GENERAL
Jan 20, 2015Department of Parks and Recreation$51,530.57DESIGN-CONSULTANT-IOTB
Aug 18, 2014Department of Parks and Recreation$50,408.60DESIGN-CONSULTANT-IOTB
Nov 26, 2014School Construction Authority$45,264.38CONSTRUCTION-BUILDINGS
Aug 22, 2014School Construction Authority$42,537.11CONSTRUCTION-BUILDINGS
Oct 29, 2014School Construction Authority$41,888.38CONSTRUCTION-BUILDINGS
Apr 3, 2015School Construction Authority$41,550.00CONSTRUCTION-BUILDINGS
Feb 24, 2015School Construction Authority$35,612.62CONSTRUCTION-BUILDINGS
Dec 9, 2014Department of Cultural Affairs$34,429.70DESIGN-CONSULTANT-BUILDINGS
May 26, 2015Department of Cultural Affairs$34,159.36DESIGN-CONSULTANT-BUILDINGS
May 19, 2015School Construction Authority$33,510.70CONSTRUCTION-BUILDINGS
Apr 27, 2015Department of Parks and Recreation$30,414.50CONTRACTUAL SERVICES GENERAL
Jan 5, 2015Department of Transportation$27,058.43DESIGN-CONSULTANT-IOTB
FY 2014top 20 of 76 payments$756,302
DateAgencyAmountCategoryPurchase order
Sep 23, 2013Department of Parks and Recreation$79,738.50DESIGN-CONSULTANT-IOTB
Aug 22, 2013School Construction Authority$51,306.25CONSTRUCTION-BUILDINGS
Aug 22, 2013School Construction Authority$50,165.08CONSTRUCTION-BUILDINGS
Jul 24, 2013School Construction Authority$41,804.23CONSTRUCTION-BUILDINGS
Aug 22, 2013School Construction Authority$33,650.34CONSTRUCTION-BUILDINGS
Jan 29, 2014School Construction Authority$24,647.55CONSTRUCTION-BUILDINGS
Feb 3, 2014Department of Parks and Recreation$24,369.20DESIGN-CONSULTANT-IOTB
Jun 10, 2014City University Construction Fund$21,799.56OTHER EXPENDITURES-REPORTABLE
Nov 4, 2013Department of Cultural Affairs$21,410.00DESIGN-CONSULTANT-BUILDINGS
Jun 23, 2014Department of Cultural Affairs$19,947.14DESIGN-CONSULTANT-IOTB
Feb 26, 2014City University Construction Fund$19,645.00OTHER EXPENDITURES-REPORTABLE
Apr 28, 2014School Construction Authority$19,421.32CONSTRUCTION-BUILDINGS
Aug 23, 2013School Construction Authority$19,005.00CONSTRUCTION-BUILDINGS
Sep 23, 2013Department of Parks and Recreation$18,276.90DESIGN-CONSULTANT-IOTB
Aug 6, 2013School Construction Authority$17,851.40CONSTRUCTION-BUILDINGS
May 12, 2014Department of Parks and Recreation$17,017.00DESIGN-CONSULTANT-IOTB
Aug 12, 2013Department of Parks and Recreation$16,980.00DESIGN-CONSULTANT-IOTB
Sep 27, 2013School Construction Authority$16,780.31CONSTRUCTION-BUILDINGS
Aug 19, 2013Department of Environmental Protection$16,750.84DESIGN-CONSULTANT-IOTB
Jan 29, 2014School Construction Authority$14,143.18CONSTRUCTION-BUILDINGS
FY 2013top 20 of 92 payments$1,174,955
DateAgencyAmountCategoryPurchase order
Nov 13, 2012Department of Cultural Affairs$102,825.71DESIGN-CONSULTANT-BUILDINGS
Sep 17, 2012Department of Parks and Recreation$53,324.55DESIGN-CONSULTANT-IOTB
Jul 23, 2012Department of Parks and Recreation$51,522.97DESIGN-CONSULTANT-IOTB
Jan 22, 2013Department of Parks and Recreation$47,264.55DESIGN-CONSULTANT-IOTB
Aug 15, 2012Department of Parks and Recreation$39,002.20DESIGN-CONSULTANT-IOTB
Jul 16, 2012Department of Parks and Recreation$37,658.72DESIGN-CONSULTANT-IOTB
Oct 24, 2012Department of Parks and Recreation$36,195.64DESIGN-CONSULTANT-IOTB
Sep 24, 2012Department of Parks and Recreation$35,283.71DESIGN-CONSULTANT-IOTB
Jun 4, 2013Department of Cultural Affairs$33,718.72DESIGN-CONSULTANT-IOTB
Feb 7, 2013School Construction Authority$29,209.32CONSTRUCTION-BUILDINGS
Nov 13, 2012Department of Cultural Affairs$28,601.12DESIGN-CONSULTANT-BUILDINGS
Dec 3, 2012Department of Parks and Recreation$27,146.73DESIGN-CONSULTANT-IOTB
Aug 29, 2012Department of Cultural Affairs$25,831.16DESIGN-CONSULTANT-IOTB
Nov 13, 2012Department of Environmental Protection$25,658.00DESIGN-CONSULTANT-IOTB
Jul 25, 2012School Construction Authority$23,153.90CONSTRUCTION-BUILDINGS
Dec 10, 2012Department of Parks and Recreation$22,291.37DESIGN-CONSULTANT-IOTB
