Intergraph Corporation: New York City Government Payments
as recorded by New York City: INTERGRAPH CORPORATION
Intergraph Corporation is the 416th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 16th in CONTRACTUAL SERVICES GENERAL spending. Its payments amount to 1.5% of everything the Police Department has paid vendors in that span. Payments to it fell 1.6% year over year.
Primary spending category: CONTRACTUAL SERVICES GENERAL
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| PAY FOR SURETY BOND/INSUR PREM | 2 | $800,000 | Oct 10, 2012 – Oct 7, 2013 |
| CAPITAL PURCHASED EQUIPMENT | 57 | $75,877,445 | Aug 19, 2010 – Jul 26, 2024 |
| CONTRACTUAL SERVICES GENERAL | 44 | $67,878,840 | May 1, 2017 – May 28, 2025 |
| DATA PROCESSING SUPPLIES | 2 | $5,400,000 | Jan 24, 2017 – Feb 14, 2017 |
| TRAINING PRGM CITY EMPLOYEES | 3 | $373,328 | Jul 17, 2013 – Jun 7, 2016 |
| DATA PROCESSING EQUIPMENT MAINTENANCE | 33 | $23,063,487 | Feb 20, 2015 – Sep 25, 2023 |
| MAINT & REP GENERAL | 2 | $173,480 | Aug 28, 2017 – Aug 28, 2017 |
| OTHR SERV AND CHRGS-GENERAL | 1 | $0 | Jun 7, 2016 – Jun 7, 2016 |
| OVERNIGHT TRVL EXP-SPECIAL | 1 | $0 | Sep 4, 2013 – Sep 4, 2013 |
| <Non-Applicable Expenditure Object> | 1 | -$350 | Jun 25, 2020 – Jun 25, 2020 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 12 of 12 payments$10,443,674
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 18, 2024 | Police Department | $1,723,835.15 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2025 | Police Department | $1,660,863.41 | CONTRACTUAL SERVICES GENERAL | – |
| May 28, 2025 | Police Department | $1,660,863.41 | CONTRACTUAL SERVICES GENERAL | – |
| May 28, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2025 | Police Department | $869,967.08 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 9, 2024 | Police Department | $861,917.58 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 14, 2025 | Police Department | $790,896.33 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 26, 2024 | Department of Citywide Administrative Services | $16,252.36 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 26, 2024 | Department of Citywide Administrative Services | $6,965.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 26, 2024 | Department of Citywide Administrative Services | $4,999.58 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2024top 9 of 9 payments$10,619,263
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 1, 2024 | Police Department | $2,585,752.74 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 26, 2023 | Police Department | $2,585,752.73 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 2, 2024 | Police Department | $2,585,752.72 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 14, 2023 | Police Department | $1,663,933.55 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 25, 2023 | Police Department | $756,707.65 | CONTRACTUAL SERVICES GENERAL | – |
| Oct 24, 2023 | Department of Citywide Administrative Services | $361,163.31 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 1, 2023 | Department of Citywide Administrative Services | $70,971.56 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 25, 2023 | Department of Information Technology and Telecommunications | $4,941.50 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 25, 2023 | Police Department | $4,287.57 | CONTRACTUAL SERVICES GENERAL | – |
FY 2023top 8 of 8 payments$10,461,157
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 20, 2023 | Police Department | $2,495,900.33 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 14, 2022 | Police Department | $2,495,900.32 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 19, 2022 | Police Department | $2,495,900.32 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 25, 2022 | Police Department | $1,670,520.60 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 25, 2022 | Police Department | $835,260.30 | CONTRACTUAL SERVICES GENERAL | – |
| Oct 11, 2022 | Department of Citywide Administrative Services | $361,166.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 1, 2023 | Police Department | $80,259.12 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 25, 2022 | Department of Information Technology and Telecommunications | $26,250.24 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2022top 8 of 8 payments$10,087,884
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 11, 2022 | Police Department | $2,505,780.90 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 11, 2022 | Police Department | $2,505,780.90 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 18, 2022 | Police Department | $2,505,780.90 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 18, 2021 | Police Department | $1,612,471.63 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 18, 2021 | Police Department | $806,235.81 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 31, 2022 | Department of Citywide Administrative Services | $63,417.05 | CAPITAL PURCHASED EQUIPMENT | – |
| May 2, 2022 | Department of Citywide Administrative Services | $63,417.04 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 20, 2021 | Department of Information Technology and Telecommunications | $25,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2021top 12 of 12 payments$16,578,939
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 15, 2020 | Police Department | $2,431,319.22 | CAPITAL PURCHASED EQUIPMENT | – |
| May 19, 2021 | Police Department | $2,418,707.43 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 6, 2021 | Police Department | $2,418,707.43 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 7, 2020 | Police Department | $2,288,536.33 | CAPITAL PURCHASED EQUIPMENT | – |
| Mar 1, 2021 | Police Department | $2,177,656.01 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 22, 2020 | Police Department | $1,655,861.99 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 4, 2020 | Police Department | $1,279,641.69 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 22, 2020 | Police Department | $762,845.44 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 15, 2020 | Police Department | $639,820.85 | CAPITAL PURCHASED EQUIPMENT | – |
| May 19, 2021 | Police Department | $381,627.37 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 27, 2020 | Department of Information Technology and Telecommunications | $99,711.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 3, 2020 | Department of Information Technology and Telecommunications | $24,504.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2020top 11 of 11 payments$15,782,330
