ZHL Group Inc: New York City Government Payments
as recorded by New York City: ZHL GROUP INC
ZHL Group Inc is the 155th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 28th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 6% of everything the Fire Department has paid vendors in that span. Payments to it rose 13.8% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 14 | $8,334,811 | Dec 9, 2016 – Nov 17, 2021 |
| PROMPT PAYMENT INTEREST | 16 | $8,260 | Mar 21, 2011 – Jun 5, 2025 |
| POLLUTION REMEDIATION OBLIGATIONS | 84 | $7,817,627 | Feb 27, 2013 – Jun 17, 2025 |
| PROF SERV OTHER | 3 | $72,332 | Nov 1, 2010 – Feb 26, 2013 |
| PROF SERV COMPUTER SERVICES | 1 | $6,422 | Jun 17, 2024 – Jun 17, 2024 |
| CLEANING SERVICES | 1 | $60,610 | May 30, 2017 – May 30, 2017 |
| PROF SERV ENGINEER & ARCHITECT | 12 | $590,701 | Jul 3, 2013 – May 16, 2022 |
| RENTALS OF MISC.EQUIP | 3 | $435,621 | Aug 28, 2023 – Jun 13, 2025 |
| MAINTENANCE REPAIRS - GENERAL | 2 | $41,238 | May 9, 2012 – Nov 13, 2012 |
| DESIGN-CONSULTANT-BUILDINGS | 7 | $395,704 | Jan 30, 2017 – Apr 25, 2022 |
| MAINT & REP GENERAL | 57 | $3,861,458 | Mar 8, 2010 – Jun 26, 2024 |
| MAINT & OPER OF INFRASTRUCTURE | 553 | $36,416,470 | Feb 8, 2010 – Jun 24, 2025 |
| CONSTRUCTION-BUILDINGS | 2,009 | $344,191,241 | Feb 8, 2010 – Jun 23, 2025 |
| EQUIPMENT GENERAL | 11 | $335,952 | Jul 24, 2012 – Sep 6, 2016 |
| CAPITAL PURCHASED EQUIPMENT | 17 | $2,643,183 | Jul 18, 2018 – Mar 4, 2024 |
| BOOKS-OTHER | 1 | $250 | May 24, 2022 – May 24, 2022 |
| LEASEHOLD IMP CONSTRUCTION | 21 | $2,353,527 | Mar 28, 2016 – Jan 21, 2025 |
| CONTRACTUAL SERVICES GENERAL | 23 | $2,033,407 | Feb 7, 2011 – Oct 24, 2016 |
| LABOR LAW PAYMENTS | 1 | $19,458 | Mar 19, 2013 – Mar 19, 2013 |
| OTHR SERV AND CHRGS-GENERAL | 39 | $1,787,491 | Sep 25, 2012 – Sep 4, 2018 |
| MAINTENANCE SUPPLIES | 1 | $172,372 | Feb 26, 2013 – Feb 26, 2013 |
| IOTB CONSTRUCTION | 66 | $15,115,573 | Jan 19, 2010 – Feb 27, 2025 |
| OFFICE EQUIPMENT | 2 | $111,480 | Jul 23, 2013 – Jul 23, 2013 |
| <Non-Applicable Expenditure Object> | 29 | -$5,600 | Jul 14, 2014 – Oct 16, 2017 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 113 payments$27,805,695
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 23, 2024 | School Construction Authority | $2,066,690.70 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2025 | Fire Department | $1,815,220.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2024 | Fire Department | $1,319,515.40 | CONSTRUCTION-BUILDINGS | – |
| May 12, 2025 | School Construction Authority | $1,234,933.93 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2024 | School Construction Authority | $1,212,950.07 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2025 | Fire Department | $1,203,872.45 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2025 | Fire Department | $1,174,114.92 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2025 | School Construction Authority | $1,172,300.23 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2024 | Fire Department | $976,901.46 | CONSTRUCTION-BUILDINGS | – |
| Feb 5, 2025 | Fire Department | $885,598.87 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2025 | Fire Department | $823,573.46 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2025 | Fire Department | $799,504.95 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2024 | Fire Department | $797,600.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2025 | Fire Department | $787,281.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2024 | Department of Health and Mental Hygiene | $712,952.05 | LEASEHOLD IMP CONSTRUCTION | – |
| Jul 29, 2024 | Fire Department | $582,850.28 | CONSTRUCTION-BUILDINGS | – |
| Jul 30, 2024 | Police Department | $515,482.36 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2024 | Fire Department | $511,100.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2025 | Fire Department | $466,461.21 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2025 | Police Department | $433,784.70 | MAINT & OPER OF INFRASTRUCTURE | – |
FY 2024top 20 of 233 payments$24,438,285
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 5, 2024 | Fire Department | $1,177,040.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2024 | Police Department | $1,126,845.44 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2024 | Fire Department | $1,093,302.62 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2024 | Fire Department | $850,846.82 | POLLUTION REMEDIATION OBLIGATIONS | – |
| Apr 22, 2024 | Fire Department | $811,808.19 | CONSTRUCTION-BUILDINGS | – |
| Feb 26, 2024 | Fire Department | $807,238.25 | CONSTRUCTION-BUILDINGS | – |
| Oct 10, 2023 | Fire Department | $760,260.89 | POLLUTION REMEDIATION OBLIGATIONS | – |
| Jan 29, 2024 | Fire Department | $753,344.58 | CONSTRUCTION-BUILDINGS | – |