Jan 2, 2013Department of Cultural Affairs$21,229.40DESIGN-CONSULTANT-BUILDINGS
Nov 13, 2012Department of Parks and Recreation$21,000.00DESIGN-CONSULTANT-IOTB
Aug 13, 2012Department of Cultural Affairs$19,719.34DESIGN-CONSULTANT-BUILDINGS
Feb 7, 2013School Construction Authority$18,397.07CONSTRUCTION-BUILDINGS
FY 2012top 20 of 125 payments$1,768,486
DateAgencyAmountCategoryPurchase order
Feb 22, 2012Department of Cultural Affairs$122,405.24DESIGN-CONSULTANT-IOTB
Oct 17, 2011Department of Parks and Recreation$108,263.40DESIGN-CONSULTANT-IOTB
May 1, 2012Department of Parks and Recreation$95,122.22DESIGN-CONSULTANT-IOTB
Apr 11, 2012Department of Cultural Affairs$64,339.75DESIGN-CONSULTANT-BUILDINGS
Jul 28, 2011Department of Parks and Recreation$63,006.11DESIGN-CONSULTANT-IOTB
Sep 7, 2011Department of Parks and Recreation$57,193.83DESIGN-CONSULTANT-IOTB
Jul 13, 2011Department of Environmental Protection$48,724.00DESIGN-CONSULTANT-IOTB
Oct 24, 2011Department of Parks and Recreation$44,074.71DESIGN-CONSULTANT-IOTB
Aug 29, 2011Department of Parks and Recreation$43,839.13DESIGN-CONSULTANT-IOTB
Sep 7, 2011Department of Parks and Recreation$43,244.86DESIGN-CONSULTANT-IOTB
Jul 27, 2011Department of Parks and Recreation$42,353.12DESIGN-CONSULTANT-IOTB
Jul 19, 2011School Construction Authority$36,571.33CONSTRUCTION-BUILDINGS
Jul 14, 2011Department of Parks and Recreation$36,316.91DESIGN-CONSULTANT-IOTB
Jul 14, 2011Department of Environmental Protection$35,870.50DESIGN-CONSULTANT-IOTB
Jul 15, 2011Department of Parks and Recreation$34,741.23DESIGN-CONSULTANT-IOTB
Aug 29, 2011Department of Parks and Recreation$33,829.86DESIGN-CONSULTANT-IOTB
Apr 16, 2012Department of Parks and Recreation$29,496.45DESIGN-CONSULTANT-IOTB
Dec 2, 2011Department of Parks and Recreation$27,065.85DESIGN-CONSULTANT-IOTB
Aug 29, 2011Department of Parks and Recreation$26,044.30DESIGN-CONSULTANT-IOTB
May 14, 2012Department of Parks and Recreation$24,805.00DESIGN-CONSULTANT-IOTB
FY 2011top 20 of 131 payments$2,312,948
DateAgencyAmountCategoryPurchase order
Sep 7, 2010Department of Parks and Recreation$179,319.82DESIGN-CONSULTANT-IOTB
Jul 20, 2010Department of Parks and Recreation$105,976.42DESIGN-CONSULTANT-IOTB
Dec 27, 2010Department of Homeless Services$102,109.06DESIGN-CONSULTANT-BUILDINGS
Sep 21, 2010Department of Parks and Recreation$90,351.41DESIGN-CONSULTANT-IOTB
Feb 14, 2011Department of Parks and Recreation$74,304.59DESIGN-CONSULTANT-IOTB
Jul 19, 2010Department of Environmental Protection$61,228.74DESIGN-CONSULTANT-IOTB
Sep 13, 2010Department of Parks and Recreation$57,304.36DESIGN-CONSULTANT-IOTB
Feb 8, 2011Department of Parks and Recreation$56,683.95DESIGN-CONSULTANT-IOTB
Mar 1, 2011Department of Parks and Recreation$55,350.01DESIGN-CONSULTANT-IOTB
Sep 29, 2010Department of Parks and Recreation$54,131.70DESIGN-CONSULTANT-IOTB
Dec 6, 2010Department of Parks and Recreation$47,484.68DESIGN-CONSULTANT-IOTB
Aug 30, 2010Department of Parks and Recreation$46,567.13DESIGN-CONSULTANT-IOTB
May 24, 2011Department of Parks and Recreation$40,664.46DESIGN-CONSULTANT-IOTB
Aug 10, 2010Department of Parks and Recreation$38,953.91DESIGN-CONSULTANT-BUILDINGS
Apr 29, 2011School Construction Authority$38,905.66CONSTRUCTION-BUILDINGS
May 16, 2011Department of Transportation$34,700.00DESIGN-CONSULTANT-IOTB
Aug 10, 2010Department of Parks and Recreation$33,247.82DESIGN-CONSULTANT-IOTB
Aug 30, 2010Department of Parks and Recreation$32,140.59DESIGN-CONSULTANT-IOTB
Nov 10, 2010Department of Parks and Recreation$29,690.66DESIGN-CONSULTANT-IOTB
Sep 13, 2010Department of Parks and Recreation$28,946.34DESIGN-CONSULTANT-IOTB
FY 2010top 20 of 68 payments$1,249,564
DateAgencyAmountCategoryPurchase order
Mar 1, 2010Department of Parks and Recreation$140,329.25DESIGN-CONSULTANT-IOTB
Apr 12, 2010Department of Parks and Recreation$85,348.76DESIGN-CONSULTANT-IOTB