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 3, 2019 | Police Department | $2,687,247.56 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 28, 2019 | Police Department | $2,288,536.33 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 2, 2020 | Police Department | $2,288,536.33 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 30, 2019 | Police Department | $2,288,536.33 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 25, 2020 | Police Department | $1,919,462.54 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 3, 2019 | Police Department | $1,404,722.30 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 31, 2019 | Police Department | $1,279,641.69 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 3, 2019 | Police Department | $1,083,998.00 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 29, 2019 | Police Department | $405,515.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jul 29, 2019 | Police Department | $136,484.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 25, 2020 | Police Department | -$350.00 | <Non-Applicable Expenditure Object> | – |
FY 2019top 7 of 7 payments$7,598,933
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 18, 2019 | Police Department | $1,625,996.00 | CONTRACTUAL SERVICES GENERAL | – |
| Oct 22, 2018 | Police Department | $1,625,995.00 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 16, 2019 | Police Department | $1,625,995.00 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 4, 2018 | Police Department | $1,500,000.00 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 10, 2018 | Police Department | $1,035,983.00 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 13, 2018 | Department of Citywide Administrative Services | $146,300.39 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 19, 2019 | Department of Citywide Administrative Services | $38,663.52 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2018top 16 of 16 payments$10,255,892
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 21, 2018 | Police Department | $1,553,973.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 16, 2018 | Police Department | $1,553,972.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 9, 2018 | Police Department | $1,160,270.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 16, 2018 | Police Department | $1,125,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Oct 4, 2017 | Police Department | $1,012,997.74 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 4, 2017 | Police Department | $990,357.00 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 11, 2017 | Department of Citywide Administrative Services | $838,635.63 | CAPITAL PURCHASED EQUIPMENT | – |
| May 21, 2018 | Police Department | $517,991.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 9, 2018 | Police Department | $393,702.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 16, 2018 | Police Department | $375,000.00 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 11, 2017 | Police Department | $216,116.11 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 4, 2017 | Police Department | $209,468.01 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 28, 2017 | Police Department | $157,405.40 | MAINT & REP GENERAL | – |
| Apr 9, 2018 | Department of Citywide Administrative Services | $124,088.44 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 28, 2017 | Police Department | $16,075.00 | MAINT & REP GENERAL | – |
| Oct 4, 2017 | Police Department | $10,841.12 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2017top 10 of 10 payments$18,191,237
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 14, 2017 | Department of Information Technology and Telecommunications | $4,500,000.00 | DATA PROCESSING SUPPLIES | – |
| Oct 6, 2016 | Department of Information Technology and Telecommunications | $3,150,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 9, 2016 | Department of Information Technology and Telecommunications | $2,250,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| May 1, 2017 | Police Department | $1,500,000.00 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 19, 2016 | Police Department | $1,485,534.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Mar 27, 2017 | Police Department | $1,485,534.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 29, 2016 | Police Department | $1,485,533.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Aug 3, 2016 | Police Department | $939,459.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jan 24, 2017 | Department of Information Technology and Telecommunications | $900,000.00 | DATA PROCESSING SUPPLIES | – |
| May 23, 2017 | Police Department | $495,177.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2016top 10 of 10 payments$8,305,228
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 4, 2015 | Department of Information Technology and Telecommunications | $1,800,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Sep 29, 2015 | Police Department | $1,409,186.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Dec 28, 2015 | Police Department | $1,409,186.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Apr 18, 2016 | Police Department | $1,409,186.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 8, 2015 | Police Department | $907,942.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 17, 2016 | Department of Information Technology and Telecommunications | $900,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 6, 2016 | Police Department | $469,728.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 7, 2016 | Department of Information Technology and Telecommunications | $0.00 | TRAINING PRGM CITY EMPLOYEES | – |
| Jun 7, 2016 | Department of Information Technology and Telecommunications | $0.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 7, 2016 | Department of Information Technology and Telecommunications | $0.00 | OTHR SERV AND CHRGS-GENERAL | – |
FY 2015top 11 of 11 payments$10,389,709