| Aug 29, 2023 | Fire Department | $742,778.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2024 | Fire Department | $702,702.13 | CONSTRUCTION-BUILDINGS | – |
| Dec 29, 2023 | Fire Department | $634,908.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2023 | Fire Department | $557,000.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 20, 2023 | Fire Department | $547,565.18 | POLLUTION REMEDIATION OBLIGATIONS | – |
| Feb 7, 2024 | Fire Department | $516,178.80 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2023 | Fire Department | $454,960.00 | CONSTRUCTION-BUILDINGS | – |
| May 30, 2024 | Fire Department | $450,414.20 | CONSTRUCTION-BUILDINGS | – |
| Jul 18, 2023 | Fire Department | $449,844.01 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2024 | Fire Department | $447,340.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2024 | Fire Department | $422,781.18 | CONSTRUCTION-BUILDINGS | – |
| Feb 26, 2024 | Fire Department | $397,109.96 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 98 payments$13,429,867
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 18, 2023 | Police Department | $1,199,832.08 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2023 | Police Department | $1,110,300.11 | CONSTRUCTION-BUILDINGS | – |
| Jul 11, 2022 | Fire Department | $656,020.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2023 | Police Department | $602,545.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2023 | Police Department | $563,206.34 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2022 | Fire Department | $540,349.19 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2023 | Fire Department | $507,135.93 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2023 | Fire Department | $395,540.57 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 28, 2023 | Fire Department | $388,790.20 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2023 | Fire Department | $355,239.07 | CONSTRUCTION-BUILDINGS | – |
| Sep 7, 2022 | Fire Department | $336,763.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2023 | Fire Department | $300,308.17 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2023 | Police Department | $291,692.24 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2022 | Fire Department | $289,000.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2023 | Fire Department | $287,073.60 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2023 | Police Department | $277,646.73 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2023 | Fire Department | $267,157.37 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2023 | Fire Department | $266,526.71 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2023 | Fire Department | $249,900.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2022 | Fire Department | $224,377.00 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 129 payments$16,644,572
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 12, 2022 | Fire Department | $1,373,880.66 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2021 | Police Department | $1,208,322.03 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2022 | Police Department | $727,814.70 | CONSTRUCTION-BUILDINGS | – |
| Jan 31, 2022 | Fire Department | $589,116.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2021 | Police Department | $542,363.99 | CONSTRUCTION-BUILDINGS | – |
| Nov 10, 2021 | Police Department | $491,072.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2021 | Fire Department | $458,250.33 | CONSTRUCTION-BUILDINGS | – |
| Dec 20, 2021 | Fire Department | $440,302.11 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2021 | Police Department | $405,732.09 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2022 | Department of Health and Mental Hygiene | $391,385.75 | CONSTRUCTION-BUILDINGS | – |
| May 4, 2022 | Police Department | $386,451.34 | CONSTRUCTION-BUILDINGS | – |
| Dec 20, 2021 | Fire Department | $382,975.00 | CONSTRUCTION-BUILDINGS | – |
| May 31, 2022 | Fire Department | $378,210.53 | CONSTRUCTION-BUILDINGS | – |
| May 4, 2022 | Police Department | $373,987.76 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2022 | Fire Department | $361,487.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2022 | Fire Department | $349,960.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2021 | Police Department | $332,847.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2021 | Fire Department | $275,324.30 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2022 | Department of Health and Mental Hygiene | $272,281.03 | LEASEHOLD IMP CONSTRUCTION | – |
| Nov 9, 2021 | Police Department | $250,500.00 | POLLUTION REMEDIATION OBLIGATIONS | – |
FY 2021top 20 of 177 payments$28,118,467
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 16, 2021 | Police Department | $1,288,139.23 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2021 | Police Department | $1,114,119.70 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2021 | Fire Department | $1,076,704.65 | CONSTRUCTION-BUILDINGS | – |
