Rev Ambulance Group Orlando Inc: New York City Government Payments
as recorded by New York City: REV AMBULANCE GROUP ORLANDO INC
Rev Ambulance Group Orlando Inc is the 194th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 4th in CAPITAL PURCHASED EQUIPMENT spending. Its payments amount to 1.3% of everything the Health and Hospitals Corporation has paid vendors in that span. Payments to it fell 10.9% year over year.
Primary spending category: CAPITAL PURCHASED EQUIPMENT
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2025 | Health and Hospitals Corporation | 138 | $63,597,780 |
| FY 2025 | Fire Department | 23 | $4,653,431 |
| FY 2024 | Health and Hospitals Corporation | 179 | $75,460,043 |
| FY 2024 | Fire Department | 8 | $1,150,368 |
| FY 2023 | Health and Hospitals Corporation | 59 | $33,292,590 |
| FY 2023 | Fire Department | 13 | $2,946,889 |
| FY 2022 | Health and Hospitals Corporation | 28 | $23,312,508 |
| FY 2022 | Fire Department | 11 | $3,509,185 |
| FY 2021 | Health and Hospitals Corporation | 34 | $21,191,773 |
| FY 2021 | Fire Department | 15 | $8,453,703 |
| FY 2020 | Health and Hospitals Corporation | 13 | $4,893,433 |
| FY 2020 | Fire Department | 5 | $2,122,207 |
| FY 2019 | Health and Hospitals Corporation | 20 | $13,703,716 |
| FY 2018 | Health and Hospitals Corporation | 31 | $53,053,832 |
| FY 2018 | Fire Department | 2 | $61,319 |
| FY 2017 | Health and Hospitals Corporation | 14 | $19,996,784 |
| FY 2017 | Fire Department | 12 | $1,514,507 |
| Total | 605 | $332,914,068 |
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| AUTOMOTIVE SUPPLIES & MATERIAL | 4 | $666,912 | Jan 9, 2024 – Jan 9, 2024 |
| CAPITAL PURCHASED EQUIPMENT | 535 | $312,989,356 | Jul 22, 2016 – Jun 25, 2025 |
| LEASING OF MISC EQUIP | 60 | $18,144,660 | Jul 25, 2016 – Sep 3, 2024 |
| MOTOR VEHICLES | 5 | $1,013,140 | Jul 29, 2019 – Jul 15, 2020 |
| SUPPLIES + MATERIALS - GENERAL | 1 | $100,000 | Jan 9, 2024 – Jan 9, 2024 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 161 payments$68,251,212
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| May 28, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| May 28, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| May 28, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| May 28, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| May 27, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2024top 20 of 187 payments$76,610,411
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 12, 2024 | Health and Hospitals Corporation | $914,995.54 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 12, 2024 | Health and Hospitals Corporation | $914,995.54 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 16, 2024 | Health and Hospitals Corporation | $614,372.65 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 24, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 16, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 24, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 29, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 9, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 24, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| May 20, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 1, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| May 9, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 16, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
| May 8, 2024 | Health and Hospitals Corporation | $457,497.77 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2023top 20 of 72 payments$36,239,479
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 21, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 11, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 25, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 21, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 10, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 29, 2023 | Health and Hospitals Corporation | $1,223,366.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 22, 2023 | Health and Hospitals Corporation | $1,223,366.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 7, 2022 | Health and Hospitals Corporation | $1,178,969.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 14, 2022 | Health and Hospitals Corporation | $1,178,969.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 7, 2022 | Health and Hospitals Corporation | $1,178,969.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 6, 2023 | Health and Hospitals Corporation | $1,177,213.26 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 13, 2023 | Health and Hospitals Corporation | $1,177,213.26 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 29, 2023 | Health and Hospitals Corporation | $815,577.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 27, 2023 | Health and Hospitals Corporation | $815,577.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 22, 2023 | Health and Hospitals Corporation | $815,577.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 14, 2023 | Health and Hospitals Corporation | $815,577.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 13, 2023 | Health and Hospitals Corporation | $784,808.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 13, 2023 | Health and Hospitals Corporation | $784,808.84 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 21, 2022 | Health and Hospitals Corporation | $668,837.40 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 11, 2022 | Health and Hospitals Corporation | $668,837.40 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2022top 20 of 39 payments$26,821,693