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 31, 2015 | Department of Information Technology and Telecommunications | $3,600,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jun 3, 2015 | Department of Information Technology and Telecommunications | $2,250,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 20, 2015 | Police Department | $996,912.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $996,912.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $777,158.02 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 16, 2015 | Police Department | $453,971.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $365,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $365,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $365,000.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Feb 20, 2015 | Police Department | $219,754.49 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 22, 2015 | Police Department | $0.00 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
FY 2014top 8 of 8 payments$15,087,089
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 16, 2013 | Police Department | $7,321,577.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 26, 2013 | Police Department | $4,041,286.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 17, 2013 | Police Department | $1,593,867.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 17, 2013 | Department of Information Technology and Telecommunications | $1,357,030.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 7, 2013 | Police Department | $400,000.00 | PAY FOR SURETY BOND/INSUR PREM | – |
| Jul 17, 2013 | Police Department | $373,328.00 | TRAINING PRGM CITY EMPLOYEES | – |
| Sep 4, 2013 | Police Department | $0.00 | OVERNIGHT TRVL EXP-SPECIAL | – |
| Sep 4, 2013 | Police Department | $0.00 | TRAINING PRGM CITY EMPLOYEES | – |
FY 2013top 8 of 8 payments$10,966,276
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 10, 2012 | Police Department | $2,700,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Jan 22, 2013 | Police Department | $2,100,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 23, 2013 | Police Department | $1,941,286.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 10, 2013 | Department of Information Technology and Telecommunications | $1,730,358.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 16, 2012 | Police Department | $1,718,065.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 10, 2012 | Police Department | $400,000.00 | PAY FOR SURETY BOND/INSUR PREM | – |
| Feb 25, 2013 | Department of Information Technology and Telecommunications | $200,277.66 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 16, 2012 | Department of Information Technology and Telecommunications | $176,289.00 | CAPITAL PURCHASED EQUIPMENT | – |
FY 2012top 11 of 11 payments$6,013,217
FY 2011top 5 of 5 payments$12,785,402
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 10, 2011 | Department of Information Technology and Telecommunications | $8,969,859.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 2, 2011 | Department of Information Technology and Telecommunications | $1,730,358.80 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 11, 2011 | Department of Information Technology and Telecommunications | $1,001,388.30 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 19, 2010 | Department of Information Technology and Telecommunications | $750,000.00 | CAPITAL PURCHASED EQUIPMENT | – |
| Apr 11, 2011 | Department of Information Technology and Telecommunications | $333,796.10 | CAPITAL PURCHASED EQUIPMENT | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| May 28, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | Contracts |
| May 28, 2025 | Police Department | $1,660,863.41 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Apr 14, 2025 | Police Department | $869,967.08 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Apr 14, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Apr 14, 2025 | Police Department | $1,660,863.41 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Apr 14, 2025 | Police Department | $790,896.33 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Apr 14, 2025 | Police Department | $949,037.91 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Oct 18, 2024 | Police Department | $1,723,835.15 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Aug 9, 2024 | Police Department | $861,917.58 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Jul 26, 2024 | Department of Citywide Administrative Services | $6,965.00 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jul 26, 2024 | Department of Citywide Administrative Services | $4,999.58 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jul 26, 2024 | Department of Citywide Administrative Services | $16,252.36 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Apr 1, 2024 | Police Department | $2,585,752.74 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Jan 2, 2024 | Police Department | $2,585,752.72 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Oct 24, 2023 | Department of Citywide Administrative Services | $361,163.31 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Sep 26, 2023 | Police Department | $2,585,752.73 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Sep 25, 2023 | Department of Information Technology and Telecommunications | $4,941.50 | DATA PROCESSING EQUIPMENT MAINTENANCE | Contracts |
| Sep 14, 2023 | Police Department | $1,663,933.55 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Aug 1, 2023 | Department of Citywide Administrative Services | $70,971.56 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
| Jul 25, 2023 | Police Department | $756,707.65 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Jul 25, 2023 | Police Department | $4,287.57 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Mar 20, 2023 | Police Department | $2,495,900.33 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Feb 1, 2023 | Police Department | $80,259.12 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Dec 14, 2022 | Police Department | $2,495,900.32 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Oct 11, 2022 | Department of Citywide Administrative Services | $361,166.04 | CAPITAL PURCHASED EQUIPMENT | Capital Contracts |
Other vendors serving Police Department
- Turner STV a Joint Venture $778,670,707
- Motorola Solutions, Inc $447,294,700
- International Business Machines Corp $386,937,736
- City World Estate Auto Holdings LLC $167,586,802
- Vexcel Corporation $166,929,809
- Information Builders, Inc $112,849,876
- Manhattan Ford Lincoln Mercury Inc Manhattan Automobile Co $87,003,316
- Integrated Parking Solutions, LLC $80,972,739
- Major Chevrolet Inc $75,456,926
- Citnalta Construction Corp $74,547,491
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data