| Feb 23, 2021 | Fire Department | $1,021,934.97 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2020 | Police Department | $839,934.32 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2021 | Fire Department | $838,200.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2020 | Fire Department | $757,370.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2021 | Police Department | $700,325.45 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2021 | Police Department | $696,825.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2021 | Police Department | $690,000.00 | POLLUTION REMEDIATION OBLIGATIONS | – |
| May 26, 2021 | Fire Department | $637,877.46 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2021 | Department of Design and Construction | $637,203.28 | N/A | – |
| Sep 15, 2020 | Police Department | $634,200.25 | CONSTRUCTION-BUILDINGS | – |
| Nov 30, 2020 | Police Department | $627,000.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2021 | Police Department | $565,753.25 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2021 | Department of Health and Mental Hygiene | $500,718.68 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jan 28, 2021 | Fire Department | $498,833.06 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2020 | Fire Department | $488,909.51 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2020 | Fire Department | $480,980.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2021 | Police Department | $467,500.00 | POLLUTION REMEDIATION OBLIGATIONS | – |
FY 2020top 20 of 197 payments$36,845,499
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 23, 2019 | Fire Department | $1,647,502.94 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2019 | Fire Department | $1,361,522.47 | CONSTRUCTION-BUILDINGS | – |
| Sep 23, 2019 | Fire Department | $1,068,880.21 | CONSTRUCTION-BUILDINGS | – |
| Nov 4, 2019 | Police Department | $1,054,404.79 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2019 | Department of Small Business Services | $1,003,126.77 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2020 | Fire Department | $876,000.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2020 | Police Department | $860,365.99 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 9, 2019 | Fire Department | $827,000.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2019 | Fire Department | $752,084.08 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2019 | Department of Small Business Services | $649,178.06 | CONSTRUCTION-BUILDINGS | – |
| Dec 31, 2019 | Fire Department | $645,500.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 21, 2020 | Fire Department | $641,863.31 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2020 | Police Department | $638,000.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 31, 2019 | Fire Department | $608,365.74 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2020 | Police Department | $585,850.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2020 | Police Department | $569,688.74 | CONSTRUCTION-BUILDINGS | – |
| Jan 24, 2020 | Department of Design and Construction | $535,318.01 | N/A | – |
| Jun 8, 2020 | Police Department | $529,000.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2020 | Police Department | $528,647.10 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2019 | Fire Department | $517,500.00 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 216 payments$59,798,697
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 4, 2019 | Fire Department | $2,836,965.20 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2018 | Department of Small Business Services | $2,079,700.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2019 | Fire Department | $2,060,211.02 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2018 | Fire Department | $1,612,983.20 | IOTB CONSTRUCTION | – |
| Nov 21, 2018 | Fire Department | $1,472,795.07 | CONSTRUCTION-BUILDINGS | – |
| Jul 9, 2018 | Fire Department | $1,414,000.00 | IOTB CONSTRUCTION | – |
| Mar 20, 2019 | Fire Department | $1,400,850.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2018 | Department of Design and Construction | $1,372,473.95 | N/A | – |
| Aug 29, 2018 | Fire Department | $1,364,484.85 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2018 | Fire Department | $1,264,000.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 5, 2018 | Department of Small Business Services | $1,207,433.64 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2019 | Fire Department | $1,181,878.75 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2018 | Police Department | $1,155,000.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 22, 2018 | Fire Department | $1,128,022.02 | CONSTRUCTION-BUILDINGS | – |