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 18, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 29, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 19, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 4, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 9, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| May 4, 2022 | Health and Hospitals Corporation | $1,337,674.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 14, 2022 | Health and Hospitals Corporation | $1,200,563.13 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 3, 2022 | Health and Hospitals Corporation | $1,166,162.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 9, 2021 | Health and Hospitals Corporation | $1,166,162.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 9, 2022 | Health and Hospitals Corporation | $1,003,256.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 30, 2022 | Health and Hospitals Corporation | $1,003,256.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 4, 2021 | Health and Hospitals Corporation | $899,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 13, 2021 | Health and Hospitals Corporation | $874,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 3, 2021 | Health and Hospitals Corporation | $874,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 17, 2021 | Health and Hospitals Corporation | $874,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 4, 2021 | Health and Hospitals Corporation | $874,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 3, 2021 | Health and Hospitals Corporation | $874,622.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 13, 2021 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Jun 13, 2022 | Health and Hospitals Corporation | $668,837.40 | CAPITAL PURCHASED EQUIPMENT | – |
| May 4, 2022 | Health and Hospitals Corporation | $668,837.40 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2021top 20 of 49 payments$29,645,475
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 20, 2020 | Health and Hospitals Corporation | $2,542,009.90 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 1, 2021 | Health and Hospitals Corporation | $1,141,927.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 31, 2020 | Health and Hospitals Corporation | $1,141,927.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 28, 2021 | Health and Hospitals Corporation | $1,141,927.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 11, 2021 | Health and Hospitals Corporation | $1,141,927.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 4, 2020 | Health and Hospitals Corporation | $1,075,687.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 4, 2020 | Health and Hospitals Corporation | $1,075,687.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 20, 2020 | Health and Hospitals Corporation | $1,041,803.96 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 10, 2020 | Health and Hospitals Corporation | $1,016,803.96 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 10, 2020 | Health and Hospitals Corporation | $1,016,803.96 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 30, 2020 | Health and Hospitals Corporation | $856,500.70 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 30, 2020 | Health and Hospitals Corporation | $856,500.70 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 22, 2021 | Health and Hospitals Corporation | $856,445.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 18, 2021 | Health and Hospitals Corporation | $856,445.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 17, 2020 | Health and Hospitals Corporation | $805,299.24 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 22, 2020 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Apr 21, 2021 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Oct 16, 2020 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Sep 21, 2020 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Nov 30, 2020 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
FY 2020top 18 of 18 payments$7,015,640
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 6, 2020 | Health and Hospitals Corporation | $1,207,155.20 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 3, 2020 | Health and Hospitals Corporation | $905,366.40 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 3, 2020 | Health and Hospitals Corporation | $905,366.40 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 23, 2019 | Health and Hospitals Corporation | $737,995.77 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2020 | Fire Department | $683,055.02 | LEASING OF MISC EQUIP | – |
| Jun 5, 2020 | Fire Department | $683,055.00 | LEASING OF MISC EQUIP | – |
| Jan 6, 2020 | Health and Hospitals Corporation | $301,788.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 29, 2020 | Fire Department | $257,042.50 | MOTOR VEHICLES | – |
| Jul 29, 2019 | Fire Department | $249,527.30 | MOTOR VEHICLES | – |
| Jul 29, 2019 | Fire Department | $249,527.30 | MOTOR VEHICLES | – |
| Dec 20, 2019 | Health and Hospitals Corporation | $245,998.59 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 29, 2019 | Health and Hospitals Corporation | $245,998.59 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 7, 2019 | Health and Hospitals Corporation | $239,527.67 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 23, 2019 | Health and Hospitals Corporation | $48,882.30 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 29, 2019 | Health and Hospitals Corporation | $16,294.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 7, 2019 | Health and Hospitals Corporation | $16,294.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 20, 2019 | Health and Hospitals Corporation | $16,294.10 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 7, 2019 | Health and Hospitals Corporation | $6,470.92 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2019top 20 of 20 payments$13,703,716
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 11, 2018 | Health and Hospitals Corporation | $2,213,987.31 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 17, 2018 | Health and Hospitals Corporation | $2,150,398.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 11, 2018 | Health and Hospitals Corporation | $2,098,341.52 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 24, 2018 | Health and Hospitals Corporation | $1,916,221.36 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 11, 2018 | Health and Hospitals Corporation | $1,836,048.83 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 11, 2018 | Health and Hospitals Corporation | $1,049,170.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 24, 2018 | Health and Hospitals Corporation | $479,055.34 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 24, 2018 | Health and Hospitals Corporation | $479,055.34 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 5, 2019 | Health and Hospitals Corporation | $301,788.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 26, 2018 | Health and Hospitals Corporation | $239,527.67 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 17, 2018 | Health and Hospitals Corporation | $210,236.21 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 13, 2019 | Health and Hospitals Corporation | $207,120.16 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 11, 2018 | Health and Hospitals Corporation | $146,646.90 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 16, 2018 | Health and Hospitals Corporation | $135,212.26 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 14, 2018 | Health and Hospitals Corporation | $123,617.79 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 13, 2019 | Health and Hospitals Corporation | $45,530.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 13, 2019 | Health and Hospitals Corporation | $45,530.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 13, 2019 | Health and Hospitals Corporation | $22,765.02 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 16, 2018 | Health and Hospitals Corporation | $1,808.88 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 14, 2018 | Health and Hospitals Corporation | $1,653.76 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2018top 20 of 33 payments$53,115,151