May 10, 2010Department of Parks and Recreation$84,167.09DESIGN-CONSULTANT-IOTB
Apr 26, 2010Department of Parks and Recreation$83,916.30DESIGN-CONSULTANT-IOTB
Mar 2, 2010Department of Parks and Recreation$47,446.26DESIGN-CONSULTANT-IOTB
Mar 30, 2010Department of Parks and Recreation$45,768.77DESIGN-CONSULTANT-IOTB
Mar 1, 2010Department of Parks and Recreation$45,059.69DESIGN-CONSULTANT-IOTB
May 10, 2010Department of Parks and Recreation$41,077.76DESIGN-CONSULTANT-IOTB
Jun 15, 2010Department of Parks and Recreation$36,087.80DESIGN-CONSULTANT-IOTB
Feb 10, 2010Department of Parks and Recreation$34,976.72DESIGN-CONSULTANT-IOTB
Feb 16, 2010Department of Parks and Recreation$31,914.38DESIGN-CONSULTANT-IOTB
Feb 9, 2010Department of Parks and Recreation$29,406.96DESIGN-CONSULTANT-IOTB
Feb 16, 2010Department of Parks and Recreation$29,214.56DESIGN-CONSULTANT-IOTB
Apr 6, 2010Department of Parks and Recreation$25,835.55DESIGN-CONSULTANT-IOTB
Mar 8, 2010Department of Homeless Services$24,150.10DESIGN-CONSULTANT-BUILDINGS
Jun 23, 2010Department of Parks and Recreation$22,647.01DESIGN-CONSULTANT-IOTB
Apr 19, 2010Department of Environmental Protection$21,742.70DESIGN-CONSULTANT-IOTB
Jan 12, 2010Department of Parks and Recreation$21,384.82DESIGN-CONSULTANT-IOTB
Mar 30, 2010Department of Parks and Recreation$19,979.32DESIGN-CONSULTANT-IOTB
Feb 17, 2010Department of Parks and Recreation$18,854.51DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
Jun 25, 2025Department of Parks and Recreation$13,000.00DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 25, 2025Department of Parks and Recreation$85,280.00DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 23, 2025School Construction Authority$37,286.08CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025Department of Parks and Recreation$8,800.00DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 12, 2025School Construction Authority$16,656.86CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$5,764.80CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$5,764.80CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2025School Construction Authority$733.91CONSTRUCTION-BUILDINGSCapital Contracts
May 19, 2025School Construction Authority$703.24CONSTRUCTION-BUILDINGSCapital Contracts
May 19, 2025School Construction Authority$1,225.55CONSTRUCTION-BUILDINGSCapital Contracts
May 19, 2025School Construction Authority$225.30CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025Department of Parks and Recreation$37,813.11DESIGN-CONSULTANT-IOTBCapital Contracts
May 7, 2025School Construction Authority$810.44CONSTRUCTION-BUILDINGSCapital Contracts
May 7, 2025School Construction Authority$350.00CONSTRUCTION-BUILDINGSCapital Contracts
May 7, 2025School Construction Authority$420.00CONSTRUCTION-BUILDINGSCapital Contracts
May 7, 2025School Construction Authority$200.00CONSTRUCTION-BUILDINGSCapital Contracts
May 5, 2025Department of Parks and Recreation$13,065.12DESIGN-CONSULTANT-IOTBCapital Contracts
May 5, 2025Department of Parks and Recreation$48,943.04DESIGN-CONSULTANT-IOTBCapital Contracts
May 5, 2025Department of Parks and Recreation$38,776.67DESIGN-CONSULTANT-IOTBCapital Contracts
May 2, 2025School Construction Authority$1,544.49CONSTRUCTION-BUILDINGSCapital Contracts
May 2, 2025School Construction Authority$3,483.76CONSTRUCTION-BUILDINGSCapital Contracts
May 2, 2025School Construction Authority$995.51CONSTRUCTION-BUILDINGSCapital Contracts
Apr 28, 2025Department of Parks and Recreation$2,233.07DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 28, 2025Department of Parks and Recreation$6,792.99DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 25, 2025Department of Parks and Recreation$47.97PROMPT PAYMENT INTERESTContracts

Other vendors serving Department of Parks and Recreation

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data