| Jan 14, 2019 | Fire Department | $1,121,000.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 13, 2019 | Fire Department | $1,056,861.79 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2019 | Police Department | $1,051,702.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 26, 2018 | Police Department | $995,000.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2018 | Department of Design and Construction | $956,080.77 | N/A | – |
| Mar 18, 2019 | Police Department | $834,121.99 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 344 payments$56,044,619
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 11, 2017 | Fire Department | $3,366,846.73 | CONSTRUCTION-BUILDINGS | – |
| Dec 29, 2017 | Department of Design and Construction | $2,389,460.10 | N/A | – |
| May 16, 2018 | Fire Department | $1,558,340.47 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2018 | Fire Department | $1,492,500.00 | IOTB CONSTRUCTION | – |
| Feb 21, 2018 | Police Department | $1,047,076.51 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2017 | Fire Department | $966,000.00 | IOTB CONSTRUCTION | – |
| Nov 24, 2017 | Fire Department | $940,174.67 | CONSTRUCTION-BUILDINGS | – |
| May 14, 2018 | Fire Department | $934,854.00 | IOTB CONSTRUCTION | – |
| Aug 7, 2017 | Department of Design and Construction | $847,574.93 | N/A | – |
| May 8, 2018 | Fire Department | $832,000.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2018 | Fire Department | $830,000.00 | IOTB CONSTRUCTION | – |
| Jan 3, 2018 | Fire Department | $817,935.97 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jun 6, 2018 | Police Department | $817,368.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 30, 2018 | Fire Department | $795,000.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2018 | Fire Department | $761,388.51 | CONSTRUCTION-BUILDINGS | – |
| Jan 12, 2018 | Department of Design and Construction | $747,772.00 | N/A | – |
| Jan 8, 2018 | Fire Department | $742,000.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2018 | Police Department | $713,200.85 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2018 | Police Department | $705,795.30 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2018 | Fire Department | $699,200.00 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 336 payments$47,093,718
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 13, 2017 | Fire Department | $1,723,297.81 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2016 | Fire Department | $1,291,111.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2017 | Fire Department | $1,120,976.30 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2017 | Fire Department | $948,908.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2017 | Fire Department | $704,901.19 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2017 | Fire Department | $700,133.67 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jun 6, 2017 | Fire Department | $645,717.70 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2017 | Fire Department | $575,984.73 | CONSTRUCTION-BUILDINGS | – |
| Feb 13, 2017 | Department of Environmental Protection | $543,000.00 | IOTB CONSTRUCTION | – |
| Feb 22, 2017 | Fire Department | $529,629.79 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2016 | Fire Department | $520,091.86 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2017 | Department of Small Business Services | $508,000.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 26, 2017 | Fire Department | $504,450.00 | CONSTRUCTION-BUILDINGS | – |
| May 22, 2017 | Fire Department | $499,500.00 | IOTB CONSTRUCTION | – |
| Jan 11, 2017 | Fire Department | $499,117.93 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2017 | Fire Department | $497,303.51 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2017 | Fire Department | $491,450.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 2, 2016 | Fire Department | $486,929.66 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2017 | Fire Department | $479,260.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2017 | Fire Department | $455,968.13 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 252 payments$32,174,394
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 2, 2016 | Fire Department | $671,601.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2016 | Fire Department | $543,328.30 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2016 | Fire Department | $539,423.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2016 | Fire Department | $527,908.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2016 | Fire Department | $519,522.48 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2016 | Fire Department | $504,115.15 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2016 | Fire Department | $492,208.26 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2016 | Fire Department | $490,200.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2016 | Fire Department | $473,310.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2016 | Fire Department | $461,189.29 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2016 | Fire Department | $455,525.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2016 | Fire Department | $454,100.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 22, 2016 | Fire Department | $425,384.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2016 | Fire Department | $418,652.94 | CONSTRUCTION-BUILDINGS | – |