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 19, 2017 | Health and Hospitals Corporation | $4,721,268.42 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 30, 2017 | Health and Hospitals Corporation | $4,196,683.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 15, 2017 | Health and Hospitals Corporation | $3,934,390.35 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 2, 2017 | Health and Hospitals Corporation | $3,672,097.66 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 16, 2018 | Health and Hospitals Corporation | $3,434,804.97 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 7, 2018 | Health and Hospitals Corporation | $3,409,804.97 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 18, 2018 | Health and Hospitals Corporation | $3,197,981.67 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 18, 2018 | Health and Hospitals Corporation | $3,197,981.67 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 8, 2018 | Health and Hospitals Corporation | $3,147,512.28 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 27, 2017 | Health and Hospitals Corporation | $3,147,512.28 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 30, 2017 | Health and Hospitals Corporation | $2,622,926.90 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 8, 2018 | Health and Hospitals Corporation | $2,098,341.52 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 27, 2017 | Health and Hospitals Corporation | $1,836,048.83 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 30, 2017 | Health and Hospitals Corporation | $1,546,276.46 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 18, 2018 | Health and Hospitals Corporation | $1,254,992.95 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 2, 2017 | Health and Hospitals Corporation | $1,049,170.76 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 16, 2018 | Health and Hospitals Corporation | $1,000,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 18, 2018 | Health and Hospitals Corporation | $983,994.36 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 16, 2018 | Health and Hospitals Corporation | $786,878.07 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 27, 2017 | Health and Hospitals Corporation | $786,878.07 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2017top 20 of 26 payments$21,511,291
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2016 | Health and Hospitals Corporation | $3,096,012.12 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 29, 2017 | Health and Hospitals Corporation | $3,096,012.12 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 8, 2017 | Health and Hospitals Corporation | $2,838,011.11 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 31, 2016 | Health and Hospitals Corporation | $2,064,008.08 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 11, 2017 | Health and Hospitals Corporation | $2,064,008.08 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 25, 2016 | Health and Hospitals Corporation | $1,831,007.07 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 16, 2016 | Health and Hospitals Corporation | $1,806,007.07 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 5, 2016 | Health and Hospitals Corporation | $1,290,005.05 | CAPITAL PURCHASED EQUIPMENT | – |
| Nov 21, 2016 | Health and Hospitals Corporation | $1,032,004.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 25, 2016 | Fire Department | $262,637.60 | LEASING OF MISC EQUIP | – |
| Aug 31, 2016 | Health and Hospitals Corporation | $258,001.01 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 15, 2016 | Health and Hospitals Corporation | $258,001.01 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 31, 2016 | Health and Hospitals Corporation | $225,484.67 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 14, 2016 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Jul 25, 2016 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Oct 18, 2016 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Jun 9, 2017 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Feb 1, 2017 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Jun 9, 2017 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
| Jun 9, 2017 | Fire Department | $131,318.80 | LEASING OF MISC EQUIP | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 25, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 23, 2025 | Fire Department | $265,301.00 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 18, 2025 | Fire Department | $265,301.00 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 16, 2025 | Health and Hospitals Corporation | $442,665.26 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 16, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 5, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jun 3, 2025 | Health and Hospitals Corporation | $470,192.95 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
Other vendors serving Health and Hospitals Corporation
- New York City Health and Hosp $19,261,290,774
- New York City Economic Development Corporation $1,136,357,870
- Nyc Office of the Comptroller Workers Compensation $674,558,717
- Dormitory Authority State of Ny $478,921,708
- Consigli Construction Co Inc $161,138,347
- Gilbane Building Company $118,989,545
- Tek Systems Inc $111,703,933
- New York Power Authority $101,251,655
- Jemco Electrical Contractors Inc $99,240,457
- The CJS Solutions Group LLC $71,494,053
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data