| Jun 2, 2016 | Fire Department | $416,076.61 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2016 | Fire Department | $402,212.09 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2016 | Fire Department | $395,632.24 | CONSTRUCTION-BUILDINGS | – |
| May 10, 2016 | Fire Department | $392,065.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2016 | Fire Department | $386,650.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2016 | Fire Department | $373,768.00 | MAINT & OPER OF INFRASTRUCTURE | – |
FY 2015top 20 of 181 payments$14,307,597
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 15, 2015 | Fire Department | $633,397.67 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2015 | Fire Department | $596,312.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 18, 2014 | Fire Department | $571,805.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2015 | Fire Department | $563,754.75 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jan 12, 2015 | Fire Department | $498,750.03 | MAINT & OPER OF INFRASTRUCTURE | – |
| Apr 22, 2015 | Fire Department | $459,027.23 | CONSTRUCTION-BUILDINGS | – |
| Feb 18, 2015 | Fire Department | $422,750.00 | MAINT & OPER OF INFRASTRUCTURE | – |
| May 5, 2015 | Fire Department | $414,959.71 | CONSTRUCTION-BUILDINGS | – |
| Mar 18, 2015 | Fire Department | $396,150.00 | MAINT & OPER OF INFRASTRUCTURE | – |
| Nov 19, 2014 | Fire Department | $393,775.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2014 | Fire Department | $376,675.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2014 | Fire Department | $375,725.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2015 | Fire Department | $357,000.00 | MAINT & OPER OF INFRASTRUCTURE | – |
| Feb 18, 2015 | Fire Department | $342,779.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 11, 2014 | Fire Department | $314,956.99 | MAINT & OPER OF INFRASTRUCTURE | – |
| May 26, 2015 | Fire Department | $289,750.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2015 | Fire Department | $274,523.18 | CONSTRUCTION-BUILDINGS | – |
| Nov 12, 2014 | Fire Department | $267,742.47 | CONSTRUCTION-BUILDINGS | – |
| Jan 5, 2015 | Fire Department | $262,295.00 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jun 22, 2015 | Fire Department | $235,611.28 | MAINT & OPER OF INFRASTRUCTURE | – |
FY 2014top 20 of 203 payments$25,669,913
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 14, 2014 | Fire Department | $663,201.69 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2013 | Fire Department | $568,721.57 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2014 | Fire Department | $493,287.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2014 | Police Department | $474,442.44 | IOTB CONSTRUCTION | – |
| Mar 4, 2014 | Fire Department | $464,366.77 | CONSTRUCTION-BUILDINGS | – |
| Sep 3, 2013 | Fire Department | $462,650.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2014 | Fire Department | $458,375.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 14, 2014 | Fire Department | $458,163.91 | CONSTRUCTION-BUILDINGS | – |
| May 12, 2014 | Fire Department | $433,426.09 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2014 | Police Department | $424,072.12 | IOTB CONSTRUCTION | – |
| Oct 28, 2013 | Fire Department | $423,762.98 | CONSTRUCTION-BUILDINGS | – |
| Aug 28, 2013 | Fire Department | $407,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 23, 2013 | Fire Department | $405,542.84 | CONSTRUCTION-BUILDINGS | – |
| May 27, 2014 | Fire Department | $397,100.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2013 | Fire Department | $396,815.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2013 | Fire Department | $389,500.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2013 | Police Department | $382,996.02 | IOTB CONSTRUCTION | – |
| Nov 25, 2013 | Fire Department | $380,318.20 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2014 | Fire Department | $377,626.90 | CONSTRUCTION-BUILDINGS | – |
| Mar 5, 2014 | Fire Department | $365,819.13 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 203 payments$16,308,567
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 22, 2013 | Fire Department | $945,900.64 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2013 | Fire Department | $562,554.61 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2012 | Fire Department | $537,225.00 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2013 | Fire Department | $522,105.75 | CONSTRUCTION-BUILDINGS | – |
| Jan 16, 2013 | Fire Department | $484,500.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 6, 2013 | Fire Department | $445,498.20 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2013 | Fire Department | $404,611.37 | CONSTRUCTION-BUILDINGS | – |
| Jun 3, 2013 | Fire Department | $365,750.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 28, 2013 | Fire Department | $328,642.69 | CONSTRUCTION-BUILDINGS | – |
| Jan 16, 2013 | Fire Department | $318,250.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2012 | Fire Department | $307,135.00 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2013 | Fire Department | $300,143.97 | MAINT & OPER OF INFRASTRUCTURE | – |
| Oct 9, 2012 | Fire Department | $273,776.64 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2013 | Fire Department | $228,270.16 | CONSTRUCTION-BUILDINGS | – |
| Oct 10, 2012 | Fire Department | $225,150.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2012 | Fire Department | $213,187.69 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2013 | Fire Department | $200,426.94 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2012 | Fire Department | $189,583.90 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2013 | Fire Department | $189,050.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2013 | Fire Department | $181,714.27 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 167 payments$14,007,570
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 26, 2012 | Fire Department | $540,544.97 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 26, 2011 | Fire Department | $482,410.34 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2011 | Fire Department | $383,115.61 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 23, 2011 | Fire Department | $349,010.90 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2012 | Fire Department | $318,745.34 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2012 | Fire Department | $297,259.97 | CONSTRUCTION-BUILDINGS | – |
| Feb 15, 2012 | Fire Department | $282,530.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2011 | Fire Department | $279,740.59 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2011 | Fire Department | $275,169.07 | CONSTRUCTION-BUILDINGS | – |
| Jul 11, 2011 | Fire Department | $271,386.98 | CONSTRUCTION-BUILDINGS | – |
| Aug 10, 2011 | Fire Department | $266,160.43 | CONSTRUCTION-BUILDINGS | – |
| Jun 27, 2012 | Fire Department | $257,925.00 | CONSTRUCTION-BUILDINGS | – |
| May 22, 2012 | Fire Department | $249,640.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 5, 2011 | Fire Department | $248,566.55 | CONSTRUCTION-BUILDINGS | – |
| Mar 13, 2012 | Fire Department | $248,168.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 12, 2012 | Fire Department | $246,072.92 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2011 | Fire Department | $241,128.04 | CONSTRUCTION-BUILDINGS | – |
| Jul 5, 2011 | Fire Department | $224,675.00 | CONSTRUCTION-BUILDINGS | – |
| May 21, 2012 | Fire Department | $218,861.42 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2012 | Fire Department | $214,225.00 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 95 payments$10,259,123
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 13, 2011 | Fire Department | $680,076.53 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2010 | Fire Department | $326,705.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2011 | Fire Department | $324,987.40 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2011 | Fire Department | $311,600.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2011 | Fire Department | $249,646.13 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2011 | Fire Department | $237,025.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 5, 2010 | Fire Department | $230,755.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2011 | Fire Department | $229,900.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 27, 2010 | Fire Department | $227,857.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2010 | Fire Department | $224,200.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2011 | Fire Department | $221,880.10 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2010 | Fire Department | $218,975.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2011 | Fire Department | $217,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2010 | Fire Department | $213,568.04 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2010 | Fire Department | $208,201.98 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2011 | Fire Department | $207,575.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 27, 2010 | Fire Department | $201,908.96 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2011 | Fire Department | $193,800.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 25, 2010 | Fire Department | $189,097.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2010 | Fire Department | $172,710.00 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 20 of 29 payments$3,853,001
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 12, 2010 | Fire Department | $410,019.89 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2010 | Fire Department | $346,222.75 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2010 | Fire Department | $338,442.71 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2010 | Fire Department | $240,796.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Fire Department | $229,179.02 | CONSTRUCTION-BUILDINGS | – |
| Jun 22, 2010 | Fire Department | $203,860.80 | MAINT & OPER OF INFRASTRUCTURE | – |
| Jan 19, 2010 | Department of Environmental Protection | $196,540.12 | IOTB CONSTRUCTION | – |
| May 19, 2010 | Fire Department | $185,930.70 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2010 | Fire Department | $179,455.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Fire Department | $174,420.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2010 | Fire Department | $165,775.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2010 | Fire Department | $159,006.25 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2010 | Fire Department | $140,600.00 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2010 | Fire Department | $108,798.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Fire Department | $93,765.00 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2010 | Fire Department | $90,915.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2010 | Fire Department | $90,250.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2010 | Fire Department | $89,426.70 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Fire Department | $68,875.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2010 | Fire Department | $56,050.00 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 24, 2025 | Department of Health and Mental Hygiene | $29,547.74 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
| Jun 23, 2025 | Department of Health and Mental Hygiene | $4,000.00 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
| Jun 23, 2025 | Fire Department | $395,849.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $207,028.18 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Department of Citywide Administrative Services | $118,588.13 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Fire Department | $68,199.03 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
| Jun 17, 2025 | Fire Department | $144,250.00 | POLLUTION REMEDIATION OBLIGATIONS | Capital Contracts |
| Jun 17, 2025 | Fire Department | $294,912.71 | POLLUTION REMEDIATION OBLIGATIONS | Capital Contracts |
| Jun 16, 2025 | Police Department | $840.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | Police Department | $5,200.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 13, 2025 | Police Department | $162,859.96 | RENTALS OF MISC.EQUIP | Contracts |
| Jun 12, 2025 | Fire Department | $1,174,114.92 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | Fire Department | $1,618.86 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | Fire Department | $24,255.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | Fire Department | $123.27 | PROMPT PAYMENT INTEREST | Contracts |
| May 21, 2025 | Fire Department | $107,185.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 19, 2025 | Department of Citywide Administrative Services | $292,501.23 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 16, 2025 | Department of Citywide Administrative Services | $242,940.53 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 12, 2025 | School Construction Authority | $1,234,933.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 5, 2025 | Fire Department | $799,504.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 28, 2025 | Fire Department | $237,443.26 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 24, 2025 | Fire Department | $1,611.82 | PROMPT PAYMENT INTEREST | Contracts |
| Apr 21, 2025 | Fire Department | $106,357.50 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
| Apr 15, 2025 | Fire Department | $125,971.58 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
| Apr 15, 2025 | Fire Department | $8,843.39 | MAINT & OPER OF INFRASTRUCTURE | Contracts |
Other vendors serving Fire Department
- VF Imagewear (west) Inc VF Solutions $185,294,719
- Motorola Solutions, Inc $182,775,558
- Purvis Systems, Incorporated $164,266,259
- Ferrara Fire Apparatus Inc $121,320,145
- Prudential Insurance Co of Am- Erica the $95,147,354
- Ufoa Annuity Local 854 Cio $66,659,592
- Adil Business Systems Inc $62,882,312
- New York State Industries for the Disabled Inc $59,213,336
- Workwear Outfitters LLC $47,434,466
- Mythics Inc $43,674,616
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data